Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 18385 (2)ANDERSON CONSUITINCt bgiNEERS, INC. Civil • Water Resources • Environmental November 13, 2003 Mr. Terry Robinson City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 Re: Design of Spring Creek Stabilization Measures for Utility Line Protection, West of Centre Avenue (ACE Project No. COFC2003.08) Dear Terry: This letter represents our invoice for services provided in support of the referenced project for the period from July 28 through October 25, 2003. During this period, the work effort on this project consisted of- (a) completion of hydraulic analyses; (b) completion of construction drawings and technical specifications; and (c) completion of reporting and documentation associated with the project. As we have already discussed, during the completion of this project we incurred costs for work that was not included in the original scope. Specifically, responding to review comments associated with stormwater issues was not anticipated in the scope of work. Consequently, we respectfully request a change order in the amount of $940 to cover our costs associated with additional analysis and documentation necessary to address stormwater review comments. Please note that pursuant to your verbal approval of this change order, we have adjusted our contract amount accordingly; our additional costs are already reflected in the attached invoice. If you have any questions or comments concerning this invoice please do not hesitate to contact me. Sincerely. ANDERSON CO ULT NGINEERS, INC Gregg ✓A• lP.E. jba% Too . GJK/tlt Attachments T:10PEMCofc1003-081 C0FC2003-08_INV2. wpd 5aia46. April 24, 2003 772 Whalers Way, Suite 200 • Fort Collins, CO. 80525 Phone: (970) 226-0120 • Fax: (970) 226-0121 • www.acewater.com ANdERSON CONSUITINCI ENCIINEERS, INC. 772 Whalers Way Suite 200 Fort Collins, CO 80525 (970)226-0120 Invoice To: City of Ft Collins -Utilities 700 Wood Street PO Box 580 Fort Collins, CO 80522 Invoice No. 11548 Invoice Date: November 13, 2003 Project: COFC2003.08 Design of Spring Creek Stabilization Measures for Utility Line Protection, West of Centre Avenue Manager: Gregory J. Koch Professional Services for the Period: 7/28/2003 to 10/25/2003 Billing Group: 001 Cost Plus to a Maximum Contract #: PO# 3303170 Original Contract Amount = $19,490.00 Change Order #1 = $940.00 Revised Contract Amount = $20,430.00 Professional Services Brian L. Van Zanten Gregory J. Koch Mark K. Kempton Mark R. Colhour Patty J. Burger Thomas A. Woodruff Reimbursables Color Copies (in-house) Reproduction (in-house) Mileage (Company Vehicle) Mileage (Employee Vehicle) Project Totals: Contract Maximum: Previous Billings Against Maximum: Current Billings Against Maximum: Balance After This Invoice: Rate $70.00 $97.00 $59.00 $52.00 $47.00 $52.00 Professional Services Totals Reimbursables Totals Project Subtotal: Billing Adi.-- Cost Plus to Max: Billing Total: Hours 7.50 26.00 27.00 3.00 10.50 16.50 $20,430.00 $15,544.70 $4,885.30 $0.00 Charge 525.00 2,522.00 1,593.00 156.00 493.50 858.00 $6,147.50 Charge $35.00 $125.70 $5.00 $8.50 �i1 /4.1u $6,321.70 -$1,436.40 $4,885.30 ANdERSON CONSUITINCt ENGINEERS, INC. Project: COFC2003.08 Bill Group: 001 Total Project Invoice Amount: Invoice Date Bill Gr 11448 8/13/2003 001 9/15/2003 Billing Summary Professional Services Reimbursable Expenses Outside Services: Other Services and Fees Finance Charges: Taxes: Total: Description Amount Invoice $ 15,544.70 Payment $ 15,544.70 Current $4,750.68 $134.62 $0.00 $0.00 $0.00 $0.00 $4,885.30 Invoice: 11548 November 13, 2003 Page 2 of 2 $49885.30 U 03 Reference Y Balance Due $ 0.00 Check 00199622 Total AR: $ 0.00 Prior $15,519.00 $25.70 $0.00 $0.00 $0.00 $0.00 $15,544.70 Total $20,269.68 $160.32 $0.00 $0.00 $0.00 $0.00 $20,430.00 Aged Receivables: Current 31-60 61-90 91-120 over120 $4,885.30 $0.00 $0.00 $0.00 $0.00