HomeMy WebLinkAboutRESPONSE - BID - 5821 PEDESTRIAN BRIDGE AND BIKE (3)SECTION 00300
BID FORM
PROJECT: PEDESTRIAN BRIDGE AND BIKE TRAIL EXTENSION AT OVERLAND TRAIL ROAD AND
THE CACHE LA POUDRE RIVER; Bid No. 5821
Place lOI'� Cp�fi
Date
1. In compliance with your Invitation to Bid dated 0C.4.y. 07003 ,
and subject to all conditions thereof, the undersigned
Trainor Construction Co. a * Corporatio Limited Liability
Company, Partnership, Joint Venture, or So e Proprietor)** authorized to do
business in the State of Colorado hereby proposes to furnish and do
everything required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid bond
in the sum of 5% ($
) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: St. Paul Fire & Marine Insurance Co. 2000 S. Colorado
Rlv #2='480, Denver CO. 80222
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7/96 Section 00300 Page 1
LIST OF EQUIPMENT OWNED/LEASED
Cat 345BL Hydraulic Excavator
Cat 325BL Hydraulic Excavator
Komatsu WA250 Loader
Boom Truck
Cat IT-28 Front End Loader
Cat 325L Hydraulic Excavator
Cat 330 Hydraulic Excavator
Cat 315 Hydraulic Excavator
Cat 235 Hydraulic Excavator
Komatsu 150PC Hydraulic Excavator
Komatsu 220LC Hydraulic Excavator
Cat 936 Front End Loader
Cat 938 Front End Loader
Komatsu 250 Front End Loader
Cat II-28F Front End Loader
Cat II-28F Front End Loader
Cat 416 Backhoe
35-Ton Linkbelt Truck Crane
35-Ton Tadano Truck Crane
P & H Omega 65 Crane
Barbco 48" Boring Machine
Tunnel Boring Machines — 3 EA — American Augers
Akkerman 5000 Jacking System/524 Haul System -and Tunnel Boring: Machine...
Air Compressors
Trench Boxes, Plates & Shields
Concrete Forms
Generators
Demo Saws
Van Trailers
Pumps
Chipping Hammers
Welders
Ford Oiler/Fuel Truck
Ford Water Truck
Kenworth Dump Truck
Pickups
Office Trailer
TRAINOR CONSTRUCTION COMPANY
15000 W. 44th Avenue #B
Golden, CO 80403
Phone 303-273-9382 Fax 303-273-9354
Areas of Expertise
Employment:
Experience:
Education:
HARRY BRUST
Construction Estimating
Project Management
Project planning and Scheduling
Concrete Structures
Storm and Sanitary Construction
Waterline Construction
Project Manager/Estimator — Trainor Construction
Project Superintendent— Eby Construction
25 years concrete and utility construction, estimating,
and project management
BS, Industrial Construction Management
Colorado State University, Ft. Collins
TRAINOR CONSTRUCTION COMPANY
15000 W. 44th Avenue #B
Golden, CO 80403
Phone 303-273-9382 Fax 303-273-9354
Dave Emm
Areas of Expertise: Construction Estimating
Project Management
Accounting Supervision
Financial Management
Purchasing/Scheduling
Safety, EEO & Affirmative Action Supervision
Employment: Project Manager/Controller — Trainor Construction
Controller/Estimator — Railroad Builders Inc.
Experience: 14 years construction accounting, estimating, and
project management
Education: BS, Accounting/Small Business Administration
University of Colorado, Boulder
TRAINOR CONSTRUCTION COMPANY
15000 W. 44th Avenue #8
Golden, CO 80403
Phone 303-273-9382 Fax 303-273-9354
SCOTT KYLER
Areas of Expertise: Quality Assurance
Construction Management
Project Planning and Scheduling
Concrete Structures
Bridges
WaterNVastewater Treatment Plants
Storm and Sanitary Sewer Construction
Employment: Project Manager/Estimator - Trainor Construction
Resident Project Representative — Camp, Dresser &
McKee
Project Manager/Estimator — Park Construction
Estimator — Robert E. McKee Construction
Estimator/Field Engineer— Eby Construction
Project Engineer —Weaver Construction
Experience:
Education:
26 years concrete and utility construction, estimating,
and project management
1976, BS, Industrial Construction Management
Colorado State University, Ft. Collins, Colorado
TRAINOR CONSTRUCTION COMPANY
15000 W. 44th Avenue #B
Golden, CO 80403
Phone 303-273-9382 Fax 303-273-9354
JACK WILLIAMS
Areas of Expertise: Storm and Sanitary Sewer Construction
Waterline Construction
Project Supervision
Project Planning and Scheduling
Employment: Project Superintendent — Trainor Construction
Foreman/Heavy Equipment Operator - Binder
Experience: 30 years experience in utility construction and 12
years supervisory experience
Education: Army Special Forces — 10/16/70 to 04/12/72
21. What are the limits of your public liability? DETAIL
See AttarhPd c tif'cate of Insurance
What company? Travelers Insurance Company
22. What are your company's bonding limitations? per Job 5 Million
R-ankl ogWork in prngracaf 10 Million
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at �j�%p�,,, [o this day of 4/ou a 20P-3
State of CO1or-ado
County of Ueffserson
/ being my worn deposes and says that he is
of ✓he-'yof �'Orue �a and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this _mac day of
epae.i. t —LAp1 Q2g�
1� 41 c
Nota/rry. Public A
&0 ic%, C 603
My commission expires q—/5-U.7
" pTAq
PUBLIC
op C
es on E�xp� °0\01
7/96 Section 00420 Page 3
10-31-03:11:57
3038246694 # 3/ 4
v--�-'�
-P.. CERTIFICATE OF LIABILITY
PRODUCER (303)824-6600 FAX (303)370-0118
Moody Insurance Agency, Inc.
3773 Cherry Creek North Drive
Suite 800
DATE (MMMWffM
INSURANCE 1o/31/zoo3
10/31/2003
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Denver, CO 80209-3804
INSURERS AFFORDING COVERAGE
NAIC
INSURED
INSURERA: Travelers Indemnity Co of Illin
is
Trainor Construction Company, Inc.
4800 Brighton Blvd.
Denver, CO 80216
INSURERS: Pinnacol Insurance Company
INSURERC: Charter Oak Fire Ins Co (Travel
rs)
INSURERD:
INSURER E:
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOT✓VITHSTANDINC
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS,
MNE
TYPEOFINSURANCE
POLICY NUMBER
PO LICY EFFECTIVE
01/01/2003
POUCYEXPIRATION
LIIBTMEEI
GENERAL LIABILITY
DTC0784F7426
01/01/2004
EACH OCCURRENCE
S 1 000,000
C
X COMMERCIAL GENERAL LIABILITY
CLAIMS MADE Q OCCUR
X Bl nkt Addl Insured
DAMAGE TO RENTED
$ 300,00
MED EXP (Arty one pesos)
S 5.000
PERSONAL SADV INJURY
S 1 000 000
X
Limited Pollution
GENERAL AGGREGATE
S 2,000,000
GENL AGGREGATE LIMIT APPLIES PER:
POLICY X JECT r I LOC
PRODUCTS -COMPA)P AGO
$ 2 OOO QOO
AUTOMOBILE
X
LUIBILITY
ANYAUTO
DT810784F7426
01/01/2003
01/01/2004
COMBINED SINGLE UMIT
(Eaaoddend
E
1,000,000
A
X
X
ALL CMNED AUTOS
SCHEDULEDAUTOS
HIRED AUTOS
NONOVNNED AUTOS
BODILY INJURY
(Parpel )
E
BODILYnt)
(Per aoddraodd eM)
S
X
Pollution
PROPERTY DAMAGE
(Pei aoddanq
S
GARAGE UABELITY
AUTO ONLY• EA ACCIDENT
S
ANY AUTO
OTHER THAN EA ACC
AUTOONLY: AGO
S
$
EIICESSUABRELLA LIABILITY
X OCCUR CLAIMS MADE
CUP784F7426
01/01/2003
01/01/2004
EACH OCCURRENCE
S 10,000,000
AGGREGATE
S 10.000.000
A
E
DEDUCTIBLE
X RETENTION S 10,00
S
$
WORKERS COMPENSATION AND
3397538
01/01/2003
01/01/2004
X I WCSTATU- I I OTH-
B
EMPLOYER IETORIN7Y
ANYPROPRETORJPARTNDED? UPIVE
OFFICERIMEMBER EXCLUDED?
rcyyaae deeaux Antler
SPEGAWL PROVISIONS bobs
INCLUDED UNDER
UMBRELLA LIABILITY
E.L EACHACCDENT
$ S00 000
E.L. DISEASE • EA EMPLOYEE
5 S00 OO
E.L. DISEASE - POLICY LIMIT
$ 500,000
OTHER
DESCRIP719N OF OPERATKINBf LOCATIONS li(ENICLEBIF CLUSIONS AD4ED BY ENDORSEM@NT!SPECULL PI TVISIONS
Re: Pedestrian Bri ge & Bi a TraT Extension at Overlanc Trail Road and The Cache La Poudre River
ity of Fort Collins is named as additional insured under the general liability with respect to
ork performed by the insured.
City of Fort Collins
P 0 Box S80
Fort Collins, CO 80522-0580
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE TIE
EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL
30 DAYS WRITTEN NOTICE TO THE CERTIRr:ATE HOLDER NAMED TO THE LEFT.
BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY
OF ANY KIND UPON THE INSI
AUTHORMW REPRESENTATIVE
AL,UKU AD (ZUUIIUI) ®ACORD CORPORATION 1988
10-31-03;11:57 ,
;3038246694 # 4/ 4
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terns and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder In lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
AI:VKU zo lZutrifun)
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 150 of the contract.
ITEM SUBCONTRACTOR
CQL�ssJ N� �`INt
_ Mc hCEN,Le A&Ar AVack
Qj... Ciwsrwe��c
ri
No S��ce.�-k�w liver /S l
�s74
7/96 Section 00430 Page 1
�M
Ciof Fort Collins CITY OF FORT COLLINS
ty
ADDENDUM No. 2
BID #5821
PEDESTRIAN BRIDGE BIKE TRAIL EXTENSION AT
OVERLAND TRAIL ROAD AND CACHE LA POUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5821 Pedestrian Bridge Bike Trail Extension at Overland Trail Road and Cache
La Poudre River.
OPENING DATE. November 6, 2003, 3;00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Clarification to Section 01010/1.09, Summary of Work, Regulatory
Requirements. Contractor is not responsible for obtaining a 404 permit from
the U.S. Army Corps of Engineers. Owner will obtain the permit and provide
a copy to the Contractor. Contractor shall follow any special provisions of
the permit.
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
,ENCLOSED WITH THE BID/QUOTE STATING THATTHIS ADDENDUM HAS BEEN RECEIVED.
NOV-06-03 THU 03:27 PM CITY/FT COLLINS, PURCHAS FAX NO, 970 2216707 P,03/03
BID n5821 BID SCHEDULE —ADDENDUM 4
Bid
Item
Description
Estimated
Quantity
Unit
Unit
Price
Cost
1
Mobilization and Demobilization
1
LS
O
0.040
2
Water Control
1
LS
W. 0 0
3
Traffic Control
1
LS
po
.0
4
Surveying
1
LS
0
, O
5
Clearirtg,_Grubbing and Stripping
1
LS
45. 90,
6,
Ceissonl,;6-Foot Dia.
25
LF
O
160 5. D
7
Caisson 2.6-Foot Die.
25
LF
7, Tj
8
Caisson 3,4-Foot Dia.
25
LF
/
, d
9
Caisson 4,'4-Foot Dia.
25
LF
0
10
Caisson 5.`4-Foot Dia.
25
LF
076005
00
11
Caisson 6, 4-Foot Dia.
25
LF
2o
lyl-aa.00
12
Caisson 7, 4-Foot Dia,
25
LF
IIA-26
Y';50-r. ob
13
Caisson 8, 4-Foot Dia.
25
LF
. 00
9 00 . 00
14
Caisson 9, 4-Foot Dia.
25
LF]CO.
Ra
. 00
15
Pier No.1 and Pier Cap
1
LS
.00
60• �d
16
Pier No. 2 and Pier Cap
1
LS
. 00
00. 40 0
17
Pier No. 3 and Pier Cap
1
LS
ID a
L 0
18
Pier. No. 4 and Pier Cap
1
LS
,OQ
.00
19
Pier No. 5 and Pier Cap
1
LS
AZA
20
Pier No. 6 and Pier Cap
1
LS
d0
9 d 0
21
Pier No. 7 and Pier Cap
1
LS
0
22
Pier No. 8andFier Cap
1
LS
j 0
.30.60
23
Pier No. 9 and Pier Cap
1
LS
6. PC
Ono I DO
24
Abutment A (North Abutment)
1
LS
42r, M. 0
0 Od
25
Abutment B (South Abutment)
1
LS
6
O
26
Superstructure (154Feet Span Prefabricated
Bride
2
EA
27
Superstructure (50-Feet Span Prefabricated
Bridge)
7
EA
ar a 2s• Oa
0
28
Superstructure (25-Feet Span Prefabricated
Bridge)
1
EA
/000-00
! tvw 06
29
Type H Riprap Bank Protection
153
SY
0
30
Type VH Riprap Bank Protection
771
SY
0.00
60/410,00
$1
Colored Concrete Trail (6% 8', and 10' wide)
6621
SF
O
32
Colored Concrete Trail — Channel Trail
Section 10' wide
2083
SF
/C-• 00
14P.0
33
Stacked Boulder Retaining Wall
183
LF
13"VC7 00
34
Modular Block Retaining Wall
271
LF
0
(j O
35
Cast -in -Place Concrete Retaining Wall
148
LF
e%Ay. 00
Y 43.00
36
[)riven Steel Sheet Pile (Non -cofferdam)
750
SF
0
7 O 00
37
RestorationPAS,//an
38
Pedestrian Crossing
1
LS
/ CD
/ej 0
TOTAL BID: $ S O
liars
iy�o
—iff--04-03 TUE 02:46 PM CITY/FT COLLINS, PURCHAS FAX NO, 970 2216707 P-01/02
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 3
BID 05821
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River
OPENING DATE: November 12, 2003 — 3;00p.m. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
SPECIFICATIONS
1. The bid opening date has been changed. The bid will be opened on November 12, 2003 at 3:00p.m. (Our
Clock).
2. Clarification to Section 01010/1.09, Summary of Work, Regulatory Requirements. Contractor is not
responsible for obtaining a 404 permit from the U.S. Army Corps of Engineers (USACE). Owner will obtain
the permit and provide a copy to the Contractor. Contractor shall follow any special provisions of the
permit. After discussions with the USACE, it is expected that a nationwide permit will be issued for this
project. At this time, construction disturbance to the existing sand barlisland near pier 1 is not expected to
be an issue with the USACE. Contractor must restore all disturbance in the channel bed to existing
conditions and existing contours. Disturbance area is limited to the City of Fort Collins' property, Lyons
Park access, the permanent easement along the south bank of the river, and construction easements on
the Hetzel and Delehoy properties. Reference the property ownership figure included with Addendum 1.
Contractor shall take care to protect and minimize construction disturbance to the south bank line, which
Includes sensitive habitat and the Hyde Natural Area. Disturbance on City of Fort Collins property up to the
south Delehoy property line is expected for construction of the bank protection. Disturbance within the
construction easement shall be minimized to the extent possible. Trees should be protected except those
noted for pruning or removal on the Drawings. If special, unforeseen conditions are placed on the
Contractor by the USACE through the 404 permit, a change order will be pursued at that time. FEMA did
not require any special conditions for the project.
3_ Clarification to Section 01010/1.10, Summary of Work, Easements and Rights -of -Way. Referencethis
section for information regarding limits of construction. Although not shown on the Drawings, minor access
may be obtained from the Delehoy's through their pasture to the Hyde Natural Area if the work necessitates
it: However, there are numerous trees along the south bank that restrict accessing with large equipment or
vehicles to the riverbank and this cannot be considered a primary access. Construction easement has not
been obtained across the Delehoys property at this time, but the Delehoy's have given verbal permission
for access. Any disturbance would require restoration back to existing or better conditions. The primary
cunstruction access is from two locations: (1) Lyons Park, which provides access to the channel bed_
. Equipment may be mobilized along the channel bed, but disturbance should be minimized to the extent
practicable. Some equipment can cross under the Overland Trail Road bridge on City of Fort Collins
property between the bridge's center pier and north abutment. The roadway bridge must be protected.
Clearance should be checked for equipment travel under the bridge. (2) The existing driveway onto the
Hetzel property. off of Overland Trail Road provides access to both City of Fort Collins property and the
construction easement near the north abutment. The channel bed can also be accessed via this route.
215 North Mason Street • Znd Floor • P.O. Box 580 • Fort Cpllins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
TUE 02,46 PH CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P.02/02
4. Clarification to Sheets 5, 6, and 7 of the Drawings. The scale for Sheet 5 Is 1-inch equals 40-feet. The
scale for Sheets 6 and 7 is 1-inch equals 20-feet.
5. Clarification to Section 02520/2,06, Portland Cement Concrete Paving, Concrete Mix. Coloring agent shall
be Davis Colors of Los Angeles, California, 'Yosemite Brown', 2 lb./sack.
6. Clarification of the color requirements for Riprap and Boulders. All buried riprap and boulders will have no
color requirement. All exposed riprap and boulders must be an approved color. Approved colors include
tan, brown, dark brown and black Red or pink rock is not acceptable. The ENGINEER Will determine the
color of all submitted rock for acceptance.
7. Clarification of materials for Stacked Boulder Retaining Wall. The boulders are NOT required to be
sandstone. Approved equals for the boulders will be determined by, but not limited to, the dimensional
compliance of each stone per the requirements of the drawings and specifications and color.
8. Clarification of paint material for all steel tube railings to be painted as follows: 1 coat P&L Effecto Rust
Inhibiting Primer. 2 coats of P&L Effecto Enamel (Black, flat)
9. The following bridge manufacturers have been pre -qualified by the Owner and added to the bridge
suppliers list:
EXCEL Bridge Manufacturing Co.
12001 Shoemaker Ave
Santa Fe Springs, CA W670
(800) 648-0054
U.S. Bridge
201 Wheeling Avenue
Cambridge, OH 43725
(888) USBRIDGE
ATTACHMENTS
NONE
If you should have any questions, please contact Jason Stutzman, P.E., Project Manager at (970) 221-6366,
John Stephen, CPPO, Senior Buyer at (970) 221-6777 or Chris Carlson, P.E., C.F.M., Consultant Engineer at
(970) 223-5556.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BIDIQUOTE STATING THAT THIS ADDENDUM
HAS BEEN RECEIVED.
Page 2 of 2
NOV-06-03 THU 03:26 PH CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P.01/03
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No, 4
BID #5821
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River
OPENING DATE: November 14, 2003 — 3:00 p.m. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made -
SPECIFICATIONS
Clarification to Section 0101011.22 Summary of Work. Restoration, and Section 02960, Landlcape Work.
As stated in Section 0101011.22A, Contractor shall return all areas disturbed by the Work to their original or
better conditions in both function, topography, and appearance. All replacement vegetation shall be of the
same kind as disturbed unless otherwise approved by Owner. For example, wetlands shall be restored as
wetlands (1:1 area ratio minimum), willows restored with willows, grass with grass. A seed mixture is
included in Section 01010/1.22B for dry land grass restoration. Plant warranty and tree protection
standards are included in Section 02950. Restoration also includes topography. Unless otherwise
indicated by proposed contours in the Drawings, Sheet 2 of 23 (Site Plan), the topography of all disturbed
areas shall be restored to match existing topography subject to the maximum permissible deviation from
alignment and elevation as specified in Section 01010/1.16, Summary of Work, Construction Survey, which
is 0.10 feet.
2. Modification to the Drawings. Sheet 7 of 23 (General Plan of Structure). Abutment B Section G-G_ The
detail currently indicates hand railing to be extended beyond the bridge structure and Abutment B along the
concrete trail. Hand railing is not required along the concrete trail at this location.
3. Modification to the Drawings, sheet 4 of 23 (Site Uetaus). Uetan 4, 1 VD1c0l rlangran uetan. ano bectlon
0552212,01 Steel Railings, Structural Steel. Painted steel handrail was called out in several locations along
the concrete trail. Detail 4 on Sheet 4 of 23 calls for the handrail to be 1'/a-inch O.D. Handrail size may
also be Schedule 40 steel pipe diameter.
4. Clarification to Section 02469/2 01, Sheet Piling and Cofferdams. Sheet Piles. Steel sheet piling shall be a
corrugated steel sheeting nongalvanized interlocking type, at least 4.2 mm (8 gage) in thickness with a
section modulus of at least 16 cubic inches per linear foot, and conform to ASTM A 857/A 857M, Grade 36
minimum, or ASTM A 3281A 328M.
S. Modification to Section 02857/1.02, Pre fabricated Superstructure. Qualified Suppliers and Section
02852/7.02. Pre -fabricated Superstructure, Quality Certification. All proposed suppliers shall have current
AISC Simple Steel Bridge or Major Steel Bridge certification. Suppliers without AISC Major Steel Bridge
certification must provide documentation of at least five (6) successful bridge projects using 150-foot or
greater spans in addition to those requirements described in Paragraphs 1.02D and 1.02E.
Add nrlt,m #4 Page 1 of')
__ 215 North mason Street • 2nd Floor • P.O. Box 380 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
NOV-06-03 THU'03 0 PM CITY/FT COLLINS, PURCHAS FAX N0, 970 2216707
P. 02/03
6. Bid Item No. 38 has been added to the revised bid schedule attached as follows. This item was
inadvertently missing from the original bid schedule. Information for this item is represented an the plans
and the definition of bid item is as follows:
Bid Item, No 38 — Pedestrian Crossing
Measurement. Measurement shall be as a single lump sum item.
Payment. Payment will be at the lump sum price and shall Include crosswalk striping, pedestrian
crossing signs with flashing lights, providing metered electric service to the signs from existing
overhead electric lines, buried service conduit, purchase, installation, transportation, location and
protection of utilities, and all materials, equipment, and personnel necessary for a complete installation
as indicated in the Drawings.
7: Pre qualified Suppliers: The following is a complete list of the current prequalified bridge manufacturer as
approved by the Owner.
Continental Bridge
8301 State Highway 29 North
Alexandria, Minnesota 56308
(800)328-2047
BIG R Manufacturing
P.O. Box 1290
Greeley, Colorado 80632-1290
(800)234-0734
Acrow Corporation
P.O. Box 812
Carlstadt, New Jersey
(201) 933-0450
Wheeler Consolidated
9330 James Avenue South
Bloomington, MN 55431
(800)328-3986
ATTACHMENTS
Revised Bid Schedule —Addendum 4
U.S Pridge (Ohio Bridge)
201 Wheeling Avenue
Cambridge, Ohio 43725
(888) USBRIDGE
Steadfast Brldt es
119 40 Street N.E.
Fort Wayne, Alabama 35967
(600) 749-7515
EXCEL Bridge Manufacturing Co.
12001 Shoemaker Avenue
Sante Fe Springs, California 90670
(800) 548-0054
If you should have any questions, please contact Jason Stutzman, P.E., Project Manager at (970) 221-6386,
John Stephen, CPPO, Senior Buyer at (970) 221-6777 or Chris Carlson, P-E., C.F.M., Consultant Engineer at
(970) 223-5556.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BYA WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STA77NG THAT THIS ADDENDUM
HAS BEEN RECEIVED.
Addendum *4 Page 2 of 2
RECE'VE® OCT y g `20
SECTION 00416
BID BOND
KNOW ALL MEN By THESE PRESENTS: that we, the undersigned TRATNOR CONSTRUCTION
CO. as Principal, and _ST PAiiT FTRF A m RINE r�, •-R•--�
Surety, are hereby held and firmly bouna unto the Cit of Fqrt Collins,�=Coloradvs as OWNER, in the .sum of $ Five Percent (5t)*.for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns. *of Total Asoun.t of Bid
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the' City of Fort Collins, Colorado the accompanying Bid and hereby
made.a.part hereof to enter into'a Construction Agreement for the construction
of. Fort Collins' Project, PEDESTRIAN BRIDGE AND BIKE TRAIL EXTENSION AT OVERI;AND
TRAIL ROAD AND THE CACHE LA POUDRE RIVER; Bid No. 5821.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid -shall be accepted and the Principal shall executeanddeliver
a Contract 'in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in Connection therewith, and shall in all
other Xespects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein, stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety' and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any eudh extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and fie accepted by the OWNER.
7/96 Section 00410 Page. 02
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands.'
and seals this 6th day of N vemb , 201a, and such of them as axe
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, -the day and year first set forth'.
above.
PRINCIM
Name: TRAINOR CONSTRUCTION CO.
Address: 15000 W. 44th Ave. #B
Gold . CO 80 3
By;
Title;
ATTEST.-
By:1
(SEAL)
SMETT
'ST: PATTT FIRE ANT) MARINE TTSuR ALtG9-49NPANY
200Q So. Colorado Blvd #2-480
Denvet, CO 80222
sy L �
Ve
Title: __ata T. •Kall�a
torney- n-Fact
(SEAL)
MOODY INSURANCE AGENCY, INC.
3773 CHERRY CREEK NORTH DRIVE, SUITE 800
DENVER, COLORADO 80209-3804
PHONE: (303) 824-6600
7/96 Section 00410 Page 03
meStPaul
POWER OF ATTORNEY
Power of Attorney No.
Seaboard Surety Company
St. Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
St. Paul Mercury Insurance Company
23406
United States Fidelity and Guaranty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
Certificate No. 1929674
KNOW ALL MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York, and that
St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under
the laws of the State of Minnesota, and that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, and
that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance
Underwriters, Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do
hereby make, constitute and appoint
Jody Anderson, Evan E. Moody, Brad Moody, Vera T. Kalba and Kimberly D. Johnson
of the City of Denver , State Colorado , their true and lawful Attomey(s)-in-Fact,
each in their separate capacity if more than one is named above, to sign its name as surety to, and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the
performance of contracts and executing or guaranteeing bonds and undertakity 44dired or p�i`rrtttted�i�y actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this inswm-W iiyttnbe,ssi {t-andysis 9th day of July 2002
Seaboard Surety CompanypUntted States Fidelity and Guaranty Company
St. Paul Fire and Marine tie Coraary ` " Fidelity and Guaranty Insurance Company
St. Paul Guardian Insuranc 41 y .. Fidelity and Guaranty Insurance Underwriters, Inc.
St. Paul Mercury.
..
6rC,.
41nFIY F11164 O`,M Iyy.L9\ JD<,8y'n
7!927
s EAL o^ i sBiL '�
# a
OPf.EN �'S„uc< f. ANC P
State of Maryland
City of Baltimore
t .k.
- %
J1951
PETER W. CARMAN, Vice President
THOMAS E. HUIBREGTSE, Assistant Secretary
On this 9th day of July , 2002 , before me, the undersigned officer, personally appeared Peter W. Carman and
Thomas E. Huibregtse, who acknowledged themselves to be the Vice President and Assistant Secretary, respectively, of Seaboard Surety Company, St. Paul Fire and
Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, United States Fidelity and Guaranty Company, Fidelity and
Guaranty Insurance Company, and Fidelity and Guaranty Insurance Underwriters, Inc.; and that the seals affixed to the foregoing instrument are the corporate seals of
said Companies; and that they, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing the names of the
corporations by themselves as duly authorized officers.
In Witness Whereof, I hereunto set my hand and official seal.
My Commission expires the 1st day of July, 2006.
REBECCA EASLEY-ONOKALA, Notary Public
86203 Rev. 7-2002 Printed in U.S.A.
CM•�u' ���e{� St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company
aid 1 St. Paul Guardian Insurance Company Fidelity and Guaranty Insurance Company
St. Paul Mercury Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc.
Seaboard Surety Company St. Paul Medical Liability Insurance Company
Bond No. Bid 11/6/03
RIDER CONTAINING
DISCLOSURE NOTICE OF TERRORISM COVERAGE
This disclosure notice is required by the Terrorism Risk Insurance Act of 2002 (the
"Act"). No action is required on your part. This Disclosure Notice is incorporated in
and a part of the attached bond, and is effective the date of the bond.
You should know that, effective November 26, 2002, any losses covered by the
attached bond that are caused by certified acts of terrorism would be partially
reimbursed by the United States under a formula established by the Act. Under this
formula, the United States reimburses 90% of covered terrorism losses exceeding
the statutorily established deductible paid by the insurance company providing the
coverage.
Under the Act, there is a cap on our liability to pay for covered terrorism losses if the
aggregate amount of insured losses under the Act exceeds $100,000,000,000 during
the applicable period for all insureds and all insurers combined. In that case, we will
not be liable for the payment of any amount which exceeds that aggregate amount of
$100,000, 000, 000.
The portion of your premium that is attributable to coverage for acts of terrorism is
0.00.
IMPORTANT NOTE: THE COST OF TERRORISM COVERAGE IS SUBJECT TO
CHANGE ON ANY BONDS THAT PREMIUM IS CHARGED ANNUALLY.
TOTAL OF BASE BID
S
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (250) of the total Agreement Price.
RESPECT SUBMITTrED. Trainor Construction CO
lye
Signature Date
vice President
Title
N/A
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:
Address 15000 W 44th Ave #B
Telephone
Golden, CO 80403
(303) 273-9382
7/96 Section 00300 Page 4
Evidence of Construction in Colorado
PROJECT: CHERRY CREEK DROPS 22 AND 23 & TRAIL/BRIDGE IMPROVEMENTS
OWNER: URBAN DRAINAGE AND FLOOD CONTROL DISTRICT
DESCRIPTION: CONSTRUCTION OF TWO GROUTED BOULDER DROP
STRUCTURES AND STREM IMPROVEMENTS. NEW PEDESTRIAN BRIDGES AND
CONCRETE PATH.
CONTRACT AMOUNT: $0.7 MILLION
DURATION: 2002
PROJECT: PINEHURST TRIBUTARY
OWNER: URBAN DRAINAGE AND FLOOD CONTROL DISTRICT
DESCRIPTION: FLOOD CONTROL, CONCRETE DROP STRUCTURES
CONTRACT AMOUNT: $0.7 MILLION
DURATION: 2002
PROJE : LAKEWOOD GULCH - LAKEWOOD, CO
OWNER: DENVER WASTEWATER MANAGEMENT
DESCRIPTION: 50 X 50 CLEAR SPAN BRIDGE WITH RETAINING WALLS,
CHANNEL IMPROVEMENTS AND PEDESTRIAN SIDEWALK IMPROVEMENTS
CONTRACT AMOUNT: $0.7 MILLION
DURATION: 1999
TRAINOR CONSTRUCTION CO.
15000 W. 44th Aye. #B
GOLDEN, CO 80403
(303) 273-9382
9/11103
COMPLETE LIST OF PROJECTS IN PROGRESS
TRAINOR
TRAINOR
GENERAL
CONTRACT
PERCENT
REMAINING
NAME OF PROJECT
OWNER
ENGINEER
CONTRACTOR
AMOUNT
COMPLETE
AMOUNT
TREX
CDOT
SOUTHEAST CORRIDOR CON. SECC
$
1,343,787
55%
$
604,704
2001 EMERGENCY SANITARY
DENVER WASTEWATER
DENVER WASTEWATER
TRAINOR
$
250,000
45%
$
136,856
NORTH DENVER SANITARY SEWER PH III-B
DENVER WASTEWATER
DENVER WASTEWATER
TRAINOR
$
1,081,654
80%
$
216,331
TAFT HILL BRIDGE
FT COLLINS
FT COLLINS
TRAINOR
$
283,614
0%
$
283,614
CENTER & YORK SANITARY
DENVER WASTEWATER
DENVER WASTEWATER
TRAINOR
$
968.766
65%
$
339,068
2002 GENERAL STORM
DENVER WASTEWATER
DENVER WASTEWATER
TRAINOR
$
716,305
50%
$
358,153
BURLINGTON PARALLEL PIPELINE
THORNTON
BLACK & VEATCH
TRAINOR
$
640,570
95%
$
32,029
ERIE WATER RECLAMATION
ERIE
HDR
TRAINOR
$
630,117
40%
$
378,070
HUTCHISON PARK
URBAN DRAINAGE
SELLARDS & GRIGG
TRAINOR
$
813,293
50%
$
406,647
ECCV WESTERN WELL FIELD CONNECTION
E CHERRY CREEK VALLEY
CDM
BRB
$
102,055
80%
$
20,411
W BELLEVIEW WIDENING
JEFFCO
MULLER
BRANNAN
$
547.997
50%
$
273,999
THORNTON 2003 WATER & SEWER
THORNTON
THORNTON
TRAINOR
$
218,871
0%
$
218,871
LAFAYETTE N TRUNK FORCE MAIN
LAFAYETTE
McLAUGHLIN
TRAINOR
$
266,671
0%
$
266,671
LAFAYETTE BASELINE ROAD WIDENING
LAFAYETTE
CLC
BRANNAN
$
18,627
0%
$
18.627
$ 7,882.327 $ 3,554,049
11. List the more important projects recently completed by your company, stating
the approximate cost of each, and the month and year completed, location
and type of construction.
12. List your major equipment available for this contract.
Sea Attanhg-d
13. Experience in construction Work similar in importance to this
project:
R Attached
14. Background and experience of the principal members of your organization,
including officers:
See Attached
15. Credit available: S f /�•,��ieJ
16. Bank reference:Wells Fargo,
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
Yes
18. Are you licensed as a General CONTRACTOR? Yes
If yes, in what city, county and state? Denyer,Denyer, Colorado what
class, license and numbers?
19. Do you anticipate subcontracting Work under this Contract?yes
If yes, what percent of total contract? 8 %p *" _
and to whom? A,.1 /�i�a Sls.�i.L• 4("roue,!/, oroUt ye!1,4Pf,ro. ,. , • /40ac
20. Are any lawsuits pending against you or your firm at this time? No
If
DETAIL yes,
7/96 Section 00420 Page 2
TRAINOR CONSTRUCTION CO
15000 W. 44th Ave. #B
GOLDEN, CO 80403
(303)273-9382
QUALIFICATION
LIST OF PROJECTS COMPLETED IN THE LAST 5 YEARS
TRAINOR
TRAINOR
GENERAL
CONTRACT
DATE
NAME OF PROJECT
OWNER
ARCHITECT
CONTRACTOR
AMOUNT
COMPLETED
1998
4TH & RACE STORM SEWER
DENVER WASTEWATER
DENVER WASTEWATER
TRAINOR
$
233,901
9/1/98
1995 DENVER WASTEWATER SANITARY
DENVER WASTEWATER
DENVER WASTEWATER
TRAINOR
$
531,125
6/30198
FLORIDA AVE BIKEPATH
CITY OF DENVER
CITY OF DENVER
TRAINOR
$
359.000
7/15/98
N 11TH STORM SEWER
BRIGHTON
BRIGHTON
TRAINOR
$
695,323
11/30/98
128TH & ZUNI TUNNEL
BROOMFIELD
BROOMFIELD
TRAINOR
$
95,563
11/30/98
HIGHLANDS RANCH BORES
HIGHLANDS RANCH
RMC
TRAINOR
$
144,971
10/31/98
IDAHO SPRINGS BIKEWAY
IDAHO SPGS
IDAHO SPGS
TRAINOR
$
283,193
9/30/98
FRUITDALE SANITATION
FRUITDALE SANITATION
LANE
TRAINOR
$
298,497
7/31/98
BROADWAY VIADUCT TUNNEL
COOT
COOT
PCL
$
38.000
2/15/98
SANTA FE & BELLEVIEW BORE
COOT
COOT
CONCRETE WORKS
$
42,000
2/15/98
SKYLINE VISTA PARK
WESTMINSTER
HENKELS & MCCOY
URBAN FARMER
$
46,928
2/28/98
TAFf HILL UNDERPASS
FT COLLINS
RMC ,
TRAINOR
$
280,710
6/3MB
E-470 TUNNEL
E-470 AUTHORITY
MK CENTENNIAL
AMES
$
54,350
3/31/98
1-25 & 58TH AVE. BORES
COOT
COOT
HAMON
$
56,680
5/30/98
BIG DRY CREEK SANITARY RELOCATE
METRO WASTEWATER
MUERER
TRAINOR
$
72,110
5/30/98
YALE AVE BIKEPATH
AURORA
AURORA
TRAINOR
$
149,000
6/30/98
UINTAH STREET BORE
COLD SPGS
BLACK & VEATCH
SUN
$
31,900
6/30/98
ARVADA WATER BORES
ARVADA
ARVADA
WYCON
$
57,200
7/10198
WALMART 42" TUNNEL
WALMART
PATE
$
50,000
6/30198
1997
4TH & MONACO SANITARY SEWER
DENVER WASTEWATER
DENVER WASTEWATER
TRAINOR
$270,400
8131/97
29 ROAD & 1-70 BUSINESS LOOP SANITARY
CENTRAL GRAND VALLEY
WASTWATER
TRAINOR
$
78,000
12/15/97
CLEAR CREEK SANITATION BORE
CLEAR CREEK SANITATION
LANE
TRAINOR
$
61,000
12/31/97
11TH & 12TH AVE. SEWER INTERCEPTORS
CITY OF LAKEWOOD
LAKEWOOD
TRAINOR
$1,022,000
10/31/97
SOUTHWEST WATER PROJECT CONTRACT 5
CITY OF COLORADO SPGS
BROWN & CALDWELL
TIERDAEL
$
557,000
9115197
38TH & FOX
COOT
COOT
KRAEMER
$
589,406
8/31/97
COLORADO SPRINGS ELECTRIC BORES
COLO SPRGS ELECTRIC
POWER ENGINEERS
TEMPEST
$
155,590
9/30/97
RTD LIGHT RAIL UTILITIES SW CORRIDOR PH 2
RTD
RTD
TRAINOR
$658,000
8/31/97
ELK LAKE SANITARY EXTENSION
CITY OF GREELEY
PICKETT
TRAINOR
$220,915
8/26/97
PARK CENTRE UTILITIES
PARK CENTRE LTD.
YORK
TRAINOR
$107,000
9112/97
PAR 649 ACCESS BRIDGE REHABILITATION
METRO WASTEWATER
METRO WASTEWATER
TRAINOR
$121,5W
12/15/96
TOLLGATE SANITARY SEWER REPAIR
CITY OF AURORA
AURORA
TRAINOR
$53,000
12/1/96
DAHLIA PIT INTERCONNECT
CITY OF THORNTON
DREXEL BARRELL
TRAINOR
$580,000
4/15/97
CLEAR CREEK SANITATION EXTENSION
CLEAR CREEK SANITATION
LANE
TRAINOR
$368,786
3131/97
CHANSON PLAZA LIFT STATION
GRANT WATER/SANITATION
TRAINOR
$208,800
4/15/97
REPUBLIC PARK LIFT STATION
CASTLEWOOD SANITATION
TRANSYSTEMS
TRAINOR
$149,652
4/30197
CADDOA BASIN STORM SEWER
CITY OF LOVELAND
RBD
TRAINOR
$430.696
5/31/97
RTD LIGHT RAIL UTILITIES SW CORRIDOR PH 1
RTD
RTD
TRAINOR
$270,106
5131/97
FOSSIL CREEK TRAIL
CITY OF FT. COLLINS
FT. COLLINS
TRAINOR
$167,007
4/3W7
HARMONY TRANSMISSION PHASE IV
CITY OF FT. COLLINS
RMC
ERS
$121,767
4/15/97
INVERNESS FILING 22 OUTFALL STORM SEWER
INVERNESS WATER & SAN
MULHERN MIRE
TRAINOR
$150,259
5/18/97
CANYON VIEW BUSINESS PARK
II"1l[oj:vBL[K*73:I
1:10 AtHaiPJ9
TRAINOR $ 447,941
2000
YALE & DAHLIA SANITARY
3RD & PLATTE SANITARY
RED SEAL SANITARY
27TH AVE & HUMBOLT ST.
PUEBLO RAW WATER 86" TUNNEL
JEWELL INTERCEPTOR
FLORIDA AVE. SANITARY SEWER
KILGORE N SUBDIVISION
AURORA RAMPART 54" WL
DIRECT TV
WEST SIDE TRIBUTARY
ARVADA SEWER MAIN
NORTH TABLE MTN SEWER
S WADSWORTH SIDEWALK
SANDERSON GULCH BORES
LOTH & JOHNSON
CANTERBERRY CROSSING
COLLEGE PARK SANITARY SEWER
2000 SANITARY SEWER REPLACEMENT
PERFORMING ARTS SCULPTURE PARK
POWERHOUSE PLAZA
BERKELEY 2000 WATER & SEWER IMPROV
JORDAN RD. SEWER MODIFICATIONS
W. 56TH AVE. BRIDGE
1999
LAKEWOOD GULCH
7TH & DOWNING STORM SEWER
SWANSEA STORM SEWER
1ST & BRYANT STORM SEWER
20TH & MEADE STORM SEWER
1998 SANITARY SEWER IMPROVEMENTS
WESTWOOD SUBDIVISION
W T-BONE SUBDIVISION UTILITIES
ROGERS ROAD TUNNEL
88TH STREET SANITARY
LOWRY BUSINESS CEN I ER TRUNK UTILITIES
AIRPORT BOOSTER PUMP STATION
PLATTE CANYON RES. RIVER OUTLET
ROLLING HILLS CLUBHOUSE
SOUTHBRIDGE
1-25 & 58TH BORES
CONDUIT 133
COMMUNITY DITCH
44TH INDUSTRIAL PARK TUNNEL
PUEBLO WEST BORE
SANTA FE & BELLEVIEW TUNNEL
DECATUR STREET SANITARY
10TH & MAIN SANITARY
URBAN FARMER STORM
MORGAN PIPELINE BORES
1-70 & WASHINGTON TUNNEL
44TH & TABOR SANITARY
GREAT LAWN DRAINAGE
KINNEY RUN BORE
CONDUIT 55
WESTFIELD UTILITIES
MILLER & RIDGE SANITARY
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
PUEBLO BOARD OF WTRWRK
METRO WASTWATER
CITY OF AURORA
KILGORE
CITY OF AURORA
HUGHES COMMUNICATIONS
URBAN DRAINAGE
ARVADA
N TABLE W&S
LAKEWOOD
METRO WASTEWATER
GOLDEN
CANTERBERRY
COLLEGE PARK W & S
LITTLETON
DENVER TRANSPORTATION DIV
LRA
BERKELEY
COTTONWOOD W & S
CITY OF ARVADA
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
WINDSOR
GREELEY
LONGMONT
SUPERIOR
LOWRY REDEVELOPMENT
BROOMFIELD
DENVER WATER
ROLLING HILLS CC
SOUTHBRIDGE
CDOT
DENVER WATER
BROADLANDS METRO
44TH INDUSTRIAL
PUEBLO WEST
CDOT
FEDERAL HGHTS
BROOMFIELD
URBAN FARMER
N COLO WATER
CDOT
FRUITDALE
LOWRY REDEVELOPMENT
GOLDEN
DENVER WATER
LOWRY REDEVELOPMENT
CLEAR CREEK
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
BLACK & VEATECH
CH2M HILL
CITY OF AURORA
BCA GROUP
CITY OF AURORA
ANDERSON & HASTINGS
ICON ENGINEERING
ARVADA
N TABLE W&S
LAKEWOOD
HDR
TST
EVO
LANE ENGINEERING
LITTLETON
CITY & COUNTY OF DENVER
LRA
MARTIN/MARTIN
MULHERN MRE
MULLER
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
NORTHERN ENGINEERING
NORTH STAR
SEAR -BROWN
McLAUGHLIN
BRW
HDR
DENVER WATER
JOHN WILLIAMS
CDOT
DENVER WATER
HURST
CLYDE YOUNG
CDOT
FEDERAL HGHTS
BROOMFIELD
MONTGOMERY WATSON
CDOT
LANE
BRW
TST
DENVER WATER
BRW
LANE
TRAINOR
$
523.729
6/30/00
TRAINOR
$1,407,424
6/30/00
TRAINOR
$
840,260
11/15/00
TRAINOR
$
278,419
12/1/00
PATE
$
329,250
1/15/01
BTC
$
579,565
2115/01
TRAINOR
$
151,868
1/31/01
KIP CO
$
153,288
12/31/00
TRAINOR
$
204,200
2/12/01
HYDER
$
380.000
1/31/01
TRAINOR
$
227,991
1/1/01
TRAINOR
$
880.747
3131/00
TRAINOR
$
548,000
4/14/00
TRAINOR
$
199,256
4/12/00
TIERDAEL
$
465,601
5/31100
KIPCO
$
204,000
6/31/00
TRAINOR
$
512,473
6/15100
TRAINOR
$
118,647
9/20/00
TRAINOR
$
168.424
9130/00
TRAINOR
$
271,785
12/l/00
TRAINOR
$
262,586
10/31/00
TRAINOR
$
238,494
11/31/00
TRAINOR
$
540,306
1215/00
CENTRIC-JONE; $
201,671
12/1/00
TRAINOR
$
867,491
10/1199
TRAINOR
$
183,304
8/31199
TRAINOR
$
207,667
811199
TRAINOR
$
389,355
6/30/99
TRAINOR
$
666,897
8/1/99
TRAINOR
$
132,453
8/1/99
TRAINOR
$
66,403
12/15/99
TRAINOR
$
398,111
11/30/99
E-Z
$
56,840
8/31/99
TRAINOR
$
134,926
9130/99
TRAINOR
$3,063,050
1/31/99
TRAINOR
$
882,408
4/30199
TRAINOR
$
206,860
4/30/99
TRAINOR
$
106,450
3/31/99
KIPCO
$
48,647
4/30/99
HAMON
$
81,505
2/28199
TRAINOR
$
178.419
2/28/99
TRAINOR
$
414,349
6/30/99
T LOWELL
$
25,020
4/30/99
PATE
$
71,893
5/31/99
CONC WORKS
$
77,543
6/30/99
TRAINOR
$
67,075
6/30/99
TRAINOR
$
228,034
6/15/99
TRAINOR
$
47,679
6/15/99
BRB
$
272,201
7/31/99
KRAEMER
$
56,898
7/15/99
TRAINOR
$
89,094
6/30199
TRAINOR
$
450.000
7/31/99
SCHEMEUSER
$
78,903
8/13/99
TIC
$
50,525
7/15199
TRAINOR
$
344,846
8/1/99
TRAINOR
$
114,286
8/20/99
QUALIFICATION
LIST OF PROJECTS COMPLETED IN THE LAST 3 YEARS
NAME OF PROJECT OWNER
2003
NORTH DENVER SANITARY SEWER PH Ill -A
DUDLEY SEWER MAIN
51STNORK SANITARY
LOWRY POWERHOUSE PLAZA
1 ST/STUART SAN & 2NDAIVOLFF STORM
SWANSEA STORM
COLORADO ACADEMY WATERLINE
SEDALIA GRILL WATERLINE
BROOMFIELD REUSE WATER - JEFFCO AIRPORT
2002
NORTH GOLDEN WATERLINE
PINEHURST TRIBUTARY
VILLAGE @ 5 PARKS
WALKER LIFT STATION
AURORA ENCASEMENTS
CENTENNIAL GARDENS
CHERRY CREEK DROPS
PARKHILL STORM SEWER TUNNEL
PALMER DIVIDE RD
AURORA SANITARY 2000
W. 64TH WATERLINE BORE
HUNT ST. WELL HOUSE
PINERY 16" WATERLINE
2ND/STEELE STORM SEWER
EAST SIDE INTERCEPTOR
VIRGINIA VILLAGE PHASE III
TRAILMARK BRIDGE
HIGHLINE CANAL
2001
PROSPECT PARK
VIRGINIA VILLAGE
2000 GEN. STORM SEWER IMPROV.
1-225 & HAMPDEN TUNNELS
LOWRY BLDG 401 & 402 STORM/SANITARY
CONDUIT 133
BAYAUD PARK
ROCKY MTN. DITCH STORM SEWER
38TH & PERRY STORM SEWER
1 ST/BRYANT - YALE TO ST. PAUL
CSU MASTER DRAINAGE
COLOROW PUMP STATION
ARVADA 2000 SEWER REPLACEMENT
MONTCLAIR ACADAMY
1.25 & COLFAX
1-225 & PARKER
RANGEVIEW SANITARY
BROOMFIELD BOOSTER PUMP C/O
JOHNSTOWN SEWER BORES
BRIGHTON WATERLINE BORES
TRAINOR CONSTRUCTION CO.
15000 W. 441h Ave. #B
GOLDEN, CO 80403
(303)273-9382
DENVER WASTEWATER
ARVADA
DENVER WASTEWATER
LOWRY
DENVER WASTEWATER
DENVER WASTEWATER
COLORADO ACADEMY
SEDALIA W&S
BROOMFIELD
GOLDEN
URBAN DRAINAGE
VILLAGE HOMES
WALKER MANUFACTURING
AURORA
DENVER BOTANIC GARDENS
URBAN DRAINAGE
DENVER WASTEWATER
DOUGLAS COUNTY
AURORA
CITY OF ARVADA
SEDALIA W&S
PINERY W&S
DENVER WASTEWATER
WINDSOR
DENVER WASTEWATER
TRAILMARK METRO
HIGHLANDS RANCH
DENVER WASTWATER
DENVER WASTEWATER
DENVER WASTEWATER
CDOT
LRA
DENVER WATER
LRA
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
CSU
WILLOWBROOK W & S DIST
CITY OF ARVADA
LRA
COOT
COOT
LITTLETON
BROOMFIELD
JOHNSTOWN
BRIGHTON
TRAINOR
TRAINOR
GENERAL
CONTRACT
DATE
ENGINEER
CONTRACTOR
AMOUNT
COMPLETED
DENVER WASTEWATER
TRAINOR
$4.319,462
1131/03
ARVADA
TRAINOR
$ 926,049
6130/03
DENVER WASTEWATER
TRAINOR
$ 529,213
1131/03
BRW
TRAINOR
$1.823,007
6/30/03
DENVER WASTEWATER
TRAINOR
$1.325,066
8/31/03
DENVER WASTEWATER
TRAINOR
$ 261,604
8/31/03
MTN DESIGN
FRANSON
$ 93,882
8/15/03
MUERER
TRAINOR
$ 39,656
8/15/03
RMC
TRAINOR
$1,745,938
7131/03
McLAUGHLIN
KIOWA
MUERER
HEFTA
AURORA
CIVITAS
ICON
DENVER WASTEWATER
FE LS BU R G/HOLT/U LL EVIG
AURORA
SEAR -BROWN
MUERER
MERRICK
DENVER WASTEWATER
ROTHBERG,TAMBURINI
DENVER WASTEWATER
NORRIS DULLEA
FELSBURG/HOLT/U LLEVIG
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
CDOT
BRW
DENVER WATER
BRW
DENVER WASTEWATER
DENVER WASTEWATER
DENVER WASTEWATER
CSU
MEURER
CITY OF ARVADA
ERG
CDOT
COOT
LITTLETON
BROOMFIELD
TST
CARTER/BURGESS
TRAINOR
TRAINOR
TRAINOR
TRAINOR
TRAINOR
JC BROOKS
TRAINOR
NEW DESIGN
WINSLOW
TRAINOR
RIGOR
TRAINOR
TRAINOR
TRAINOR
SCOTT
TRAINOR
TRAINOR
TRAINOR
TRAINOR
TRAINOR
TRAINOR
SEMA
TRAINOR
TRAINOR
TRAINOR
TRAINOR
TRAINOR
TRAINOR
TARCO
TRAINOR
TRAINOR
TRAINOR
CENTRIC
SEMA
TRAINOR
TRAINOR
HALL-IR WIN
SCHEUMSER
35,184
738,613
386,178
215,000
62,646
100,110
834,417
95,058
175,043
222,641
25,025
171,978
65,400
936,122
83,540
777,643
91,642
126.289
$ 72,700
$1.513,054
$ 469.993
$ 117,132
$ 105,539
$ 188,571
$ 218,356
$ 209,857
$ 101,259
$ 412.253
$ 132.216
$1,338.084
$ 176,585
$ 66,654
$ 120.396
$ 54,468
$ 154,505
$ 20,000
$ 107,075
$ 64,560
11/30/02
10/31/02
11/30/02
10/l/02
9/30/02
6/30102
7/31/02
6/30/02
7/31 /02
3131 /02
1/11102
1/15/02
1/4/02
4/15/02
1/15/02
4/19/02
3/1/02
4/12/02
3/31 /01
7/31 /01
8/31 /01
12/31/01
11/30/01
8131 /01
11/30/01
9/30101
10/31/01
11/30/01
9130101
12/15/01
2/28/01
4/30/01
4/30/01
3131 /01
4130/01
4/15/01
5/18/01