Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 5795 NORTH COLLEGE AVE JEFFERSON ST RIVERSIDE AVE (7)P. 01 TRANSACTION REPORT JUL-21-03 MON 02:50 PM K BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUL-21 02:41 PM 913039891655 55" 2 SEND ( M) OK 098 02:43 PM 913037917405 1101" 2 SEND ( M) OK 098 02:44 PM 913032897707 54" 2 SEND ( M) OK 098 02:45 PM 913034270882 54" 2 SEND ( M) OK 098 02:46 PM 913036652980 57" 2 SEND ( M) OK 098 02:48 PM 913037908524 58" 2 SEND ( M) OK 098 02:49 PM 96790000 54" 2 SEND ( M) OK 098 TOTAL 6M 33S PAGES: 14 Administrative Services Purchasing Division. SECTION 00020 INVITATION TO BIDS City of Fort Collins Date: June 27, 2003 Scaled Bids will he received by the City of Fort Collins (hereinafter_ referred to as OWNER), at the cfficc of the Purchasing Division, 3:00 P.M., our clock, on July 29, 2003, for t1ae North C.:e l.legp Avenue and Jefferson Street /P,,;verslde Avenue Improvements; Bid No. 5795. If delivered, they are to be delivered to 215 North Mason Street, 2`'" Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. C- Box 5601, Fort Collins, C0 80522-0580- :.t said place and time, and promptly thereafter, all Bids that have been duly received -will be publ..icly opened and read aloud. The Contract Documents provide fcr: t. Three intersections and major arterial roadway reconstructed with 11 �_ inch concrete pavement. Total quantity of concrete pavement is approximately 1.11,000 square yards. 2. Installation of over 2,000 square, -yards of 6 inch thick concrete decorative sidewalk and bike path. Brick p:e•,ar bards are included as corner treatments at the intersections. 3. I L1Sra11at1CP. c' a reinforced Concrete pipe storm. sewer Line ranuing in size from 42 inches to 25 inches, 4. P.sphalt Mill (2 inch-4 inch depth) and overlay (4 inch depth) of Riverside Avenue. T,e:ngth is approximately 4,600 feet, width ranges from 45 fret to 55 feet, Some full"'. depth asphalt construction is also included. 5. Installation of pedestrian lighting. 6. Street median and sidewalk landscaping. 7. coordination of required utility relocations and installation of :rilrcad crossing material, 8. Traffic control of work listed above. 9. Other