HomeMy WebLinkAboutCORRESPONDENCE - BID - 5821 PEDESTRIAN BRIDGE AND BIKE (5)Pedestrian Bridge and Bike Trail Extension
at Overland Trail Road and the Cache La Poudre River
PRE -BID MEETING NOTES
Thursday, OCTOBER 16, 2003
10:00 I. INTRODUCTIONS/WELCOME
H. ATTENDANCE SHEET
III. BID OPENING
IV. SCHEDULE
10:15 V. SUMMARY OF WORK
VI. HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL
REQUIREMENTS
VII. SITE PLANNING & COORDINATION
VII. TRAFFIC CONTROL AND WORK AREA SAFETY
10:30 GENERAL QUESTIONS
11:00 PROJECT SITE TOUR
11
Pedestrian Bridge and Bike Trail Extension
at Overland Trail Road and the Cache La Poudre River
' An e
PR&BID MEETING NOTES
Thursday, OCTOBER 16, 2003
I. INTRODUCTIONS
Jason Stutzman - Project Engineer COFC, Park Planning (970) 221-6366
Chris Carlson — Design Consultant Engineer AYRES Associates (970) 223-5556
Chris Longo — Design Consultant Engineer AYRES Associates (970) 223-5556
John Stephen — Senior Buyer COFC, Purchasing (970) 221-6777
David Richer — Geotechnical Engineer Terracon (970) 484-0359
II. ATTENDANCE SHEET - Be sure to register.
III. BID OPENING
Tuesday, November 6, 2003 3:00 P.M. at Purchasing Office
215 North Mason 2"a Floor, Fort Collins
"Questions received less than seven (7) days prior to the date for opening of the
Bids may not be answered" per section 00100.
IV. SCHEDULE
Notice of Award — aprox. a week after opening
Pre -Construction Meeting - Prior to issuing Notice to Proceed
Construction - As soon as possible after Notice to Proceed
TEKELINE REQUIREMENTS — Completion Dates for the Project
Substantial Completion —120 Calendar days
Final Acceptance — 30 Calendar days
Pedestrian Bridge and Bike Trail Extension
at Overland Trail Road and the Cache La Poudre River
Al.
PRE -BID MEETING NOTES
Thursday, OCTOBER 169 2003
V. SUMMARY OF WORK
The City of Fort Collins plans to extend the Poudre River trail from Taft Hill Road upstream to
Lyons Park, which is located immediately north of Overland Trail Road on the north bank of the
river. This specific project is limited to only a portion of the overall extension work. The project
begins at the Hyde Natural Area, which is on the south side of the river approximately 725 feet
downstream of the Overland Trail Road Bridge. A 10-feet wide concrete trail will be constructed
from the Hyde Natural Area to a pedestrian bridge abutment. A series of 25- and 50-feet span
pre -fabricated pedestrian bridges comprise a boardwalk that will run along the south riverbank.
The trail will then cross the river using two continuous 150-feet span pedestrian bridges to a.
north bank abutment. From the north abutment, the trail quickly slopes back down to match
existing grades.
The trail will cross Overland Trail Road in two manners: under the existing roadway bridge and
ramped up to an at -grade crossing. The at -grade crossing is necessary since the underpass
crossing will be under water 2-3 months per year. Both crossings will end at Lyons Park, which
is owned by the Colorado Division of Wildlife and operated by Larimer County.
Refer to Section 01010 of the specifications for additional scope information.
VI. HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL
REQUIREMENTS
Bidder Oualifications — This item will be added to Addendum #1
"Bidder shall indicate experience in similar types and sizes of work within the past 5 years.
Project experience shall specifically include construction of bridge structures (pedestrian and/or
roadway) in a river environment, pre -fabricated pedestrian bridges, caisson construction,
riverbank protection and stabilization, and general work in a river environment. Provide at least
5 references."
Project:
Contact:
Suuerintendents - General Contractor is required to provide a designated full time
superintendent on site at all times that Work is progressing.
Liquidated Damaees -As defined in the Agreement Section 00520.
Warranty — City has a two-year warranty period
Pedestrian Bridge and Bike Trail Extension
at Overland Trail Road and the Cache La Poudre River
PRE -BID MEETING NOTES
Thursday, OCTOBER 16, 2003
Construction Hours - 7:00 A.M. to 6:00 P.M., Monday through Friday, except legal Holidays.
Weekend work and Night work may be allowed on a limited basis to
construct improvements to take advantage of favorable weather
conditions.
Construction Surveying - Provided by Contractor. NOTE TOLERANCES FOR
HORIZONTAL & VERTICAL CONTROL
Geotechnical and Materials Testing - Provided by Owner.
Project Meeting - Once a week, to be determined.
Progress and Schedule Revisions - Schedules shall be updated weekly
VII. SITE COORDINATION WITH OTHER CONTRACTORS - Section 00800
Staging Equipment
Storing Materials
Site and Adjacent Property Access
Utility companies i.e. relocations
Poudre Valley REA
Larimer County — Lions Park Construction Access
Adjacent Property Owners — Construction Easements
VIII. TRAFFIC CONTROL AND WORK AREA SAFETY
Traffic Control for the project will be paid for Lump Sum and will include all costs for all
traffic control associated with the project.
The Contractor shall provide, at Contractors expense, all work area safety control devices, such
as barricades and safety fence around all excavations, trenches, and drop-offs.
HIGHLIGHTS FROM PLANS & TECHNICAL SPECS
Horizontal & Vertical Tolerances are critical
• Tree Pruning and Removal will verified by the ENGINEER in the field prior to work being performed.
4
Pedestrian Bridge and Bike Trail Extension
at Overland Trail Road and the Cache La Poudre River
PRE -BID MEETING NOTES
Thursday, OCTOBER 16, 2003
• Be aware of all permits required for this Work and the expected times required to obtain permits.
• City Property Ownership and Construction Easements available for construction will be provided in
Addendum #1. Staging area location is described in the specifications
• Be aware of lead times for acquiring prefabricated bridges.
5