HomeMy WebLinkAboutAddenda - BID - 5821 PEDESTRIAN BRIDGE AND BIKE (2)Administrative Services Purchasing Division City of Fort Collins CITY OF FORT COLLINS ADDENDUM No. 3 BID #5821 PEDESTRIAN BRIDGE AND TRAIL EXTENSION AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER SPECIFICATIONS AND CONTRACT DOCUMENTS Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River OPENING DATE: November 12, 2003 — 3:00p.m. (Our Clock) To all prospective bidders under the specification and contract documents described above, the following changes are hereby made. SPECIFICATIONS 1. The bid opening date has been changed. The bid will be opened on November 12, 2003 at 3:00p.m. (Our Clock). 2. Clarification to Section 01010/1.09, Summary of Work, Regulatory Requirements. Contractor is not responsible for obtaining a 404 permit from the U.S. Army Corps of Engineers (USACE). Owner will obtain the permit and provide a copy to the Contractor. Contractor shall follow any special provisions of the permit. After discussions with the USACE, it is expected that a nationwide permit will be issued for this project. At this time, construction disturbance to the existing sand bar/island near Pier 1 is not expected to be an issue with the USACE. Contractor must restore all disturbance in the channel bed to existing conditions and existing contours. Disturbance area is limited to the City of Fort Collins' property, Lyons Park access, the permanent easement along the south bank of the river, and construction easements on the Hetzel and Delehoy properties. Reference the property ownership figure included with Addendum 1. Contractor shall take care to protect and minimize construction disturbance to the south bank line, which includes sensitive habitat and the Hyde Natural Area. Disturbance on City of Fort Collins property up to the south Delehoy property line is expected for construction of the bank protection. Disturbance within the construction easement shall be minimized to the extent possible. Trees should be protected except those noted for pruning or removal on the Drawings. If special, unforeseen conditions are placed on the Contractor by the USACE through the 404 permit, a change order will be pursued at that time. FEMA did not require any special conditions for the project. Clarification to Section 01010/1.10, Summary of Work, Easements and Rights -of -Way. Reference this section for information regarding limits of construction. Although not shown on the Drawings, minor access may be obtained from the Delehoy's through their pasture to the Hyde Natural Area if the work necessitates it. However, there are numerous trees along the south bank that restrict accessing with large equipment or vehicles to the riverbank and this cannot be considered a primary access. Construction easement has not been obtained across the Delehoy's property at this time, but the Delehoy's have given verbal permission for access. Any disturbance would require restoration back to existing or better conditions. The primary construction access is from two locations: (1) Lyons Park, which provides access to the channel bed. Equipment may be mobilized along the channel bed, but disturbance should be minimized to the extent practicable. Some equipment can cross under the Overland Trail Road bridge on City of Fort Collins property between the bridge's center pier and north abutment. The roadway bridge must be protected. Clearance should be checked for equipment travel under the bridge. (2) The existing driveway onto the Hetzel property off of Overland Trail Road provides access to both City of Fort Collins property and the construction easement near the north abutment. The channel bed can also be accessed via this route. Page 1 of 2 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 4. Clarification to Sheets 5, 6, and 7 of the Drawings. The scale for Sheet 5 is 1-inch equals 40-feet. The scale for Sheets 6 and 7 is 1-inch equals 20-feet. 5. Clarification to Section 02520/2.06, Portland Cement Concrete Paving, Concrete Mix. Coloring agent shall be Davis Colors of Los Angeles, California, 'Yosemite Brown', 2 lb./sack. 6. Clarification of the color requirements for Riprap and Boulders. All buried riprap and boulders will have no color requirement. All exposed riprap and boulders must be an approved color. Approved colors include tan, brown, dark brown and black. Red or pink rock is not acceptable. The ENGINEER will determine the color of all submitted rock for acceptance. 7. Clarification of materials for Stacked Boulder Retaining Wall. The boulders are NOT required to be sandstone. Approved equals for the boulders will be determined by, but not limited to, the dimensional compliance of each stone per the requirements of the drawings and specifications and color. 8. Clarification of paint material for all steel tube railings to be painted as follows: 1 coat P&L Effecto Rust Inhibiting Primer. 2 coats of P&L Effecto Enamel (Black, flat) 9. The following bridge manufacturers have been pre -qualified by the Owner and added to the bridge suppliers list: EXCEL Bridge Manufacturing Co. 12001 Shoemaker Ave Santa Fe Springs, CA 90670 (800)548-0054 U.S. Bridge 201 Wheeling Avenue Cambridge, OH 43725 (888) USBRIDGE ATTACHMENTS NONE If you should have any questions, please contact Jason Stutzman, P.E., Project Manager at (970) 221-6366, John Stephen, CPPO, Senior Buyer at (970) 221-6777 or Chris Carlson, P.E., C.F.M., Consultant Engineer at (970)223-5556. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Page 2 of 2