Loading...
HomeMy WebLinkAboutPrebid - BID - 5818 SOFT GOLD PARK (2)CITY OF FORT COLLINS SOFT GOLD NEIGHBORHOOD PARK PRE -BID MEETING NOTES WEDNESDAY, OCTOBER 169 2000 10:00 I. INTRODUCTIONS/WELCOME H. ATTENDANCE SHEET III. BID OPENING IV. SCHEDULE 10:15 V. SUMMARY OF WORK VI. HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQUIREMENTS VII. SITE PLANNING & COORDINATION VIII. TRAFFIC CONTROL AND WORK AREA SAFETY 10:30 GENERAL QUESTIONS 11:00 PROJECT SITE TOUR I. II. CITY OF FORT COLLINS SOFT GOLD NEIGHBORHOOD PARK PRE -BID MEETING NOTES WEDNESDAY, OCTOBER 16, 2000 INTRODUCTIONS Jason Stutzman - Project Engineer Hetty Bixby - Project Landscape Architect Craig Kisling - Project Landscape Architect John Stephen - Senior Buyer Shaun Moscrip — Architect Chuck Ainsworth — Irrigation Designer COFC, Park Planning COFC, Park Planning COFC, Park Planning COFC, Purchasing Aller . Lingle Architects Rocky Mountain Rain ATTENDANCE SHEET - Be sure to register. BID OPENING Thursday, October 30, 2003 3:00 P.M. at Purchasing Office 215 North Mason 2°d Floor, Fort Collins (970)221-6366 (970) 416-2192 (970)221-6367 (970)221-6777 (970)223-1820 (907)227-7492 "Questions received less than seven (7) days prior to the date for opening of the Bids may not be answered" per section 00100. IV. SCHEDULE Notice of Award — aprox. November 6, 2003 Pre -Construction Meeting - Prior to issuing Notice to Proceed Construction - As soon as possible after Notice to Proceed TIMELINE REQUIREMENTS — Completion Dates for the Project Substantial Completion — May 31, 2003 Final Acceptance — June 30, 2003 CITY OF FORT COLLINS SOFT GOLD NEIGHBORHOOD PARK PRE -BID MEETING NOTES WEDNESDAY, OCTOBER 16, 2000 1 lulu K15TIL13 Was): , The City of Fort Collins Soft Gold Park project is located at 520 Hickory Street, approximately one -quarter (1/4) mile west of College Avenue on Hickory Street, Fort Collins, Colorado. The Work for the project includes earthwork grading; regulated stormwater drainage improvements; installation of water, sewer and electrical utilities; restroom; picnic shelter; plaza; playground (including concrete curb, and safety surfacing), baseball field, dog park, bicycle course, parking lot, soil preparation and fine grading, irrigation; landscaping, boulders, site furnishings and miscellaneous items of work. The site is approximately 17 acres in size of which approximately 11 acres will be disturbed and constructed upon. VI. HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQUIREMENTS Electronic File for Earthwork Gradine — will be made available upon request Superintendents - General Contractor is required to provide a designated full time superintendent on site at all times that Work is progressing. Liquidated Damages -As defined in the Agreement Section 00520. Warranty — City has a two-year warranty period Construction Hours - 7:00 A.M. to 6:00 P.M., Monday through Friday, except legal Holidays. Weekend work and Night work may be allowed on a limited basis to construct improvements to take advantage of favorable weather conditions. Construction Surveying - Provided by Contractor. Geotechnical and Materials Testing - Provided by Owner. Project Meetine - Once a week, to be determined. Progress and Schedule Revisions - Schedules shall be updated weekly. CITY OF FORT COLLINS SOFT GOLD NEIGHBORHOOD PARK PRE -BID MEETING NOTES WEDNESDAY, OCTOBER 16, 2000 VII. SITE COORDINATION WITH OTHER CONTRACTORS - Section 00800 Staging Equipment Storing Materials Site and Adjacent Property Access City Engineering & Inspection City Light & Power Crews Playground Installation Crews `Art in Public Places' Contractor Adjacent Property Owners VIII. TRAFFIC CONTROL AND WORK AREA SAFETY Traffic Control for the project will be Paid for Lump Sum and will include all costs for all traffic control associated with the project. The Contractor shall provide, at Contractors expense, all work area safety control devices, such as barricades and safety fence around all excavations, trenches, and drop-offs. HIGHLIGHTS FROM PLANS & TECHNICAL SPECS • Utility extensions in the R.O.W. (Water, Sewer, Stone) —All work subject to current City Street Standards for installation and approval. Inspections by COFC Engineering & PPD • Site excavation & disturbance limits • Water Quality Pond and Erosion Control Requirements • Building Permits — To be under Contractor's name, but fees paid by City PP&D • Bicycle course — earth embankment with detailed shaping • Core Area Artistic Scoring Pattern— has unique and specific scoring pattern. Joints to be tooled. OWNER rep to be on site during layout and cutting. • Soil Amendment rate is 6 C.Y. per 1000 s.f in all areas of irrigated turf, per section 02920, 3.01. • Earthwork and Grading requirements —Give particular attention to sections 01000, 1.16 and 02310. All grading will be expected to meet these requirements. 4