BID FORM
PROJECT: US 287 CROSSWALKS; BID NO. 5816
Place Fort Collins
Date October 23, 2003
1. In compliance with your Invitation to Bid dated C)tA- ( .20V 3 ,
and subject to all conditions thereof, the undersigned
G.L. Hoff Company a "(Corporation, t-iffri�---ri�rlrrl-ity
Eery,-P�rtnerShiTr,-t-�ientnr- tsr-�a�CT-ppapTyzZZSY�j ** authorized to do
business in the State of Colorado hereby proposes to furnish and do
everything required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid bond
in the sum of 5% of bid amount ($
) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the .corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: Employers Mutual Casualty Company, PO Box 370010, Denver, CO 80237
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through
7/96 Section 00300 Page 1
Sitework and Utilities for New Kuck Mechanical Building
Subcontracted the sitework and utilities for the new Kuck Mechanical
building to Delehoy Construction. Scope of work included overlot
grading, structural fill, building excavation, foundation insulation, underslab
gravel, fine grading, installation of sewer line, storm drainage, waterline,
fireline and asphalt patch.
Owner: Kuck Mechanical, Inc.
General Contractor: Delehoy Construction
3109 South Taft Hill Road
Fort Collins, CO 80526
Contact: Mark Delehoy, 970-226-0836
Contract: $1251840.00
Change Orders: three $7,008.00
Own Forces: 100%
Completion: March, 2002
Pedestrian Links to Transfer Areas
Street and sidewalk improvements for City of Loveland Bus system.
Scope included removal and replacement of concrete curb, gutter,
sidewalk, cross pans, bus pads and crosswalk, and asphalt paving as per
Federal and CDOT specifications.
Owner: City of Loveland
105 West 5th Street
Loveland, CO 80537
Contact: Donna Camilliere-Frye
Project Manager, 970-96202511
City of Loveland Engineering Department
Contract: $72,737.88
Change Orders: one $16,614.58 (quantity bid)
Own Forces: 85%
Completion: July, 2002
Chlorination System Improvements
Construction of a new 11 feet wide by 25 feet long by 6 feet deep concrete
chlorine contact basin with perimeter handrail, a new chlorine solution
pump and appurtenances for the wastewater treatment plant in Pierce.
Owner: Town of Pierce
240 Main Street
Pierce, CO 80650
Contact: Steven Butherus, Project Manager
Ketterling, Butherus and Norton Engineers LLC
820 8th Street Plaza, Greeley, CO 80631
970-395-9880
Contract: $33,811.50
Change Orders: none
Own Forces: 95%
Completion: June, 2002
Colorado State University Equine Center Detention Pond
Construction of a 6 acre-foot earthen retention pond including excavation,
sitework, seeding,
sluice gate, portable slurry pump and irrigation sprinkler.
Owner:
Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact:
Jim Stoddard, Project Manager, 491-0138
Contract:
$154,410.00
Change Orders:
none
Own Forces:
94%
Completion:
August, 2002
Nick Davidson, Inc. Remodel
Remodeling of existing building for detailing, parts storage, and wash bay
for auto dealership.
Scope of work included landscaping, site concrete,
masonry, interior finishes, overhead doors, roofing, heating, air
conditioning, and electrical.
Owner:
Nick Davidson, Inc
1604 North Lincoln Avenue
Loveland, CO 80538
Contact:
Joe Gebhardt, owner, 970-667-3950
Contract:
$270,002.00
Change Order:
four Add $30,321.27
Own Forces:
58%
Completion:
August, 2002
Lower Hoffman Lake Spillway / Outlet Modification Project
Demolition and removal of existing bridge abutments and spillway outlet
structure including dewatering. Construction of structural concrete and
reinstallation of bridge and sluice gate. Removal and replacement of
concrete bike path and riprap.
Owner: Seven Lakes Reservoir Company
808 23rd Avenue, Greeley, CO
Contact: John Gauthiere, Engineer, 970-330-0855
Gauthiere Engineering
2157 Buena Vista Drive
Greeley, CO 80634
Contract: $103,135.07
Change Orders: none
Own Forces: 100%
Completion: October, 2002
Douglas Lake Boat Dock
Installation and construction of floating boat docks, concrete approach and
support ramps, pedestrian
pathway, and wood retaining wall.
Owner:
State of Colorado Division of Wildlife
6060 North Broadway
Denver, CO 80216
Contact:
Kay Sinclair, Project Manager, 970-472-4433
Contract:
$89,256.00
Change Order:
two Add $8,842.75
Own Forces:
100%
Completion:
October, 2002
Benner Office Building
Subcontracted a portion of the work for the construction of the office
building at 3760 East 15th Street, Loveland, CO. Scope or work included
all excavation, utilities and site concrete for phase 2 including the
completion of 15th Street and building concrete.
Owner: Benner Holdings, LLC
Loveland, CO
Contact: Jeryl Benner, Manager, 970-566-9778
Benner Development Company, LLC
3053 Nature Run
Loveland, CO 80537
Contract: $109,017.00
Change Orders: one Add $373.00
Own Forces: 100%
Completion: October, 2002
Johnstown Ready Mix Batch Plant
Construction of new concrete batch plant facility including excavation and
site work, caissons, foundation, construction of pre-engineered metal
building, mechanical, electrical, interior finishes, and construction of a
truck washing facility.
Owner: Loveland Ready Mix Concrete, Inc.
PO Box 299
Loveland, CO 80539
Contact: Steve Fancher, VP, 970-667-1108
Contract: $323,152.00
Change Orders: three Deduct: ($4,179.68)
Own Forces: 61%
Completion: October, 2002
Annual Trial Gardens Shade Structure
Construction of a custom metal structure and roof system for Colorado
State University shade gardens. The project included sitework, concrete
foundation, brick veneer and colored patterned concrete walkways.
Owner: Colorado State University
365 Aylesworth Hall Southeast
Fort Collins, CO 80523
Contact: Cass Bietler, Project Manager, 970-491-0158
Facilities Management
Colorado State University
Fort Collins, CO 80523
Contract: $165,480.33
Change Orders: three, Add: $46,507.33
Own Forces: 42%
Completion: January, 2003
G.L. Hoff Company
2001 Projects
Elkhorn Retail Shops
Construction of a new, two story, 16,000 square foot retail building in Estes
Park. The scope of work included contaminated soil remediation,
foundation, utility lines, building construction, rough in for twelve retail
units, exterior finishes, elevator, mechanical and electrical.
Owner: Ed Grueff, 970-586-5421
3225 Devils Gulch Road
Estes Park, CO 80517
Contact: owner
Contract: $1,363,217 .00
Completion: November, 2001
Edora Skate Park
Construction of a new concrete, in ground, skate board park with flat and
vertical curved concrete work. Scope of work included excavation,
structural steel, and shotcrete work.
Owner: City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact: Jason Stutzman, 970-221-6366
Park Planning and Development
Contract: $347,846.00
Completion: August, 2001
East Drive to Center Street Steam Loop
Construction of concrete trench and installation of steam piping for
Colorado State University. Scope of work included excavation, structural
concrete, and mechanical work.
Owner: Colorado State University
365 Aylesworth Hall Southeast
Fort Collins, CO 80523
Contact: Cass Beitler, Project Manager, 970-491-0158
Contract: $702,443.00
Completion: August, 2001
Pella Crossing Irrigation System Improvements
Installation of a new submersible pump and guide rail system and
construction of a new set well and piping. Scope of work included removal
of existing lake pump, wet well, catwalk and discharge piping, and
installation of meter pit, discharge line, suction line, intake screen, slide gate,
and sitework.
Owner: Boulder County
2040 14th Street
Boulder, CO 80302
Contact: Kenneth V. Sjodin, 720-622-0109
Boulder County Parks and Open Space
Contract: $92,305.85
Completion: May, 2001
George Rist Dam Rehabilitation Project
Construction of new outlet structure, repair of damaged section of dam and
replacement of riprap. Scope of work included excavation, sitework,
structural concrete and pipeline installation.
Owner: City of Loveland
500 East Third Street
Loveland, CO 80537
Contact: Rod Chapman, Project Manager, 970-962-2454
Contract: $157,918.00
Completion: July, 2001
Geist Reservoir Dam Rehabilitation Project
Repair of dam and outlet. Scope of work included construction of coffer
dam and excavation for new outlet, installation of outlet, upstream and
downstream headwalls, sluice gate, staff gage and trash rack, removal and
replacement of existing spillway culvert, raise top of dam, and set riprap.
Owner: Frank Walsh
PO Box 30
Sterling, CO 80751
Contact: David Marsh, Project Engineer, 970-490-2620
Smith Geotechnical Engineering Consultants
Contract: $37,895.25
Completion: February, 2001
Sheldon Lake North Shore
Construction of concrete and crusher fines pavement and access ramp.
Install a stone cap on the existing wall, and provide furnishings and
related site work for the north shore of Sheldon Lake.
Owner: City of Fort Collins
215 North Mason Street
Fort Collins, CO 80521
Contact: Hetty Bixby, Project Manager, 970-416-2192
Contract: $84,180.00
Completion: December 2001
Loveland Financial Center
Subcontractor to Big T Construction for construction of the site grading,
site concrete and parking lot at the new commercial building.
Owner: Loveland Financial Center
West 37th Street, Loveland, CO 80538
Contact: Jasper Johnson, Bid T Construction, 970-635-0503
Contract: $68,272.00
Completion: December 2001
G.L. Hoff Company
Construction Experience
Gregory L. Hoff, President and Construction Manager
For the past thirty years, Greg has been involved with all aspects of construction. Greg
established G.L. Hoff Company in 1984. Serving as president and project superintendent,
Greg is a driving force in the company.
Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering
Technology, his early work included surveying and architectural design and drafting. He
has held a Class B Commercial Contractor's License with the City of Fort Collins since
1976. Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, and
Boulder.
Prior to 1984, Greg worked with AI Hockett, Inc. initially as an architectural draftsman and
progressing to project superintendent. He was also a partner in H&M Builders from 1976
to 1980. This company specialized in custom homes, tenant finish and custom millwork.
Beginning in 1984, Greg established G.L. Hoff Company, a commercial general contracting
company which specializes in all types of commercial construction including sitework,
excavation, structural concrete, and commercial buildings. As president and construction
superintendent for G.L. Hoff Company, Greg supervises a wide variety of projects
including, schools, churches, city and government projects, city park developments, as well
as many light industrial and concrete construction jobs. Greg oversees project scheduling,
review of construction procedures and specifications, monitors quality control and safety
enforcement on job sites. As president and construction supervisor, Greg works closely
with project owners, architects and engineers throughout the project.
Greg is an active member of the Loveland construction community. He has volunteered his
time to the Loveland Construction Advisory Board for over 15 years. While serving as
Chairman, this Board, the city adopted licensing for contractors. He is currently serving on
a review committee to study the International Building Code prior to adoption by the City
of Loveland.
Joel S. Reger, Estimator and Project Manager
Joel has a Bachelor of Science Degree in Construction Management from Colorado State
University and seventeen years experience in the construction field. He has continued his
education with estimating seminars including training with American Building Company's
estimating Access workshop. He is also an active member of the Sigma Lambda Chi
honorary national construction fraternity.
During the past thirteen years, as the chief estimator with G.L. Hoff Company, Joel has
compiled bids and development estimates for projects valued at up to five million dollars.
As chief estimator, he directs the project bidding process as well as the review of
specifications. He also works directly with project management, coordinating proposal
requests and change orders with the architect or owner, overseeing material orders to insure
that the project is completed in a timely manner and according to specifications. Joel is an
important and effective member of every Design -Build project with G.L. Hoff Company.
He works closely with the owner and architect to understand project goals and provide
detailed project budgets and construction options to meet the owner's needs.
William L. Vance, Project Superintendent
Bill brings over twenty six years of experience in construction related fields to his position
as project field supervisor. His background includes heavy equipment operating, truss
construction, carpentry, and cost estimating. He also has experience in both commercial
and residential property development from site work and utility lines through finish
carpentry. Bill has built over five hundred new homes as well as several light commercial
properties. He has supervised many projects with G.L. Hoff including the Elkhorn Retail
Shops, and the ATI Remodel and Addition. His commanding knowledge of construction
methods enables Bill to be an effective field superintendent.
7
G.L. Hoff Company
CONTRACTOR
BY: Joel S. Reger, Vice President
ADDRESS: 1815 Wbst 12th Street
Loveland, CO 80537
8., BID SCHEDULE (Base Bid)
Please use the attached Bid Schedule when submitting your bid.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the total Agreement Price.
RESP T tMITTED:
Sign r Date
Tit e
#B-6
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:
Mir am T. Hoff, t4uVtary Treasurer
Address 1815 West 12th Street
Loveland, CO 80537
Telephone 970-669-3255
7/96 Section 00300 Page 2
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned G. L. Hoff Company
as Principal, and Employers Mutual Casualty Company as
Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado,
as OWNER; in the sum of $ 5% of total bid for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction
of Fort Collins Project, US 287 CROSSWALKS; BID NO. 5816.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it .being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
7/96 Section 00410 Page 2
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this 23rd day of October , 20 03, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCIPAL
Name: G. L. Hoff Company
Address: 1815 W. 12th St.
Loveland, CO 80537
By:
Title:
(SEAL)
7/96
SURETY
Employers Mutual Casualty Company
P.O. Box 370010
Denver(, �CO 80237
Title: Attorney -in✓✓✓ -Fact (�
(SEAL)
Section 00410 Page 3
No Text
SECTION 00330
BID SCHEDULE
US 287 Crosswalks - College and Laporte Intersection
City of Fort Collins Bid No. 5816
CDOT Project No. SHE M455-058 (13777)
Item No.
Description
Unit
Contract
Quantity
Estimated Cost
Unit Cost
Total Project Cost
202.01
Removal of Concrete Pavement
SY
652
S 10 . $
S 7,041.60
202.02
Removal of Concrete Mat (Medians)
SY
13
S 10.8c
S 140.40
202.03
Removal of Curb &Gutter
LF
III
S 3.6
s 399.60
202.04
Removal of Sidewalk & Ramps
SY
252
S 10. 8C
S 2,721.60
-202.05
Removal of Pavers
SF
260
S 1.0
$ 260.00
202.06
Removal of Traffic Signal Pole Concrete Base
EA
1
S 357.0(
s 357.00
208.01
Erosion Control
LS
I
S 482. OC
$ 482.00
210.01
Modify Inlet
EA
I
s 3 , 217.0
s 3,217.00
210.02
Adjust Manhole
EA
1
S 312.0(
$ 312.00
210.03
Adjust Valve Box
EA
I
S 282.0
S 282.00
403.02
Hot Bituminous Pavement Patching -Grading S
TON
14
$ 181 . 5
$ 2 , 541.00
412.01
Concrete Pavement (6") (Patching)
SY
171
S 27 . 1
$ 4,634.10
412.02
Concrete Pavement (10")(Colored Concrete Crosswalk)
SY
405
$ 70. 3
$ 28,491.75
608.01
Concrete Sidewalk (6")
SY
350
$ 28.8c
s 10,097.50
608.02
Concrete Curb Ramp (6")
SY
22
$ 42. 7
s 940.50
608.03
Concrete Curb Ramp (Special)
SY
40
$ 80. 2
S - 3,210.00
608.04
Detectable Warnings (Truncated Domes)
SF
251
$ 24.6(
S 6,174.60
609.01
Curb & Gutter Type 2 (Section IIB)
LF
89 _
$ 12 . 0
s 1,068.00
609.02
Curb Type 2 (6' Barrier) (Section B) (6" wide)
LF
I I -
S 13.8c
$ 152.35
609.04
Curb Type 2 (6' Barrier) (Section B) (18" Wide)
LF
I I
$ 17.5c
S 193.05
610.01
Brick Pavers (Type 1)
SF
160
S 20.2c
S 3,240.00
610.02
Brick Pavers (Type 2)
SF
884
S 20. 2c
s 17,901.00
625.01
Construction Surveying
LS
1
$1 , 200. 00
S 1,200.00
626.01
Mobilization -
LS
1
$1, 513 . 00
$ 1,513.00
630.01
Construction Traffic Control
LS
1
s6,169.00
s 6,169.00
TOTAL COST $ 102,739.05
One hundred two thousand seven hundred thirty nine Dollarsand .five Cents.
Signed 47_()/ Address
Company . Hoff Company
Check One:
Individual Doing Business in Company Name
X Corporation
Partnership
1815 W. 12th Street
Loveland, CO 80537
Phone/Fax 970-669-3255, fax 970-663-1566
Section 00300 Page 3
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410Bid Bond
00420Statement of Bidder's Qualifications
00430Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM
SUBCONTRACTOR
Traffic Control Northern Colorado Traffic Control - MBE
Brick Pavers Creative Hardscape - MBE
7/96 Section 00430 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All
questions must be answered and the data
comprehensive.
given must be
This statement must be notarized. If
clear and
be
necessary, questions
answered on separate attached sheets. The Bidder
may
information
may submit any
he desires.
additional
1.
Name of Bidder: G.L. Hoff Company
2.
Permanent main office address: 1815 West 12th Street, Loveland,
CO 80537
3.
When organized: January 1984
4.
If a corporation, where incorporated: Colorado, October 1989
5•
How many years have you been engaged in the contractingbusiness
present firm or trade
under your
name? 19 ears
6•
Contracts on hand: (Schedule these, showing the amount of each
the
contract
appropriate anticipated dates of completion.)
and
Fish Creek Pedestrian Trail, Estes Park, $262,922. 12-2003
UNC Apartment Playground, Greeley, $116,004. 12-2003
DOW Bellvue Hatchery Drain, Bellvue $ 17.073. to-2on1
7• General character of Work performed by
your company:
Commercial general contractor: complete the following areas with our
own forces: sitework concrete, carpentry, ro ect management
8. Have you ever failed to complete any Work awarded to you? no
If so, where and why?
9. -Have your ever defaulted on a contract?
If so, where and why?
10. Are you debarred by any government agency?
If yes list agency name.
7/96
no
Section 00420 Page 1
11. List the more important projects recently completed by your company, stating
the approximate cost of each, and the month and year completed, location
and type of construction.
Please refer to the attached information
12. List your major equipment available for this contract.
dumu truck CAT 928 loader, CAT 320 track excavator, backhoe, bobcat,
motor grader, gradingtractor, concrete pump.
13. Experience in construction Work similar in importance to this
project:
Please refer the attached lists
14. Background and experience of the principal members of your organization,
including officers:
PlPage refer to the attached lists
Credit available: $ 200,000.
Bank reference: Loran Emmonds, Bank Otte Loveland, CO
Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
Are you licensed as a General CONTRACTOR? yes
If yes, in what city, county and state? Fort Collins and others What
class, license and numbers? #RA
Do you anticipate subcontracting Work under this Contract? yes
If yes, what percent of total contract?less than 15%
and to whom? seeding
Are any lawsuits pending against you or your firm at this time?
If
DETAIL
no
7/96 Section 00420 Page 2
yes,
21
What are the limits of your public liability?
2 million liabilit with 2 million umbrella
What company? Agent: Flood & Peterson, Travelei
22. What are your company's bonding limitations?
5 million range
DETAIL
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at Loveland this 23rd day of October 20 03
G.L. Hoff Company
Name of Bi r
Title: Miriam T. Hoff, Secretfry' Treasurer
State of Colorado
County of
Larimer )
Miriam T. Hoff being duly sworn deposes and says that he is
Sec.Treas. of G.L. Hoff Company and that
(name of organization)
the answers to the foregoing questions -and all statements therein contained are
true and correct.
Subscribed and sworn to before me this Z� `L day of
2001.
Notary Public
My commission expires
7/96 Section 00420 Page 3
G.L. Hoff Company
2002 Projects
Estes Park Sanitation District Centrifuge Building
Construction of a new concrete block building with precast tee
construction for a centrifuge. The work included piping, valves, electrical
and instrumentation.
Owner: Estes Park Sanitation District
1201 Graves Avenue
Estes Park, CO 880517
Contact:
Jim Duell, District Manager 970-586-2866
John Burgeson, 970-223-9600
Shepherd Miller Inc., Project Engineer
Contract:
$264,053.00
Change Orders:
one $2,586.00
Own Forces:
55%
Completion:
January, 2002
Rehabilitation of Owl Creek Ditch Hydraulic Structures
Removal and replacement of ten concrete hydraulic structures, providing
and installing 25 meter gates, 21 precast concrete flumes, and construction
of 4 cast -in -place flumes and other miscellaneous headwalls and structures
along the Owl Creek Ditch.
Owner: Owl Creek Supply and Irrigation Company
PO Box 206
Eaton, CO 80615
Contact: Duane Smith, 970-490-2620
Smith Geotechnical
Contract: $383,000.00
Change Orders: three $29,476.50
Own Forces: 100%
Completion: April, 2002