Loading...
HomeMy WebLinkAboutPrebid - BID - 5795 NORTH COLLEGE AVE JEFFERSON ST RIVERSIDE AVE (2)North College & Jefferson/ Riverside Improvements Project VICINITY MAP Pre- Bid Meeting July 101h, 2003 215 Mason Street, Community Room City of Fort Collins Engineering & CDOT sir Please be sure to sign in & include email! 1 Introductions . City / CDOT Staff . John Lang, City of FC, Cc Project Manager . Dean Mingner, City of FC, Co Project Manager . Pete Graham, CDOT, Project Manager . Dan Peterson, oty of FC, Inspector . Tim M[Tague, City of FC, Utilities Coordination (Water, Sewer and Stonn) . Alan Rutz, aty of FC, Light & Power . Consultant / Design . Dean Bradley, FHU, Project Manager . Michelle Hanson, FHU, Design Engineer Bid Opening ■ July 29th, 2003 — 3:00 PM (Our Clock) . 215 North Mason Street, 2nd Floor ■ Purchasing Department it Important Dates / Requirements . Two day partnering session required . Mandatory Pre -Construction Meeting . Anticipated Notice to Proceed — Week of August 181h, 2003 1 Schedule / Incentive e Substantial Completion Date — March 5, 2004. . Final Completion Date — April 30, 2004. . Incentive/Disincentive — plus or minus $3,500/Day for early or late Substantial Completion — incentive not to exceed 5% of Base Bid. e $500/Day Uquidated Damages for each calendar day that expires after Final Completion date, until the work is ready for Final Payment and Acceptance. e Required Christmas Holiday "no work" shutdown. Work must be completed through Phase 3B. North College &.1efferson/Riverside Improvements Project - Schedule 20173 2004 Au Se 1 Oct Nov Dec Jan F¢b Mar ril N College - Jefferson * "` to the River Nov 14 - Jan 5 Jefferson I Riverside Overay No Work Allowed Mulberry/Riverside " Intersection - Phasing & Traffic Control e See proposed phasing plans. e Traffic Control Plans must be submitted and approved by City Traffic Department. . See Specifications (Revision of section 104) regarding parking. . Temporary Signals are the responsibility of Contractor — must be coordinated with City Traffic. e Work shall be planned around Holidays, & Downtown events. (No lane closures) e CSU Home football schedule will be identified. . Work that affects truck turns must be carefully planned and accelerated. e Adequate notice of closures and alternate access must be provided for all businesses and residences. Typical Construction Phasing Plan za Typical Construction Phasing Plan o = e:aWO { 3 Prosecution & Progress . Long work hours, night work & weekend work will be allowed with advanced notice (48 hrs min) and Engineer's approval. . Night work and late hours will not be allowed within 500' of residences (Riverside). Summary of Work ■ 11 1/2-inch Concrete Pavement (14,000 SY). More than 2/3 is high early strength (Fast Track). ■ Concrete sidewalk/bike path (2,000 SY) ■ Storm Sewer (2,100 LF sizes 15" to 42", RCP) ■ Asphalt mill and overlay (6,500 ton) . Pedestrian Lighting . Landscaping . Coordination of required utility relocations . Traffic control including temporary signals 4 5 Coordination of Work by Others ■ City Light & Power will be installing Street Lighting. . City Utilities will be installing sanitary sewer line. ■ Qwest & Xcel have required relocations of facilities. . City Traffic will be installing new traffic signals, signs and striping. 2 Site Management / Miscellaneous • Construction Surveying will be provided by City of Fort Collins crews. Written survey requests will be required (48 hour notice). Restaking will be paltl by the Contractor. • Weekly Project Meeting will be required. • Up-to-date Critical Path Method (CPM) schedule will be required. Two -week look -ahead schedules will be required at each weekly meeting. . Testing — See Revision of Section 106. Owner pays for compaction, backil beddirg, concrete & pavement tests. Contractor pays for manholes, mix designs, gradation, all retesting. • Contractor to supply Field Offices for Owner & Construction Staging Area, Location is responsibility of Contractor, subject to approval by Engineer. • 2-year warranty on all "defective" work from date of Final Acceptance. Federal Requirements Apply . INCLUDING: . Davis Bacon Wage Rates . Buy America Requirements . Disadvantaged Business Enterprise (DBE). Goal = 10% . On -the -lob Training • Thanks for attending. . Questions? • Field Visit 7