Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5821 PEDESTRIAN BRIDGE AND BIKE (3)SECTION 00300 BID FORM PROJECT: PEDESTRIAN BRIDGE AND BIKE TRAIL EXTENSION AT OVERLAND TRAIL ROAD AND THE CACHE LA POUDRE RIVER; Bid No. 5821 Place lOI'� Cp�fi Date 1. In compliance with your Invitation to Bid dated 0C.4.y. 07003 , and subject to all conditions thereof, the undersigned Trainor Construction Co. a * Corporatio Limited Liability Company, Partnership, Joint Venture, or So e Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: St. Paul Fire & Marine Insurance Co. 2000 S. Colorado Rlv #2='480, Denver CO. 80222 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7/96 Section 00300 Page 1 LIST OF EQUIPMENT OWNED/LEASED Cat 345BL Hydraulic Excavator Cat 325BL Hydraulic Excavator Komatsu WA250 Loader Boom Truck Cat IT-28 Front End Loader Cat 325L Hydraulic Excavator Cat 330 Hydraulic Excavator Cat 315 Hydraulic Excavator Cat 235 Hydraulic Excavator Komatsu 150PC Hydraulic Excavator Komatsu 220LC Hydraulic Excavator Cat 936 Front End Loader Cat 938 Front End Loader Komatsu 250 Front End Loader Cat II-28F Front End Loader Cat II-28F Front End Loader Cat 416 Backhoe 35-Ton Linkbelt Truck Crane 35-Ton Tadano Truck Crane P & H Omega 65 Crane Barbco 48" Boring Machine Tunnel Boring Machines — 3 EA — American Augers Akkerman 5000 Jacking System/524 Haul System -and Tunnel Boring: Machine... Air Compressors Trench Boxes, Plates & Shields Concrete Forms Generators Demo Saws Van Trailers Pumps Chipping Hammers Welders Ford Oiler/Fuel Truck Ford Water Truck Kenworth Dump Truck Pickups Office Trailer TRAINOR CONSTRUCTION COMPANY 15000 W. 44th Avenue #B Golden, CO 80403 Phone 303-273-9382 Fax 303-273-9354 Areas of Expertise Employment: Experience: Education: HARRY BRUST Construction Estimating Project Management Project planning and Scheduling Concrete Structures Storm and Sanitary Construction Waterline Construction Project Manager/Estimator — Trainor Construction Project Superintendent— Eby Construction 25 years concrete and utility construction, estimating, and project management BS, Industrial Construction Management Colorado State University, Ft. Collins TRAINOR CONSTRUCTION COMPANY 15000 W. 44th Avenue #B Golden, CO 80403 Phone 303-273-9382 Fax 303-273-9354 Dave Emm Areas of Expertise: Construction Estimating Project Management Accounting Supervision Financial Management Purchasing/Scheduling Safety, EEO & Affirmative Action Supervision Employment: Project Manager/Controller — Trainor Construction Controller/Estimator — Railroad Builders Inc. Experience: 14 years construction accounting, estimating, and project management Education: BS, Accounting/Small Business Administration University of Colorado, Boulder TRAINOR CONSTRUCTION COMPANY 15000 W. 44th Avenue #8 Golden, CO 80403 Phone 303-273-9382 Fax 303-273-9354 SCOTT KYLER Areas of Expertise: Quality Assurance Construction Management Project Planning and Scheduling Concrete Structures Bridges WaterNVastewater Treatment Plants Storm and Sanitary Sewer Construction Employment: Project Manager/Estimator - Trainor Construction Resident Project Representative — Camp, Dresser & McKee Project Manager/Estimator — Park Construction Estimator — Robert E. McKee Construction Estimator/Field Engineer— Eby Construction Project Engineer —Weaver Construction Experience: Education: 26 years concrete and utility construction, estimating, and project management 1976, BS, Industrial Construction Management Colorado State University, Ft. Collins, Colorado TRAINOR CONSTRUCTION COMPANY 15000 W. 44th Avenue #B Golden, CO 80403 Phone 303-273-9382 Fax 303-273-9354 JACK WILLIAMS Areas of Expertise: Storm and Sanitary Sewer Construction Waterline Construction Project Supervision Project Planning and Scheduling Employment: Project Superintendent — Trainor Construction Foreman/Heavy Equipment Operator - Binder Experience: 30 years experience in utility construction and 12 years supervisory experience Education: Army Special Forces — 10/16/70 to 04/12/72 21. What are the limits of your public liability? DETAIL See AttarhPd c tif'cate of Insurance What company? Travelers Insurance Company 22. What are your company's bonding limitations? per Job 5 Million R-ankl ogWork in prngracaf 10 Million 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at �j�%p�,,, [o this day of 4/ou a 20P-3 State of CO1or-ado County of Ueffserson / being my worn deposes and says that he is of ✓he-'yof �'Orue �a and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this _mac day of epae.i. t —LAp1 Q2g� 1� 41 c Nota/rry. Public A &0 ic%, C 603 My commission expires q—/5-U.7 " pTAq PUBLIC op C es on E�xp� °0\01 7/96 Section 00420 Page 3 10-31-03:11:57 3038246694 # 3/ 4 v--�-'� -P.. CERTIFICATE OF LIABILITY PRODUCER (303)824-6600 FAX (303)370-0118 Moody Insurance Agency, Inc. 3773 Cherry Creek North Drive Suite 800 DATE (MMMWffM INSURANCE 1o/31/zoo3 10/31/2003 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Denver, CO 80209-3804 INSURERS AFFORDING COVERAGE NAIC INSURED INSURERA: Travelers Indemnity Co of Illin is Trainor Construction Company, Inc. 4800 Brighton Blvd. Denver, CO 80216 INSURERS: Pinnacol Insurance Company INSURERC: Charter Oak Fire Ins Co (Travel rs) INSURERD: INSURER E: THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOT✓VITHSTANDINC ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, MNE TYPEOFINSURANCE POLICY NUMBER PO LICY EFFECTIVE 01/01/2003 POUCYEXPIRATION LIIBTMEEI GENERAL LIABILITY DTC0784F7426 01/01/2004 EACH OCCURRENCE S 1 000,000 C X COMMERCIAL GENERAL LIABILITY CLAIMS MADE Q OCCUR X Bl nkt Addl Insured DAMAGE TO RENTED $ 300,00 MED EXP (Arty one pesos) S 5.000 PERSONAL SADV INJURY S 1 000 000 X Limited Pollution GENERAL AGGREGATE S 2,000,000 GENL AGGREGATE LIMIT APPLIES PER: POLICY X JECT r I LOC PRODUCTS -COMPA)P AGO $ 2 OOO QOO AUTOMOBILE X LUIBILITY ANYAUTO DT810784F7426 01/01/2003 01/01/2004 COMBINED SINGLE UMIT (Eaaoddend E 1,000,000 A X X ALL CMNED AUTOS SCHEDULEDAUTOS HIRED AUTOS NONOVNNED AUTOS BODILY INJURY (Parpel ) E BODILYnt) (Per aoddraodd eM) S X Pollution PROPERTY DAMAGE (Pei aoddanq S GARAGE UABELITY AUTO ONLY• EA ACCIDENT S ANY AUTO OTHER THAN EA ACC AUTOONLY: AGO S $ EIICESSUABRELLA LIABILITY X OCCUR CLAIMS MADE CUP784F7426 01/01/2003 01/01/2004 EACH OCCURRENCE S 10,000,000 AGGREGATE S 10.000.000 A E DEDUCTIBLE X RETENTION S 10,00 S $ WORKERS COMPENSATION AND 3397538 01/01/2003 01/01/2004 X I WCSTATU- I I OTH- B EMPLOYER IETORIN7Y ANYPROPRETORJPARTNDED? UPIVE OFFICERIMEMBER EXCLUDED? rcyyaae deeaux Antler SPEGAWL PROVISIONS bobs INCLUDED UNDER UMBRELLA LIABILITY E.L EACHACCDENT $ S00 000 E.L. DISEASE • EA EMPLOYEE 5 S00 OO E.L. DISEASE - POLICY LIMIT $ 500,000 OTHER DESCRIP719N OF OPERATKINBf LOCATIONS li(ENICLEBIF CLUSIONS AD4ED BY ENDORSEM@NT!SPECULL PI TVISIONS Re: Pedestrian Bri ge & Bi a TraT Extension at Overlanc Trail Road and The Cache La Poudre River ity of Fort Collins is named as additional insured under the general liability with respect to ork performed by the insured. City of Fort Collins P 0 Box S80 Fort Collins, CO 80522-0580 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE TIE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIRr:ATE HOLDER NAMED TO THE LEFT. BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSI AUTHORMW REPRESENTATIVE AL,UKU AD (ZUUIIUI) ®ACORD CORPORATION 1988 10-31-03;11:57 , ;3038246694 # 4/ 4 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terns and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. AI:VKU zo lZutrifun) SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 150 of the contract. ITEM SUBCONTRACTOR CQL�ssJ N� �`INt _ Mc hCEN,Le A&Ar AVack Qj... Ciwsrwe��c ri No S��ce.�-k�w liver /S l �s74 7/96 Section 00430 Page 1 �M Ciof Fort Collins CITY OF FORT COLLINS ty ADDENDUM No. 2 BID #5821 PEDESTRIAN BRIDGE BIKE TRAIL EXTENSION AT OVERLAND TRAIL ROAD AND CACHE LA POUDRE RIVER SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5821 Pedestrian Bridge Bike Trail Extension at Overland Trail Road and Cache La Poudre River. OPENING DATE. November 6, 2003, 3;00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Clarification to Section 01010/1.09, Summary of Work, Regulatory Requirements. Contractor is not responsible for obtaining a 404 permit from the U.S. Army Corps of Engineers. Owner will obtain the permit and provide a copy to the Contractor. Contractor shall follow any special provisions of the permit. If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ,ENCLOSED WITH THE BID/QUOTE STATING THATTHIS ADDENDUM HAS BEEN RECEIVED. NOV-06-03 THU 03:27 PM CITY/FT COLLINS, PURCHAS FAX NO, 970 2216707 P,03/03 BID n5821 BID SCHEDULE —ADDENDUM 4 Bid Item Description Estimated Quantity Unit Unit Price Cost 1 Mobilization and Demobilization 1 LS O 0.040 2 Water Control 1 LS W. 0 0 3 Traffic Control 1 LS po .0 4 Surveying 1 LS 0 , O 5 Clearirtg,_Grubbing and Stripping 1 LS 45. 90, 6, Ceissonl,;6-Foot Dia. 25 LF O 160 5. D 7 Caisson 2.6-Foot Die. 25 LF 7, Tj 8 Caisson 3,4-Foot Dia. 25 LF / , d 9 Caisson 4,'4-Foot Dia. 25 LF 0 10 Caisson 5.`4-Foot Dia. 25 LF 076005 00 11 Caisson 6, 4-Foot Dia. 25 LF 2o lyl-aa.00 12 Caisson 7, 4-Foot Dia, 25 LF IIA-26 Y';50-r. ob 13 Caisson 8, 4-Foot Dia. 25 LF . 00 9 00 . 00 14 Caisson 9, 4-Foot Dia. 25 LF]CO. Ra . 00 15 Pier No.1 and Pier Cap 1 LS .00 60• �d 16 Pier No. 2 and Pier Cap 1 LS . 00 00. 40 0 17 Pier No. 3 and Pier Cap 1 LS ID a L 0 18 Pier. No. 4 and Pier Cap 1 LS ,OQ .00 19 Pier No. 5 and Pier Cap 1 LS AZA 20 Pier No. 6 and Pier Cap 1 LS d0 9 d 0 21 Pier No. 7 and Pier Cap 1 LS 0 22 Pier No. 8andFier Cap 1 LS j 0 .30.60 23 Pier No. 9 and Pier Cap 1 LS 6. PC Ono I DO 24 Abutment A (North Abutment) 1 LS 42r, M. 0 0 Od 25 Abutment B (South Abutment) 1 LS 6 O 26 Superstructure (154Feet Span Prefabricated Bride 2 EA 27 Superstructure (50-Feet Span Prefabricated Bridge) 7 EA ar a 2s• Oa 0 28 Superstructure (25-Feet Span Prefabricated Bridge) 1 EA /000-00 ! tvw 06 29 Type H Riprap Bank Protection 153 SY 0 30 Type VH Riprap Bank Protection 771 SY 0.00 60/410,00 $1 Colored Concrete Trail (6% 8', and 10' wide) 6621 SF O 32 Colored Concrete Trail — Channel Trail Section 10' wide 2083 SF /C-• 00 14P.0 33 Stacked Boulder Retaining Wall 183 LF 13"VC7 00 34 Modular Block Retaining Wall 271 LF 0 (j O 35 Cast -in -Place Concrete Retaining Wall 148 LF e%Ay. 00 Y 43.00 36 [)riven Steel Sheet Pile (Non -cofferdam) 750 SF 0 7 O 00 37 RestorationPAS,//an 38 Pedestrian Crossing 1 LS / CD /ej 0 TOTAL BID: $ S O liars iy�o —iff--04-03 TUE 02:46 PM CITY/FT COLLINS, PURCHAS FAX NO, 970 2216707 P-01/02 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 3 BID 05821 PEDESTRIAN BRIDGE AND TRAIL EXTENSION AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER SPECIFICATIONS AND CONTRACT DOCUMENTS Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River OPENING DATE: November 12, 2003 — 3;00p.m. (Our Clock) To all prospective bidders under the specification and contract documents described above, the following changes are hereby made. SPECIFICATIONS 1. The bid opening date has been changed. The bid will be opened on November 12, 2003 at 3:00p.m. (Our Clock). 2. Clarification to Section 01010/1.09, Summary of Work, Regulatory Requirements. Contractor is not responsible for obtaining a 404 permit from the U.S. Army Corps of Engineers (USACE). Owner will obtain the permit and provide a copy to the Contractor. Contractor shall follow any special provisions of the permit. After discussions with the USACE, it is expected that a nationwide permit will be issued for this project. At this time, construction disturbance to the existing sand barlisland near pier 1 is not expected to be an issue with the USACE. Contractor must restore all disturbance in the channel bed to existing conditions and existing contours. Disturbance area is limited to the City of Fort Collins' property, Lyons Park access, the permanent easement along the south bank of the river, and construction easements on the Hetzel and Delehoy properties. Reference the property ownership figure included with Addendum 1. Contractor shall take care to protect and minimize construction disturbance to the south bank line, which Includes sensitive habitat and the Hyde Natural Area. Disturbance on City of Fort Collins property up to the south Delehoy property line is expected for construction of the bank protection. Disturbance within the construction easement shall be minimized to the extent possible. Trees should be protected except those noted for pruning or removal on the Drawings. If special, unforeseen conditions are placed on the Contractor by the USACE through the 404 permit, a change order will be pursued at that time. FEMA did not require any special conditions for the project. 3_ Clarification to Section 01010/1.10, Summary of Work, Easements and Rights -of -Way. Referencethis section for information regarding limits of construction. Although not shown on the Drawings, minor access may be obtained from the Delehoy's through their pasture to the Hyde Natural Area if the work necessitates it: However, there are numerous trees along the south bank that restrict accessing with large equipment or vehicles to the riverbank and this cannot be considered a primary access. Construction easement has not been obtained across the Delehoys property at this time, but the Delehoy's have given verbal permission for access. Any disturbance would require restoration back to existing or better conditions. The primary cunstruction access is from two locations: (1) Lyons Park, which provides access to the channel bed_ . Equipment may be mobilized along the channel bed, but disturbance should be minimized to the extent practicable. Some equipment can cross under the Overland Trail Road bridge on City of Fort Collins property between the bridge's center pier and north abutment. The roadway bridge must be protected. Clearance should be checked for equipment travel under the bridge. (2) The existing driveway onto the Hetzel property. off of Overland Trail Road provides access to both City of Fort Collins property and the construction easement near the north abutment. The channel bed can also be accessed via this route. 215 North Mason Street • Znd Floor • P.O. Box 580 • Fort Cpllins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 TUE 02,46 PH CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P.02/02 4. Clarification to Sheets 5, 6, and 7 of the Drawings. The scale for Sheet 5 Is 1-inch equals 40-feet. The scale for Sheets 6 and 7 is 1-inch equals 20-feet. 5. Clarification to Section 02520/2,06, Portland Cement Concrete Paving, Concrete Mix. Coloring agent shall be Davis Colors of Los Angeles, California, 'Yosemite Brown', 2 lb./sack. 6. Clarification of the color requirements for Riprap and Boulders. All buried riprap and boulders will have no color requirement. All exposed riprap and boulders must be an approved color. Approved colors include tan, brown, dark brown and black Red or pink rock is not acceptable. The ENGINEER Will determine the color of all submitted rock for acceptance. 7. Clarification of materials for Stacked Boulder Retaining Wall. The boulders are NOT required to be sandstone. Approved equals for the boulders will be determined by, but not limited to, the dimensional compliance of each stone per the requirements of the drawings and specifications and color. 8. Clarification of paint material for all steel tube railings to be painted as follows: 1 coat P&L Effecto Rust Inhibiting Primer. 2 coats of P&L Effecto Enamel (Black, flat) 9. The following bridge manufacturers have been pre -qualified by the Owner and added to the bridge suppliers list: EXCEL Bridge Manufacturing Co. 12001 Shoemaker Ave Santa Fe Springs, CA W670 (800) 648-0054 U.S. Bridge 201 Wheeling Avenue Cambridge, OH 43725 (888) USBRIDGE ATTACHMENTS NONE If you should have any questions, please contact Jason Stutzman, P.E., Project Manager at (970) 221-6366, John Stephen, CPPO, Senior Buyer at (970) 221-6777 or Chris Carlson, P.E., C.F.M., Consultant Engineer at (970) 223-5556. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BIDIQUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Page 2 of 2 NOV-06-03 THU 03:26 PH CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P.01/03 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No, 4 BID #5821 PEDESTRIAN BRIDGE AND TRAIL EXTENSION AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER SPECIFICATIONS AND CONTRACT DOCUMENTS Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River OPENING DATE: November 14, 2003 — 3:00 p.m. (Our Clock) To all prospective bidders under the specification and contract documents described above, the following changes are hereby made - SPECIFICATIONS Clarification to Section 0101011.22 Summary of Work. Restoration, and Section 02960, Landlcape Work. As stated in Section 0101011.22A, Contractor shall return all areas disturbed by the Work to their original or better conditions in both function, topography, and appearance. All replacement vegetation shall be of the same kind as disturbed unless otherwise approved by Owner. For example, wetlands shall be restored as wetlands (1:1 area ratio minimum), willows restored with willows, grass with grass. A seed mixture is included in Section 01010/1.22B for dry land grass restoration. Plant warranty and tree protection standards are included in Section 02950. Restoration also includes topography. Unless otherwise indicated by proposed contours in the Drawings, Sheet 2 of 23 (Site Plan), the topography of all disturbed areas shall be restored to match existing topography subject to the maximum permissible deviation from alignment and elevation as specified in Section 01010/1.16, Summary of Work, Construction Survey, which is 0.10 feet. 2. Modification to the Drawings. Sheet 7 of 23 (General Plan of Structure). Abutment B Section G-G_ The detail currently indicates hand railing to be extended beyond the bridge structure and Abutment B along the concrete trail. Hand railing is not required along the concrete trail at this location. 3. Modification to the Drawings, sheet 4 of 23 (Site Uetaus). Uetan 4, 1 VD1c0l rlangran uetan. ano bectlon 0552212,01 Steel Railings, Structural Steel. Painted steel handrail was called out in several locations along the concrete trail. Detail 4 on Sheet 4 of 23 calls for the handrail to be 1'/a-inch O.D. Handrail size may also be Schedule 40 steel pipe diameter. 4. Clarification to Section 02469/2 01, Sheet Piling and Cofferdams. Sheet Piles. Steel sheet piling shall be a corrugated steel sheeting nongalvanized interlocking type, at least 4.2 mm (8 gage) in thickness with a section modulus of at least 16 cubic inches per linear foot, and conform to ASTM A 857/A 857M, Grade 36 minimum, or ASTM A 3281A 328M. S. Modification to Section 02857/1.02, Pre fabricated Superstructure. Qualified Suppliers and Section 02852/7.02. Pre -fabricated Superstructure, Quality Certification. All proposed suppliers shall have current AISC Simple Steel Bridge or Major Steel Bridge certification. Suppliers without AISC Major Steel Bridge certification must provide documentation of at least five (6) successful bridge projects using 150-foot or greater spans in addition to those requirements described in Paragraphs 1.02D and 1.02E. Add nrlt,m #4 Page 1 of') __ 215 North mason Street • 2nd Floor • P.O. Box 380 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 NOV-06-03 THU'03 0 PM CITY/FT COLLINS, PURCHAS FAX N0, 970 2216707 P. 02/03 6. Bid Item No. 38 has been added to the revised bid schedule attached as follows. This item was inadvertently missing from the original bid schedule. Information for this item is represented an the plans and the definition of bid item is as follows: Bid Item, No 38 — Pedestrian Crossing Measurement. Measurement shall be as a single lump sum item. Payment. Payment will be at the lump sum price and shall Include crosswalk striping, pedestrian crossing signs with flashing lights, providing metered electric service to the signs from existing overhead electric lines, buried service conduit, purchase, installation, transportation, location and protection of utilities, and all materials, equipment, and personnel necessary for a complete installation as indicated in the Drawings. 7: Pre qualified Suppliers: The following is a complete list of the current prequalified bridge manufacturer as approved by the Owner. Continental Bridge 8301 State Highway 29 North Alexandria, Minnesota 56308 (800)328-2047 BIG R Manufacturing P.O. Box 1290 Greeley, Colorado 80632-1290 (800)234-0734 Acrow Corporation P.O. Box 812 Carlstadt, New Jersey (201) 933-0450 Wheeler Consolidated 9330 James Avenue South Bloomington, MN 55431 (800)328-3986 ATTACHMENTS Revised Bid Schedule —Addendum 4 U.S Pridge (Ohio Bridge) 201 Wheeling Avenue Cambridge, Ohio 43725 (888) USBRIDGE Steadfast Brldt es 119 40 Street N.E. Fort Wayne, Alabama 35967 (600) 749-7515 EXCEL Bridge Manufacturing Co. 12001 Shoemaker Avenue Sante Fe Springs, California 90670 (800) 548-0054 If you should have any questions, please contact Jason Stutzman, P.E., Project Manager at (970) 221-6386, John Stephen, CPPO, Senior Buyer at (970) 221-6777 or Chris Carlson, P-E., C.F.M., Consultant Engineer at (970) 223-5556. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BYA WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STA77NG THAT THIS ADDENDUM HAS BEEN RECEIVED. Addendum *4 Page 2 of 2 RECE'VE® OCT y g `20 SECTION 00416 BID BOND KNOW ALL MEN By THESE PRESENTS: that we, the undersigned TRATNOR CONSTRUCTION CO. as Principal, and _ST PAiiT FTRF A m RINE r�, •-R•--� Surety, are hereby held and firmly bouna unto the Cit of Fqrt Collins,�=Coloradvs as OWNER, in the .sum of $ Five Percent (5t)*.for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. *of Total Asoun.t of Bid THE CONDITION of this obligation is such that whereas the Principal has submitted to the' City of Fort Collins, Colorado the accompanying Bid and hereby made.a.part hereof to enter into'a Construction Agreement for the construction of. Fort Collins' Project, PEDESTRIAN BRIDGE AND BIKE TRAIL EXTENSION AT OVERI;AND TRAIL ROAD AND THE CACHE LA POUDRE RIVER; Bid No. 5821. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid -shall be accepted and the Principal shall executeanddeliver a Contract 'in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in Connection therewith, and shall in all other Xespects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein, stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety' and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any eudh extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and fie accepted by the OWNER. 7/96 Section 00410 Page. 02 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands.' and seals this 6th day of N vemb , 201a, and such of them as axe corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, -the day and year first set forth'. above. PRINCIM Name: TRAINOR CONSTRUCTION CO. Address: 15000 W. 44th Ave. #B Gold . CO 80 3 By; Title; ATTEST.- By:1 (SEAL) SMETT 'ST: PATTT FIRE ANT) MARINE TTSuR ALtG9-49NPANY 200Q So. Colorado Blvd #2-480 Denvet, CO 80222 sy L � Ve Title: __ata T. •Kall�a torney- n-Fact (SEAL) MOODY INSURANCE AGENCY, INC. 3773 CHERRY CREEK NORTH DRIVE, SUITE 800 DENVER, COLORADO 80209-3804 PHONE: (303) 824-6600 7/96 Section 00410 Page 03 meStPaul POWER OF ATTORNEY Power of Attorney No. Seaboard Surety Company St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company St. Paul Mercury Insurance Company 23406 United States Fidelity and Guaranty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Certificate No. 1929674 KNOW ALL MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York, and that St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, and that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, and that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Jody Anderson, Evan E. Moody, Brad Moody, Vera T. Kalba and Kimberly D. Johnson of the City of Denver , State Colorado , their true and lawful Attomey(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety to, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakity 44dired or p�i`rrtttted�i�y actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this inswm-W iiyttnbe,ssi {t-andysis 9th day of July 2002 Seaboard Surety CompanypUntted States Fidelity and Guaranty Company St. Paul Fire and Marine tie Coraary ` " Fidelity and Guaranty Insurance Company St. Paul Guardian Insuranc 41 y .. Fidelity and Guaranty Insurance Underwriters, Inc. St. Paul Mercury. .. 6rC,. 41nFIY F11164 O`,M Iyy.L9\ JD<,8y'n 7!927 s EAL o^ i sBiL '� # a OPf.EN �'S„uc< f. ANC P State of Maryland City of Baltimore t .k. - % J1951 PETER W. CARMAN, Vice President THOMAS E. HUIBREGTSE, Assistant Secretary On this 9th day of July , 2002 , before me, the undersigned officer, personally appeared Peter W. Carman and Thomas E. Huibregtse, who acknowledged themselves to be the Vice President and Assistant Secretary, respectively, of Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, United States Fidelity and Guaranty Company, Fidelity and Guaranty Insurance Company, and Fidelity and Guaranty Insurance Underwriters, Inc.; and that the seals affixed to the foregoing instrument are the corporate seals of said Companies; and that they, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing the names of the corporations by themselves as duly authorized officers. In Witness Whereof, I hereunto set my hand and official seal. My Commission expires the 1st day of July, 2006. REBECCA EASLEY-ONOKALA, Notary Public 86203 Rev. 7-2002 Printed in U.S.A. CM•�u' ���e{� St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company aid 1 St. Paul Guardian Insurance Company Fidelity and Guaranty Insurance Company St. Paul Mercury Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Seaboard Surety Company St. Paul Medical Liability Insurance Company Bond No. Bid 11/6/03 RIDER CONTAINING DISCLOSURE NOTICE OF TERRORISM COVERAGE This disclosure notice is required by the Terrorism Risk Insurance Act of 2002 (the "Act"). No action is required on your part. This Disclosure Notice is incorporated in and a part of the attached bond, and is effective the date of the bond. You should know that, effective November 26, 2002, any losses covered by the attached bond that are caused by certified acts of terrorism would be partially reimbursed by the United States under a formula established by the Act. Under this formula, the United States reimburses 90% of covered terrorism losses exceeding the statutorily established deductible paid by the insurance company providing the coverage. Under the Act, there is a cap on our liability to pay for covered terrorism losses if the aggregate amount of insured losses under the Act exceeds $100,000,000,000 during the applicable period for all insureds and all insurers combined. In that case, we will not be liable for the payment of any amount which exceeds that aggregate amount of $100,000, 000, 000. The portion of your premium that is attributable to coverage for acts of terrorism is 0.00. IMPORTANT NOTE: THE COST OF TERRORISM COVERAGE IS SUBJECT TO CHANGE ON ANY BONDS THAT PREMIUM IS CHARGED ANNUALLY. TOTAL OF BASE BID S 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price. RESPECT SUBMITTrED. Trainor Construction CO lye Signature Date vice President Title N/A License Number (If Applicable) (Seal - if Bid is by corporation) Attest: Address 15000 W 44th Ave #B Telephone Golden, CO 80403 (303) 273-9382 7/96 Section 00300 Page 4 Evidence of Construction in Colorado PROJECT: CHERRY CREEK DROPS 22 AND 23 & TRAIL/BRIDGE IMPROVEMENTS OWNER: URBAN DRAINAGE AND FLOOD CONTROL DISTRICT DESCRIPTION: CONSTRUCTION OF TWO GROUTED BOULDER DROP STRUCTURES AND STREM IMPROVEMENTS. NEW PEDESTRIAN BRIDGES AND CONCRETE PATH. CONTRACT AMOUNT: $0.7 MILLION DURATION: 2002 PROJECT: PINEHURST TRIBUTARY OWNER: URBAN DRAINAGE AND FLOOD CONTROL DISTRICT DESCRIPTION: FLOOD CONTROL, CONCRETE DROP STRUCTURES CONTRACT AMOUNT: $0.7 MILLION DURATION: 2002 PROJE : LAKEWOOD GULCH - LAKEWOOD, CO OWNER: DENVER WASTEWATER MANAGEMENT DESCRIPTION: 50 X 50 CLEAR SPAN BRIDGE WITH RETAINING WALLS, CHANNEL IMPROVEMENTS AND PEDESTRIAN SIDEWALK IMPROVEMENTS CONTRACT AMOUNT: $0.7 MILLION DURATION: 1999 TRAINOR CONSTRUCTION CO. 15000 W. 44th Aye. #B GOLDEN, CO 80403 (303) 273-9382 9/11103 COMPLETE LIST OF PROJECTS IN PROGRESS TRAINOR TRAINOR GENERAL CONTRACT PERCENT REMAINING NAME OF PROJECT OWNER ENGINEER CONTRACTOR AMOUNT COMPLETE AMOUNT TREX CDOT SOUTHEAST CORRIDOR CON. SECC $ 1,343,787 55% $ 604,704 2001 EMERGENCY SANITARY DENVER WASTEWATER DENVER WASTEWATER TRAINOR $ 250,000 45% $ 136,856 NORTH DENVER SANITARY SEWER PH III-B DENVER WASTEWATER DENVER WASTEWATER TRAINOR $ 1,081,654 80% $ 216,331 TAFT HILL BRIDGE FT COLLINS FT COLLINS TRAINOR $ 283,614 0% $ 283,614 CENTER & YORK SANITARY DENVER WASTEWATER DENVER WASTEWATER TRAINOR $ 968.766 65% $ 339,068 2002 GENERAL STORM DENVER WASTEWATER DENVER WASTEWATER TRAINOR $ 716,305 50% $ 358,153 BURLINGTON PARALLEL PIPELINE THORNTON BLACK & VEATCH TRAINOR $ 640,570 95% $ 32,029 ERIE WATER RECLAMATION ERIE HDR TRAINOR $ 630,117 40% $ 378,070 HUTCHISON PARK URBAN DRAINAGE SELLARDS & GRIGG TRAINOR $ 813,293 50% $ 406,647 ECCV WESTERN WELL FIELD CONNECTION E CHERRY CREEK VALLEY CDM BRB $ 102,055 80% $ 20,411 W BELLEVIEW WIDENING JEFFCO MULLER BRANNAN $ 547.997 50% $ 273,999 THORNTON 2003 WATER & SEWER THORNTON THORNTON TRAINOR $ 218,871 0% $ 218,871 LAFAYETTE N TRUNK FORCE MAIN LAFAYETTE McLAUGHLIN TRAINOR $ 266,671 0% $ 266,671 LAFAYETTE BASELINE ROAD WIDENING LAFAYETTE CLC BRANNAN $ 18,627 0% $ 18.627 $ 7,882.327 $ 3,554,049 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 12. List your major equipment available for this contract. Sea Attanhg-d 13. Experience in construction Work similar in importance to this project: R Attached 14. Background and experience of the principal members of your organization, including officers: See Attached 15. Credit available: S f /�•,��ieJ 16. Bank reference:Wells Fargo, 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General CONTRACTOR? Yes If yes, in what city, county and state? Denyer,Denyer, Colorado what class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract?yes If yes, what percent of total contract? 8 %p *" _ and to whom? A,.1 /�i�a Sls.�i.L• 4("roue,!/, oroUt ye!1,4Pf,ro. ,. , • /40ac 20. Are any lawsuits pending against you or your firm at this time? No If DETAIL yes, 7/96 Section 00420 Page 2 TRAINOR CONSTRUCTION CO 15000 W. 44th Ave. #B GOLDEN, CO 80403 (303)273-9382 QUALIFICATION LIST OF PROJECTS COMPLETED IN THE LAST 5 YEARS TRAINOR TRAINOR GENERAL CONTRACT DATE NAME OF PROJECT OWNER ARCHITECT CONTRACTOR AMOUNT COMPLETED 1998 4TH & RACE STORM SEWER DENVER WASTEWATER DENVER WASTEWATER TRAINOR $ 233,901 9/1/98 1995 DENVER WASTEWATER SANITARY DENVER WASTEWATER DENVER WASTEWATER TRAINOR $ 531,125 6/30198 FLORIDA AVE BIKEPATH CITY OF DENVER CITY OF DENVER TRAINOR $ 359.000 7/15/98 N 11TH STORM SEWER BRIGHTON BRIGHTON TRAINOR $ 695,323 11/30/98 128TH & ZUNI TUNNEL BROOMFIELD BROOMFIELD TRAINOR $ 95,563 11/30/98 HIGHLANDS RANCH BORES HIGHLANDS RANCH RMC TRAINOR $ 144,971 10/31/98 IDAHO SPRINGS BIKEWAY IDAHO SPGS IDAHO SPGS TRAINOR $ 283,193 9/30/98 FRUITDALE SANITATION FRUITDALE SANITATION LANE TRAINOR $ 298,497 7/31/98 BROADWAY VIADUCT TUNNEL COOT COOT PCL $ 38.000 2/15/98 SANTA FE & BELLEVIEW BORE COOT COOT CONCRETE WORKS $ 42,000 2/15/98 SKYLINE VISTA PARK WESTMINSTER HENKELS & MCCOY URBAN FARMER $ 46,928 2/28/98 TAFf HILL UNDERPASS FT COLLINS RMC , TRAINOR $ 280,710 6/3MB E-470 TUNNEL E-470 AUTHORITY MK CENTENNIAL AMES $ 54,350 3/31/98 1-25 & 58TH AVE. BORES COOT COOT HAMON $ 56,680 5/30/98 BIG DRY CREEK SANITARY RELOCATE METRO WASTEWATER MUERER TRAINOR $ 72,110 5/30/98 YALE AVE BIKEPATH AURORA AURORA TRAINOR $ 149,000 6/30/98 UINTAH STREET BORE COLD SPGS BLACK & VEATCH SUN $ 31,900 6/30/98 ARVADA WATER BORES ARVADA ARVADA WYCON $ 57,200 7/10198 WALMART 42" TUNNEL WALMART PATE $ 50,000 6/30198 1997 4TH & MONACO SANITARY SEWER DENVER WASTEWATER DENVER WASTEWATER TRAINOR $270,400 8131/97 29 ROAD & 1-70 BUSINESS LOOP SANITARY CENTRAL GRAND VALLEY WASTWATER TRAINOR $ 78,000 12/15/97 CLEAR CREEK SANITATION BORE CLEAR CREEK SANITATION LANE TRAINOR $ 61,000 12/31/97 11TH & 12TH AVE. SEWER INTERCEPTORS CITY OF LAKEWOOD LAKEWOOD TRAINOR $1,022,000 10/31/97 SOUTHWEST WATER PROJECT CONTRACT 5 CITY OF COLORADO SPGS BROWN & CALDWELL TIERDAEL $ 557,000 9115197 38TH & FOX COOT COOT KRAEMER $ 589,406 8/31/97 COLORADO SPRINGS ELECTRIC BORES COLO SPRGS ELECTRIC POWER ENGINEERS TEMPEST $ 155,590 9/30/97 RTD LIGHT RAIL UTILITIES SW CORRIDOR PH 2 RTD RTD TRAINOR $658,000 8/31/97 ELK LAKE SANITARY EXTENSION CITY OF GREELEY PICKETT TRAINOR $220,915 8/26/97 PARK CENTRE UTILITIES PARK CENTRE LTD. YORK TRAINOR $107,000 9112/97 PAR 649 ACCESS BRIDGE REHABILITATION METRO WASTEWATER METRO WASTEWATER TRAINOR $121,5W 12/15/96 TOLLGATE SANITARY SEWER REPAIR CITY OF AURORA AURORA TRAINOR $53,000 12/1/96 DAHLIA PIT INTERCONNECT CITY OF THORNTON DREXEL BARRELL TRAINOR $580,000 4/15/97 CLEAR CREEK SANITATION EXTENSION CLEAR CREEK SANITATION LANE TRAINOR $368,786 3131/97 CHANSON PLAZA LIFT STATION GRANT WATER/SANITATION TRAINOR $208,800 4/15/97 REPUBLIC PARK LIFT STATION CASTLEWOOD SANITATION TRANSYSTEMS TRAINOR $149,652 4/30197 CADDOA BASIN STORM SEWER CITY OF LOVELAND RBD TRAINOR $430.696 5/31/97 RTD LIGHT RAIL UTILITIES SW CORRIDOR PH 1 RTD RTD TRAINOR $270,106 5131/97 FOSSIL CREEK TRAIL CITY OF FT. COLLINS FT. COLLINS TRAINOR $167,007 4/3W7 HARMONY TRANSMISSION PHASE IV CITY OF FT. COLLINS RMC ERS $121,767 4/15/97 INVERNESS FILING 22 OUTFALL STORM SEWER INVERNESS WATER & SAN MULHERN MIRE TRAINOR $150,259 5/18/97 CANYON VIEW BUSINESS PARK II"1l[oj:vBL[K*73:I 1:10 AtHaiPJ9 TRAINOR $ 447,941 2000 YALE & DAHLIA SANITARY 3RD & PLATTE SANITARY RED SEAL SANITARY 27TH AVE & HUMBOLT ST. PUEBLO RAW WATER 86" TUNNEL JEWELL INTERCEPTOR FLORIDA AVE. SANITARY SEWER KILGORE N SUBDIVISION AURORA RAMPART 54" WL DIRECT TV WEST SIDE TRIBUTARY ARVADA SEWER MAIN NORTH TABLE MTN SEWER S WADSWORTH SIDEWALK SANDERSON GULCH BORES LOTH & JOHNSON CANTERBERRY CROSSING COLLEGE PARK SANITARY SEWER 2000 SANITARY SEWER REPLACEMENT PERFORMING ARTS SCULPTURE PARK POWERHOUSE PLAZA BERKELEY 2000 WATER & SEWER IMPROV JORDAN RD. SEWER MODIFICATIONS W. 56TH AVE. BRIDGE 1999 LAKEWOOD GULCH 7TH & DOWNING STORM SEWER SWANSEA STORM SEWER 1ST & BRYANT STORM SEWER 20TH & MEADE STORM SEWER 1998 SANITARY SEWER IMPROVEMENTS WESTWOOD SUBDIVISION W T-BONE SUBDIVISION UTILITIES ROGERS ROAD TUNNEL 88TH STREET SANITARY LOWRY BUSINESS CEN I ER TRUNK UTILITIES AIRPORT BOOSTER PUMP STATION PLATTE CANYON RES. RIVER OUTLET ROLLING HILLS CLUBHOUSE SOUTHBRIDGE 1-25 & 58TH BORES CONDUIT 133 COMMUNITY DITCH 44TH INDUSTRIAL PARK TUNNEL PUEBLO WEST BORE SANTA FE & BELLEVIEW TUNNEL DECATUR STREET SANITARY 10TH & MAIN SANITARY URBAN FARMER STORM MORGAN PIPELINE BORES 1-70 & WASHINGTON TUNNEL 44TH & TABOR SANITARY GREAT LAWN DRAINAGE KINNEY RUN BORE CONDUIT 55 WESTFIELD UTILITIES MILLER & RIDGE SANITARY DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER PUEBLO BOARD OF WTRWRK METRO WASTWATER CITY OF AURORA KILGORE CITY OF AURORA HUGHES COMMUNICATIONS URBAN DRAINAGE ARVADA N TABLE W&S LAKEWOOD METRO WASTEWATER GOLDEN CANTERBERRY COLLEGE PARK W & S LITTLETON DENVER TRANSPORTATION DIV LRA BERKELEY COTTONWOOD W & S CITY OF ARVADA DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER WINDSOR GREELEY LONGMONT SUPERIOR LOWRY REDEVELOPMENT BROOMFIELD DENVER WATER ROLLING HILLS CC SOUTHBRIDGE CDOT DENVER WATER BROADLANDS METRO 44TH INDUSTRIAL PUEBLO WEST CDOT FEDERAL HGHTS BROOMFIELD URBAN FARMER N COLO WATER CDOT FRUITDALE LOWRY REDEVELOPMENT GOLDEN DENVER WATER LOWRY REDEVELOPMENT CLEAR CREEK DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER BLACK & VEATECH CH2M HILL CITY OF AURORA BCA GROUP CITY OF AURORA ANDERSON & HASTINGS ICON ENGINEERING ARVADA N TABLE W&S LAKEWOOD HDR TST EVO LANE ENGINEERING LITTLETON CITY & COUNTY OF DENVER LRA MARTIN/MARTIN MULHERN MRE MULLER DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER NORTHERN ENGINEERING NORTH STAR SEAR -BROWN McLAUGHLIN BRW HDR DENVER WATER JOHN WILLIAMS CDOT DENVER WATER HURST CLYDE YOUNG CDOT FEDERAL HGHTS BROOMFIELD MONTGOMERY WATSON CDOT LANE BRW TST DENVER WATER BRW LANE TRAINOR $ 523.729 6/30/00 TRAINOR $1,407,424 6/30/00 TRAINOR $ 840,260 11/15/00 TRAINOR $ 278,419 12/1/00 PATE $ 329,250 1/15/01 BTC $ 579,565 2115/01 TRAINOR $ 151,868 1/31/01 KIP CO $ 153,288 12/31/00 TRAINOR $ 204,200 2/12/01 HYDER $ 380.000 1/31/01 TRAINOR $ 227,991 1/1/01 TRAINOR $ 880.747 3131/00 TRAINOR $ 548,000 4/14/00 TRAINOR $ 199,256 4/12/00 TIERDAEL $ 465,601 5/31100 KIPCO $ 204,000 6/31/00 TRAINOR $ 512,473 6/15100 TRAINOR $ 118,647 9/20/00 TRAINOR $ 168.424 9130/00 TRAINOR $ 271,785 12/l/00 TRAINOR $ 262,586 10/31/00 TRAINOR $ 238,494 11/31/00 TRAINOR $ 540,306 1215/00 CENTRIC-JONE; $ 201,671 12/1/00 TRAINOR $ 867,491 10/1199 TRAINOR $ 183,304 8/31199 TRAINOR $ 207,667 811199 TRAINOR $ 389,355 6/30/99 TRAINOR $ 666,897 8/1/99 TRAINOR $ 132,453 8/1/99 TRAINOR $ 66,403 12/15/99 TRAINOR $ 398,111 11/30/99 E-Z $ 56,840 8/31/99 TRAINOR $ 134,926 9130/99 TRAINOR $3,063,050 1/31/99 TRAINOR $ 882,408 4/30199 TRAINOR $ 206,860 4/30/99 TRAINOR $ 106,450 3/31/99 KIPCO $ 48,647 4/30/99 HAMON $ 81,505 2/28199 TRAINOR $ 178.419 2/28/99 TRAINOR $ 414,349 6/30/99 T LOWELL $ 25,020 4/30/99 PATE $ 71,893 5/31/99 CONC WORKS $ 77,543 6/30/99 TRAINOR $ 67,075 6/30/99 TRAINOR $ 228,034 6/15/99 TRAINOR $ 47,679 6/15/99 BRB $ 272,201 7/31/99 KRAEMER $ 56,898 7/15/99 TRAINOR $ 89,094 6/30199 TRAINOR $ 450.000 7/31/99 SCHEMEUSER $ 78,903 8/13/99 TIC $ 50,525 7/15199 TRAINOR $ 344,846 8/1/99 TRAINOR $ 114,286 8/20/99 QUALIFICATION LIST OF PROJECTS COMPLETED IN THE LAST 3 YEARS NAME OF PROJECT OWNER 2003 NORTH DENVER SANITARY SEWER PH Ill -A DUDLEY SEWER MAIN 51STNORK SANITARY LOWRY POWERHOUSE PLAZA 1 ST/STUART SAN & 2NDAIVOLFF STORM SWANSEA STORM COLORADO ACADEMY WATERLINE SEDALIA GRILL WATERLINE BROOMFIELD REUSE WATER - JEFFCO AIRPORT 2002 NORTH GOLDEN WATERLINE PINEHURST TRIBUTARY VILLAGE @ 5 PARKS WALKER LIFT STATION AURORA ENCASEMENTS CENTENNIAL GARDENS CHERRY CREEK DROPS PARKHILL STORM SEWER TUNNEL PALMER DIVIDE RD AURORA SANITARY 2000 W. 64TH WATERLINE BORE HUNT ST. WELL HOUSE PINERY 16" WATERLINE 2ND/STEELE STORM SEWER EAST SIDE INTERCEPTOR VIRGINIA VILLAGE PHASE III TRAILMARK BRIDGE HIGHLINE CANAL 2001 PROSPECT PARK VIRGINIA VILLAGE 2000 GEN. STORM SEWER IMPROV. 1-225 & HAMPDEN TUNNELS LOWRY BLDG 401 & 402 STORM/SANITARY CONDUIT 133 BAYAUD PARK ROCKY MTN. DITCH STORM SEWER 38TH & PERRY STORM SEWER 1 ST/BRYANT - YALE TO ST. PAUL CSU MASTER DRAINAGE COLOROW PUMP STATION ARVADA 2000 SEWER REPLACEMENT MONTCLAIR ACADAMY 1.25 & COLFAX 1-225 & PARKER RANGEVIEW SANITARY BROOMFIELD BOOSTER PUMP C/O JOHNSTOWN SEWER BORES BRIGHTON WATERLINE BORES TRAINOR CONSTRUCTION CO. 15000 W. 441h Ave. #B GOLDEN, CO 80403 (303)273-9382 DENVER WASTEWATER ARVADA DENVER WASTEWATER LOWRY DENVER WASTEWATER DENVER WASTEWATER COLORADO ACADEMY SEDALIA W&S BROOMFIELD GOLDEN URBAN DRAINAGE VILLAGE HOMES WALKER MANUFACTURING AURORA DENVER BOTANIC GARDENS URBAN DRAINAGE DENVER WASTEWATER DOUGLAS COUNTY AURORA CITY OF ARVADA SEDALIA W&S PINERY W&S DENVER WASTEWATER WINDSOR DENVER WASTEWATER TRAILMARK METRO HIGHLANDS RANCH DENVER WASTWATER DENVER WASTEWATER DENVER WASTEWATER CDOT LRA DENVER WATER LRA DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER CSU WILLOWBROOK W & S DIST CITY OF ARVADA LRA COOT COOT LITTLETON BROOMFIELD JOHNSTOWN BRIGHTON TRAINOR TRAINOR GENERAL CONTRACT DATE ENGINEER CONTRACTOR AMOUNT COMPLETED DENVER WASTEWATER TRAINOR $4.319,462 1131/03 ARVADA TRAINOR $ 926,049 6130/03 DENVER WASTEWATER TRAINOR $ 529,213 1131/03 BRW TRAINOR $1.823,007 6/30/03 DENVER WASTEWATER TRAINOR $1.325,066 8/31/03 DENVER WASTEWATER TRAINOR $ 261,604 8/31/03 MTN DESIGN FRANSON $ 93,882 8/15/03 MUERER TRAINOR $ 39,656 8/15/03 RMC TRAINOR $1,745,938 7131/03 McLAUGHLIN KIOWA MUERER HEFTA AURORA CIVITAS ICON DENVER WASTEWATER FE LS BU R G/HOLT/U LL EVIG AURORA SEAR -BROWN MUERER MERRICK DENVER WASTEWATER ROTHBERG,TAMBURINI DENVER WASTEWATER NORRIS DULLEA FELSBURG/HOLT/U LLEVIG DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER CDOT BRW DENVER WATER BRW DENVER WASTEWATER DENVER WASTEWATER DENVER WASTEWATER CSU MEURER CITY OF ARVADA ERG CDOT COOT LITTLETON BROOMFIELD TST CARTER/BURGESS TRAINOR TRAINOR TRAINOR TRAINOR TRAINOR JC BROOKS TRAINOR NEW DESIGN WINSLOW TRAINOR RIGOR TRAINOR TRAINOR TRAINOR SCOTT TRAINOR TRAINOR TRAINOR TRAINOR TRAINOR TRAINOR SEMA TRAINOR TRAINOR TRAINOR TRAINOR TRAINOR TRAINOR TARCO TRAINOR TRAINOR TRAINOR CENTRIC SEMA TRAINOR TRAINOR HALL-IR WIN SCHEUMSER 35,184 738,613 386,178 215,000 62,646 100,110 834,417 95,058 175,043 222,641 25,025 171,978 65,400 936,122 83,540 777,643 91,642 126.289 $ 72,700 $1.513,054 $ 469.993 $ 117,132 $ 105,539 $ 188,571 $ 218,356 $ 209,857 $ 101,259 $ 412.253 $ 132.216 $1,338.084 $ 176,585 $ 66,654 $ 120.396 $ 54,468 $ 154,505 $ 20,000 $ 107,075 $ 64,560 11/30/02 10/31/02 11/30/02 10/l/02 9/30/02 6/30102 7/31/02 6/30/02 7/31 /02 3131 /02 1/11102 1/15/02 1/4/02 4/15/02 1/15/02 4/19/02 3/1/02 4/12/02 3/31 /01 7/31 /01 8/31 /01 12/31/01 11/30/01 8131 /01 11/30/01 9/30101 10/31/01 11/30/01 9130101 12/15/01 2/28/01 4/30/01 4/30/01 3131 /01 4130/01 4/15/01 5/18/01