HomeMy WebLinkAboutRESPONSE - BID - 5818 SOFT GOLD PARK (4)SECTION 00300
BID FORM
PROJECT: SOFT GOLD PARK; BID NO. 5818
Place L\ k t1 • cI IAA p,,:I
Date b c d- q � a o o •,
1. In compliance with your Invitation to Bid dated J cN
and subject to all conditions thereof, the ersigned
k C--, J V�, c- , n), C cS a * Corporation, 1- L Y
Company, Part i Joint re or Sdi2 ** 1�_> -� P a ietor) authorized to do
business in the State of Colorado hereby proposes to furnish and do
everything required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid bo d
in the sum of 5�� ($ 5'Q
G (3, C� ) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
5. All the various phases of Work .enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through y .
7/96 Section 00300 Page 1
21. What are the limits of your public liability? DETAIL
5 million per ocr_nranra
What company? Flood-� peterson 4687 W 18th Street r,-ool X Co Rn by
J , F y
22. What are your company's bonding limitations? 8 million nor ;(970) 356-0123
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at 418 N. 9th Avenue this
Title president
State of Colorado
County of Weld
19th day of November 20 03.
trnest t. Uuran being duly sworn deposes and says that he is
PYesident of puran Excavating•, Inc. and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me day of
November , 20D2. ��., ..«. - ,
Nozary 1<UD11c
1. 9l1RAN
My commission expires 3-6-06
7/96 Section 00420 Page 3
Duran Excavating, Inc.
Current Projects for
November 2003
Project
Architect/
Contract
Percent
Scheduled
Name
Owner
En ineer
Amount
Complete
Completion
Windsor Street
Town of
Town of
Improvements
Windsor
Windsor
$ 383,319.05
80%
November-03
11th Avenue
City of
Loris &
Widening
Greeley
Associates, Inc.
$ 577,053.00
1 90%
1 November-03
Greeley Mall
Cinemark USA, Inc
Envirodesi n
Sitework
USA,Inc
Inc.
$ 220,885.00
1 80%
1 December-03
Current Projects for 2003 1 11/19/2003
Major construction projects Duran Excavating, Inc. has completed in the past five years:
PROJECT
ARCHITECT/
CONTRACT
PERCENT
DATE
NAME
OWNER
ENGINEER
AMOUNT
COMPLETE
COMPLETED
Marycrest Harmony &
Serenity Residence
Sacred Heart Corp.
Davis Partnership, PC
$ 356,503.00
Complete
1998
Monoco Parkway /
Waste Water
Eastman Avenue
City & County of Denver
Management
$ 642,121.00
Complete
1998
Lipan Distribution
Michael Barber
Complex
Public Service Company
Architecture
$ 819,094.00
Complete
1998
Denver Human
Denver Capital Leasing /
Service Center
City & County of Denver
OZ Architecture
$ 619,260.00
Complete
1999
Greeley / Weld County
Greeley / Weld County
Isbill Associated
Airport
Airport
Raytheon Infrastructures
$ 595,824.00
Complete
1998
Greeley High School #3
Weld County
Klipp, Cloussy,
North Ride High
School District # 6
Jenks, Dubois, P.C.
$ 475,464.00
Complete
1999
Larimer County
Larimer County Facilities
Reilly Johnson
Detention Center
Management
Architecture
$ 192,497.00
Complete
1999
AT & T
At & T Corporation
MBC Architects P.C.
$ 136,841.00
Complete
1999
C.W. Fentress, J.H.
Hines D.T.C.
Hines Interests
Bradbum & Associates
$ 366,856.00
Complete
1999
Greeley/ Weld County
Greeley/Weld County
Isbill Associated
Airport 235
Airport
Raytheon Infrastructures
$ 2,397,495.62
Complete
1999
Greeley West
Weld County
Isbill Associated
High School
School District # 6
Raytheon Infrastructures
$ 412,573.00
Complete
1999
REI Denver Flagship
ecreational Equipment, IncMithum
Partners, Inc.
$ 709,307.00
Complete
1999
Arvada Red Rocks
Red Rocks
Community College
Community College
Davis Partnership, PC
$ 90,365.00
Complete
1999
Anheuser-Busch
Morrison Knudsen
Anheuser-Busch
St. Louis, Mo.
Corporation
$ 386,602.00
Complete
1999
Amgen Lakecenter
Utility & Production
Amgen, Inc.
Bechtel Corporation
$ 164,050.00
Complete
1999
Hollywood & Irish
Storm Sewer Drain
Larimer County Purchasing
Ares Associates
$ 737,841.00
Complete
1999
Greeley Central
Weld County
High School
School District # 6
KBN
$ 130,110.00
Complete
1999
Amgen Lakecenter
Administration Addition
Amgen, Inc.
S.A. Miro, Inc.
$ 75,800.00
Complete
1999
Major projects completed the last five years Page 1 of 3 11/19/2003
Major construction projects Duran Excavating, Inc. has completed in the past five years:
PROJECT
ARCHITECT/
CONTRACT
PERCENT
DATE
NAME
OWNER
ENGINEER
AMOUNT
COMPLETE
COMPLETED
Fort Morgan
Fort Morgan
Slater Paul
High School
School District
& Associates
$ 78,000.00
Complete
1999
Expo Park/
Westerly Creek
City of Aurora
CH2M Hill
$ 2,217,934.00
Complete
2000
Skyland Recreation
Center
City & County of Denver
Chamberlin Architects
$ 163,354.00
Complete
2000
Northwest Business Park
Catellus Development
Martin/Martin
Utilities & Drainage
Corporation
Consulting Engineers
$ 565,923.00
Complete
2000
Weld County School
Northridge High School
District Six
KBN Engineers
$ 346,691.00
Complete
2000
Northridge High School
Weld County School
Robert Schreve
Soccer Field
District Six
Architects
$ 559,900.00
Complete
2000
Greeley Airport
Greeley/ Weld
Demolition of Terminal
Count
N/A
$ 148,420.00
Complete
2000
Rocky Mt. Mutual
Meeker Commons
Housing Association
S.A. Miro, Inc.
$ 275,528.00
Complete
2000
CSU
Colorado State
Sciences Lab Upgrade
University
OZ Architecture
$ 175,662.00
Complete
2000
Agilent
Agilent
Technologies
Technologies
H & I Architects
$ 272,072.00
Complete
2000
Cache Bank
College Greens
Lee Architects
& Retail Center
Commercial LLC
& Interior Designers
392,588 00
Complete
2000
Ross Hall
University
Christopher Carvell
Demolition
of Northern Colorado
Architects
$ 150,643.00
Complete
2000
Vans Skate Park
Vans
Rengel & Company
Westminster
California
Architects
$ 160,000.00
Complete
2001
Buckley Air National
Navy Marine Corp
Navel Facilities
Guard
Reserve Center
Engineering Command
$ 503,000.00
Complete
2001
Fox Run
Donaldson & Company
Northern Engineering
Development
Fort Collins, Co.
Services, Inc.
$ 1,203,000.00
Complete
2001
Hwy 14 Development
City of Fort Collins
CDOT / COFC
Gateway Park Entrance
Fort Collins, Co.
Parks & Planning
$ 521,939.00
Complete
2002
Ross Hall
UNC Facility
Christopher Carvell
Expansion/Renovation
Planning & Construction
Architects
$ 410,734.00
Com lets
2002
CSU Microbiology
Colorado State
Slater Paul
Building
University
Architects, Inc.
$ 175,000.00
Complete
2002
Major projects completed the last five years Page 2 of 3 11/19/2003
Major construction projects Duran Excavating, Inc. has completed in the past five years:
PROJECT
ARCHITECT/
CONTRACT
PERCENT
DATE
NAME
OWNER
ENGINEER
AMOUNT
COMPLETE
COMPLETED
Olive Garden
The
JVA, Inc.
at Greeley Mall
Macedch Company
En ineers
$ 73,330.00
Complete
2002
Nat'l Wildlife Research
Acquest Development
S.A. Miro, Inc.
Outdoor Pen Project
Company
Engineers
$ 1,481,289.00
Complete
2002
Lefthand Creek
City of
Carter -Burgess
Channel Improvement
Longmont
Engineering
$ 1,385,207.15
Complete
2002
Walnut Street
City of
City of
Reconstruction
Windsor
Windsor
$ 591,577.15
Complete
2002
Centennial Library
Weld County
Klipp,Colussy, Jenks
Renovation
Library District
Dubois Architects
$ 33,000.00
Complete
2002
Anschutz Inpatient
Haselden
H&L HDR
Pavilion BP#5
Construction, Inc.
A Joint Venture
$ 173,565.00
Complete
2002
Fort Lupton
Fort Lupton
Fort Lupton
School
School District
School District
$ 203,000.00
Complete
2003
East Elementary
Weld County
RB & B
School
School Dist No. 6
Architects
$ 580,339.00
Complete
2003
Tommy C. Square
Tom & Annabelle
Pickett Engineering
Corzona
Inc.
$ 319,190.00
Complete
2003
Sunnyslope
City of
Bums &
Subdivisions
Broomfield
McDonnell
$ 1,452,432.00
Complete
2003
Greeley Mall
Cinemark USA, Inc
Envirodesign
Sitework
USA,Inc
Inc.
$ 220,685.00
Complete
2003
Research Complex 1
University
Fentress Bradbum
Fitzsimmons
of Colorado
Architects
$ 743,068.00
Complete
2003
Anschutz Inpatient
Haselden
H&L HDR
Pavilion BP#4 & #8
Construction, Inc.
A Joint Venture
$ 183,837.00
Complete
2003
Greeley Weld
Greeley Weld
Washington
County Airport
County Airport
Infrastructure Services
$ 2,651,890.00
Complete
2003
Greeley Downdown
City of
Cityof
Redevelopment
GreeleyGreeley$
1,714,387.00
Complete
2003
Horsetooth Reservoir
Larimer County
Larimer County
Inlet BayImprovements
Public Works
Public Works
$ 198,464.00
Complete
2003
Major projects completed the last five years Page 3 of 3 11/19/2003
CITY AND COUNTY PROJECTS DONE IN THE LAST FIVE YEARS
DURAN EXCAVATING, INC.
PROJECT
ARCHITECT/
CONTRACT
PERCENT
DATE
NAME
OWNER
ENGINEER
AMOUNT
COMPLETE
COMPLETED
Broomfield
City of Broomfield
City of Broomfield
$ 184,712.00
Complete
1995
Klipp, Colussy,
Denver Central Library
City & County of Denver
Jenks, & Dubois
$ 834,500.00
Complete
1995
Eighth Ave. Storm Sewer
City of Greeley
Barnett Consulting, Eng.
$ 952,600.00
Complete
1995
Monoco Parkway /
Waste Water
Eastman Avenue
City & County of Denver
Management
$ 642,121.00
Complete
1998
Denver Human
Denver Capital Leasing /
Service Center
City & County of Denver
OZ Architecture
$ 619,260.00
Complete
1999
Hollywood & Irish
Storm Sewer Drain
Larimer County Purchasing
Ares Associates
$ 737,841.00
Complete
1999
Expo Park/
Westerly Creek
City of Aurora
CH2M Hill
$2,217,934.00
Complete
2000
Skyland Recreation
Center
City & County of Denver
Chamberlin Architects
$ 163,351.00
Complete
2000
Weld County School
Northridge High School
District Six
KBN Engineers
$ 346,691.00
Complete
2000
Northridge High School
Weld County School
Robert Schreve
Soccer Field
District Six
Architects
$ 559,900.00
Complete
2000
Greeley Weld Coun
Greeley Weld County
Isbill Associated
Airport
Airport
Ratheon Infrastructures
$ 595,824.00
Complete
2001
Highway 14 Gateway
City of Fort Collins
CDOTICOFC
Park Entrance
Fort Collins
Parks & Planning
$ 521,939400
Complete
2002
Lefthand Creek
City of
Carter -Burgess
Channel Im rovicement
Lon monrt
Engineering
$1,385,207.15
Complete
2002
Walnut Street
Town of
Town of
Reconstruction
Windsor
Windsor
$ 591,577.15
Complete
2002
Centennial Library
Weld County
Kli p,Colussy, Jenks
Renovation
Library District
Dubois Architects
$ 33,000.00
Com late
2002
Fort Lupton
Fort Lupton
Fort Lupton
School
School District
School District
$ 203,000.00
Complete
2003
East Elementary
Weld County
RB & B
School
School Dist No. 6
Architects
$ 580,339.00
Complete
2003
Sunn slope
City of
Burns &
Subdivisions
Broomfield
McDonnell
$1,452,432.00
Complete
2003
Greeley Weld County
Greeley Weld County
Washington
Airport
Airport
Infrastructure Services
$2,661,890.00
Com late
2003
Greeley Downdown
City of
City of
Redevelopment
Greeley
Greeley
$1,714,387.00
Complete
2003
Horsetooth Reservoir
Larimer County
Larimer County
Inlet Bay Im rovements
Public Works
Public Works
$ 198,464.00
Complete
2003
Windsor Street
Town of
Town of
Improvements
Windsor
Windsor
$ 383,319.05
Complete
2003
1lth Avenue
Ci of
Loris &
WideninQ
Greeley
Associates, Inc.
$ 577 053.00
Com late
2003
City County Wolff comPlelted 5 yum 11/19/2003
Duran Excavating Inc.
DURAN EXCAVATING, INC.
EQUIPMENT LIST
YEAR
DESCRIPTION
UNIT#
V.I.N #
PLATE #
1988
Chevrolet Pickup
Office
Al
1GCDK14K4JZ714659
26229HY
1995
GMC Pickup
Lloyd McEwen
A2
1GTEK14K4SZ571135
22683HY
1994
Dodge4x4
Tom Worrall
A4
1B7HF16Y4RS559699
02764HI
1999
GMC Sierra
Dick May
A6
GTEK19T7XE511933
68276HY
20M
GMC 1500 Xcab Pickup
Emle Duran
A13
2GTEK19T2Yl l97076
966ANT
2001
GMC 1500 Pickup
Lorenzo Martinez
A14
1GTHK24U11E221360
732DDP
2002
GMC Pickup
Michael Torrez
A15
1GTHC24U82E157719
584DJN
2002
GMC Pickup
Ellie Duran
A16
2GTFK69U121297137
037ERH
2002
GMCXcab2500
Larry Duran
A17
1GTHK23U92F794308
044ERI
2002
GMCXcab2500
Gary Duran
Ali
1GTHK23U92F187827
04SEPJ
1993
Ingersoll FX 130
C94
WF1003
None
1996
Dynapac Compactor
C95
59811135
D000423
1980
815 CM Cat Compactor
C96
15R365
Z39844
1995
Remmax Compactor
C97
(WB)
No SMM
1996
Remmax Compactor
C98
320563
No SMM
1995
Remmax Compactor
C99
318007
No SMM
1995
Remmax Compactor
C100
318259
No SMM
1998
Dozer
D1
pending
1993
Case 580K Backhoe
EX34
JAB0032034
Z18211
1995
Komatsu 200 Excavator
EX36
A81271
X44069
1995
Komatsu 220 Excavator
EX37
A80625
X44068
1997
PC300LC-6 Excavator
EX38
A80708
D000426
1976
Cat216 Excavator
EX39
96L3569
none
2001
Komatsu PC400 LC
EX40
A84248
Pending
1984
TCI Forklift
F20
1290102SR
None
1979
Cat12G Motor Grader
G62
61M6827
HY5307
1996
Cat140H Grader
064
2ZKO0678
W01872
1990
Cat 966E Loader
L42
99Y-07386
0000424
1993
Cat95OF Loader
L43
058AO1029
X44070
1984
Case 850C Crawler Loader
L44
7401642
Z19696
1990
Case 821 Wheel Loader
L45
JAK0023720
Z019695
1990
Case1840 Uni-Loader
L49
JAF0120709
Z19427
1994
Case 1845C Skid Str
L60
JAF0134708
X44067
1999
Cat SSL 236 Skid Loader
L51
4YZ00889
pending
1985
Cat6238 Scraper
S62
46PO1943
Z019694
1977
Cat Scraper
S63
046P00595
Z18213
1980
Mack Water Truck
TK17
DMM6856S3081
pending
2000
FL702281 Service Truck
TK18
1FVSHFBA2YHB97088
451BHJ
1979
Leased Ford Water Truck
TK19
U903VFC6456
189JA2
1987
International Service Trucj
TK20
1 HSLCHXNXHHA19361
243ETG
1993
Leased Kenworth
TK24
1XKADB9X2PJ582521
668HZ8
1989
Leased Kenworth
Form 2290 file on 8131
TK26
1 XKAD29X5KS529492
509HY8
1988
Leased Kenworth
Form 2290 file on 8131
TK26
1 XKAD59X9JS603646
676GFG
1996
Moxy(Sheela)Truck
TK27
353480
pending
1989
IHC 7140 Case Tractor
TR10
JJA0008510
None
1996
Haulette Flatbed Trailer
TL70
7732D
None
1979
Loadking Trailer Belly Dump TL72
8074
W048425
1997
Witzco Trailer
TL73
4URA11E33VS061179
W102565
1979
Cook Trailer Rock Dump
TL74
A9662
W45938
1999
B.LineTrailer
TL75
IROF51428XG077231
W116573
1978
Office Trailer Van
TL85
T92920
640ATL
1970
Office STK SMI Trailer
TL86
121891
W102981
Tamper
Z201
Hotsy
Z240
Duetzy Diesel Pump
Z280
Gorman Rupp Pump 4" Elec. Z281
Disc
11/192003
ERNEST E. DURAN (ELLIE)
Experience:
November 1981 to Present
President, Chief Executive Officer and Estimator for Duran Excavating, Inc.
June 1973 to November 1981
Estimator and Job Coordinator, NCC Construction Company, 6001 West
101 Street, Greeley, Colorado 80632
Education:
Greeley West High School, Graduated 1977
Training:
On the job training as job coordinator and estimator with NCC
Construction.
AGC Certification of Construction Management and Job Estimating, Blue
print, labor and management certification, critical path method and
scheduling.
Qualifications:
November 1978 to Present
Qualified in management and supervision of all office procedures,
equipment and material acquisition, estimating and installation in
the following areas:
Familiar with all types of building construction, remodeling, pipeline
construction, including engineered fills, and mass excavation.
1" to 96" diameter pipe, working at depths of 18" to 30 feet using
hydraulic, fabricated shoring, fabricated trench box and vertical on
site fabrication methods.
Emest E. Duran (Ellie) Resume Page 1 of 2
Installation of waterline systems for 4° to 36" D.I. P., Including meter
vaults. Install sewer lift stations..
Utilization of road base, crushed quarry material, application of
asphalt road surface and materials. Complete construction to spec
of roads and appurtenances.
Familiar with civil drawings and have the ability to compensate for
engineering conflicts.
Complete sanitary and storm sewer systems, utilities, commercial,
residential and industrial excavating as well as site demolition.
Duties have consisted of management of business, including
estimating, negotiation, and supervision of field criteria input and
coordination of engineering department and field department,
ordering materials and obtaining bonding.
Estimating duties have included estimating material,
subcontractors, fill replacement and the related manpower and
equipment requirements. Have interpreted engineering criteria and
have performed project management from start to finish.
Additional Training:
Completed 40 hours of Hazardous Waste Operating and Emergency
Response Training (29 CFR 19910.120).
Completed 6 hours of Safety Supervisor Training and is a designated
Safety Supervisor.
Completed refresher for Hazardous Waste Operation and Emergency
Response.
Computer proficient in Microsoft Windows 2000, Microsoft Word, and
Microsoft excel, Computer Ease, and Agteck and cad files.
Ernest E. Duran (Ellie) Resume Page 2 of 2
GARY L. DURAN
Experience:
November 1978 to present
Treasurer, Project manager and Superintendent for Duran Excavating, Inc.
June 1971 to November 1978
Equipment operator and assistant project superintendent, NCC
Construction, 6001 West 1& Street, Greeley Colorado 80632
Education:
Greeley West High School, Graduated 1975
Training:
On the job training as a job coordinator and job superintendent.
National safety program and training for federal hazardous materials
program.
Qualifications:
Qualified in management and field supervision, including operations,
equipment operation and installation in the following areas:
Pipeline construction
Utility installation including forming concrete, manhole
Construction for storm and sanitary sewer systems.
Installation of waterline systems for 4" to 36" D.I.P., including
Meter vaults. Install sewer lift stations.
Road construction / airport runways / parks / subdivisions
Demotion
Land reclamation
Commercial, residential, industrial excavating
Knowledge of various types of alignment and engineering
equipment for pipeline installation. Have interpretation of
engineering criteria and project management capability from start to
finish. Can establish grade offsets and preserve engineers
references.
Gary L. Duran Resume Page 1 of 2
Project: SOFT GOLD PARK ADDENDUM #3
-BID SCHEDULE
Bid
Item Description
Estimated
Quantity
Unit
Unit Price
Total
GENERAL REQUIREMENTS
1 Mobilization
1
lump sum
$
k j jqr d
$
Lo d�
2 Surveying
1
lump sum
$
1 0 � y c
$
C,�
3 Traffic Control
1
lump sum
$
3 3 0 =
$
4:> c,
RECORD DRAWINGS/DRAINAGE CERTIFICATION
4 Record Drawings, Grading & Drainage Cert.
1
lump sum
$
1 t ' "
$
DEMOLITION
5 Tree and Stump Removal
1
lump sum
$
-; a, °
$
1 8 p
6 Remove Curb & Gutter
20
if
$
ct "
$
7 Remove Drain Pan
30
sf
$
S J
$
S-
8 Remove Irrigation Head Wall
1
ea
$
v
$
9 Remove 27" ADS Pipe
55
If
$
" �
$
o
10 Remove and Replace PVC Fence
1
is
$
e .� o
$
'6 v o J
11 Remove Entrance Gates & Fencing
1
is
$
y ° '
$
y to C o
12 Remove Sidewalk
80
sf
$
$
1 4
EARTHWORK
3 Erosion Control
1
lump sum
$
i 1 S o$
� o
14 Topsoil
8,174
cy
$
. S "$
a $ c
15 Earthwork - Cut
12,860
cy
$
`� ' J
$
16 Earthwork - Haul & Dispose
983
cy
$
°
$
tj Lk c1
HICKORY STEET IMPROVEMENTS
17 Vertical Curb and Gutter
56
if
$
td °
$
1 J Lk o
18 5' Sidewalk Culvert - 4' opening
1
ea
$
;
19 Asphalt Patching - [8" deep]
1,727
sf
$
, S u
$
UTILITIES: WATER, SANITARY, STORM,
ELECTRIC
20 Connect to exist 8" Water Main
1
ea
$
$
f L� y 02
21 8" D.I.P.
160
if
$
y y o
$
-1' O w p
22 8" Gate Valve
1
ea
$
O J
$
° "
23 Misc 8" Fittings with Thrust Restraint
1
lump sum
$
e p
$
v a
24 3/4" Domestic Water Service
1
lump sum
$
9� c o "
$
C C ,
Page 1 of 4
Can complete construction of roads and appurtenances to spec,
have in depth knowledge of road base, crushed quart' material,
application of asphalt road surfaces and materials.
Have familiarization with civil drawings and have the ability to
compensate for engineering conflicts.
Have performed project superintendent, quality control; field
supervisory and subcontractor coordination duties. Have also
conducted safety meetings and insured that procedures are
followed.
Hazardous water material.
Additional training:
Completed 40 hours of hazardous waste operation and emergency
response training (29 CFR 19910.120)
Completed 6 hours of safety supervisor training, and is designated a
safety supervisor.
Completed refresher for hazardous waste operation and emergency
response.
Gary L. Duian Resume Page 2 of 2
LARRY D. DURAN
Experience:
November 1978 to present,
Secretary, Project manager and Superintendent for Duran Excavating, Inc.
June 1971 to November 1978,
Equipment operator and assistant project superintendent, NCC
Construction, 6001 West 10th Street, Greeley, Colorado 80632
Education:
Greeley West High School, Graduated 1976
Training:
On the job training as job coordinator and job superintendent with NCC
Construction.
National safety program and training for federal hazardous materials
program.
Qualifications:
Qualified in management and supervision of field development and
operations, including equipment operation and installation in the following
areas:
Pipeline construction
Utility installation including forming concrete, manhole
Construction for installation of storm and sanitary sewer systems
Installation of waterline systems for 4" to 36" D.I.P., including meter
vaults.
Install sewer lift stations
Road construction
Demolition
Land reclamation
Commercial, residential, industrial, mass excavating
Airport runways / parks / subdivisions
Larry D. Duran Resume Page 1 of 2
Have in depth knowledge of all types of pipeline material, including
engineered fill, 1" to 23" using hydraulic, fabricated shoring,
fabricated trench box and vertical on site fabrication methods.
Fracturing of solid geological formation, use and installation of
engineered rip/rap, retaining structure construction and application.
Have knowledge of various types on alignment and engineering
equipment. Can interpret engineering criteria and perform project
management from start to finish.
Have performed as project superintendent, quality control officer,
supervised and coordinated subcontractors, ordered materials,
conducted safety meetings, and make sure safety procedures were
followed, and maintained equipment on a daily basis.
Hazardous waste material removal
Additional Training:
Completed 40 hours of hazardous waste operation, and emergency
response training (29 CFR 19910.120).
Completed 6 hours of safety supervisor training and is designated a safety
supervisor.
Completed refresher for hazardous waste operation and emergency
response.
Larry D. Duran Resume Page 2 of 2
Richard H. Hay
3125 W. 6th St., Greeley, CO 80631 (970)353-7771
Experience
2000-Present
Estimator -Project Manager, Duran Excavating, Greeley,CO
Estimate and manage earthwork & utility projects to $2,500,000
1998-2000
Estimator -Project Manager,C/C Construction, Inc., Greeley,CO
Estimate and manage projects up to $1,500,000
1996-98
Project Manager, Matchless Millwork, Inc., Greeley, CO
Manage various millwork projects up to $600.000
1 qRq-qS
Estimator, Roche Constructors, Inc._, Greeley, C-0
Prepare cost estimates up to $15,000,000
1987-89
Self -Employed, Hay Construction Services, Greeley, CO
Construct various projects up to $40,000
1983-87
Estimator, Roche Constructors, Inc. Greeley, CO
Prepare cost estimates up to $10,000,000
1981-83
-Project Superintendent, Roche Constructors, Inc., Greeley, CO
Supervise construction of various projects up to $6,000.000
1979-81
Carpenter Foreman, Anderson Construction, Greeley, CO
Lead Carpenter on various projects up to $3,500,000
1977-79
Carpenter, Carolin Construction, Greeley, CO
Construct 20 tract homes of $75,000 each
1972-77
Owner/ Manager, Sambo's Restaurant, Greeley, CO
Supervise 24 hour restaurant with 50 employees
Education
2002
Sitework 98, AGTEK Earthwork Software Services
Digitizing, CAD Survey, 16 hour seminar
2001
Sitework 98, AGTEK Earthtwork Software Services
Basic, CAD Takeoff, 3-D Modeling, 24 hour seminar
1995
Timberline Precision School, Timberline Software Corporation
Precision Extended, Certified, 40 hour estimating course
1993
Windows Introduction, Colorado Computer Training LTD
Introduction to Windows, Certified, 16 hour workshop
1992
Excel, Word for Windows, Colorado Computer Training LTD
Introduction to Windows Based Programs, Certified 16 hours
1986
FAILS Management, Management Techniques, 8 hours
1986
Computer Managed Applications, Aims Community College
D-Base, Lotus 123, Word Perfect, 3 hour credit
1985
Basic Land Surveying, AGC, Colorado State University
1984
Universal Building Codes, Aims Community College, 1 hr credit
1983
Advanced Blueprint Reading, AGC, Colorado State University
1980
Architectural Drafting, Aims Community College, 3 hour credit
1976
Dale Carnegie, Public Speaking, Certified, 80 hours
1966-69
Eastern Montana College, Fine Arts, No Degree
BUSINESS - PROFESSIONAL LICENSES
DURAN EXCAVATING, INC.
Fee Type of License Name Date Date Date Date
Registered Under Issued Expires Sent Received
CITY OF AURORA
ROW Trenching 8/3/01 4/2102 8/8/01
License Duran Excavating, Inc.
#101 103305 00 CL Ellie doesn't want to renew as of 4-16-02
ROW Earthwork Ellie doesn't want to renew as of 4-16-02
License #101 103303 OOCL Duran Excavating, Inc. 8/1/01 4/2/02 1/29/01 8/13/01
$200.00 Class B Building Duran Excavating, Inc. Ellie doesn't want to renew as of 2-6-03
License #101 120436 00 CL 217/02 311/03 214/02 2/11/02
CITY AND COUNTY OF DENVER
$50.00 Contractor - Sewer
File No. SC-0061 Duran Excavating, Inc. 1/2/03 12/31/03 12/27/02 1/6103
$75.00 Contractor - Water Service
(Demo & Fire Line) Duran Excavating, Inc. 1/7/03 2/29/04 12/30/02 1/27/03
License #20287 Larry Duran Supervisor
$50.00 RW-EXCVTR Duran Excavating, Inc. 1/8/03 12/31/03 12/27/02 1/27/03
License #090539
$75.00 Demo B
Inc. 9/30/02 9/30/03 9/8/03 8/26/02
Inc. 1/1/03
Suppression System
Contractor
Reg #03-4379
Dept. of Public Works
Duran Excavating, Inc. 3/14/03
3/31/04
1/25/03 3/26/03
1,000,000.00 Prequalification
2nd time
CE-1 2,3 + 7
sent
$75.00 D-Concrete & Foundation
Duran Excavating, Inc. 1/7/03
2/29/04
12/30/02 1/27/03
License #016992
CITY OF WESTMINSTER
$110.00 Public Way Contractor
4/12100
4/12/01
Lic #59325 Don't renew as per Ellie
CITY OF GREELEY
$100.00 Concrete and Paving
Duran Excavating, Inc. 1/15/03
12/30/03
12/30/02 1/28/03
Certification #11547
�1 f-% t-41*IiFPT4I Ile] e] t7_1BIG,
State Buildings Duran Excavating, Inc. 8/31/02 8/31/03 8129/03 8/26/02
Real estate programs
C.D.O.T. Duran Excavating, Inc. 1/31/03 1/31/04 1/28/03 2/5/03
Prequalification
Codes 0954A
COLORADO STATE UNIVERSITY Can't renew they stopped this
Utility Contractor Duran Excavating, Inc. 2/5/02 215/03 2/11/02
CITY & COUNTY OF BROOMFIELD
$50.00 Class C General Contractor
License #C2003-1388
12/31/02 12/31/03 11/11/02 12/27/02
updated 9-9-03
Duran Excavating Inc. Page 1
CITY AND COUNTY OF DENVER CERTIFICATIONS AND LICENSES
CERTIFICATIONS
LARRY DURAN
Fee Type of Certification Certification Registered Date Date Date Date
Under Larry Duran Issued Expires Sent Received
$50.00 Demo B Supervisor Larry Duran 9/30/02 9/30/05 8/13102 8/23/02
License #1013416
$30.00 Drain layer Journeyman Larry Duran 3/3/03 2128/03 2/12/03 3/6/03
Certificate #2106127
$75.00 D-EX/SHR/PUCAS/DRUSHFT SUPR
Concrete and Foundations Larry Duran 2115/02 3/31/05 2/11/02 3/4/02
Supervisor
Certificate #1015745
$75.00 Water Service
License #020287 Larry Duran 1/7/03 229/04 12/30/02 1/27/03
$50.00 Water Service Supervisor Larry Duran 10/31/02 10/31/05 915/02 9/18/02
Certificate #1017660
CITY OF AURORA
ROW Earthwork
Certificate #Q9554 Larry Duran 12/31/03
ROW Trenching
Certificate #Q9553 Larry Duran 12/31/03
Class B Building
Certificate #Q11427 Larry Duran 8/16/00 8/31/03 829/03
STATE OFCOLORADO
$65.00 Fire Suppression System Contractor
Reg #03-4379 Larry Duran 111/03 1/1/04 1227/02 1/6/03
CITY OF LONGMONT
$50.00 Class D (Excavating) Larry Duran Don't renew as per Ellie
#D20000312 7/11/02 6/30/03 6/14/02 7/17/02
CERTIFICATIONS
GARY DURAN
Fee Type of Certification Certification Register Date Date Date Date
Under Gary Duran Issued Expires Sent Received
$50.00 D- Concrete & Foundation Supervisor 11/30/02 11/30/05 11/15/02 1224/02
Certificate #1015981 Gary Duren
Duran Excavating Inc. Page 1 updated 9-"3
DURAN EXCAVATING, INC.
Job references list of other contractors
Washington Infrastructure Services
7800 E. Union Avenue, Suite #100
Denver, Co. 80237
Project: Weld County Airport Taxiways
Contact: Dale Mitchell
Telephone: (303) 808-9275
Contract: $2,600,000.00
Growling Bear Co., Inc.
2330 0 Avenue
Greeley, Co. 80631
Project: East Elementary School
Contact: Ron Sword
Telephone: (970) 534-0443
Contract: $500,200.00
Town of Windsor
301 Walnut Street
Windsor, Co. 80550
Project: Walnut Street Reconstruction
Contact: Darron Agawa
Telephone: (970) 302-0829
Contract: $668,736.00
City of Longmont
Public Works Division
408 Third Avenue
Longmont, Co. 80501
Project: Lefthand Creek Channel Improvement
Contact: David Hollingsworth
Telephone: (303) 651-8328
Contract: $1,569,517.00
Duran Excavating, Inc.
Job reference list of other contractors Page 1 of 3
Hensel Phelps Construction
12645 E. 19`s Avenue, Bldg 410
Aurora, Co. 80045
Project: Research Complex Fitzsimmons
Contact: Matt Schuler
Telephone: (303) 539-7200
Contract: $734,068.00
Weld County School District 6
2204 5'h Avenue
Greeley, Co. 80631
Project: New District Soccer Field
Contract: $ 575,299.18
Project: Northridge High School
Contract: $384,095.71
Contact: Marsh Ragland
Telephone: (970) 353-9100
G.E. Johnson Construction Company
310 S. 14a' Street
Colorado Springs, Co. 80904
Project: Amgen Lakecenter
Contact: Randy Henkel
Telephone: (719) 473-5324
Contract: $166,050.00
Larimer County
212 West Magnolia Avenue
Fort Collins, Co. 80522
Project: Hollywood &c Irish Stormwater
Contact: Todd Jurgens
Telephone: (970) 498-5711
Contract: $905,253.00
Hensel Phelps Construction Company
1700 E. 2e Avenue
Denver, Co. 80205
Project: REI Denver Flagship
Contact: Mike Choutka
Telephone: (303) 539-7200
Contract: $910,813.00
Duran Excavating, Inc.
Job reference list of other contractors Page 2 of 3
Greeley Weld County Airport
600 Crosier Avenue
Greeley, Co. 80631
Project: Construct Runway
Contact: Dale Mitchell (Isbill Associated Raytheon)
Telephone: (303) 808-9275
Contract: $2,424,937.00
City and County of Denver
1437 Bannock Street, Room 379
Denver, Co. 80202
Project: West Harvard Gulch
Contact: Tom Lindholm
Telephone: (303) 446-3400
Contract: $289,566.45
Gerald H. Phipps
P.O. Box 40387
Denver, Co. 80204-2400
Project: Greeley High School #3
Contact: Bruce Schnieder
Telephone: (303) 571-5377
Contract: $480,418.00
City & County of Denver
1437 Bannock Street, Room 379
Denver, Co. 80207
Project: Monaco Parkway/ Eastman Avenue
Contact: Steve Bello
Telephone: (303) 446-3400
Contract: $642,120.54
Duran Excavating Inc.
Job reference list of other contractors Page 3 of 3
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Duran Excavating Inc.
as Principal, and Travelers Casualty and Surety Company of ericaas
Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado,
as OWNER, in the sum of $5% of Amount Bid for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction
of Fort Collins Project, SOFT GOLD PARK; BID NO. 5818.
NOW THEREFORE,
(a) If said Bid shall be.. rej_e_cte_d,__or._--
(b) If said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form'of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
7/96
Section 00410 Page 2
Project: SOFT GOLD PARK ADDENDUM #3
BID SCHEDULE
Bid
Item Description
Estimated
Quantity
Unit
Unit Price
Total
25
Domestic Backup Service for Irrigation
1
lump sum
$
y o `:
$
26
Fire Hydrant Assembly & 6" D.I.P.
1
ea
$
p ° .J
$ X e
27
Connect to exist. 12" Sanitary Sewer Main
1
ea
$
$ tG lsg ,
28
12" Sanitary Sewer Main
355
if
$
AL, ,�
$ —1 -5 t o
29
Manholes
1
ea
$
1 y Q n
$ 1 C
30
Sewage Grinder Pump System
1
lump sum
$
l
t � � o ,
$
31
Concrete Cutoff Wall
1
ea
$
��;
��� a V
$
32
DELETED
33
27" RCP Class IV (CIP)
56
if
$
$
3s3 e, o
34
8" SDR 35 - Culverts
460
if
$
,° $
35
Class 6 Rip Rap - Buried
2
ton
$
, 21O ° $
'311 5< "O
36
Water Quality Spillway Structure
1
ea
$
o � ,° a $
(
37
Electrical Service & Distribution
1
lump sum
$'
5 o$
� J
i r.
38
Pedestrian light
1
ea.
$
C1 4 S $
r, 6 ''
ACCESS DRIVE AND PARKING LOT
39
Vertical Curb and Gutter
89
If
$
910Zo
$
40
Outfall Curb and Gutter
516
if
$
1 y ° "
$
1 �Oy '
41
Concrete Flatwork - 5" Fiber
1517
sf
$
$
y Ck
42
ABC Class 6 - (5 in.)
361
ton
$
1 I
$
'
I C
43
HBP Grading S - (4 in)
406
ton
$
° v
4`l .
$
19
44
A.D.A. Access Ramps
2
ea
$
(F lc o , w
$
3 o
45
Striping
1
lump sum
$
$
1 O c
CORE AREA
46
Restroom
1
lump sum
$
d 6-0 O Z
$ / yy p J D
47
Prefabricated Picnic Shelter
1
lump sum
$ 1 C1
f
e�
p 0 o
o'D
$ CA, C o o
48
Seat Wall; retaining wall w/ stucco finish
25
if
$
O " $
1 5- 11
";)—I -I �
49
Concrete Flatwork - 5" Fiber
6161
sf
$
o
$ o
50
Colored Concrete Flatwork - 5" Fiber
1796
sf
$
$ p� p
51
Granite boulders
20
ton
$
o n
J
$
52
River rock boulders
14
ton
$
4,y , o y
$ l 1 ' 1 to .�
53
Cobble
5
ton
$
��-� ` "
$ - c"
54
Site Furnishings
1
lump sum
$ ,�
� 1
$ 6 1 G d e9
Page 2 of 4
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this 13th day of November , 20 03, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCIPAL SURETY
Travelers Casualty and Surety Company
Name: Duran Excavating, Inc. of America
Address: 418 N. 9th Avenue
Gr ele C 0631
By:
Title:
ATTEST:
By: -1 %%ice^ ✓�"�
(SEAL)
7/96
One Tower Square
Hartford, CT 06183
B
Mary Powell
Title: Attorney -in -Fact
(SEAL)
Section 00410 Page 3
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
TRAVELERS CASUALTY AND SURETY COMPANY
FARMINGTON CASUALTY COMPANY
Hartford, Connecticut 06183-9062
POWER OF ATTORNEY AND CERTIFICATE OF AUTHORITY OF ATTORNEY(S)-IN-FACT
KNOW ALL PERSONS BY THESE PRESENTS, THAT TRAVELERS CASUALTY AND SURETY COMPANY OF
AAZRICA, TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY COMPANY,
corporations duly organized under the laws of the State of Connecticut, and having their principal offices in the City of Hartford,
County of Hartford, State of Connecticut, (hereinafter the "Companies") bath made, constituted and appointed, and do by these
presents make, constitute and appoint: Connie K. Boston, Donald B. Martin, Chris S. Richmond, Darlene Krings, William C.
Bender, Kelly T. Urwiller, Russell J. Michels, Linda M. Nikolaeff, Debra S. Morris, Mary M. Powell, of Greeley, Colorado,
their true and lawful Attorneys)-m-Fact, with full power and authority hereby conferred to sign, execute and acknowledge, at any
place within the United States, the following instrument(s): by his/her sole signature and act, any and all bonds, recognizances,
contracts of indemnity, and other writinga obligatory in the nature of a bond, recognizance, or conditional undertaking and any and
all consents incident thereto and to bind the Companies, thereby as fully and to the same extent as if the same were signed by the
duly authorized officers of the Companies, and all the acts of said Attorney(s)-in-Fact, pursuant to the authority herein given, are
hereby ratified and confirmed.
This appointment is made under and by authority of the following Standing Resolutions of said Companies, which Resolutions are
now in frill forte and effect:
VOTED: That the Chairman, the President, any Via Chairman, any Executive Via President, my Senior Vice President, any Vice President, any
Second Vice President, the Treasure, any Assistant Treasurer, the Corporate Secretary or my Assistant Secretary may appoint Attorneys -in -Fact
and Agents to act for and on behalf of the company and may give such appointee such authority as his or her certificate of authority may prescribe
to sign with the Company's name and seal with the Company's seal bonds, recognizance, contracts of indemnity, and other writings obligatory in
the nature of a baud, recognizance. or conditional umdestaking- and any of said officers or the Board of Directors at any time may remove any such
appointee and revoke the power given him or her.
VOTED: That the Chairman, the President, any Vice Chairman, any Executive Via President, any Senior Via President or any Vice President
may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is
in writing and a copy thereof is filed in the office of the Secretary.
VOTED: That any bond, reagnizmce, centtact of indemnity, or writing obligatory in the nature of a baud, recognizance, or conditional
undertaking shall be valid and binding upon the Company when (a) signed by the President any Via Chairman, any Executive Via President, any
Senior Vice President or any Vice President, my Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or my
Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary. or (b) duly executed (under seal, if
required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or
by one or more Company officers pursuant to a written delegation of authority.
This Power of Attorney and Certificate of Authority is signed and sealed by facsimile (mechanical or printed) under and by
authority of the following Standing Resolution voted by the Boards of Directors of TRAVELERS CASUALTY AND SURETY
COMPANY OF AMERICA, TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY
COMPANY, which Resolution is now in fall force and effect. -
VOTED: That the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice
President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any
power of attorney or to any certificate relating thereto appointing Resident Via Presidents, Resident Assistant Secretaries or AttorneWin-Fact for
purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and eery such power of attorney
or certificate hearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and
certified by such facsimile signature and facsimile seal shall be valid and binding upon the Company in the future with respect to any band or
undertaking to which it is attached.
(11.00 Standard)
Project: SOFT GOLD PARK ADDENDUM #3
BID SCHEDULE
Bid Estimated
Item Description Quantity Unit Unit Price Total
PLAYGROUND AREAS
55
Retaining Walls
160
if
$
S
$
56
Playground Curb
309
if
$
J
$
(r ) ct46
57
Extruded Conc. Edging (6" x 4") - Shrub Beds
390
if
$
o "
$
1 O o
58
Playground Ramps (3)
90
sf
$
$
'7/ c
59
Subdrains
1
lump sum
$
1 c
$
t ,;, ='
60
Granite Boulders
19
ton
$
( 1
. a
$
(t G—q
61
Flagstone in Shrub Beds
20
ea
$
1 p , Q " $
62
Engineered Wood Safety Surfacing
225
cy
$
$ w
63
Sand Surfacing
6
cy
$
l� -j .� " $ ct
64
Crusher Fines
1,364
sf
$
a " $
SIDEWALKS AND PATHS
65 Concrete Sidewalks
7,586
sf
$
° `=
$
VOLt -I S c6 a
66 Crusher Fines Path
6,612
sf
$
1 5 °
$
9 C1 1 A G
BICYCLE COURSE
67 Grading and shaping
1
lump sum
$
o c
$
S C Q
DOG PARK
68 Do Park
g
1
lump
P sum
BASEBALL FIELD
69 Baseball Field
1
lump sum
$
4 p ,z�
$
� u C
70 Infield Mix
465
ton
$
'� a
$
t b C1
IRRIGATION
71 Irrigation System
1
lump sum
$
0
J 7
LANDSCAPING
72
Fine Grading
10.8
ac $
yd o c o ,
$ 3 9,°
73
Shade Trees
32
ea $
IPS ,° o
$ 4 -X a 7
74
Evergreen Trees
32
ea $
a� 5 c c
$ * 1 a a
75
Ornamental Trees
12
ea $
�p 1 ° J
$ CA y5c�
76
Shrubs #5
44
ea $
Page 3 of 4
Project: SOFT GOLD PARK ADDENDUM #3
BID SCHEDULE
Bid
Estimated
Item Description
Quantity
Unit
Unit Price
Total
77 Vines, Grasses, Perennials #1
36
ea
$
t p c
$ '2 p
y lc Ci
78 Perennials 2 1/4"
38
ea
$
3
$ a 9,
79 Irrigated Seed
4.8
ac
$G
o
$
80 Non -Irrigated Seed
6
ac
$
Sao
J
$ 13 q,o
TOTAL
Figure
-SLL22 7-hp-,,,l Dollars �-
(written)
Alternate Bid Items
Alternate Bid Item # 1
Multi -Use Court (add) 1 lump sum $ S 0 c o a$
Alternate Bid Item #2
o ,
Lean-to Shelter at Dog Park (add) 1 lump sum $ 1 p o o -
Alternate Bid Item #3
Fescue Sod (add sod and deduct seed) 9,818 sf $ o a $
Page 4 of 4
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410Bid Bond
00420Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 150 of the contract.
ITEM
7/96
SUBCONTRACTOR
Section 00430 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive, This statement must be notarized. If necessary, questions ma} be
answered on separateattached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder:
Duran Excavatin Inc.
2. Permanent main office address:
418 North 9th nip r ��Iey C=p63i
3. When organized: November 1978
4
5
5
If a corporation, „here incorporated: Colorado
How nano years have you been engaged in the con-r-^+
Present firm or trade name? - a' -tang business under your
25 years
Contracts on hand: !Schedule these, showing the amount of each
the appropriate anticipated dates of comnletion.j h contrac and
�e attachal
�• General character cf Work performed by your company;
Site utilities _ Fnr«�......,. r
8• Have you ever failed to complete any Work awarded
If so, where and why? to you? No
°• Have your ever defaulted on a contract? No
If so, where and whv?
10. Are you debarred by any government agency? —No
If yes ,
:st agent.: name.
7/96
Section 00420 Page 1
1=. List the more important projects recentlyyCompleted _
stating the approximate cost of eac-, and the month and`_,-ar company,
location and type of construction. ear completed,
12. List vcur major equipment available for this centrac
Cee w�4�-L-d
1
-. Experience in construction Work similar in importance tc this
project:
14 - Background and experience Of the princiAal T?T.^ Of VOl:r organ; Z3t10n,
ircludine officers: -
1 Credit available: : 750p000.00
1c Bank reference: _
Will you, upor. request, fill out a detaile' (970) 339-5100
any other information that may be-1nancial statement and furnish
Yes y equ�'ed by the OWNER?
-G. Fire you licensed as a G�r= .
f eral CONTRACTOR? Yes
I- ves, in what city, county and state.
class, license and numbers? See attached Licence list What
�c
Do you anticipate subcontracting Work under this Contract? If yes, ;:hat pert f Yes
percent o_ tetai contract? Unknown
and to whom? Unknown
GQ. Are any lawsuits pending against you or your firm at this If time. No
yes
7/96