Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5823 CITY OF FORT COLLINS AND CSU TRANSIT CENTER (6)SECTION 00300 BID FORM PROJECT: CITY OF FORT COLLINS AND COLORADO STATE UNIVERSITY TRANSIT CENTER PHASE 1A; Bid No. 5823 Place 215 N Mason St, Ft -Collins, CO Date November 5, 2003 1. In compliance with your Invitation to Bid dated October 13, 2003 , and subject to all conditions thereof, the undersigned Delta Construction of Northern Colorado. Inc a **(Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal. is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% Bid Bond ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bondsis as follows: _EMC Insurance Companies Pn Rnr 719 nec mninpqlTA 50303 0719 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and -overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether.it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. 1 7/96 Section 00300 Page 1 CONSTRUCnOK INC. Delta Projects Completed by Year Contract % Self Name Description Project Address Owner/Client Architect Facility Type Amount Performed Finish Date Cathedral Home GSG Architecture New Cathedral Home for Children Educational Facili Laramie, WY 307-238-8968 Construction $1,100,000 15% Dec-02 Westfield Village Westfield Construction New Westfield Village Modular installations Laramie, WY 970-218-8750 None Construction $380,000 30% Ma -02 4373 N. Street Bud Baldwin Hawk Architecture New Wy ech Hotrod Shop Educational/Industnal Laramie, WY 307 742-3776 . .... ._. ........- .._> .._....... - Enterprises Vaught Frye New _._....._ .......�_ Kids' Harbor Daycare Daycare facility 970-562-9990 970-224-1197 Construction $1,100,000 100/0 Au -02 7250 Greenridge Rd Dick Schmidt Architecture West New Schmidt Earthbuilders Office/Indusfiral Windsor, CO 970-962-9091 970-204-0424 Construction $624,660 15% Mar-03 Year2001 4700 Innovation Drive Rod Ardnt Greg Fisher New Cyotmation Bldg II Office/Biomedical/R&D Fort Collins, CO 970-266-8027 970-484-8433 Construction $1,029,887 100% Sep-01 3693 County Rd. 30 Jim Sampson Randell Johnson New Scion Industries Office / Industrial Fort Collins, CO 970-207-1720 970-686-7464 Construction $1 505 000 100/0 Mar-02 4715 Innovation Dr. Bill Newland Vaught Frye AMCC Office Tenant Finish Fort Collins, CO 970-225-9016 970-224-1197 Commercial TF $593,000 15% Jan-01 W. Stashak & 1267 N. 15th Street Paul & Kerry Greaser Associates New Reynolds Crossing Office/Campus Laramie, WY 307-745-8664 970416-9080 Construction $4,200,000 30% On going Year2000 4700 Innovation Drive Rod Ardnt Greg Fisher New omation Bld I Office/Biomedical/R&D Fort Collins, CO 970-266-8027 970484-8433 Construction $1,200,000 10% Feb-01 4715 Innovation Dr. Bill Newland Vaught Frye Hercules Industries . office/ Warehouse ......... Fort Collins CO ....._..__--'. ............. 970-225-9016 ....._._ _.. 970 224 1197 _.... ._...._.__........................ -... New Addition ..--__ ...._....$1,.._.... $1 162,760 . __ 10% _._.._._.. Sep-00 148 E. Foothills Pkway Jim McWilliams Vaught Frye Retail _..._. Goodyear Tire Center Retail Rennovation Fort Collins, CO 970-482-9533 970-224-1197 Rnnovation $600,000 20% Oct-00 201 W. 67th Court Randy Willer Architecture West New Vi-Per Vet Clinic 2 veterinary bld s. Loveland, CO 970-278-0668 970-204-0424 Construction $2,100,000 10% Au -00 3550 Eastbrook Dr. Lyle Sampson United Media Office TF Fort Collins, CO 970-377-4160 None Tenant Finish $202,000 300/6 May-00 2330 East Prospect Neenan Interior New Veeco/lon Tech -......-" ........... High Tech R&D ..... .. ......... Fort Collins, CO -_... Veeco/lon Tech 970-493-8747 Construction $806,000 10% Apr-00 Projects completed by year Page 2 JOHN BAKER CONSTRUCTION MANAGER DELTA CONSTRUCTION, INC. EXPERIENCE: 1999 - PRESENT DELTA CONSTRUCTIONS INC., FORT COLLINS, COLORADO Preconstruction Manager 1992 -1999 THE NEENAN COMPANY, FORT COLLINS, COLORADO Preconstruction Manager/Project Manager 1986 -1992 HENSEL PHELPS CONSTRUCTION COMPANY9 GREELEY, COLORADO Project Engineer MAJOR PROJECTS INCLUDE: • The Ranch at Larimer County Fair Grounds: five pre-engineered metal buildings totaling 230,000 square feet. These buildings include the Maintenance Building, Exhibition Building, Indoor Arena along with the East and West Livestock Pavilions, Loveland, Colorado. • Obermann Dental Office: Preconstruction services for 12,000 square foot dental office building including a fun play area manufactured by Delta Play Company consisting of a series of tubes and platforms, Fort Collins, Colorado. • Vision Graphics: Preconstruction services for a 22,000 square foot site -cast high bay warehouse addition to existing facility located near Loveland Airport, Colorado. • Cytomation I, II, III: Preconstruction services for three one-story brick buildings totaling 80,000 square feet. Consists of storage, lab, and office areas in Fort Collins, Colorado. • Hercules Industries: Preconstruction services for a 12,000 square foot masonry addition with matching facade to an existing building; including an additional 12,000 square foot spec office/warehouse. • Veeco/Ion Tech: 24,000 square foot pre -cast core and shell .building. • Vi-Per Investments: Preconstruction services for a 12,000 square foot, two- story, core and shell finish. • Ball Aerospace & Technologies Corp: 117,700 square foot, $13 million R&D facility for the development of high tech communication devices. The facility includes a 30,000-gallon immersion tank, 90,000 square feet of high bay testing and integration space with 15-ton overhead cranes, and 27,000 square foot office space. This project is located adjacent to Jefferson County Airport and required extensive coordination with FFA and Airport Authority, Broomfield, Colorado. • Quantum Peripherals -Phase 2: An additional 67,000 square feet of research facility and approximately 20,000 square feet of two-story office space, Louisville, Colorado. • Quantum Peripherals -Phase 1: 190,000 square foot facility with 60,000 square feet of two-story office and cafeteria space and 130,000 square feet of high bay research and utility support spaces at a total project cost of $49 million, Louisville, Colorado. John Baher, Constrtmion Vlanagar; Delia Construction, Inc. F'a-e • Longmont United Hospital: Five story patient bed tower located on the existing LUH campus. Facility includes two floors of patient recovery rooms, NICU, cafeteria, meeting rooms, conference rooms, lobby and administrative space, Longmont, Colorado. • Rocky Mountain Cancer Center: This three story 39,000 square foot facility required extensive negotiations with Denver's Uptown Hospital District to meet their design and construction covenants, Denver, Colorado. • Midtown Surgery Center: 18,000 square foot outpatient surgery center consisting of pre and post operation, four operating rooms, twenty-three hour recovery rooms and administrative space, Denver, Colorado. • Plum Creek Medical Center: 12,000 square foot gatekeeper facility consisting of medical office, imaging and emergency care, Castle Rock, Colorado. • Poudre Valley Hospital -A, B and C Wing Remodel and Additions: $18 million addition of fourth and fifth floors to existing wing and new construction of B Wing and C Wing, Fort Collins, Colorado. • Colorado Convention Center: $95 million convention center for the City and County of Denver constructed in a fast track, design build format in eighteen months, Denver, Colorado. OTHER PROJECTS: Assignments with HPCC prior to being promoted to Project Engineer include Stapleton B Concourse for United Airlines in Denver, Colorado, the Atlas Centaur facility for General Dynamics in San Diego, California, the Device Assembly Buildings for the Department of Energy near Las Vegas, Nevada and the Blade Repair facility for the U.S. Air Force at Tinker Air Force Base, Oklahoma — among others. EDUCATION: DECEMBER 1985 COLORADO STATE UNIVERSITY, FORT COLLINS, COLORADO Bachelor of Science in Industrial Construction Management John, Bakcr, {'onstrucdon eta na er, Delta Construction, lac. Pao-1 GREG ORR DIRECTOR OF OPERATIONS DELTA CONSTRUCTION, INC. EXPERIENCE: 2000 DELTA CONSTRUCTION COMPANY, INC., FORT COLLINS, COLORADO Director of Operations 1992 — 2000 NEENAN COMPANY Senior Project Manager 1991-1992 ADOLFSON & PETERSON Field Engineer 1988 —1989 WALTERS CONSTRUCTION MANAGEMENT Labor Foreman 1986 —1987 F.R ORR CONSTRUCTION COMPANY Laborer MAJOR PROJECTS INCLUDE: • Kids Harbor Daycare: 11,200 square foot day care facility constructed of wood frame with EFIS and timber architecture, Loveland, Colorado. • Obermann Dental Office: 12,000 square foot dental office with the latest in technology and innovations, Fort Collins, Colorado. • Vision Graphics: 22,000 square foot tilt up structural addition to existing production floor, Loveland, Colorado. • Cytomation Phase I and ll,: Two buildings totaling 80,000 square feet of storage/lab/R&D/office space, Fort Collins, Colorado. • Dovatron: 72,000 square foot office and production facility, Longmont, Colorado • Union Medical Campus Phases I and II: 6.5 million dollar, 145,000 square foot, medical office building, Colorado Springs, Colorado. • Boston Chicken Corporate Headquarters: 92,000 square feet ($9,600,000) Phase 11 of Boston Chicken/ Einstein Bagels Headquarters, Golden, Colorado • Triad West: 105,000 square foot spec warehouse/office/production facility, Golden, Colorado • Balzers Thin Films: $1,200,000 tenant finish with classroom and clean rooms, Golden, Colorado • Quantum SSPG: 460,000 square foot office, warehouse, and production facility including a 700 person full service cafeteria, Colorado Springs, Colorado • 1899 Wynkoop: 270,000 square foot, $17,600,000 office, retail and underground parking, Denver, Colorado Crcg On', Project Manager, Ddta C mstnuction, Inc, Page 1 EDUCATION: 1992 COLORADO STATE UNIVERSITY, FORT COLLINS, COLORADO Bachelors of Science, Construction Management 1996 Primavera training courses including P3 scheduling and expedition Cleanroom Design Build workshop, Arizona State University. 1997 Alliance for Construction Excellence Clean room Taskforce hosted by Arizona State University's Del E. Webb School of Construction. Grey? On-, Project Manager, J.Mt t C omtrucdon, Inc. Page 2 PAUL HOFFMAN PRESIDENT DELTA CONSTRUCTION, INC. EXPERIENCE: 1993 — PRESENT DELTA CONSTRUCTION COMPANY, INC., FORT COLLINS, COLORADO President Delta is a General Contracting firm with over 25 years of experience in Southeastern Wyoming and Northern Colorado. Annual sales of $11 million 1988 —1993 THE NEENAN COMPANY, FORT COLLINS, COLORADO Project Manager Responsible for owner coordination, contract administration, subcontractor negotiation, project buyout, project scheduling and estimating. MAJOR PROJECTS INCLUDE: • Northgate Office Building: 10,200 square foot office building in Laramie, Wyoming. • First National Bank of Wyoming: Branch bank in Laramie, Wyoming. • First National Bank: Two banking facilities with drive -ups in Loveland, Colorado. • Centennial Medical Office Building: 70,000 square foot MOB in South Denver, Colorado. • First National Bank Plaza: Branch bank in Fort Collins, Colorado. • First National Bank: Drive -up remodel for main bank in Fort Collins, Colorado. • Custom Homes at Ptarmigan Golf Course in Fort Collins, Colorado. • Custom Homes in Laramie, Wyoming • McCarty Honda/KIA: Showroom and detail area in Laramie, Wyoming. • United States Wildlife: Tenant improvements for Government R&D Lab in Fort Collins, Colorado. • Front Range Steel: 14,000 square foot steel fabricating plant with separate office building in Wellington, Colorado. • River Bend Park Phase I & II: Self -developed 15,000 square foot industrial/commercial building in Laramie, Wyoming. • Bowman Brewpub in Downtown Laramie, Wyoming. • Fish's Liquor Mart: 10,000 square foot precast concrete building in Fort Collins, Colorado. • Orthopedic Center of the Rockies, MRL 3,526 square foot magnetic imaging medical office building in Fort Collins, Colorado. • Oppenheimer Management Corporation: 42,970 square foot two-story office and production building in Denver, Colorado. • Gerry Baby Products: 385,000 square foot facility including an office building (40,000 S.F.), 3 production buildings (71,000 S.F. each), and a warehouse building (131,000 S.F.) in Thornton, Colorado. • Donnelly Applied Films: 38,700 square foot office building in Boulder, Colorado. PaUl I loEfinran; I'resiticm. Delta Construction. Inc. Pale I • First Interstate Bank Drive -up Facility: 1,400 square foot drive -through banking facility in Fort Collins, Colorado. • First Interstate Bank Branch Office Facility: 3,800 square foot office banking facility in Fort Collins, Colorado. • Western Forge: 56,000 square foot production and warehouse facility in Colorado Springs, Colorado. • Data Ray: 65,000 square foot production facility for computers in Westminster, Colorado. • D.I.S.C.: 40,200 square foot high -end office building in Boulder, Colorado. • Builder's Square: 90,000 square foot retail/warehouse building in Fort Collins, Colorado. • Valli Hi Plaza: Project included a Walgreen's retail space and a complete renovation of a retail strip center in Colorado Springs, Colorado. • Broomfield Family Practice: 16,000 square foot medical office building in Broomfield, Colorado. • ESAB Automation: 108,000 square foot office and manufacturing facility in Fort Collins, Colorado. • Avista Medical Office Building: 40,000 square foot three-story medical office building in Louisville, Colorado. • Orthopedic Center of the Rockies: 43,000 square foot two-story orthopedic facility in Fort Collins, Colorado. 1987 — 1988 WESTERN STATES CONSTRUCTION COMPANY, INC., LOVELAND, COLORADO. Cost and Scheduling Engineer: Developed and maintained project schedules and overall project cost control. Estimator: Responsible for lump sum and unit price bids ranging in contract price from $200,000 to $20 million. Contract Quality Control Representative: Responsible for quality control, field inspection, submittal review and report documentation. Project Engineer: Responsible for project control, submittal administration, estimating and buyout. 1985 -1987 COLORADO STATE UNIVERSITY, DEPARTMENT OF INDUSTRIAL SCIENCES, FORT COLLINS, COLORADO. Instructor: Taught an evening graduate class in Microcomputer Applications in Construction. Software taught includes Lotus 1-2-3, Primavera, as well as database and word processing applications. Graduate Teaching and Research Assistant: Taught a graduate -level course in Computer Applications. Assisted in teaching a senior -level Scheduling and Cost - Control course, and taught six drafting fundamentals courses. SUMMER 1986 DELTA CONSTRUCTION COMPANY, INC., LARAMIE, WYOMING Estimator Managed entire bidding process for lump sum projects. Developed a computerized estimating system. JANUARY 1985 - M.A. MORTENSON CONSTRUCTION COMPANY, LAKEWOOD, COLORADO JULY 1985 Carpenter Worked in all aspects of carpentry for the construction of a $20 million Marriott Hotel. 1983 - 1986 INDEPENDENT CONTRACTOR 1 aLd l lof nan, President, Delta i'oastruction. Inc. ('a,ge 21 Designed, estimated and constructed residential construction projects. 1980 - 1985 DELTA CONSTRUCTION COMPANY, INC., LARAMIE, WYOMING Labor Foreman Supervised laborers and general construction fieldwork. EDUCATION: MAY 1987 COLORADO STATE UNIVERSITY, FORT COLLINS, COLORADO Master of Science in Construction Management MAY 1984 UNIVERSITY OF WYOMING, LARAMIE, WYOMING Bachelor of Science in Manufacturing Technology Paul Hoffman, President, I:3eltar Co structi.o.n Izac. Page 3 SECTION 00410 BID BOND KNOW ALT., MEN BY THESE PRESENTS! that we, the undersigned Delta Construction of Northern Colorado, Inc.as Principal, and "Emnlovers Mutual Casualty Comnanv Surety, are hereby hold and firmly bound unto the as OWNER, in the sum of $ 5% of total bid for truly to be made, we hereby jointly and severally assigns. Lne payment of which, well and bind ourselves, successors, and THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, CITY OF FORT COLLINS AND COLORADO STATE UNIVERSITY TRANSIT CENTER PHASE IA; Bid No. 5823. NOW THEREFORE, (a) -If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it .being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall,. in no event, exceed'the,penal'amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 2 I IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 5th day of November , 2003, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL Delta Construction of Name: Northern Colorado Inc Address: 208 Racquette Dr. '.ts Ill��.�.i , ATTEST: By; ($EAL) 7/96 L SURETY Employers Mutual Casualty Company P.O. Box 370010 Denver, CO 80237 By: Title: Attorney -in -Fact (SEAL) Section 00410 Page. 3 through 1 Delta Con CONTRAC O BY: Paul Hoffman - President ADDRESS: 208 Racquette Drive Ft. Collins, CO 80524 8. BID SCHEDULE (Base Bid) Please use the attached Bid Schedule when submitting your bid. 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPmT U Y UBMITT �l04L 11/5/03 Signature Date President Title A-99 License Number (If Applicable) (Seal - if Bid is by corporation) Attest C� J ^ter Address 208 Racquette Drive Ft. Collins, CO 80.524 Telephone 970-498-9766 7/96 Section 00300 Page 2 No Text City of Fort Collins & Colorado State University Transit Center -Phase IA BID SCHEDULE Each following Items shall include the costs of all labor, materials, tools, equipment, services, incidentals, overhead, profit, and bonds. ITEM 1. LANDSCAPE / IRRIGATION IMPROVEMENTS (INSIDE FENCE) Provide and install landscaping / irrigate improvements inside fence Also, include hydrant and drain sump as shown SUBTOTAL $ 2. PHONE SERVICE INCLUDING CONDUIT / BORING Two (2) 1" conduits including boring, trenching, backfill with flowfill, installation of emergency phone provided by others. SUBTOTAL $-2 l(a OU 3. All required work less above Items 1 and 2. SUBTOTAL $ Q, 00 TOTAL LUMP SUM r Section 00300 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM N0 ., .a A 0U-e(L iC'"% 7/96 SUBCONTRACTOR Section 00430 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Delta Contruction of Northern Colorado, Inc. 2. Permanent main office address: 208 Racquette Dr., Ft. Collins, CO 3. When organized: 1975 4. If a corporation, where incorporated: Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name?5 years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) See attached "Work Under Contract"/ 7. General character of Work performed by your company: General Contractor -Commercial Construction 8. Have you ever failed to complete any Work awarded to you? no. If so, where and why? 9. Have your ever defaulted on a contract? No If so, where and why? 10. Are you debarred by any government agency? If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. See attached "Delta Projects Completed by Year" 12. List your major equipment available for this contract. Pick-up trucks, skidsteer, demo saws. 13. Experience in construction Work similar in importance to this project: CSU Ropes Course, Larimer County Community Corrections project, The Ranc at arimer oun y Fairgroun s 14. Background and experience of the principal members of your organization, including officers: See attached resumes 15. Credit available: $ 16. Bank reference: FirGt National Rank, Todd Camnhell (970) 482 4861 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes — 18. Are you licensed as a General CONTRACTOR?Yes If yes, in what city, county and state? CO- Love land & Ft. 'CollinSWhat class, license and numbers? Class I-2589, Class A-99 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? 80% and to whom?grading, concrete paving, irrigation 20. Are any lawsuits pending against you or your firm at this time? No If DETAIL yes, 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL $3,000,000 What company? Travelers Insurance 22. What are your company's bonding limitations? Single Project - $5,000,000 Aggregate Program - $8,000,000 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at 3:00 p.m. this 5th day of November 2003_ Del C n uction of lNorthern Colorado, Inc. Name of B d By: r A M , Title: President State of Colorado County of Larimer Paul B. Hoffman being duly sworn deposes and says that he is President ofDelta Construction of NC and that .(name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this 5th N vember20 03. of y Public My commission expires�� day of kY P JEANNA M. WHIPPLE ' f �5'S5�7.w .......... My Cb on E;m Aug. 31. =5 7/96 Section 00420 Page 3 WORK UNDER CONTRACT CONSTRUCTION, INC Start Schedule Project Name Owner/Client Architect Facility Type Construction Type Contract Amount Date % Complete Completion Hawk Architecture Merl Hayworth Trill dro _TriHydro 970-223-8471 New Bi@dhi New Construction $ 1,935,000 Oct-03 1% Regis University 'Temp Classrooms Charlie Lockman None Office Renovation ------ 50o Sep-03 Dr. Kent Oberman Vaught Frye Obennann Waiting Room 970-223-8687 970-224-1191 Dental Office Addition 127 00 99% ------ ------ 1­11 -------- ... ..... ------ _M�yQ3.... Value Plastics Mike Rainsberger Value Plastics 970-223-9769 None ----- - ­­­­ ----- ----- - Office Remodel Renovation $ 300,000 Aug-03 47% Oct-03 -- -------- - - ----- — - ------- Building Specialties, Inc. Storm Repair Charlie Lockman None Retail/Manufacturing Renovation 242,800 May-03 $ 47% Oct-03 Rg:ks AMT Rebuild— Charlie Lockman None Office/Manufacturing Renovation $ 415,500 May-03 80% Sep -03 Advanced Manufacturing Technologies Merl Hayworth ,Technologies Erica Bried 970-223-8471 Office/Manufacturing New Construction $ 1,098,845 Feb-03 90% Oct-03 Colorado State University Bill Conn CSU Ropes Course . ... .. ... Per Course New Construction 118,866 Jun-03 95% Oct-03 - ------ Laramie Ice Arena City of Laramie Nortrak Robert Krenser Olson Lavoie 303-294-9244 Entertainment Facility Interior Finish 700 May-03 99% Oct-03 Pre-engineered Metal None Building New Construction 302,048 Jul-03 49% Nov-03 Neenan Co. Rio Grande Hospital Valley Citizens Foundations 970493-8747 Medical Facility $ 525,000 Dec-03 1% Jan-04 kiSUArcliit�dure city offonicollins Construction Latimer County Babs Comel Jerry Poole Community Corrections 970-498-5907 307-238-8968 Correctional Government New Construction $ 4000,000 Mar-03 1% ----- - I _Apr-04 Colorado State University Bill Conn CSU Dairy Patti None Demo Building ------ Demolition .... 80,862 Hold 0% Work Under Contract Page 1 CONSTRUCTION, INC. Delta Projects Completed by Year Contract % Self Name Description Project Address Owner/Client Architect Facility Type Amount Performed Finish Date Year 2003 City of Laramie Interior Finishes to Core 3510 Garfield St. Gary Remington Olson Lavoie Laramie Ice Rink & Shell Laramie, WY 307-721-5271 303-294-9244 Tenant Finish $460,700 30% Oct-03 5225 Yellowstone Blvd. Sheryl Asmus Hawk Architecture New Cool River Wine & Spirits Retail Building Cheyenne, WY 307-635-1669 970-223-9471 Construction $483,487 15% Jun-03 Bullock & Smith 4 Pre-engineered Metal Crossroads Blvd. Larimer County Tommy Wade New Larimer County Fairgrounds Buildings Loveland, CO 865-546-5772 Construction $3,232,895 20% Jun-03 Erica Bried Randell Johnson New Advanced Manufacturing Office/Manufacturing Patton Avenue in Lovelan, 970-416-7577 970-686-7464 Construction $1,098,845 10% Oct-03 Nortrak Pre-engineered Metal 1740 Pacific Avenue Robert Krenser New Nortrak Building Cheyenne, WY 307-778-8700 None Construction $302,050 10% Nov-03 1501 Academy Court Charlie Lockman Re 's Universi Buildin R air Fort Collins, CO 970-215-1704 None R air $415,500 20% S -03 3325 Timberline Rd. Mike Rainsberger Value Plastics 2nd Floor Office Remodel Fort Collins, CO 970-223-9762 None Remodel $300,000 300% Sep-03 7320 Greendale Road Randy Vlandered Hawk Architecture New Legacy Counters OfficelManufactunng Windsor, CO 970-416-9143 970-223 8471 Construction $525,814 15% Jun-0 Centre Ave University New . ................................ . CSU Ropes Course Sitework/Ropes Course Fort Collins, CO Bill Conn Per Hogestad Construction $118,866 20°(o Oct-03 Year2002 2235 E. Mulberry Doug Johnson ABE Designworks New John Industrial Fort CO 303-931-5021 303-926-7801 Construction $300,000 15% 7330 Greendale Road Paul Hoffman Hawk Architecture New .Collins, DCI Windsor Highlands Office/Industiial Windsor, CO 970-218-8750 970-223-8471 Construction $265,000 15% Jun-03 1220 Oakpark Drive Dr. Kent Obermann Vaught Frye New ToodiZone Dental Office Fort Collins, CO 970-223-8687 970-224-1197 Construction $1,051,297 10% Mar-02 327 S. Link Lane Lynn Mecham Hawk Architecture Carriage Shoppe Industrial Fort Collins, CO 970482-3597 970-223-8471 Addition $433,480 10% May-03 Projects completed by year Page 1