HomeMy WebLinkAboutRESPONSE - BID - 5821 PEDESTRIAN BRIDGE AND BIKESECTION 00300
BID FORM
PROJECT: PEDESTRIAN BRIDGE AND BIKE TRAIL EXTENSION AT OVERLAND TRAIL ROAD AND
THE CACHE LA POUDRE RIVER; Bid No. 5821
Place Fort'Collins
Date November 14, 2003
1. In compliance with your Invitation to Bid dated October 8, 2003 ,
and subject to all conditions thereof, tD.14undersigned
ECI Site Construction Management a * * ( ora i Limited Liability
Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do
business in the State of Colorado hereby proposes to furnish and do
everything required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by -the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid bond
in the sum of 5% of total bid ($
5% ) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: Employers Mutual Casualty Company, P.O. Box 712, Des Moines, IA 50303
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7/96 Section 00300 Page 1
WILLOW FARM PARK
OWNER:
City of Longmont
747 Coffman Street
Longmont, CO 80501
Paula Fitzgerald
(303) 651-8448
ARCHITECT:
Design Concepts
211 N. Public Road
Lafayette, CO 80026
Carol Henry
(303) 664-5301
CONTRACT AMOUNT: $1,112,118
COMPLETION DATE: 5/00
PROJECT MANAGER
AND SUPERINTENDENT: Mike Paetzel
Landscaping Superintendent: Ray Gonzales
SCOPE: Construction of a 14-acre community park including the renovation of a 50-year-old barn into a picnic
shelter and restrooms. Site work included the site amenities, a post tension roller hockey rink, basketball court,
multi -use playing fields, concrete walks including decorative concrete features, 7,000 S.F. playground with a hand
pump water feature, site lighting, asphalt parking lot, landscaping, irrigation, picnic shelter, and 25 ton pedestrian
bridge. This project was awarded the Gold Hard Hat Award for Outstanding Landscape Project of 2000.
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder:ECI Site Construction Management a division of Environmental
Concerns, Inc.
2. Permanent main office address: 2526 E. Hwy 402, Loveland, CO 80537
3. When organized: May 1,1983
4. If a corporation, where incorporated: State of Colorado
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 23 Years
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
RFR ATTArHRn
7. General character of Work performed by your company:
Park construction and managment,installation of pump stations,sleeving,misc.
grading,and subgrades, erosion contro ,site amenities,. cruer nes trails,
pavers,and small storm drain systems.
8. Have you ever failed to complete any Work awarded to you? NO
If so, where and why?
9. Have your ever defaulted on a contract?
If so, where and why?
10. Are you debarred by any government agency?
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company, stating
the approximate cost of each, and the month and year completed, location
and type of construction.
SEE ATTACHED
12. List your major equipment available for this contract.
SEE ATTACHED
13. Experience in construction Work similar in importance to this
project:
90% of our projects are municipal park projects
See attached project references
14. Background and experience of the principal members of your organization,
including officers:
SEE ATTACHED
15. Credit available: $ N/A
16. Bank reference: iinme State Rank Contact, Garth Thomas 915 N. Cleveland Ave
Loveland, CO 80537
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER? _
YES
18. Are you licensed as a General CONTRACTOR? YES
If yes, in what city, county and state? Loveland, Larimer, Colorado What
class, license and numbers?
19. Do you anticipate subcontracting Work under this Contract? YES
If yes, what percent of total contract? 70%
and to whom?
20. Are any lawsuits pending against you or your firm at this time? NO
If yes,
DETAIL
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
See attached insurance certificate
What company? Flood & Peterson Contact: Dan Mills: Agent
22. What are your company's bonding limitations? $10 million range
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at ina this day of 2003.
ECI Site Construction Management
Name
By:
State of Colorado
County of
Larimer
Jay Brian Peterson being duly sworn deposes and says that he is
President of ECI Site Construction Management and that
(name of organization}
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me thisr,day of
Jjjft1VjgA. , 2003.
ary euniic
My commission expires
7/96
�Q\5 otla co�V
c, NOTAI?
PUBLIC
O,c COLO�P
Section 00420 Page 3
ECI SITE CONSTRUCTION MANAGEMENT
CURRENT WORK IN PROGRESS
PROJECT/LOCATION
DESCRIPTION
CONTRACT
GENERAL
EST.
OWNER
%
OF WORK
AMOUNT
CONTRACTOR
COMP.
COMPLETE
DATE
Section 30 Park & Ballfields
Park Construction w/
$9,545,532
ECI
11/03
City and County of Broomfield
93%
Broomfield
Sythetic Turf Field
CM/GC
303-464-5801
Douglas County Fairgrounds Regional Park
Park Construction
$1,441,523
ECI
4/04
Douglas County Government
25%
Douglas County
303-663-6226
Kittredge Tennis Court Replacement
Tennis Court Complex
$1,041,706
ECI
10/03
University of Colorado at Boulder
98%
Boulder, CO
Construction
303-735-3136
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER ARCHITECT
CONTRACT
COMPLETION
APS Stadium
Aurom Public Schools Davis Partnership
$
807,100.16
8/03
Aurora, CO
303-367-3000 303-861-8555
Greenland Open Space
Douglas County Government Architerra
$
651,930.24
6/03
Douglas County
303-660-7495 303-948-0766
Valmont Sod
City of Boulder N/A
$
153,165.18
6103
Boulder, CO
303-413-7225
Louisville In -Line Rink
City of Louisville Design Concepts
$
351,607.82
5/03
Louisville, CO
303-335-4909 303-664-5301
East West Greemvay
Monenson - G.C. EDAW
$
1,244,402.00
8103
Stapleton Redevelopment
303-321-4122 303-5954522
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
CSU Transit Center
City of Fort Collins
Coover-Clark & Associates, P.C.
$
1,892,216.45
12/02
Fort Collins, CO
970-221-6273
303-783-0040
Diamond Valley Sports Complex
Town of Windsor
Jim Sell Design, Inc.
$
490,535.00
10/02
Windsor, CO
970-674-2444
970-484-1921
Douglas County Entry Signage
Douglas County Government
Design Concepts
$
93,463.00
10/02
Douglas County
303-470-0140
303-664-5301
Springer Park & Perry Pines Park
Douglas County Government
Design Concepts
$
63,809.00
10/02
Douglas County
303-470-0140
303-664-5301
Bluffs Regional Park
Douglas County Government
The Arohiterra Group
$
637,424
6t02
Douglas County
303-663-6226
303-948-0766
East(West Regional Trail
Douglas County Government
The Architerra Group
$
165,666
8/02
Douglas County
303-663-6226
303-948-0766
Jim Hamm Pond & Nature Area
City of Longmont
The Norris Dullea Company
$
630,855
6/02
City of Longmont
303-651-8448
303-892-1166
Fossil Creek Park Ph. IA
City of Fort Collins
BHA Design
$
956,545
5/02
City of Fort Collins
970-221-6618
970-223-7577
Dad Clark Park - Maintenance
Highlands Ranch Metro District
Shalkey & Team, Inc.
$
7,412
5/02
Highlands Ranch Metro. District
303-791-2710
303-820-3340
Highland Heritage Regional Park Entry Sign
Douglas County Government
Design Concepts
$
61,329
5/02
Douglas County Government
303-470-0140
303-664-5301
Aurora Wheel Park
City of Aurora
ICON Engineering, Inc.
$
1.968,600
5/02
City of Aurora
303-739.7179
303-221-0802
Athletic Fields at the Ridge at West Meadows
Foothills Park & Recreation Dist.
Design One
$
1,426,495
5/02
Foothills Park & Recreation District
303-409-2304
303-832-2020
Valmont City Park Ph. I
City of Boulder
McLaughlin Water Engineers, Inc.
$
2.237,584
5/02
City of Boulder
303413.7225
303-458-5550
Rock Creek South Recreation Center
Superior Metro District No. 2
The Norris Dulles Company
$
2,007,216
5/02
Superior Metro District
303-987-0835
303-892-1166
Fairgrounds Regional Park Playground
Douglas County Government
Design Concepts
$
87,182
4102
Douglas County Government
303-470-0140
303-664-5301
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Dad Clark Park
Highlands Ranch Metro District
Shalkey & Team, Inc.
$
700,217
9101
Highlands Ranch Metro. District
303-791-2710
303-820-3340
Castle Rock Community Park
Town of Castle Rock
Carder -Burgess
$
3,350,502
a/o1
Town of Castle Rock
303-814-7446
303-820-5240
Bingham Lake
Douglas County Government
The Architerra Group
$
218,650
8/01
Douglas County Government
303-470-0140
303-948-0766
Eaton Park
City of Boulder
City of Boulder
$
152,770
8/01
City of Boulder
303-413-7228
303-413-7228
Bayou Gulch Regional Park Ph. I
Douglas County Government
Design Concepts
$
291,347
5/01
Douglas County Government
303-470-0140
303-664-5301
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Boulder Skate Park
City of Boulder
Shapins Associates
$
695,190
12/00
Boulder, CO
303-413-7227
303-442-4588
Big Dry Creek
Highlands Ranch Metro. District
Mundus Bishop Design, Inc.
$
633,963
10/00
Highlands Ranch Metro. District
303-791-2710
303-830-2585
Highland Heritage Regional Park
Douglas County Government
Design Concepts
$
531,184
9/00
Douglas County Government
303-470-0140
303.664-5301
Challenger Park Phase Vill
Douglas County Government
Design Concepts
$
171,124
7100
Parker, CO
303-660-7490
303-664-5301
Foothills Community Park
City of Boulder
Design Concepts
$
1,642,803
7/00
City of Boulder
303-413-7223
303-664-5301
Challenger Park Phase VII
Douglas County Government
Design Concepts
$
1,181,530
6/00
Parker, CO
303-660-7490
303-665-5313
Cottonwood Glen Park
City of Fort Collins
City of Fort Collins
$
1,137,277
6100
Fort Collins, CO
970-221-6618
970-221.6618
Willow Farm Park
City of Longmont
Design Concepts
$
1,111,036
6/00
Longmont, CO
303-651-8448
303-664-5301
Pinery Park
Douglas County Government
Design Concepts
$
87,813
2/00
Douglas County
303-660-7490
303-664-5301
Bradfield Park
City of Boulder
Play Environments
$
389,654
4/00
Boulder, CO
303-441-3061
303-682-0854
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Challenger Park Phase VI
Douglas County Government
Design Concepts
$
545,975
3/99
Parker, CO
303-660-7490
303-6645301
Redstone Park
Highlands Ranch Metro. District
Design Concepts
$
3,123,338
9/99
Highlands Ranch Metro. District
303-791-2710
303-664-5301
Community Park in North Boulder
City of Boulder
Design Concepts
$
1,270,635
10/99
Boulder, CO
303413-7227
303-6645301
West Woods Park
City of Arvada
City of Arvada
$
308,231
9/99
Arvada, CO
303-660.1036
303-6W-1036
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through + -
ECI Site Construction Management
BY: CT �
BY:
Box 2135, Loveland, CO 80539
ADDRESS:
8. BID SCHEDULE (Base Bid)
7/96 Section 00300 Page 2
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Challenger Park Phase V
Douglas County Government
Design Concepts
$
423,725
3/98
Parker, CO
303-660-7490
303-6645301
Columbine Meadows Park
City of Broomfield
The Norris Dulles Company
$
423,757
5/98
Broomfield, CO
303438-6388
303-892-1166
Grant Frontier Park
City and County of Denver
Wank and Associates
$
1,044,065
6198
Denver, CO
303-640-5491
303-628-0053
Cobblestone Park
City of Westminster
Civitas, Inc.
$
590,410
7198
Westminster, CO
303-430-2400 ext. 2214
303571-0053
Mitchell Gulch Neighborhood Park
Town of Castle Rock
The Norris Dulles Company
$
558,218
10/98
Castle Rock, CO
303-660-1036
303-892-1166
Westfield Park
City of Fort Collins
BHA Design, Inc.
$
1,021,493
10/98
Fort Collins, CO
970-227-6366
970-223-7577
COMMERCIAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Alexander Dawson School
Alexander Dawson Foundation
Fletemeyer 8 Lee Associates, Inc.
$
470,561
5/98
Lafayette, CO
702-733-7880
303-443-3750
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Stazio Ballfields Phase II
City of Boulder
Bucher, Willis, & Ratliff
$
1.464,415
6/97
Boulder, CO
303- 41-3400
303-292-5056
Daniel L. Schaefer
Foothills Park & Rec. District
Donald H. Godi & Associated, Inc.
$
490.061
6/97
Lakewood, CO
303-987-2673
303-989-2853
Xeric Demonstration Garden
City of Greeley
MDG, Inc.
$
107,662
8/97
Greeley, CO
970351.2131
303-5715787
Grandview Cemetery
City of Fort Collins
City of Fort Collins
$
48,359
8/97
Fort Collins, CO
970-221-6660
970-221-6660
Letthand Creek Park
City of Longmont
Rocky Mountain Consultants, Inc.
$
570,374
10/97
Longmont, CO
303-651-8448
303-7725282
Brighton Ballfields
City of Brighton
Design Concepts
$
1,030,397
11197
Brighton, CO
303-6594050
303-644.5301
Lafayette Library
City of Lafayette
Civitas, Inc.
$
148,090
10/97
Lafayette, CO
303-665-5588
303-571-0053
COMMERCIAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Potts P.U.D.
Russ Campion
Architecture One
$
64,455
05/97
Fort Collins, CO
970-490-1447
970.669-9060
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Loveland Sculpture Park
City of Loveland
Landmark Engineering
$
413.022
10196
Loveland, CO
970-962-9800
970-667-6286
Challenger Park Phase IV B
Douglas County Government
Design Concepts
$
309,311
10/96
Parker, CO
303-660-7490
303-447-8144
Ridgeview Park
City of Fort Collins
City of Fort Collins - Chuck Ainsworth
$
96,923
10/96
Fort Collins, CO
97D-221-6360
970-2216360
Roger's Grove Phase It
City of Longmont
Wank Associates
$
204,337
08/96
Longmont, CO
303-651-8446
303-628-OW3
Sloan Lake Trail Improvements
City of Denver
EDAW, Inc.
$
465,040
07/96
Denver, CO
303-964-2552
303-534-0747
Challenger Park Phase IV
Douglas County Government
Design Concepts
$
212,916
07/96
Parker, CO
303-660.7480
303-447-8144
Northglenn Park Construction
City of Northglenn
City of Northglenn
$
212,592
07/96
Northglenn, CO
303-450-8839
303-450-8839
Superior Elementary
Boulder Valley School District
Environmental Concerns, Inc.
$
148,909
09196
Boulder, CO
303- 47-5081
970-6696291
Highlands Ranch Phase II
Highlands Ranch Metro District
The Norris Dulles Company
$
40,546
07196
Highlands Ranch, CO
303-791-0430
303-860-1166
COMMERCIAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Courtyard by the Marriott
White Lodging Services
Lantz-Boggio Architects, P.C.
$
128,078
11/96
Louisville, CO
219-769-2367
303-773-0436
Emerald Glen
Bray Enterprises
BHA Designs
$
258,212
07/96
Loveland, CO
97D-663-1897
970-223-7577
North Park Office Building
Virga Corporation
Bruce Pizzimenti - Play Environments
$
31,403
04/96
Loveland, CO
970-667-2627
303682-0854
RESIDENTIAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Delfik Residence
Bruce and Nancy Deifik
EDAW, Inc.
$
150,037
06/96
Greeley, CO
303-3534222
303-595-4522
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Challenger Park, Phase III
Douglas County Parks
Design Concepts
$
201,722
10/95
Parker, CO
303-660-7490
303-447-8144
North Shore Park
City of Longmont
Kent Scott Nelson
$
315,851
10/95
Longmont, CO
303-651-8446
719-630-7322
Brighton Park
City of Brighton
$
109,946
4/95
Brighton, CO
303-773-3800
Roger's Grove Park
City of Longmont
Paula Fitzgerald
$
95,590
4/95
Longmont, CO
303-651-8446
303-651-8446
Bein Park
Town of Berthoud
Play Environments
$
131,911
3/95
Berthoud, CO
970532-2643
303-682-0854
Centennial Park Pump Station
City of Loveland
Aqua Engineering
$
101,806
4/95
Loveland, CO
970-962-2451
970-229-9668
New Fort Collins High School
Poudre R-1 School District
Architectural Horizons
$
1,465,000
08/95
Fort Collins, CO
970482-7722
970-225-2704
Highlands Ranch 100 Park
Highlands Ranch Metro District
The Norris Dulles Company
$
400,584
10/95
Highlands Ranch, CO
303-791-0430
303-860-1166
Boulder High School Pump Station
Boulder Valley School District
Aqua Engineering
$
108,252
4/95
Boulder, CO
303-4475044
970-229-9668
COMMERCIAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Mariana Glen Phases I & II
Bray Enterprises
BHA Design
$
222,201
9195
Loveland, CO
970-663-1897
970-223-7577
Mckee Medical Center
Mckee Medical Center
Aqua Engineering
$
187,882
10195
Loveland, CO
970-6354170
970-229-9668
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Challenger Regional Park Phase It
Douglas County
Design Concepts
$
125,692
9/94
Parker, CO
303-660-7490
303-447-8144
Drake Wastewater Treatment Plant
City of Fort Collins
EDAW, Inc.
$
194,779
5/94
Fort Collins, CO
970-221-6660
970484-6073
Sheridan Lighted Ballfields
South Suburban Parks 8 Rec District
Design Concepts
$
282,096
5/94
Sheridan, CO
303-795-6531
303-447-8144
Skyview High School
Adams County School District
Fletemeyer 8 Lee
$
189,380
8194
Thornton, CO
303-443-3750
COMMERCIAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
KMart Distribution Center
KMart Corporation
Randy Randall Assoc.
$
201,203
7/94
Brighton, CO
303-654.0054
3034654746
Rocky Mountain Factory Outlet Mall
JMJ Properties
Environmental Concerns, Inc.
$
135,690
7/94
Loveland, CO
616-7984670
970-669-6291
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Stephens Park, Phase If
Town of Vail
EDAW, Inc.
$
237,133
7/93
Vail, CO
303479-2161
970484-6073
Longmont Service Center
City of Longmont
Paula Fitzgerald
$
72,830
10193
Longmont, CO
303-651-8446
303-051.8446
Challenger Regional Park - Phase I
Douglas County
Design Concepts
$
284,052
9/93
Parker, CO
303-660-7490
303-447-8144
Brighton Recreation Center
City of Brighton
Winston Associates
$
120,058
6/93
Brighton, CO
303-773-3800
303-440-9200
Foothills Athletic Complex
Foothills Parks & Rec District
Larry Rogers Design
$
142,656
5/93
Lakewood, CO
303-987-3602
303-989-6995
Laurel Elementary School
Poudre School District
Dulaney Architects
$
76,183
7/93
Fort Collins, CO
970490-3507
303-770-0987
COMMERCIAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Longmont Shopko Stores
Shopko, Inc.
Reams & Patterson, Inc.
$
67,290
10/93
Longmont, CO
Loveland Shopko Stores
Shopko, Inc.
Tups Associates
$
88,898
10/93
Loveland, CO
303-755-6315
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Squires Park Soccer Fields
City of Westminster
Norris Dullea Co.
$
119,150
8/92
Westminster, CO
303-430-2400
303-860-1166
Southshore Scenic Parkway
City of Loveland
Jerry Adamson
$
146,930
5/92
Loveland, CO
970-962-2451
970-962-2451
Westview Middle School
St. Vrain School District
Paula Fitzgerald
$
146,377
6192
Longmont, CO
303-776-6200
303-776-0960
Southwest Elementary School
Poudre School District
Dulaney Architecture
$
106,320
9/92
Fort Collins, CO
970490-3507
303-770-0987
Southshore Park, Phase II
City of Loveland
Aqua Engineering
$
40,801
6192
Loveland, CO
970-962-2451
970-229-9668
Northtake Park Pump Station
City of Loveland
Aqua Engineering
$
67,045
6/92
Lowland, CO
970-962-2451
970-229-9668
COMMERCIAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
High Plains Youth Center
ReBoundl Colorado
Rockne Associates
$
136,812
6/92
Brush, CO
303-730-1418
303-730-6125
Benson Park Children's Sculpture
High Plains Arts Council
Ripley & Assoc.
$
47,044
11/92
Garden, Loveland, CO
970-663-2940
ECI SITE CONSTRUCTION MANAGEMENT
MAJOR PROJECTS COMPLETED
MUNICIPAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Longmont Price Park Xeriscape
City of Longmont
EDAW, Inc.
$
27,000
10/91
Longmont, CO
303-651-8376
970-484-6073
Northlake Parks Sidewalks
City of Loveland
City of Loveland
$
33,886
9/91
Loveland, CO
970-962-2451
970-962-2451
Northlake Park Athletic Fields
City of Loveland
City of Loveland
$
83,761
7/91
Loveland, CO
970-962-2451
970-962-2451
Greenway Neighborhood Park
City of Broomfield
Fleebneyer & Lee
$
221,818
6/91
Broomfield, CO
303469-3301
303-443-3750
South Shields Street Improvements
City of Fort Collins
City of Fort Collins
$
45,627
8191
Fort Collins, CO
970-221-6660
970-221-6660
Canal Importation Channel
City of Fort Collins
City of Fort Collins
$
32,000
10/91
Fort Collins, CO
970-221-6660
970-221-6660
Utility Service Center
City of Fort Collins
CityScape
$
11,100
4191
Fort Collins, CO
970-221-6660
970-226-4074
COMMERCIAL
PROJECT NAME
OWNER
ARCHITECT
CONTRACT
COMPLETION
Harbor Walk Improvements
The Group, Inc.
The Group, Inc.
$
17,000
7/91
Fort Collins, CO
970-221-0700
970-221-0700
Spirit of Joy Church
Spirit of Joy Church
Linda Ripley
$
32,550
10/91
Fort Collins, CO
Dan Ostermiller Office & Water Feature
Dan Ostermiller
Environmental Concerns, Inc.
$
26,000
8191
Loveland, CO
Sculptor
970fi6M291
Loveland Sculpture Works
High Plains Arts Council
Environmental Concerns, Inc.
$
47,350
8/91
Loveland, CO
Benson Park Plaza
High Plains Arts Council
Stacy Swearingen
$
56,000
8/91
Loveland, CO
Chatfield Arboretum
Denver Botanical Gardens
EDAW, Inc.
$
33,000
5/91
Denver, CO
ENVIRONMENTAL CONCERNS, INC.
EQUIPMENT LIST
AS OF 7/29/03
VEHICLES
YEAR
MAKE
MODEL
VIN
1990
Chevy
Suburban
1GBEV16K4LF146493
1990
GMC
2-Ton Dump
1GDG6H1P1LJ603217
1991
GMC
2-Ton Topkick
1GDG6HIP7MJ058789
1994
Chevy
C1500
1GCDC14Z7RZ231364
1995
Dodge
Ram Pickup
1B7KF26C6SS204149
1995
Dodge
Ram Pickup
lB7KF26C1SS198146
1997
Chevy
K1500 Extended Cab
2GCEK19RXV1274373
1999
Dodge
Ram 1500 CC
3B7HF13Z2XM539227
2001
Ford
F Series
3FTSW31 F81 MA13654
2001
Dodge
Ram 2500
3B7KF2361G752033
2002
Dodge
Ram 2500
3B7KF23622M248270
2003
Dodge
Ram
1D7HU18ZX3S138045
EQUIPMENT
John Deere 4x4 Tractor
790
LV079OG475301
1992
Case Uni Loader
1845c
JAF0101800
1993
Case Backhoe
580JK
JJG0176878
1994
Case Backhoe
580SK
JJG0173372
1998
Case Skid Steer
1845c
JAF0274586
1998
Case Pallet Forks
LAF1137
SN# 41087
Case Pallet Forks
1998
Vermeer
V5750
Lease / Purchase
Vermeer Tree Spade
TS-30
1VRC101L9T1001780
1993
Fabricated Wheel Compactor
1999
Case Trencher
560
JAF0254012
2001
Case Skid Steer
1845c
JAF0334249
2003
Case 75XT Skid Steer Loader
JAF0352005
TRAILERS
1973
Porta space Office Trailer
CMP
1094
1985
GE Captial Office/Construction Trailer
GSV-832
582640
1985
830 Satellite Mobile Storage Office
SE# 17320
1983
Red Equipment Trailer
ID612191COLO
1992
Homemade 4-Wheeler Trailer
1 D0601907CO
1992
Eager Beaver
10HDB
112HAN302NLO39349
1993
Sport Trailer
6X10 CARGO
ST10BPC12S9935143
1997
Big Tex Trailer
12P1-20
16VPX2027V1388907
2002
Big Tex Trailer
4K8PX182721 H92485
MISCELLANEOUS
Fimco Lawn & Garden Sprayer
LG25B 25 Gal 12-volt
(2) Honda Water Pumps
WH2OX
1995
Lowe 12" Auger
Model DFB - 12
Pentax Transit AL6
Sanborn Air Compressor
Model B07FL350-20
SE# L0880931
Skil Circular Saw
1994
Stihl Weed Eater
Model FS76
SE# 626919490
Toro Lawnmower
Bench Grinder
Model 59500
Husqvarna Chain Saw
50 Rancher
Hotsey
Model 550B
1995
Coleman Powermate Generator
1994
Gen Set Generator Pro 4000
6EGHB28018A
1994
Walker Mower
MTSD
SE# 2414601637
Box Scraper
1998
John Deere Box Bushhog
BX720
1995
Spectra Physics Laser Transit
David White Auto Lazer
2110
SN#AG144759
Laser 2110 - Level
SN# AG193815
Maxey Snow Plow
SN# A4061
John Deere Snow Blower
TRS22
MOTR22A180264
Snapper Lawn Mower
ECLP21601RV
95101584
1999
CTI Forks
60 S
56271
Stihl Trimmer
241080629
MANAGEMENT
QUALIFICATIONS
PRINCIPALS:
Brian Peterson, President
Brian graduated from the University of Nebraska Curtis with a degree in
commercial horticulture. He has over 25 years experience in the site
construction industry and founded ECI in 1980. Brian manages company
operations including marketing.
RICK COULTER, Vice President and General Superintendent
Rick has over 20 years experience in the site construction industry and
specializes in project team management, value engineering and
Owner/Contractor relations. Rick oversees field operations by conducting routine
site visits and attending weekly site meetings. Rick also maintains close one- on -
one relationships with all superintendents and project managers.
OFFICE STAFF:
Ted Johnson, Project Manager and Lead Estimator
Ted is a 1999 graduate of Colorado State University with a B.S. in Construction
Management. Ted has worked with ECI since 1997 and is the lead estimator,
responsible for project procurement and owner negotiations. Ted also works as
a project manager and is familiar with design/build and CM/GC project formats.
Ted has a strong background in civil, park, and site construction management
and project budgeting.
Tina Connect, Project Manager and ECI Administrator
Tina is a 1995 graduate of Colorado State University and joined ECI that same
year. As a project manager, Tina coordinates all project documentation and
works closely with the ECI estimating and field staff. Tina also coordinates all
project administration for ECI, which includes all aspects of budgeting, cost
control and analysis, and contract documentation. Tina is also involved in
marketing and has given numerous presentations on delivery methods for site
construction.
Selina Coulter, Administrative Assistant
Selina is an integral part of the ECI office team. She performs certified and
standard payroll, human resources, MSDS documentation, insurance certificate
administration, accounts payable and receivable and many other standard office
duties.
NOV-06-03 THU 03112 PM CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P,03/03
DID V5821 BID SCHEDULE —ADDENDUM4
Bid
Item
description
Estimated
Quantity
Unit
Unit
Price
Cost
_
.2 00
1
Mobilization and Demobilization
1
LS
d °
2
Water Control
1
LS
�
Iti I
3
Traffic Control
1
LS
°o
Z 80 •-
4
Surveying
1
LS
3 so
,37d O°'
5
Clearing, Grubbing and Stripping
1
LS
Q ?�
6
Caisson 1, 6-Foot Dia.
25
LF
—
, Sd
7
Caisson 2, 6-Foot Dia_
25
LF
4 Zy ao
5 '
8
Caisson 3, 4-Foot Dia.
25
LF
2 $Z.•-
9
Caisson 4, 4-Foot Dia.
25
LF
2 82 •
O `=
10
Caisson 5, 4-Foot Dia.
25
LF
Z Z°$
O5o .0=
11
Caisson 6, 4-Foot Dia.
25
LF
Z 82.4—°
OSO. °Q
12
Caisson 7, 4-Font Dia.
25
LF
Z, $3,°_
O
13
Caisson 8, 4-Foot Dia.
25
LF
Z
":f I vg AD
14
Caisson 9, 4Foot Dia.
25
LF
293. °O
15
Pier No_ 1 and Pier Cap
1
LS
S g
_
S $ T2 • p
16
Pier No. 2 and Pier Cap
1
LS
b 9&
b 9 w
17
Pier No. 3 and Pier Cap
1
LS
°W
18
Pier No. 4 and Pier Cap
1
LS
a'
19
Pier No. 5 and Pier Cap
1
LS
$t
(644. tta
20
Pier No. 6 and Pier Cap
1
LS
w-
p°Q
No.7andPierCap
1
LS
4°
L t.•°—"
Pier No. 8 andPier Cap
1
LS
Z =�
C
rPier
Pier No. 9 and Pier Cap
1
LS
ooAbutment
A (North Abutment)
1
LS
. n�
249Abutment
B (South Abutment)
1
LS
Superstnicture (154-Feet Span Prefabricated
Bride
2
EA
ZO 2
oc�
27
Superstructure (50-Feet Span Prefabricated
Shd e
7
EA
Z tic)
28
Superstructure (25-Feet Span Prefabricated
Bridge)
1
EA
ev
Z
29
Type H Riprap Bank Protection
153
SY
t
S
30
Type VH Riprap Bank Protection
771
SY
31
Colored Concrete Trail (6', 6', and 10' wide)
6621
SF
a
a .
32
Colored Concrete Trail — Channel Trail
Section 10' wide
2083
SF
3 GS
33
Stacked Boulder Retaining Wall
183
LF
oo
3 _
34
Modular Block Retaining Wall
271
LF
,
35
Cast -in -Place Concrete Retaining Wall
148
LF
p?
36
Driven Steel Sheet Pile (Non -cofferdam)
750
SF
L
37
Restoration
1
LS
Q ,,
38
Pedestrian Crossing
1
LS
q9—
TOTAL BID: $ $ H SO 3S`
Sean Reynolds, Junior Estimator / Bid Administrator
Sean joined the ECI office staff full time in February of 2002. Sean graduated
from Colorado State University with a bachelor degree in natural science. Sean
assists ECI project managers and estimators with bid take -offs, project
scheduling using SureTrak, bid document procurement, submittals, and
subcontractor bid solicitations.
FIELD STAFF
Mike Paetzel, Superintendent
Mike started with ECI in 1989. He is experienced in all phases of site
construction and manages substantial and diverse projects. These projects
include skate parks, roller hockey rinks, multi -use buildings, and other complex
site elements. Mike is also involved in ECI's safety program and conducts
company accident investigations and coordinates field safety management.
Wes Statkus, Superintendent
Wes has been with ECI for over 7 years. He has experience with drainage
projects including box culvert construction and is key in the supervision of
landscaping and irrigation subcontractors. Wes is also instrumental in
performing and supervising ECI's warranty work and assists in project punch list
and close out.
Chad Oleson, Superintendent
Chad has over 19 years experience in the utility, earthwork and site construction
industry. Chad has worked with ECI since 1994 and has successfully completed
large park and public improvement projects. Chad specializes in site demolition,
concrete, grading, and drainage installation.
John Oatsvall, Superintendent
John has more than 7 years of experience with ECI. He has managed the
construction of many diverse projects including neighborhood parks, trails, and
synthetic turf field drainage and base installation.
Ray Gonzales, Superintendent
Ray started with ECI in 1989. He has managed the construction of larger park
projects and has experience with site drainage and grading, concrete flatwork
and post tension courts, landscaping, irrigation, and site amenity installation.
Bob Coulter, Superintendent
Bob has over 30 years experience in site and building construction. He has
worked for ECI since 1998. Bob manages site construction projects that
encompass restroom/concession buildings and shelter structures.
ACORD- CERTIFICATE OF
LIABILITY INSURANCE
DATE(MWDD/YYYY)
10/17/03
PRODUCER
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
Flood & Peterson Insurance Inc
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
4821 Wheaton Drive
HOLDER. THIS CERTIFICATE DOES NOT AMENDI EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
P O Box 270370
Fort Collins, CO 80527
INSURERS AFFORDING COVERAGE
NAIC it
INSURED
INSURERA: Travelers Insurance
Environmental Concerns, Inc.
INsuRER6: Pinnacol Assurance
ECI Site Construction Management
PO Box 2135
INSURER C:
Loveland, CO 80539
INSURER D:
INSURER E:
L:OVtKAIdt5
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
IN3K
LTR
ADD'
INSRN
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE
DATE MWDDM'
POLICY EXPIRATION
ATE (MWDWYYI
LIMITS
A
GENERAL LIABILITY
X COMMERCIAL GENERAL LIABILITY
CLAIMS MADE O OCCUR
DTCO8099A7531ND
10/01/03
10/01/04
EACH OCCURRENCE
ai 000 000
DAMAGE TO RENTED
OC
E300 000
MED EXP (Any one person)
$5 000
PERSONAL B ADVINJURY
$1 000 000
GENERAL AGGREGATE
$2 000 000
GENT AGGREGATE LIMIT APPLIES PER:
POLICY PE OT LOC
PRODUCTS - COMPIOP AGG
s2,000,000
A
AUTOMOBILE
LIABILITY
ANY AUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
HIRED AUTOS
NON -OWNED AUTOS
DT8108099A7531ND
10/01/03
10/01/04
COMBINED SINGLE LIMIT
(Ea accident)
$1,000,000
X
BODILY INJURY
(Per person)
$
X
BODILY INJURY
(Per accident)
$
X
PROPERTY DAMAGE
(Per accident)
$
GARAGE LIABILITY
ANY AUTO
AUTO ONLY - EA ACCIDENT
$
OTHER THAN EA ACC
AUTO ONLY: AGG
$
S
A
EXCESS/UMBRELLA LIABILITY
X OCCUR CLAIMS MADE
RDEDUCTIBLE
X RETENTION $10000
DTSMCUPS099A753
10/01/03
10/01/04
EACH OCCURRENCE
s2.000.000
AGGREGATE
s2 000 000
S
$
$
B
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
ANY PROPRIETORIPARTNERIEXECUTIVE
OFFICER/MEMBER EXCLUDED?
Des, ECIALAL PROVISIONS belowa under
SP
1221742
07/01/03
-T
07/01/04
X WC STATU- I OTH-
-EEL
E.L. EACH ACCIDENT
$1,000 oDo
E.L. DISEASE - EA EMPLOYE
$1,000 000
E.L. DISEASE - POLICY LIMIT
51,000,000
OTHER
DESCRIPTION OF OPERATIONS / LOCATIONS I VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT SPECIAL PROVISIONS
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
For Information Only DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 'A0_ DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
IMPOSE NO OBLIGATION" UABILrrj O�,ANY KINDgAJII THE INSURER, ITS AGENTS OR
AUTHORIZED REPRESENTATfW ff -
♦^�MM e
-^ ••--r 1 MJP W AI.OKU GUKPOKATION 1988
665 MOSS STREET e GOL17g14, COLORADO,80401 • :OPI'ICE 303.425 5$89 •FAX 303-425 i7g1
AIA. PREQUALIFICATION
The undersigned certifies the truth and correctness of all statements and of all
answers to questions made hereinafter.
Date Submitted:
Completed by:
7/14/2003
Mike Wilkerson
Name: M.L.L.. lnc.
Address: 665 Moss Street
Golden, Colorado 80401
Phone / x+aa: 303-425-5889 / 303-425-11.91
Principal Office: Golden, Colorado
Company Type: Coq?gEg ion
1. How many years has your organization been in business as a contractor
under the present firm's name? 4 Years
2. How many years has your organization been in business under its present
business name? 4_
3. If a Corporation, answer the following:
a. Date of incorporation: Mardi 1999
b. State of incorporation: Colorado
c. President: Timatby Lemke
d. Vice President:
e. Secretary: Phil Ayer
f. Treasurer:
4. What percent of the work do you normally perform with your own forces?
95%
a. List trades:
i. Cast in place concrete structures
ii. Concrete flat work
iii. Storm drainage structures
5. Have you ever failed to complete any work awarded to you? If so, indicate
when, where, and why. Have you ever defaulted on a contract? If so, when,
where, and why? No
6. Has any officer or partner of your organization ever been all officer or
partner of any other organization that failed to complete a construction
contract? H so, state the circumstances: No
7_ Is the contractor authorized to transact business in Colorado? Yes
S. Is the contractor's principal place of business in Colorado? Yes
9. Does the contractor maintain a place of business in Colorado?
Z0 30Vd 'ONI 33W TGTT-9Zb-£0£ TG:60 £00Z/ZT/TT
10. Has the contractor paid Colorado unemployment compensation taxes in at
least 75% of the 8 quarters immediately prior to the date of submittal? Yes
11. List major construction projects contractor has under contract on this date:
SeeSeeAachhed
12. List Major Construction projects contractor has completed in the past three
years: See Attached
13. List States and Categories in which the contractor is legally qualified to do
business: lorado: General Con�ting Site Work. Concrete'Work
14. Bank References:
15. Trade References: See .Attached
16. Name of bonding and insurance companies and naive and address of agents
and the maximum bonding capacity.
17. The undersigned agrees to furnish, upon request by the owner, within five
days after request, a current statement of financial condition, including
contractor's latest regular dated financial statement of balance sheet.
1& Contractor authorizes investigation of all statements contained in the
contract documents and further autborizes any person providing a reference
to give any and all information, personal or otherwise, concerning the
contractor.
19. Contractor Name: M.L.L. Inc.
20, Authorized Signature: Timothy Igmke
-2 - w- e 3
Date
60 39dd '9NI -nW TGTT-9Zb-E0E TO:60 E00Z/ZT/TT
M.L.L., INC.
QUALIFICATION STATEMENT
PROJECTS IN PROGRESS
PROJECT NAME
OWNER I GENERAL
CONTRACTOR
'CONTACT PERSON
PHONE NUMBER
CONTRACTAMOUNT
DATE TO BE
COMPLETED
Croke Canal
Diamond Excavating
JP Mornan
30342-787
$1 3,217.00
6/2/2009
Pueblo CR #501
Range Engineering
Curt Grieser
719.642-6481
$V9 000.00
7/15/2003
Waynoka Bride
Pioneer Sand Company
Brad Densmore
719-599-8100
$262,000.00
7/280103
Tat 's Gulch
Edge Contracting
Cole Cattoor
720-898-1403
$145 OD0.00
8120120D3
Stubbs & Miller Structure
Pioneer Sand Company
Joe Johnson
719-599-8100
1 $70,000.00
7/9/2003
COMPLETED PROJECTS
PROJECT NAME
OWNERIGENERAL
CONTRACTOR
CONTACT PERSON PHONE NUMBER
CONTRACTAMOUNT
DATE
COMPLETED
McRay Pedestrian Crossing
McKay Metro District
Richard S urwa 303-399-1852
$477,558.00
2001
Lincoln County Box Culvert
Lincoln County
Bennie Grimes 970-664-2335
$116,818.00
2a02
Stroh Ranch Channel
Carroll & Lane
Mike Hicke 303-980-0200
$345,708.00
2002
Branburn Drainage Imp.
ERS Constructors
Eric Rfkkl 303-791-7473
$110,000.00
2002
Bright Brown Structure
101amond Excavating
JP Morgan 303-432-7877
$40,000.00
1 2003
REFERENCES
COMPANY
ADDRESS
CITY, STATE, ZIP
CONTACT PERSON
PHONE NUMBER
FAX NUMBER
Shea Homes
9135 S. Ridgelina, Blvd #100
Highlands Ranch Co. 80129
Tim Magnal
303-791-8180
303-791-6558
Diamond Excavali
5940 W. 591h Ave
Arvada Co. 80003
Chris BT*y
303-432-0241
303-432-9396
ERS Constructors
8D12 Highway 85
Sedalia Co. 8D135
Eric Rikkf
303-791-7473
303-471-2099
Hudfck Excavating
1700 N Park Street
Castle Rock, Co. 80109
Rob Warne
303-685-9500
303-688-5254
L&M Ente ises
1P.O. Box W
ISaFthoud, Co. 80513
1 Eric SUrry
1303-442-7401
303-442-2231
N
N
w
w
m
w
A
N
CJI
F-'
F'
lD
3
r
F-
Contractors Qua69cation 711512003co
p
SECTION 00410
BID BOND
ECI Site Construction
KNOW ILL MEN $Y THESE PRESENTS: that we, the undersignedManagement, a division
ll
rnnyarnc, jnr_ as Principal, and Employers Mutual Casualty Company as
Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado,
as OWNER, in the sum of $5% of total bid for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction
of Fort Collins Project, PEDESTRIAN BRIDGE AND BIKE TRAIL EXTENSION AT OVERLAND
TRAIL ROAD AND THE CACHE LA POUDRE RIVER; Bid No. 5821.
NOW THEREI?ORE,
(a) If said Bid shall be rejected, or
(b) if said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form of Contract attached hereto (properly completed in
accordance with said Hid) and shall furnish a BOND for his faithful
performance of, said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension_
Surety Companies executing bonds must be authorized to transadt business in the
State of Colorado and be accepted by the OWNER.
7/96 Section 00410 Page 02
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their haa,
and seals this 6th day of November , 2003, and such of them as
corporations have caused their corporate seals to be hereto affixed and 'the;
presents to be signed by their proper officers, the clay and year first set fp;�
above.
PRINCIPAL
ECI Site Construction Management, a
Name:division of Environmental Concerns,
Address: P•O.Box 2135
Loveland, CO 80539
T i i'r -
t► A,
ril
(SEAL)
7/96
SURETY
Employers Mutual Casualty Company
� : • 7►[�h7�Ii7
Denver, CO 80237
Title: Attorney -in -Fact
(SEAL)
Section 00410 Page 03
No Text
TOTAL OF BASE BID
tten) OLNL{
9. PRICES
v%Ar4 ,vt,vt Cc.,,45
kwr.Cire J -Pou Ir do
The foregoing prices shall include all labor, materials, tKansportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the total Agreement Price.
RESPECTFUL]
\1
Signature ian Pi
I
Title
SUBMITTED:
J
, PresidentDate
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:
Address v n Box 2135, loveland, CQ 80539
Telephone 970-669-6291
7/96 Section 00300 Page 4
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 150 of the contract.
ITEM
COW XeT E"
C' ►
7/96
SUBCONTRACTOR
M.L.L.
_a �
Section 00430 Page 1
GRANT FRONTIER PARK
OWNER:
City and County of Denver
200 West 14th Avenue
Denver, CO 80204-2700
ARCHITECT:
Wenk and Associates
1035 Cherokee Street
Denver, CO 80204
Karen Grote Billy Gregg
(303)964-2552 (303) 628-0053
CONTRACT AMOUNT: $1,044,065
COMPLETION DATE: 6/98
PROJECT MANAGER & SUPERINTENDENT:
Rick Coulter
LANDSCAPE/IRRIGATION SUPERINTENDENT:
Ray Gonzales
(2) Bridges over the Platte River at
separate locations: Grant Park and 8T"
Zuni
SCOPE: This high profile project for the City and County of Denver is part of the South Platte River Corridor
Project and is located in South Denver's Overland neighborhood. The creation of this project was the result of
negotiations between Denver City officials and the Overland Neighborhood Association who wanted safer access to an
existing park along the Platte River. To transform the park area a section of Platte River Drive was removed and the
existing park was extended and renovated. Construction included the removal and replacement of (2)
existing pedestrian bridges over the Platte River, an asphalt parking lot, concrete sidewalks and bikeway, site
signage, a playground, site amenities, irrigation and landscaping.
STEPHEN'S PARK PHASE II
OWNER:
TOWN OF VAIL
75 S. Frontage Rd.
Vail, CO 81657
ARCHITECT:
EDAW, INC.
240 E. Mountain Ave.
Fort Collins, CO 80524
Mr. Todd Oppenheimer Ms. Jana McKenzie
(303)479-2161 (970)484-6073
CONTRACT AMOUNT: $222,000
COMPLETION DATE: 4/93
PROJECT MANAGER: Brian Peterson
SUPERINTENDENT: Rick Coulter
SCOPE: This phase of park construction consisted of earthwork, large park irrigation system, precast concrete
bridge placement over the Gore River, crusher fine paths, boulders, retaining walls, sidewalks, and landscaping.
VALMONT PARK
OWNER:
City of Boulder
3198 N. Broadway
Boulder, CO 80306
ARCHITECT:
McLaughlin Water Engineers, Inc.
2420 Acott Street
Denver, CO 80211
Drew Horton Brian Chevalier
(303)413-7223 (303)458-5550
CONTRACT AMOUNT: $2,237,583
COMPLETION DATE: 4/02
PROJECT MANAGER: Ted Johnson
SUPERINTENDENT: Ray Gonzales
Pedestrian bridges including one
bridge with extensive dewatering
operations and concrete wing wall
construction.
SCOPE: A community park including earthwork, intensive site drainage and utility installation, concrete trails,
signage, asphalt parking lot, site amenities, site electrical, pedestrian foot bridges, feature boulders, rock walls,
pavers, landscaping, seed, sod, and irrigation. This project required extensive redesign by the City of Boulder during
construction in order to avoid intruding on sensitive wildlife habitats. ECI worked closely with the City of Boulder to
ensure that the project progressed as smoothly as possible during the redesign and held the project open during the
winter of 2001-2002 in order to allow the City of Boulder to complete the project per their designs in the spring of
2002.
COBBLESTONE PARK
OWNER:
City of Westminster
4800 West 92nd Avenue
Westminster, CO 80030
Becky Eades
(303)430-2400
ARCHITECT:
Civitas, Inc.
1250 Bannock Street
Denver, CO 80204
Liz Lancaster
(303)571-0053
CONTRACT AMOUNT: $590,410
COMPLETION DATE: 7/98
PROJECT SUPERINTENDENT:
Mike Paetzel
Chad Oleson
SCOPE: Park construction including earthwork, site drainage, landscape, irrigation system including an
irrigation/storm water management pond, concrete pond wall, site amenities, pedestrian bridges, concrete flatwork
and concrete pond wall, and playground.