Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5821 PEDESTRIAN BRIDGE AND BIKE (2)SECTION 00300 BID FORM PROJECT: PEDESTRIAN BRIDGE AND BIKE TRAIL EXTENSION AT OVERLAND TRAIL ROAD AND THE CACHE LA POUDRE RIVER; Bid No. 5821 Place Z15 //�O, MrI. (O(uKj Date �()V, CD ;?CO3 1. In compliance with your Invitation to Bid dated no-T, 6. and subject to all conditions thereof, the undersigned 7UGKE►$ CD05T20CJ160 10C, a **(Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of TnyE AEC,5mT' of TJ+E BID ($ in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: 1TY A n 1e9Ex,1T r-AnkiDL\l\V ^C Mrs 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7/96 Section 00300 Page 1 Duckels Construction, Inc. 3500 Duckels Court Steamboat Springs, Colorado 80487 (970) 879-6072 FAX (970) 879-6748 11/13/2003 U.S. 40 Improvements and Town of Winter Park Streetscape Project No. SP 0403-028 Owner: Town of Winter Park Charles G. Swanson P.E. Town Engineer 970-726-8081 Project Acceptance 11-10-1999 This project consisted of reconstructing and widening US 40 through the Town of Winter Park, pouring new curbs and gutters, sidewalks, and colored and stamped concrete. Installing a new storm drain system, and constructing two prefabricated steel bridges over the Fraser River. Construction Contract: 2,426,991.00 Superintendent Office Manager Project Manager Dan Wellman Cheryl Driggers Joe Backurz \ tea'_..f::�\:Lf..v.��M:.'ti�Nin.::�1.1..�. �- �:V�\.. _�..Y..-V\.'�.��: .. a v'ieI_N.l...� f.�..�T.� V'.`�:l "..::V�.�1�rt`1"1.l:�tl.T-.Tl\-✓iJ'�TJt.4F4tii\l—�•••�-- _.�IWv��1i0�r 63� February 16, 2000 Mr. Joe Backurz Duckels Construction, Inc. 3500 Duckels Court Steamboat Springs, CO 80487 Dear Joe: i ) ! Z WinterPark Re: US 40 Improvements - Project Acceptance Letter This letter is to confirm that on November 10, 1999, the Town of Winter gave final acceptance to the US 40 Improvement Project No. SP 0403-028. The acceptance was issued at the completion of all the specified work including the completion of the punchlist items. The project was advertised forfinal payment on December 1 and 8, 1999, and final payment made on December 20, 1999. I have enjoyed working with you and your staff and thank you for your efforts in providing the Town with a valuable and attractive asset. Please feel free to call me at (970) 726-8081 if you have any questions. M rles G. Swanson, P.E. Town Engineer cc: Glenn Violette, CDOT Region 3 P.O. Box 3327 • Winter Park, Colorado 80482 • (970) 726-8081 • Denver Line/Fax 442-8861 Duckels Construction, Inc. mbgt�611 3500 Duckels Court Steamboat Springs, Colorado 80487 (970) 879-6072 FAX (970) 879-6748 11/13/2003 West Vail Interchange Roundabouts Construction Town of Vail Colorado Owner: Town of Vail Colorado Project Eng: Joe Kracum P.E. 970-928-8599 Project acceptance in spring of 1999. Project consisted of two roundabouts on either side of 1-70, reconstruction on the underside of the east and west overpasses, constructing a vehicle and pedestrian bridges over the Eagle River. Rock Faced retaining walls were constructed along the on and off ramps of 1-70, extensive stream bank and bike path construction on the Eagle River and relocating a 36 inch water main and a 48 inch storm drain. Construction Contract: 5,434,540.00 The project entailed many erosion control issues as well as traffic control Head Superintendent: Todd Mac Farlane Structure Spperintendent: Dan Wellman Road Superintendent: Debbie Duckels Pipe Superintendent: Mel Ruybal MK CENTENNIAL CENTENNIAL ENGINEERING. INC. June 9, 1998 Duckel's Construction Inc. Todd MacFarlane 41230 RCR 129 Steamboat Springs, CO 80487 402 SEVENTH ST., ATRIUM STE. 111 P.O. DRAWER 309 TEL: 970-926-8599 GLENWOOD SPRINGS, CO 81602 FAX: 970-928-8526 Re: West Vail Interchange Roundabouts Construction 1111mom . ,1 i I would like to personally thank you for your diligent efforts as Superintendent on the construction of the West Vail Roundabouts. As you know MK Centennial performed the feasibility study, design, and the construction management of this complex, multi -disciplinary project. We knew the project was going to be a tough one to construct with the high traffic and business impacts the project would impose in this resort. Through your efforts, the project was completed in a very professional manner. The organization of your work crews made the area function well during construction, as well as keep the project on track. The impacts to the businesses were minimized by your foresight in planning the construction. And your interaction with the public, businesses, and client contributed to the overall success of the project. And even through the toughest moments, you handled the work very professionally. Working with you was a pleasure, and I hope to have that opportunity again. Sincerely, Joe Kracum, P.E. Office Manager, Glenwood Springs A MORRISON KNUDSEN COMPANY Duckels Construction, Inc. 1MV1661 3500 Duckels Court Steamboat Springs, Colorado 80487 (970) 879-6072 FAX (970) 879-6748 11/13/2003 Design build contract for three cart path bridges at the Catamount Ranch and Club golf course in Steamboat Springs. Owner: Cordillera Project Development: Charlie Davis 970-926-3500 Wadsworth Golf Construction Company Scott Mc Dougal 623-853-9100 Project consisted of designing and constructing three cart bridges across Walton Creek of varying spans. Pre -fabricated bridges were supplied by Continental Bridge. Construction sites were environmentally sensitive. Construction Contract: 175,522.00 Superintendent: Phil Mott Project Manager: .Joe Backurz Duckels Construction, Inc. o 0 3500 Duckels Court Steamboat Springs, Colorado 80487 (970) 879-6072 FAX (970) 879-6748 11/13/2003 Yampa Core Trail Project STE M251-005 Owner: City of Steamboat Springs .Jim Weber -Public Works Director 970-879-2060 Project acceptance was November 2001. The project consisted of constructing 2,600 I.f. of pedestrian bike path, mechanically stabilized earth walls, dry stacked boulder walls, elevated the trail with wood superstructure, and 250 feet of wrought iron railing. Construction Contract: 817,223.00 Superintendent: Derick Duckels Project Manager: Doug Dibble Duckels Construction, Inc. 3500 Duckels Court Steamboat Springs, Colorado 80487 (970) 879-6072 FAX (970) 879-6748 11/13/2003 Fraser River Trail —Phase 5 Owner: Intrawest- Winter Park Operations Corp. Mountain Planning Director: Doug Laraby 970-726-1509 Construction of a concrete/asphalt bike path at the base of the Winter Park Ski Area. Consisting of MSE Wall construction, provisions for street lighting, and storm drainage system. Construction Contract: 220,650.00 Superintendent: Dan Wellman Project Manager: Joe Backurz LIST OF EQUIPMENT OWNED BY DUCKELS CONSTRUCTION, INC. Trucks Mack Water Truck (3600 Gal.) Power Spray Kenworth Water Truck (3600 Gal.) Mack Water with Tanker Trailer (7000 Gal.) Mack Dump Truck (10 c.y.) Mack Belly Dump Truck (20 c.y.) Transports Mack Transport 3 axle loading trailer (60 tons) Mack Transport 2 axle flatbed trailer Ford Flatbed Truck Welding Truck with Welder Lube Truck Mechanics Truck Cranes/Pile Driver Delmag D16-32 Diesel Pile Hammer Pile Hammer Data: Model: Delmag 016-32-Diesel Pile Hammer Type: Single Acting — Open End Piston Weight: Approximately 3,520 Pounds Speed: 36 — 52 blows per minute Maximum Stroke: 11.2 feet Pump Setting 1 — 18,890 ftJlbs. Pump Setting 2 — 22,420 ft./lbs. Pump Setting 3 — 28,320 ftJlbs. Pump Setting 4 — 39,335 ftJlbs. Blows per Minute Stroke (Feet) Energy (Ft./Lbs.) 52 5.33 13,762 51 5.50 19,360 50 5.75 20,240 49 6.00 21,120 43 6.25 .. 22,000 47 6.50 22,830 40 6.33 24,042 45 7.17 25,238 44 7.50 26,400 43 7.33 27,582 42 3.47 23,753 4. 3.53 30,202 40 9.00 31.530 �? 9.50 33.440 33 13.00 35.?r0 30 11.17 39,313 Page 2 of 3 Cranes/Pile Driver cont. Bucyrus -Erie Crane (45 ton) Bucyrus -Erie Crane (25 ton) Grove Hydraulic All Terrain Crane (15 ton) Crushing Equipment Kolberg Screening Plant Crushing Plant — 300 tons per hour for 1-112" Miscellaneous Compressor 15kw Diesel Generator -- Gorman-Rupp 6" Water Pump Pickup Trucks Scrapers Terex TS24 Scraper Cat 627 Scraper (2 each) Dozers Cat D-8K Dozer with Kelly Ripper Cat D-8H Dozer Cat 0-7G Dozer with Triple Shank Ripper Cat D-4 Dozer Cat 814 Rubber Tire Dozer with U-Blade Loaders Cat 9888 Loader Cat 988 Loader Cat 950 Loader (2 each) Cat 922 Loader Graders Cat 14G Motor Grader Cat 140G ?Rotor Grader Cat 12F ,Motor Grader (2 each) oackhoes Cat 235 3ackhoe Bucyrus 3ackhoe Cat 225 3ackhce ,Cmatsu PC 200 3ackhoe :at 2'S Sack hOe . -n Ceere 5' 0 3ackhoe Page 1 of ] Compactors Cat 815 Compactor Raygo Rascal Vibratory Sheepsfoot Roller Raygo Rascal Vibratory Smooth Drum Roller Wacker Walk Behind Sheepsfoot Roller Cat DW-21 Scraper Pulled Sheepsfoot Roller Arrow Hydrohammer 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. 2, through f �D UCKU,si lzu MvO I G CONTRACTOR BY: 8. BID SCHEDULE (Base Bid) 7/96 Section 00300 Page 2 FRED A. DUCKELS 3500 DUCKELS COURT STEAM80AT SPRINGS, CO 80487 (970)879-6072 EDUCATION Colorado State University Graduated June 1962 Majored in Industrial Construction Management WORK EXPERIENCE 1980 — Present President, General Manager, 100% ownership Duckels Construction, inc. 1962 — 1980 General Manager, Project Manager Estimator, part owner Duckels Construction, Inc. Personally responsible for the development of the construction aspect of Duckels Construction, Inc. REFERENCES Available upon request. References: Colorado Department of Transportation 270 Ranney Street Craig, CO 81625 (970) 824-5010 Contact: Van Pilaud, Project Engineer John Bouldin, Project Engineer Colorado Department of Transportation 16 East Arvada Colorado Springs, CO 80906 (719) 634-2323 Contact: Rick Shumpert, Project Engineer Civil Design Consultants P.O. Box 775167 Steamboat Springs, CO 80477 (970)879-3022 Contact: Steve Maloney, P.E. George Serencko, P.E. Randy Hurley, P.E. Doug Bradfield, P.E. D & D, Inc. P.O. Box 775008 Steamboat Springs, CO 80477 (970) 879-2715 Contact: Skidge Moon, L.S. City of Steamboat Springs P.O. Box 775088 Steamboat Springs, CO 80477 (970) 879-2060 Contact: Jim Weber, Manager City of Craig 300 W. 4"' St. Craig, CO 81625 (970) 824-6538 Contact: Jim Pankonin, Engineer Steamboat Springs Water P.O. Box 880339 Steamboat Springs. CO 8C488 i 970) 879-2424 Contact: Jae Zimmerman JOSEPH T. BACKURZ JR. 365 BLUE SAGE CIRCLE PO BOX 770718 STEAMBOAT SPRINGS, CO. 80477 (970) 879-0301 WORK EXPERIENCE FIRM DUCKELS CONSTRUCTION, INC. 3500 Duckels Court Steamboat Springs, CO. 80487 1984-PRESENT CONSTRUCTION MANAGER & ESTIMATOR Bid, plan and manage projects. FIRM UTICO REALITY & CONSTRUCTION CO.,INC. A design, build and property management company. Home Office: 15233 Ventura Blvd., Suite 710 Los Angeles, CA. 91403 Construction Headquarters: 5675 S. Tamarac Parkway, Suite 100 Denver, CO.80111 1978-1983 PROJECT SUPERVISOR -Bid, plan, schedule and manage one or more projects concurrently. Administrate contracts and assist in planning , design and budgeting of commercial building projects. 1974-1977 FIELD SUPERVISOR- Plan, schedule, and supervise construction of design build projects. TYPE OF PROJECTS CONSTRUCTED Banks Condominiums Office Buildings Shopping Centers Warehouses Department Stores Restaurants Roads & Utilities Supermarkets Custom Homes FIRM RONCARDI INDUSTRIES, INC. A building, concrete, materials and road division company. 1 776 South Main Street East Granby, CT. 06025 Joseph T. Backurz JR. Page 2 1972-1978 DIVISION MANAGER — Bid, plan, and schedule work for construction and estimating offices. Oversee material purchasing and distribution. 1969-1972 HEAD FIELD ENGINEER & COST ESTIMATOR — In charge Of field engineering, crews and estimating office. Schedule Work for field crews, Estimate and bid projects. 1965-1968 FIELD ENGINEER- In charge of field crews, layout of roads, buildings, utilities and various concrete structures. Cost estimating roads, utility and building projects. 1964-1965 ASSIST FIELD ENGINEER - Field layout of projects. EDUCATION 1962-1964 HARTFORD INSTITUTE OF TECHNOLOGY Hartford, Connecticut 1958-1962 SUFFIELD HIGH SCHOOL Suffield, Connecticut PERSONAL SUMMARY Age 59 born August 6, 1444. Married with two children, Excellent health. 5'9" tall, weight 165 lbs. Hobbies include skiing and golf. REFERENCES DOUG BRADFIELD PRINCIPAL CIVIL DESIGN CONSULTANTS ENGINEERS AND PLANNERS PO BOX 775167 405 SOUTH LINCOLN STEAMBOAT SPRINGS, CO. 80487 (970) 879-3022 JIM WEBER DIRECTOR OF PUBLIC WORKS CITY OF STEAMBOAT SPRINGS 137 10" STREET STEAMBOAT SPRINGS, CO. 80487 (970) 879-2060 Joseph T. Backurz JR. Page 3 LUKE STUDER PRINCIPAL STUDER LUKE CONSULTING STRUCTURAL ENGINEERS 117 12T" STREET STEAMBOAT SPRING, CO. 80487 (970) 879-1181 LYKKEN & KRAMER LYNN KRAMER PRINCIPAL 143 4T" STREET STEAMBOAT SPRINGS, CO. 80487 (970) 879-2018 CHARLIE DAVIS VICE-PRESIDENT CATAMOUNT RANCH AND CLUB CORDILLERA 2206 CORDILLERA WAY EDWARDS, CO. 81632 (970) 926-2445 KENT R. ROSE DIRECTOR OF CONSTRUCTION VAIL ASSOCIATES REAL ESTATE GROUP INC. EDWARDS, CO. 81632 (800) 332-3029 BOB STODDARD MANAGER/ENGINEER MOUNT WERNER WATER AND SANITATION DISTRICT PO BOX 880339 STEAMBOAT SPRINGS, CO. 80488 MARK MARCUS REGIONAL BUILDING OFFICE STEAMBOAT SPRINGS BUILDING DEPARTMENT PO BOX 779017 STEAMBOAT SPRINGS, CO. 80477 (970) 879-2702 DAVID RONCARDI RONCARDI INDUSTRIES, INC. 1776 SOUTH MAIN STREET EAST GRANBY, CT. 06026 Joseph T. Backurz JR. Page 4 RALPH W. KEWIT, JR. PRESIDENT/OWNER UNITCO REALITY & CONSTRUCTION CO.,INC. 15233 VENTURA BLVD. LOS ANGELES, CA. 91403 RONALD J. HOUSEMAN VICE PRESIDENT/OWNER UNITCO REALITY & CONSTRUCTION CO. 5675 S. TAMARAC PARKWAY SUITE 100 DENVER, CO. 80111 (303) 740-7463 SECTION 00510 NOTICE OF AWARD Date: December 2, 2003 TO: Duckels Construction, Inc. PROJECT: PEDESTRIAN BRIDGE AND BIKE TRAIL EXTENSION AT OVERLAND TRAIL ROAD AND THE CACHE LA POUDRE RIVER; Bid No. 5821 OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated October 8, 2003 for the above project has been considered. You are the apparent successful Bidder and have been awarded an Agreement for PEDESTRIAN BRIDGE AND BIKE TRAIL EXTENSION AT OVERLAND TRAIL ROAD AND THE CACHE LA POUDRE RIVER; Bid No. 5821. The Price of your Agreement is Eight Hundred Forty-nine Thousand Six Hundred Sixty-one Dollars and ninety cents ($849,661.90). Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is by December 17, 2003. 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must bear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully -signed counterpart of the Agreement with the Contract Documents attached. City of Fort Collins OWNER By: James B. O'Neill II, CPPO, FNIGP Director of Purchasing and Risk Management Title 9/12/01 Section 00510 Page 1 BID BOND APPROVED BY THE AMERICAN INSTITUTE OF ARCHITECTS A.I.A. DOCUMENT NO. A-310 (FEB. 1970 ED.) KNOW ALL MEN BY THESE PRESENTS, that we Duckels Construction, Inc. 3500 Duckels Court, Steamboat CO 80487 as Principal, hereinafter called the Principal, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation duly organized under the laws of the State of Maryland, as Surety, hereinafter called the Surety, are held and firmly bound unto City of Fort Collins as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Amount of Bid Dollars (5% of Bid) for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Pedestrian Bridge and Bike Trail NOW THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 3`d day of November A.D. 2003 fRIKS RtlMEGIiIM71(i 81010 iJiM ail PAMELA BENTLEY ATTORNEY -IN -FACT FIDELITY AND DEPOSIT COMPANY OF lv.[AkYLANTD EXTRACT FROM BY-LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND "Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice -President, or any of the Senior Vice -Presidents or Vice -Presidents specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident Vice -Presidents, Assistant Vice -Presidents and Attorneys -in -Fact as the business of the Company may require, or to authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of mortgages,... and to affix the seal of the Company thereto." EXTRACT FROM BY-LAWS OF COLONIAL AMERICAN CASUALTY AND SURETY COMPANY "Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice -President, or any of the Senior Vice -Presidents or Vice -Presidents specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident Vice -Presidents, Assistant Vice -Presidents and Attorneys -in -Fact as the business of the Company may require, or to authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of mortgages,... and to affix the seal of the Company thereto." CERTIFICATE I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that the Vice -President who executed the said Power of Attorney was one of the additional Vice -Presidents specially authorized by the Board of Directors to appoint any Attomey-in-Fact as provided in Article VI, Section 2, of the respective By -Laws of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the loth day of May, 1990 and of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed." IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this � day of ��. Assistant Secretary NuV-06-03 THU 03:45 PM CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P,03/03 BID n5321 BID SCHEDULE - ADDENDUM 4 Bid Item Description Estimated Quantity Unit Unit Price Cost 1 Mobilization and Demobilization 1 LS N `j r d0 ?5-0, 60 2 Water Control 1 LS 7 00.00 OQ, 1100 3 Traffic Control 1 LS z,j b0• DO A670 , AO 4 Surveying 1 LS ,M . 0 © 6000000 5 Clearing, Grubbing and Stripping 1 LS / 0DO ,00 ,etc . OD 6 Caisson 1, 6-Foot Dia. 25 LF 0, o0 Q ,00 7 Caisson 2, 6-Foot Dia. 25 LF , 00 , 00 8 Caisson 3, 4-Foot Dia. 25 LF 10JaLo /,Op 9 Caisson 4, 4-Foot Dia. 25 LF d4Q, 00 66M,00 10 Caisson 5. 4-Foot Dia 25 LF 11 Caisson 6, 4-Foot Dia. 25 LF 4D, O0 ,O(j 12 Caisson 7, 4-Foot Dia. 25 LF Od / , 00 13 Caisson 8, 4-Foot Dia. 25 LF , 0,00 14 Caisson 9, 4-Foot Dia. 25 LF I 4Lq r OC7 00 15 Pier No. 1 and Pier Cap 1 LS 63C00 00 00, 00 16 Pier No. 2 and Pier Cap 1 LS / R50,00 50,00 17 Pier No. 3 and Pier Cap 1 LS 5 3,80,00 380&C 18 Pier No. 4 and Pier Cap 1 LS 5©,Op3540e ©d 19 Pier No. 5 and Pier Cap 1 LS 00,00 50p,D0 20 Pier No. 6 and Pier Cap 1 LS j ,QO 21 Pier No. 7 and Pier Cap 1 LS Zzooe 00 ? ZQ>, cc 22 Pier No. 8 and Pier Cap 1 L.S ¢Lj"0,00 2 3 Pier No. 9 and Pier Cap 1 LS 350,00 lo�3SO,!�o 24 Abutment A (North Abutment) 1 LS 3,2 00, 00 3,G !00e 00 25 Abutment B (South Abutment) 1 LS , Op ' 4, 7,520, 00 26 Superstructure (154-Feet Span Prefabricated Bridge) 2 EA 00 /q goo _ 27 Superstructure (50-Feet Span Prefabricated Bride)) 7 EA a i / r/ A 2w�+t, 0 I / 'i/ ✓tl� _ 28 Superstructure (25-Feet Span Prefabricated Bride) 1 EA 1 29 Type H Riprap Bank Protection 153 SY , 30 Type VH Riprap Bank Protection 771 SY 0, 00 31 Colored Concrete Trail (6, 8% and 10' wide) 6621 SF 32 Colored Concrete Trail - Channel Trail Section 10' wide 2083 SF l2Qp ��, 9pd - O0 _ 33 Stacked Boulder Retaining Wall 183 LF / ,O?'j 5 , pQ 34 Modular Block Retaining Wall 271 LF =Cleo(090.0 35 Cast -in -Place Concrete Retaining Wall 148 LF /80, 00 26J640.00 36 Driven Steel Sheet Pile (Non -cofferdam) 750 SF /;q- , so 00 37 Restoration 1 LS ja r p©p.0 oZ O©� 0 I 38 Pedestrian Crossing 1 LS /5 co50,00 15 rO -too Qa TOTAL BID: $ 20066 rs TOTAL OF BASE BID s 941)(0'I C?to Ot5 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price. RESPEC LY �B ITTED: / IC-l3-o3 Signature Date Title 84 -A License Number (If Applicable) (Seal - if Bid is by corporation) Attest: , Address 3500 -OUc,rCeLS (fno Z1- W,r y Ec487 Telephone r. S 7/96 Section 00300 Page 4 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410Bid Bond 00420Statement of Bidder's Qualifications 00430Schedule of Subcontractors 7/96 Section 00410 Page 01 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder:-DL)cKf-'(S C�i��"i 1�G�0%� WC, 2. Permanent main office address: 5c)o-DoGKEI,-5 auex -m{► wrj Cb'808% 3. When organized: 4. If a corporation, where incorporated: CnLOeADC 5. How many years have you been eng� �ed in the contracting business under your present firm or trade name? �t 4 rso 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) M Ab0CA3 6I? AT rA L©TS I- o N 1 o39 44 q . I o 1 260¢ -fKuzpKie iTG ' E # bo.00 �EC30 ZB03 o- S 5, w S •00*DEC- 12003 Y[Ae-&-p- w1S.TEV--T1kM K 7. General character of Work performed by your company: 14reAv4' Co�jsTeucnw. . 12[7ADS . � D*F-s. P,LboS , u'n u 8. Have you ever failed to complete any Work awarded to you? r Q If so, where and why? 9. Have your ever defaulted on a contract? IV0 If so, where and why? 10. Are you debarred by any government agency? N If yes list agency name. 7/96 Section 00420 Page 1 11. List'the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 1$yyg gwp ac.i q?nk 114 A -cos_ cpmrLETED 10-30-05 902.673 53 VI[IMTF-r-.-YAc?-K SF,IE-Z TV0061—1MT►2AIBLPST- I ► I I ---S I � 12. List your major equipment available for this contract. S>='E ATTARN-E ROMPKIRNT lJ-ST 13. Experience in construction Work similar in importance to this nroiect: 14. Background and experience of the principal members of your organization, including officers- 5JE .AnAke- 4SD 15. Credit available: 545o01000.0© 16. Bank reference: f IF16T N k-nCON Lf2?MK of -Mr= FOQ<1 ES 17. Will you, upon request, fill out a detailed financial statement and furnish any/ other information that may be required by the OWNER? 18. Are you licensed as a General CONTRACTOR? Yr< S If yes, in what city, county and � state? COLO►ZA �� What class, license and numbers? .�`Yt-A 19. Do you anticipate Subcontracting Work under this Contract? Yac' If yes, what percent of total contract? and to whom? 20 Are any lawsuits pending against you or your firm at this time?-90— If yes, DETAIL 7/96 Section 00420 Page 2 21. What are the limits of blic liabilt? iouDETAI II4 MILL10A _your ,000zocoe oo) What company? C, N, IN,EAC-E59 OH I O C'ANJA LTY 22. What are your company' s bonding limita ions? � (j�( E- M � LL 104 1�L LARS C'9A000� 0(no 0 00 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at this day of20C)7). State of 6©LdeAfl© County of E00 TT 11()C�ILFC-1--� being duly sworn deposes and says that he is of Durv-r�-LS and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscrib d and sworn to before me this 64L day of 1�1�� Up V , 2 0G3. No ry Pu lic My commission expires Q� 7/96 Section 00920 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 150 of the contract. ITEM SUBCONTRACTOR 7/96 Section 00430 Page 1