Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5795 NORTH COLLEGE AVE JEFFERSON ST RIVERSIDE AVE (2)R.C. Heath Construction Co. SECTION 00300 BID FORM PROJECT: NORTH COLLEGE AVENUE AND JEFFERSON STREET/RIVERSIDE AVENUE IMPROVEMENTS; BID NO. 5795 Place City of Fort Collins Date July 29, 2003 1. In compliance with your Invitation to Bid dated June 27, 2003 and subject to all conditions thereof, the undersigned R-C_ Heath Construction Co a **(Corporation, 3rirrted-iiabi�zrty C'rn�r�anp, Pam �e slri r,-�osnt-t1lee,--ar cTr�-PTagYI�YbY) ** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of SA of total hid ($ Instructions to Bidders. in accordance with the Invitation To Bid and 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Employers Mutual Casualty Compay 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through 7/96 Section 00300 Page 1 Attachment 1 BUY AMERICA REQUIREMENTS -49 U.S.C. 53230) - 49 CFR Part 661 Certification requirement for procurement of steel, iron, or manufactured products. Certificate of Compliance with 49 U.S.C. 53236)(1) The bidder or offeror hereby certifies that it will meet the requirements of 49 U.S.C. 53230)(1) and the applicable regulations in 49 CFR Part 661. Date RandYl J. DeMario Company Name R.C. Heath Construction Co. Title President Page 27 Attachment 4 Certification Regarding Lobbying Certification for Contracts, Grants, Loans, and Cooperative Agreements (To be submitted with each bid or offer exceeding $100,000) The undersigned [Contractor] certifies, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for making lobbying contacts to an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form—LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions [as amended by "Government wide Guidance for New Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). Note: Language in paragraph (2) herein has been modified in accordance with Section 10 of the Lobbying Disclosure Act of 1995 (P.L. 104-65, to be codified at 2 U.S.C. 1601, at seq .)] (3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, U.S.C.0 1352 (as amended by the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. [Note: Pursuant to 31 U.S.C.1352(c)(1)-(2)(A), any person who makes a prohibited expenditure or fails to file or amend a required certification or disclosure form shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such expenditure or failure.] The Contractor, R.C. Heath Construction Co, certifies or affirms the Truthfi.1kisps and accuracy of each statement of its certification and disclosure, if any. In addition, the Contr ct understa,l s and agrees that the provisions of 31 U.S.C. A 3801, of seq., apply to this July 29, 2003 Date Signature of Contractor's Authorized Official Name and Title of Contractor's Authorized Official Page 1 COLORADO DEPARTMENT OF TRANSPORTATION Project # UNDERUTILIZED DBE BID 5795 CONDITIONS ASSURANCE Location Fort Collins, Colorado Instructions: Contractor - Complete and submit this form with vour bid. Report onlv UndenrtilvPri nRi= ri tion which qualifies under the contract goal specification for this project , ram.......,... POLICY It is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have maximum opportunity to participate in the performance of contracts financed with federal, state or local entity funds. INTENDED UNDERUTILIZED DBE PARTICIPATION 1) Will your company's intended Underutilized DBE (UDBE) participation meet contract goals? ❑ yes no 2) Total intended Underutilized DBE (UDBE) participation: 0. % Meets cont ct goals ❑ yes ❑ no 3) List the UDBE firms you intend to use for your UDBE participation Name of UDBE firm(s) Certification Intended item(s) expiration date of work I understand that, if my company is determined to be the low bidder for the contract on this product, I must submit a completed CDOT Form #715 CERTIFICATION OF UNDERUTILIZED DBE PARTICIPATION to the Transportation Department by 4:00 pm the day after the bids are opened. In addition, if my company does not meet the intended contract goals, I must submit a completed CDOT Form #718 DBE GOOD FAITH EFFORT DOCUMENTATION before the above stated deadline. I understand my obligation to abide by the policy stated above. I shall not discriminate on the basis of race, color, age, sex, national origin, or handicap in the bidding process or the performance of contracts. I DECLARE UNDER PENALITY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS, THAT THE STATEMENTS MADE IN THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. Company name Date R.C.th Construction Co. July 29 2003 Company ff' r sig re Title 1 Randall J. DeMario IA,Wv President rrev:ous editions are obsolete and may not be used CDOT Form #714a 6/02 R.C. Heath Construction Co. SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: R.C. Heath Construction Co. 2 3 4 5 Permanent main office address: 141 Ra When organized: July 29, 1977 tte Drive, Fort Collins, CO 80524 If a corporation, where incorporated: Colorado How many years have you been engaged in the contracting business under your present firm or trade name? 26 years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) See Attached "Contracts on hand" 7. General character of Work performed by your company: Job Site Supervision, Structural Concrete, Rough and finish Carpentry, General Field Labor, Steel Erection 8. Have you ever failed to complete any Work awarded to you? No If so, where and why? 9. Have your ever defaulted on a contract? No If so, where and why? 10. Are you debarred by any government agency? No If yes list agency name. 7/96 Section 00420 Page 1 R.C. Heath Construction Co. 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. See Attached "Selected Recently Completed Projects" 12. List your major equipment available for this contract. Dump trucks, boom trucks, flatbed trucks, bobcats forklifts tractor, backhoe and additional equipment leased as needed. 13. Experience in construction Work similar in importance to this project: See Attached "Similar Protects" 14. Background and experience of the principal members of your organization, including officers: See Attached Key Personnel Resumes 15. Credit available: $800,000 16. Bank reference: First National Bank, 205 West Oak St., Fort Collins, CO 80522 Contact: Todd Campbell, V.P., (970) 482-4861 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the Owner? Yes 18. Are you licensed as a General Contractor? Yes If yes, in what city, county and state? Fort Collins, CO, Larimer, Colorado What class, license and numbers? Class A, License #A-1 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? 90% And to whom? See Subcontractor List. 20. Are any lawsuits pending against you or your firm at this time? No If yes, DETAIL 7/96 Section 00420 Page 2 R.C. Heath Construction Co. 21. What are the limits of your public liability? Detail: Public Liability: $1,000,000 Property Damage: $1,000,000 Employer's Liability: $ 500,000 What Company? Travelers Insurance 22. What are your company's bonding limitations? $10,000,000+. 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at 141 Racquette Drive this 29th day of July, 2003 R.C. Heath Construction Co. Name of Bidder By: Randall J. DeMarioAt-9 r1`i� Title: President State of Colorado County of Larimer Randall J. DeMario being duly sworn deposes and says that he is President of R.C. Heath Construction Co. and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to bef e�Y 2095. .60 Notary Public My commission expires woo annwMon 1* -03 day of S. s Mot 3.200E 7/96 Section 00420 Page 3 1102 R.C. err HEATH] CONSTRUCTION MANAGEMENT RC. HEATH CONSTRUCTION CO. P.O. DRAWER H • 141 RACQUETTE DR. FORT COLLINS, CO 80522 (80524) (970) 2214195 FAX (970) 221-2907 Contracts on Hand Date Contract Comp. Project Name/Type Location Amount $ Owner/Contact Phone Architect/Contact Phone 07/03 CSU Library Water Archives Fort Collins, CO 336,275 Colorado State University 970-491-0159 Colorado State University 970-491-0159 New Facility Brian Hood Brian Hood 08/03 Downtown Enhancement Project Fort Collins, CO 835,250 City of Fort Collins 970-221-6798 bha design, inc. 970-223-7577 Streetscape Project Rick Richter Jennifer Torrey 08/03 General Air Fort Collins, CO 392,147 General Air 303-892-7003 Architectural Resource Group 970-484-0126 New Pre-engineered Steel Facility Gary Armstrong Larry Trampe 08/03 Windsor Field House & Bus Barn Windsor, CO 915,800 Weld County School Dist. RE-4 970-686-5695 Architecture One 970-669-9060 Two New Facilities RLH Engineering (Owner's Rep) Al Hauser Dick Huwa 08/03 George T. Sanders Company Warehouse Brighton, CO 475,685 George T. Sanders Company 303423-9660 Acklam & Associates, Inc. 303-659-8546 New Distribution Facility Gary Sanders Jan Pyle 09/03 Liquor Max Retail Store Loveland, CO 491,335 Loveland Liquor Max 970-690-8299 Architectural Resource Group 970-484-0126 New Retail Facility Hal & Kathy Rogers Larry Trampe 11/03 CSU Lory Student Center Fort Collins, CO 1,800,000 Colorado State University 970-491-0160 Oz Architecture 303-861-5704 Food Service Renovation Tom Moss Kelly Yamasaki 11/03 Akron Prairie Vista Akron, CO 1,264,292 Housing Authority of the 970-345-6538 Architecture One 970-669-9060 New Assisted Living Facility Town of Akron Al Hauser Donna Butz 12/03 Redeemer Lutheran Church Fort Collins, CO 3,626,052 Redeemer Lutheran Church 970-225-9020 Mark Belford Architects 970-407-0070 New Facility Pastor Tim Runtsch Mark Belford 12/03 Loveland Public Safety Building Loveland, CO 974,700 City of Loveland 970-962-2635 Kenney & Associates 970-663-0548 Facility Renovations Ken Cooper Catherine Scott 05/04 Thunder Mountain Harley Davidson Loveland, CO 5,779,834 Thunder Mountain Harley Davidson 970-493-3137 Thorp Associates P.C. 970-586-9528 New Retail Facility Todd & Shellie Erdmann Roger Thorp 2004 CSU BioEnvironmental Research Building Fort Collins, CO 7,339,000 Colorado State University 970491-0160 FWA Group 704-332-7004 Facility Expansion Project Tom Moss Randy Larsen www.HEATHCONSTRUCTION.com R.C_ HEATH CONSTRUCTION MANAGEMENT R.C. HEATH CONSTRUCTION CO. P.O. DRAWER R -141 RACQUETTE DR. FORT COLLINS, CO 80522 (80524) (970) 221-4195 FAX (970) 221.2907 Randy DeMario President Randy is a graduate of Southern Illinois University with a degree in Structural Engineering. Eight years in the aerospace industry with Rockwell International and McDonnell Douglas were instrumental in Randy's abilities to deal with complex systems and schedules. With Heath Construction since 1992, Randy has managed a variety of complex projects and has developed an intimate knowledge of the processes necessary to move from a conceptual plan to actual construction. As President, Randy oversees and guides all strategic and operational functions of the company. Education 1988 —1992 University of Southern California, Los Angeles, CA Classes toward Master of Science, Civil Engineering 1981 —1985 Southern Illinois University, Carbondale IL Bachelor of Science, Structural Engineering Professional Experience 1992 - Present R.C. Heath Construction Co., Fort Collins, CO President 1988 - 1992 McDonnell Douglas Corporation, Huntington Beach, CA Manager - Structural Analysis, Advanced Launch Vehicles 1985 - 1988 Rockwell International, Downey, CA Structural Design/Analysis, US Space Station www.BEATHCONSTRUCTTON.com RL. HEATH CONSTRUCTION MANAGEMENT R.C. HEATH CONSTRUCTION CO. P.O. DRAWER H • 141 RACQUETTE DR. FORT COLLINS, CO 80522 (80524) (970) 2214195 FAX (970) 221-2907. Leon J. McCauley Vice President Leon is a graduate of Colorado State University with a degree in Mechanical Engineering. He has considerable field experience in heavy industrial and commercial construction projects ranging from large scale power, chemical and mining projects to commercial and luxury residential development and construction. Leon has personally managed most of Heath Construction's recent complex projects. As Vice President he is responsible for our project management systems and staff. Education 1987 - 1991 Colorado State University, Fort Collins, CO Bachelor of Science Mechanical Engineering Professional Experience 1997 — Present R.C. Heath Construction Co., Fort Collins, CO Vice President 1995 - 1997 The Commercial Division, Inc., Steamboat Springs, CO Project Superintendent 1991 - 1995 The Industrial Company, Steamboat Springs, CO Project Engineer www.HEATHCONSTRUCTION.com R.C. FHEATH CONSTRUCTION MANAGEMENT R.C. HEATH CONSTRUCTION CO. P.O. DRAWER H • 141 RACQUETTE DR. FORT COLLINS, CO 80522 (80524) (970) 221-4195 FAX (970) 221-2907 Selected Recently Completed Projects Page 1 of 3 Date Contract Comp. ProjectName/Type Location Amount Owner/Contact Phone Architect/Contact Phone 2003 Yancey's Food Service Company Loveland, CO 7,237,196 Yancey's Food Service Company 970-484-3123 Bozich Architects 913-342-8120 New Office/Distribution Facility Greg Yancey Don Bozich 2003 EPURA Performance Park Estes Park, CO 1,019,592 Estes Park Urban Renewal Authority 970-577-3704 Thorp Associates P.C. 970-586-9528 New Amphitheater and Park Facility Will Smith Roger Thorp 2003 Poudre Fire Authority Fort Collins, CO 1,397,433 Poudre Fire Authority 970416-2895 Vaught -Frye Architects 970-224-1191 New Fire Station #14 Bob Poncelow Joe Frye 2003 Dell Range Showtime Video Cheyenne, WY 814,800 Bumvood, LLC 303466-2482 Allred & Associates 303-465-4306 New Facility Shannon Wood Brent Allred, AIA 2002 Ridgeview Classical School Fort Collins, CO 1,073,517 Ridveview Classical School 303-589-5511 Zeiler -Pennock Architects 303-455-3322 Facility Addition Michael Tashman Jeanne Fielding 2002 Front Range Community College Fort Collins, CO 3,974,800 Front Range Community College 303-466-8811 Davis Partnership Architects 303-861-8555 Mt Antero/Blanca Peak Buildings Renovations Bob Rizzuto Edward Ehrmarm 2002 Poudre Health Services Dental Offices Fort Collins, CO 1,423,800 Poudre Health Services 970-224-5209 CCMK 970-493-1220 New Facility Chris Sheafor Sylvie Glass 2002 Interstate Honda Motorsports Fort Collins, CO 958,333 Loveland Motor Sports 970-667-0224 Architectural Resource Group 970-484-0126 New Dealership Facility Marshall Van Thorre Larry Trampe 2002 First United Presbyterian Church Greeley, CO 1,895,453 First Presbyterian Church 970-352-6565 Lee Architects 303-989-4500 Facility Addition John Trull Scott Boduch 2002 Adams County Parks/CSU Extension Building Henderson, CO 2,088,600 Adams County, CO New Facility Pat Myers 2002 Windsor/Severence Fire Station New Facility 2002 Ogallala High School Facility Addition 2002 Good Samaritan J/P. Martinez Apartments New Facility Windsor, CO 1,719,241 Windsor/Severence Fire Protection District Chief Jerry Ward Ogallala, NE 1,090,807 Ogallala School District Don Bartling Greeley, CO 2,577,069 Evangelical Lutheran Good Samaritan Society Leonard Kemnitz 303-654-6002 Bley & Associates 970-330-3322 Lauren Bley 970-686-9596 Vaught -Frye Architects 970-224-1191 Joe Frye 308-284-6751 Baker & Associates 308-632-3123 Clint Taylor 605-362-3193 Landmark Engineering Ltd 970-667-6287 Bruce Meyer 2001 Timberline Branch, Home State Bank Fort Collins, CO 1,234,133 Home State Bank 970-622-7188 RB+B Architects 970-484-0117 New Facility Steve Forbes George Brelig ww%v HEATHCONSTRUCTION.com R.C_ HeA Construction Co. CONTRAC /O BY: Randall J. DeMario, President ADDRESS: P.O. Drawer H Fort Collins, CO 80522 8. BID SCHEDULE (Base Bid) PLEASE USE THE ATTACHED BID SCHEDULE WHEN SUBMITTING YOUR BID. 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. (Seal Attest: Leon J. IP C FULL SU$�IITTED: July 29, 2003 Sig ature Ball DeMario Date President Title P.O_ Drawer H Fort Collins CO 80522 Telephone (970) 221-4195 7/96 Section 00300 Page 2 HrM EATH CONSTRUCTION MANAGEMENT R.C. HEATH CONSTRUCTION CO. P.O. DRAWER H • 141 RACQUETTE DR. FORT COLLINS, CO 80522 (80524) (970) 221-4195 FAX (970) 221-2907 Selected Recently Completed Projects Page 2 of 3 Date Contract Comp. Project Name/Type Location Amount S Owner/Contact Phone Architect/Contact Phone 2001 General Care Health Services Medical Clinic Fort Collins, CO 1,275,064 General Care Health Services, Inc. 970-482-6620 Architecture One 970-669-9060 New Facility Charles Hatchette Al Hauser 2001 McCoy Sales Office/Warehouse Louisville, CO 1,054,589 McCoy Sales Corporation 303-762-8012 Richard C. Lubischer & Asso. 303-778-6369 New Facility Tom Gee Richard Lubischer 2001 George T. Sanders Company Wheat Ridge, CO 2,432,819 George T. Sanders Company 303-423-9660 David Langley Architects 970-223-1512 Facility Addition Gary Sanders David Langley 2001 Rocky Mountain Shambhala Center Red Feather Lakes, CO 2,059,762 Rocky Mountain Shambhala Center 303-545-0092 Richard Rice Architect 303443-8540 New Housing Facility and Jeff Waltcher Jim Logan Architects 303-449-3274 New Concrete Water Tank & Distribution System 2000 Town of Frederick Police Department Frederick, CO 1,092,722 Town of Frederick 303-833-2388 Roth -Shepard Architects 303-534-7007 New Facility Linda Glantz Craig Friedman 2000 Centaurus High School Lafayette, CO 1,261,398 Boulder Valley School District RE-2 303-447-5167 C.M. Yon Architects 303-691-8000 Facility Addition Shawn Ropp Carmen Yon 2000 CSU BioEnvironmental Hazard Research Bldg Fort Collins, CO 6,188,063 Colorado State University 970-206-0947 Randall E. Larsen Architects 704-947-6150 New Facility Bill Kraus Randy Larsen 1999 Lyons MiddWSenior High School Lyons, CO 3,787,791 St. Vrain Valley School District 303-682-7250 Hutton Ford Architects 303-773-2845 Facility Addition Jeff Medwetz Todd Vandenburg 1999 Colorado State Patrol Building Fort Collins, CO 1,010,357 State of Colorado 303-239-4646 Roth & Shepard Architects 303-534-7007 New Facility Robert Dimberger Suzanne Lanyi 1999 Wal-Mart RDC 6019 Expansion Loveland, CO 5,009,998 Wal-Mart Stores, Inc. 501-271-0286 Carter & Burgess, Inc. 817-222-8500 Facility Addition Rick Williams Mike Latz 1999 Adams City High School Commerce City, CO 3,518,324 Adams City School District #14 303-289-3947 RB+B Architects 970-484-0117 Facility Remodel Jim Garguilo George Brelig 1999 Union Colony Fire Station #5 Greeley, CO 1,172,130 City of Greeley 970-350-9795 Pahl -Pahl -Pahl 303-861-7147 New Facility William Sterling Robert Grubb 1999 Dupont Elementary School Commerce City, CO 1,174,634 Adams City School District #14 303-289-3947 RB+B Architects 970-484-0117 Facility Remodel Jim Garguilo Charles fielder 1999 Adams City Middle School Commerce City, CO 1,707,143 Adams City School District #14 303-289-3947 RB+B Architects 970-484-0117 Facility Remodel Jim Garguilo Charles fielder w .HEATHCONSTRUCTION.com FH RC. HEATH CONSTRUCTION CO. EATH F.O. DRAWERS, • CO0522 (8 524) DR, FORT COLLINS, O 80522 (80524) (970) 221 3195 FAX (970) 221-2907 CONSTRUCTION MANAGEMENT Selected Recently Completed Projects Page 3 of 3 Date Contract Comp. Project Name/Type Location Amount S Owner/Contact Phone Architect/Contact Phone 1999 Fort Collins Yamaha Suzuki Sea-Doo Fort Collins, CO 1,015,665 Fort Collins Yamaha 970498-8858 Architectural Resource Group 970-484-0126 New Motorcycle Dealership Facility Brian Harris Larry Trampe 1999 Pawnee High School Grover, CO 1,660,535 Pawnee RE-12 School District 970-895-2222 MCB Architects, AIA 303-758-7858 Addition/Remodel Gery Reins John Chaney, AIA 1999 Providence Ice Centre Windsor, CO 1,601,891 Windsor Ice House, LLC 970-686-9552 Architecture One 970-669-9060 New Recreation Facility Chris Ruff Al Hauser 1998 Fiberlok Building Fort Collins, CO 1,245,974 Fiberlok, Inc. 970-221-1200 Architecture One 970-669-9060 Addition/Remodel Bob Angliss At Hauser 1998 PFA Fire Station No. 12 Fort Collins, CO 1,025,924 Poudre Fire Authority 970-221-6581 Vaught*Frye Architects 970-224-1191 New Facility Mel Carlson Joe Frye 1998 CSU Rockwell Hall Fort Collins, CO 3,208,769 Colorado Sate University 970-491-0145 Michael Barber Architects 303-595-7070 Addition/Remodel Tom Moss Bart Hams 1998 Mawson Block/Home State Bank Fort Collins, CO 2,842,793 Home State Bank 970-622-7188 RB+B Architects 970-484-0117 New Faciltiy Steve Fobes George Brelig 1998 Templed Hills Retreat Woodland Park, CO 1,034,525 Rocky Mountain Conference 719-687-9038 David A. Langley Architects 719-687-3415 New Facility Gary Conover David Langley 1998 Windsor Joint Use Maintenance Facility Windsor, CO 1,200,604 Weld Co. School Dist. RE-4 970-686-2963 Architecture One 970-669-9060 New Facility John Moore Al Hauser 1998 F.R. Comm. College/Harmony Library Fort Collins, CO 3,418,294 Front Range Community College 303-404-5408 Davis Partnership, PC 303-861-8555 New Facility David Beset Curtis Cox 1997 John's Harley Davidson Fort Collins, CO 1,179,185 RCK LLC 970-282-3464 Architecture Resource Group 970-484-0126 New Facility John Cockson Lary Trampe 1997 High Country Beverage Corporation Loveland, CO 1,270,637 High Country Beverage Corp. 970-353-1520 Architecture Resource Group 970484-0126 New Building Dave Nichols Larry Trampe 1997 _C.S.U. Lory Student Center Fort Collins, CO 1,549,547 Colorado State University 970-491-0151 Aller*Lingle Architects 970-223-1820 Additon/Remodel Tom Moss Mick Alter 1997 Windsor Schools Windsor, CO 1,013,072 Weld Co. School Dist. RE-4 970-686-7441 Hagen -Cameron Architects 719-448-0883 Addition/Remodel John Moore Tim Hodges www.HEATHCONSTRUCTION.cott HEATH CONSTRUCTION MANAGEMENT R.C. HEATH CONSTRUCTION CO. P.O. DRAWER H -141 RACQUETTE DR. FORT COLLINS, CO 80522 (80524) (970) 2214195 FAX (970) 221-2907 Similar Projects Page 1 of 3 Date Contract Comp. Project Name/Type Location Amount $ Owner/Contact Phone Architect/Contact Phone City of Fort Collins 2003 Downtown Enhancement Project Fort Collins, CO 835,250 City of Fort Collins 970-221-6798 bha design, inc. 970-223-7577 Streetscape Project Rick Richter Jennifer Torrey 2003 Poudre Fire Authority Fort Collins, CO 1,397,433 Poudre Fire Authority 970-416-2895 Vaught -Frye Architects 970-224-1191 New Fire Station #14 Bob Poncelow Joe Frye 2002 Boxelder Sanitation District Maintenance Building Fort Collins, CO 310,909 Boxelder Sanitation District 970498-0604 Architectural Resource Group 970.484-0126 New Facility Ravindra Srivastava Larry Trampe 2002 Southridge Golf Course Storage Building Fort Collins, CO 161,173 City of Fort Collins 970-221-6273 Aller-Lingle 970-223-1820 New Facility Steve White Mick Aller 2000 Clearview Channel Phase I Fort Collins, CO 402,942 City of Fort Collins Utilities 970-221-6884 Anderson Consulting Engineers 970-226-0120 Flood Control Structure Keith Meyer Greg Koch 1999 Colorado State Patrol Building Fort Collins, CO 1,010,357 State of Colorado 303-239-4646 Roth & Shepard Architects 303-534-7007 - New Facility - Robert Dimberger - Suzanne Lanyi 1998 Fire Station No. 12 Fort Collins, CO 1,025,924 Poudre Fire Authority 970-221-6581 Vaught•Frye Architects 970-224-1191 New Facility Mel Carlson Aubrey Carson 1998 FRCC Harmony Library Fort Collins, CO 3,418,294 City of Fort Collins Public Library 303-404-5408 Davis Partnership, PC 303-861-8555 New Facility David Besel Curtis Cox 1998 Poudre Fire Station No. 9 Fort Collins, CO 430,048 Poudre Fire Authority 970-221-6273 Vaught -Frye Architects 970-224-1191 New Facility Steve White Joe Frye 1995 Poudre Fire Authority Training Center Fort Collins, CO 1,755,233 Poudre Fire Authority 970-221-6273 Architecture Plus 970-493-1220 New Facility . Steve White Tom Kalert 1994 Fire Station No. 10 Fort Collins, CO 714,646 Poudre Fire Authority 970-212-6611 Vaught•Frye Architects PC 970-224-1191 New Facility Steve White Joe Frye 1992 Water Treatment Plant #2 - Fort Collins, CO 942,934 City of Fort Collins 970-221-6775 RB+B Architects 970-484-0117 New Facility - Jim ONeill George Brelig 1991 Water Quality Lab Expansion Fort Collins, CO 718,000 City of Fort Collins 970-221-6500 Black & Veatch 303-671-4200 Facility Addition Terry Robinson John Ezell 1991 Rogers Park Fort Collins, CO 515,615 City of Fort Collins 970-221-6500 City of Fort Collins Engineering 970-221-6500 New Park Leslie Bryson Leslie Bryson 1984 Old Town Plaza/Square Fort Collins, CO 528,355 Downtown Development Authority 970.484-2020 SLP, A Professional Corp. 303-623-7031 www.HEATHCONSTRUCTION.com R.C- HEATH CONSTRUCTION MANAGEMENT RC. HEATH CONSTRUCTION CO. P.O. DRAWER H -141 RACQUETTE DR. FORT COLLINS, CO 80522 (80524) (970) 221-4195 FAX (970) 221-2907 Similar Projects Page 2 of 3 Date Contract Comp. Project Name/Type Location Amount S Owner/Contact Phone Architect/Contact Phone Town of Estes Park 2003 EPURA Performance Park Estes Park, CO 1,019,592 Estes Park Urban Renewal Authority 970-577-3704 Thorp Associates P.C. 970-586-9528 New Amphitheater and Park Facility Will Smith Roger Thorp 2002 Estes Park Municipal Building Estes Park, CO 816,123 Town of Estes Park 970-586-4464 Thorp Associates, PC 970-586-9528 Facility Remodel and Addition Richard Widmer Roger Thorp 2002 Estes Park Public Library Estes Park, CO 689,205 Estes Valley Public Library District 970-586-8116 Thorp Associates, PC 970-586-9528 Facility Addition Ed Volz Roger Thorp 2000 Estes Park Medical Center Imaging Expansion Estes Park, CO 440,600 Estes Park Medical Center 970-586-2317 H&L Architecture Ltd, AIA 303-244-9350 Facility Improvements Andrew Wills Rob Davidson 2000 Estes Park HydroElectric Plant Estes Park, CO 415,597 Town of Estes Park 970-586-5331 Long Hoeft Architects 303-569-2456 Historic Renovation Michael Mangelsen Gary Long 1996 Dannels Fire Station Estes Park, CO 1,012,105 Town of Estes Park 970-586-4464 Thorp Associates, PC 970-586-9528 New Facility Richard Widmer Roger Thorpe 1995 Estes Park Walkway Phase 11 Estes Park, CO 170,451 Estes Park Urban Renewal Authority 970-586-5331 Design Studios West, Inc. 303-623-3465 Streetscape Renovation Art Anderson Jeffrey Joyce 1995 Estes Park Finishes Estes Park, CO 156,557 Estes Park Urban Renewal Authority 970-586-5331 Design Studios West, Inc. 303.623-3465 Riverwalk Extension Art Anderson Jeffrey Joyce 1994 Estes Park Medical Center Estes Park, CO 1,796,006 Estes Park Medical Center 970-586-9513 Fischer, Reece & Johnson 303-777-0407 Facility Addition Andrew Wills John Reece 1991 EPURA Parking Lot Estes Park, CO 111,383 Estes Park Urban Renewal Authority 970-586-5331 Estes Park Urban Renewal Authority 970-586-5331 New Parking Lot Art Anderson Art Anderson 1990 Big Thompson Riverwalk Phase B Estes Park, CO 496,681 Estes Park Urban Renewal Authority 970-586-5331 Design Studios West, Inc. 303-623-3465 Riverwalk Extension Art Anderson Jeffrey Joyce 1990 Estes Park Medical Center Estes Park, CO - 5775960 Estes Park Medical Center 970-586-9513 Fischer, Reece & Johnson 303-777-0407 Addition Andrew Wills John Reece 1990 Estes Park Medical Center Estes Park, CO 577,960 Estes Park Medical Center 970-586-9513 Fischer, Reece & Johnson 303-777-0407 Addition Andrew Wills John Reece 1989 Estes Park Streetscape 4 Estes Park, CO 83,721 Estes Park Urban Renewal Authority 970-586-5331 Design Studios West, Inc. 303-623-3465 Art Anderson Jefrrey Joyce 1988 Confluence Riverfmnt Park Estes Park, CO 755,873 Estes Park Urban Renewal Authority 970-586-5331 Design Studios West, Inc. 303-623-3465 Art Anderson Jeffrey Joyce www.HEATHCONSTRUCTION.com PM R.G. HEATH RC. HEATH CONSTRUCTION CO. P.O. DRAWER H • 141 RACQUETTE DR FORT COLLINS, CO 80522 (80524) (970) 221-4195 FAX (970) 221-2907 CONSTRUCTION MANAGEMENT Similar Projects f ' Page 3 of 3 Date Comp. Project Name/Type Location Contract Amount S Owner/Contact Phone Architect/Contact Phone Town of Estes Park (Continued) 1987 Estes Park Parking Lot Improvements Estes Park, CO 200,134 Estes Park Urban Renewal Authority 970-586-5331 Design Studios West, Inc. 303-623-3465 Art Anderson Jeffrey Joyce 1987 Estes Park Streetscape, Phase 3 Estes Park, CO 489,609 Estes Park Urban Renewal Authority 970-586-5331 Design Studios West, Inc. 303-623-3465 Art Anderson Jeffrey Joyce 1985 Estes Park Streetscape, Phase 2 Estes Park, CO 590,809 Estes Park Urban Renewal Authority 970-586-5331 Design Studios West, Inc. 303-623-3465 Art Anderson Jeffrey Joyce City of Loveland 12/03 Loveland Public Safety Building Loveland, CO 974,700 City of Loveland 970-962-2635 Kenney & Associates 970-663-0548 Facility Renovations Ken Cooper Catherine Scott 1998 Fire Station No. 5 Loveland, CO 567,285 City of Loveland 970-962-2670 Architecture One 970-669-9060 New Facility Don Williams Al Hauser 1996 Loveland Public Library Loveland, CO 379,147 City of Loveland 970-962-2670 Architecture One 970-669-6090 Facility Addition Don Williams Al Hauser Town of Windsor 2002 Windsor/Severence Fire Station Windsor, CO 1,709,633 Windsor/Severence Fire 970-686-9596 Vaught -Frye Architects 970-224-1191 New Facility Protection District Joe Frye Chief Jerry Ward 1998 Windsor Joint Use Maintenance Facility Windsor, CO 1,200,604 Weld Co. School Dist. RE-4 970-686-2963 Architecture One 970-669-9060 New Facility John Moore Al Hauser 1988 Windsor Municipal Pool Windsor, CO 713,833 Town of Windsor 970-686-7476 ARIX Corporation, P.C. 970-356-3930 New Facility John Voulo Bob Shreve City of Golden 1992 Golden Streetscape Golden, CO 1,701,000 City of Golden Public Works 303-279-5602 TST Inc. Consulting Engineers 303-792-0557 Streetscape Renovation Dan Hartman John Cotton www.HEATHCONSTRUCTION.com 9 SECTION 00410 BID BOND RKNOW ALL MEN BY THESE PRESENTS: i`nnafrHe�&hn C.as Principal, and Employers Mutual Surety, are hereby held and firmly bound unto the as OWNER, in the sum of $ 5% of total bid-- for truly to be made, we hereby jointly and severally assigns. that we; the undersigned Casualty Company as Citv of Fort Collins, Colorado, the payment of which, well and bind ourselves, successors, and THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, NORTH COLLEGE AVENUE AND JEFFERSON STREEWRIVER5IDE AVENUE IMPROVEMENTS; BID NO. 5795. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials 'in connection therewith, and shall in all other respects, perform the'Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect,' it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to trahsact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 1 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 28th day of July 2003, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by .their proper officers, the day, and year first set forth above. PRINCIPAL. Name: R. C. HeathConstruction Co. Address: P.O. Drawer H Fort lins CO 35 Ry : (SEAL) SURETY Employers Mutual Casualty Company P.O. Box 441098 Auror-a-. CO $OQ44 BY: JA JUL Title: Attorney -in -Fact_ (SEAL) 7/96 Section 00410 Page 2 No Text North College Avenue and Jefferson Street/Riverside Avenue Improvements Bid No 5795 Bid Tabulation R.C. Heath Construction Co. P.O. Drawer H Fort Collins, Colorado 80522 (970) 221-4195 ITEM ITEM DESCRIPTION UNIT QUANTITYNIPRICE PRICE 201-00000 Clearing & Grubing LS 1 8,585.92 8,585.92 202-00010 Removal of Tree EACH 2 392.00 10,192.00 202-00001 Removal of structure EACH 1,268.96 3,806.88 202-00033 Removal of Pipe EACH 6,517.28 26,069.12 202-00036 Removal of inlet EACH 11 788.48 10,250.24 202-00190 Removal of Conc Median Cover SY 614 15.12 9,253.44 202-00200 Removal of Sidewalk SY 2,15 15.12 32,628.96 202-00201 Removal of Curb LF 1,474 7.84 11,556.16 202-00203 Removal of Curb & Gutter LF 2,270 8.96 20,339.20 202-00205 Removal of Wheel Stop EACH 20 53.65 1,072.96 202-002xx Removal of Composite Pavement SY 12,723 4.48 56,999.04 202-00210 Removal of conc Pavement SY 192 15.12 2,903.04 202-00220 Removal of Asphalt Mat SY 5,92q 5.60 33,196.80 202-002xx Removal of Composite pavemt (planing) SY 14,140 5.60 79,217.60 202-00240 Removal of Asphalt Mat( Planing) SY 12,65q 7.48 94,656.80 202-00250 Removal of Pavement markings SF 2,00 1.85 3.696.00 202-01000 Removal of Fence LF 2 6.87 1,374.24 202-04001 Plug Culvert EACH 11 850.08 11,901.12 202-04002 Clean Culvert EACH 1,355.20 10.841.60 203-00010 Unclassified Excavation (Complete in Place) CY 5,781 3.23 18,660.32 230-00100 Muck excavation CY 25q 6.38 1,593.76 203-01597 Potholing HR 8 165.48 13,238.40 207-00205 Topsoil CY 630 13.44 8,467.20 208-00045 Concrete Washout Structure EACH 1 884.80 884.80 208-00020 Silt Fence LF 1,806 1.86 3,352.16 208-00070 Stabilized Construction Entrance EACH 2 1,120.00 2,240.00 208-00100 Sediment Removal and Disposal LS 1 560.00 560.00 208-00200 Erosion Control Supervisor LS 1 9,178.40 9,178.40 210-00050 Reset Fire Hydrant EACH 1 1,601.60 1,601.60 210-01050 Reset Chain Link Fence LF 510 8.52 4,346.72 210-XXXXX Adjust Water meter EACH 1 505.12 505.12 210-XXXXX Adjust Fire Hydrant EACH 1 616.00 616.00 210-01710 Adjust Value EACH 91 2O6.95 1,862.56 210-04010 Adjust Manhole EACH 1 332.30 3,323.04 210-04020 Modify inlet EACH 1,064.00 3,192.00 212-00006 Seeding ( Native) ACRE 0.3 896.00 268.80 213-00000 Landscape maintenance LS 1 1,680.00 1,680.00 213-00003 Mulching (Weed Free) ACRE 0.3 1,456.00 436.80 213-00008 Mulching (Wood Chip) CF 4,319 1.87 8,078.56 213-00070 Mulch Tackifier LB 50 7.84 392.00 213-00705 Landscape boulder(Special)(12'x12'x12') EACH 47 28.00 1,316.00 213-00705 LandscapBouldegSpecial)(18'x18'x18') EACH 9 95.20 9,139.20 213-00705 Landscape Boulder (Special)(24'x24N24') EACH 4 190.40 8,948.80 214-00225 Deciduous tree (2.5 Inch Caliper) EACH 1 364.00 5,824.00 Page 1 of 4 North College Avenue and Jefferson StreeNRiverside Avenue Improvements Bid No 5795 Bid Tabulation R.C. Heath Construction Co. P.O. Drawer H Fort Collins, Colorado 80522 (970) 221.4195 REM REM DESCRIPTION UNIT QUANTITY UNIT PRICE PRICE 214-00230 Deciduous Tree (3 Inch caliper Each 10 420.00 4,200.00 214-00235 Deciduous Tree (3.5 Inch caliper Each 19 504.00 9,576.00 214-00350 Deciduous Shrub (5 Gal Container) Each 103 28.00 2,884.00 214-00650 Evergreen Shrub (5 Gal Container) Each 377 33.60 12,667.20 214-00950 Perennials (1 Gal Container) Each 41 11.20 459.20 215-xxxxx Transplant Tree (3 to 6 Inch) Each 4 224.00 896.00 250-00100 Environmental health & Safety Management LS 1 22,400.00 22,400.00 304-06000 Aggregate Base Course (Class 6) TON 5,773 15.12 87,287.20 403-00720 Hot Bituminous Pavement ( Patching)( Asphalt) TON 519 140.00 71,400.00 403-33851 Hot Bituminous Pavement (Grading S)(100)(PG 64-28) TON 6,563 51.52 338,125.76 412-00600 Concrete Pavement (6 Inch) SY 892 36.98 32,989.60 412-01152 Concrete Pavement It1-1/2Inch) SY 3,742 60.83 227,622.08 412-01152 Concrete Pavement (11-112 Inch)(Fast Track)(24 Hour) SY 3,233 72.66 234,896.48 412-01152 Concrete pavement (11-1/21nch)(FastTrack)(48Hour) SY 6,151 69.67 428,561.28 603-01150 15 Inch Reinforced Concrete Pipe LF ill 40.65 4,512.48 603-01180 18 Inch Reinforced Concrete Pipe LF 677 41.89 28,358,40 603-01240 24 Inch Reinforced Concrete Pipe LF 254 46.82 11,891.04 603-01300 30 Inch Reinforced Concrete Pipe LF 70 65.30 4,570.72 603-01360 36 Inch Reinforced Concrete Pipe LF 424 118.27 50,146.88 603-01420 42 Inch Reinforced Concrete Pipe LF 303 135.52 41,062.56 603-02420 53x34 Inch reinforced Concrete Pipe Ellipyical LF 195 271.04 52,852.80 603-07240 24 inch reinforced Concrete pipe (Jacked) LF 68 689.92 46,914.56 603-07360 36 inch reinforced Concrete pipe (Jacked) LF 64 874.72 55,982.08 604-00310 Inlet type C (10 Foot) Each 1 3.203.20 3,203.20 604-16005 Inlet type 16 (Single) (5 Foot) Each 5 3,141.60 15,708.00 604-16505 Inlet type 16 (Double) (5 Foot) Each 1 4,188.80 4,188.80 604-16510 Inlet type 16 (Double) (10 Foot) Each 1 6,776.00 6,776.00 604-19105 Inlet Type R L5 (5 Foot) Each 5 4,188.80 20,944.00 604-19110 Inlet Type R L5 (10 Foot) Each 3 5,297.60 15,892.80 604-19205 Inlet Type R L10 (5 Foot) Each 1 5,667.20 5,667.20 604-30005 Manhole (Slab Base)(5Foot) Each 1 5,109.44 5,109.44 604-30010 Manhole (Slab Base)(10Foot) Each 5 7,229.60 36,148.00 604-30015 Manhole (Slab Base)(15Foot) Each 1 12,085.92 12,085.92 604-31005 Manhole (box Base)(5Foot) Each 1 8,747.20 8,747.20 604-31010 Manhole (box Base)(10Foot) Each 4 9,461.76 18,923.52 605-xxxxx 4 inch Non -Perforated pipe Underdrain LF 134 18.48 2,550.24 608-xxxxx Tree Grate Each 1 1,376.13 26,146.40 608-00000 Concrete Sidewalk SY 1,35 32.84 44,338.56 608-00005 Concrete Pavement ( Colored 7 Stamped) SY 270 84.13 22,714.72 608-0000x Concrete Pavement (11-1/021nch)(Special) SY 535 77.24 41,325.76 608-00010 Concrete Curb Ramp SY 6 240.43 1,442.56 608-000lx Curb Ramp (Type 4) Each 3 999.04 2,997.12 608-000lx Curb Ramp (Special) Each 13 910.99 11,842.88 608-xxxxx Truncated Domes SF 34118.96 3,082.24 Page 2of4 North College Avenue and Jefferson StzeetlRiverside Avenue Improvements Bid No 5795 Bid Tabulation R.C. Heath Construction Co. P.O. Drawer H Fort Collins, Colorado 80522 (970) 221-4195 REM ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE PRICE 608-0005x Concrete Pavers SY 235 100.81 23,691.36 608-00350 Concrete Sidewalk (Colored Type A) SY 605 35.63 21,554.40 608-00350 Concrete Sidewalk (Colored Type B) SY 1,615 36.90 59,597.44 608-07000 Concrete Retaining Wall SY 4q 723.74 32,568.48 608-xxxxx Splash plate SY 22 49.01 10,781.12 608-xxxxx Median Drainage Material SY 84 17.25 14.574.56 608-xxxxx Median Drainage Pipe LF 60q 5.05 3,030.72 609-20010 Curb Type 2 (Section B) LF 491 22.57 11,082.40 609-200xx Curb Type 2 (Section M)(Special) LF 17 24.95 4,466.56 609-21010 Curb and Gutter Type 2 (Section I-8) LF 1,734 12.49 21,640.64 609-21020 Curb and Gutter Type 2 (Section II-B) LF 3,322 14.73 48,928.32 609-21900 Curb and gutter type 2 (Special) LF 220 20.34 4,474.40 609-21xxx Curb and gutter type 2 (8 Inch Vertical) LF 277 18.08 5,008.64 609-24004 Gutter Type 2 ( 4 Foot) LF 140 20.36 2,850.40 609-24010 Gutter type 2 (10 Foot) LF 101 50.68 5,118.40 609-xxxxx Drive -Over Curb and Gutter LF 403 14.77 5,951.68 610-00020 Median Cover materia I(Pattemed Concrete) SF 881 11.67 10,282.72 613-00100 1 Inch Electrical Conduit LF 1,015 5.72 5,803.84 613-00200 2 Inch Electrical Conduit LF 2,267 9.37 21,244.16 613-10000 Wiring LS 1 3,608.64 3.608.64 613-16010 L' ht Standard and Luminaire (Deoora6ve) Each 2q 2,537.50 73,587.36 613-40010 L'ght Standard Foundation Each 21 222.22 6,444.48 613-50100 LghtControl Center Each 4 1,470.56 5,882.24 619-xxxxx 4' Waterline LF 165 96.10 15,855.84 619-xxxxx 6" Waterline LF 95 98.56 9,363.20 619-xxxxx 8" Waterline LF 80 104.72 8,377.60 620-00005 Field Office (Special) Each 1 22,628.48 22,628.48 623-xxxxx 1Inch Plastic Pipe LF 4,101 1.46 5,970.72 623-xxxxx 1-114 Inch Plastic Pipe LF 48 1.56 75.04 623-xxxxx 1-112 Inch plastic Pipe LF a 1.68 13.44 623-xxxxx 2 Inch Plastic pipe LF 2,241 2.24 5,019.84 623-xxxxx 4 Inch Plastic Pipe LF 654 8.40 5,493.60 623-00156 Irrigation Bubbler Each 39 13.44 524.16 623-00212 12 Inch Pop-up Spray Sprinkler Each 354 22.40 7,929.60 623-01708 1 Inch Backflow Preventor Each 4 3,024.00 6,048.00 623-03108 1 Inch Automatic control Valve Each 20 224.00 4.480.00 623-04000 Control Wire 24 Volt LF 6156 0.11 736.96 623-04008 1 Inch Quick Coupler Valve Each 8 168.00 1,344.00 623-05016 2 Inch Gate Valve Each 3 56.00 168.00 623-08112 12 Station Aurtomatic Controller Each 1 2,128.00 2,128.00 623-08116 16 Station Automatic Controller Each 1 2,800.00 2,800.00 623-xxxxx Irrigation Boring Under Railroad LF 68 24.64 1,675.52 623-xxxxx Irrigation Boring Under Road LF 80 24.64 1,971.20 626-00000 Mobilization LS 1 11 380,236.56 11 380,236.56 Page 3of4 North College Avenue and Jefferson StreetlRiverside Avenue Improvements Bid No 5795 Bid Tabulation R.C. Heath Construction Co. P.O. Drawer H Fort Collins, Colorado 80522 (970) 221.4195 ITEM REM DESCRIPTION UNIT QUANTITY UNIT PRICE PRICE 627-00001 Pavement Marking Paint Gal 35 40.32 14,112.00 630-00000 Flagging HR 18 22.40 4,032.00 630-00002 Traffic Control Officer DAY 15 347.20 52,080.00 630-00003 lUniformed Traffic Control HR 4q 33.60 1,344.00 630-00007 Traffic Control Inspection DAY 115 112.00 16,800.00 630-80001 Flashing Beacon (Portable) EACH 1,120.00 6,720.00 630-80336 Barricade (Type 3 M-B)(Temp) EACH 280.00 2,240.00 630.80341 Construction Traffic Sign (Panel Size A) EACH 7 56.00 4,368.00 630-80342 Construction Traffic Sign (Panel Size B) EACH 4 112.00 4,928.00 630-80343 Constuction Traffic Sign (panel Size C) EACH 1 145.60 1,456.00 630-80344 Construction Traffic Sign (Special) SF 46 15.68 7,353.92 630-80358 Flash Arrow Panel (C TY) EACH 6 1,680.00 10,080.00 630-80365 Portable Message Sign Panel EACH 2 6,160.00 12,320.00 630-80370 Concrete Barrier (Temp) LF 200 27.05 5,409.60 630-80390 Channelizing Device (Special) EACH 300 44.80 13,440.00 630-80510 Mobile Pavement Marking Zone LS 1 0.00 0.00 630.86800 Traffic Signal (Temporary) LS 1 99,568.00 99,568.00 630-xxxxx Traffic Signal Tecnician HR 20 72.80 14,560.00 OTAL BID PRICE I=E::=l j 3,774,162.48 10 DOLLARS ` $3,774,162.48 Page 4 of 4 R.C. Heath Construction Co. M SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 10% of the contract. ITE{Mj �Oc�'CI�7J�Q(t T V1.i'll.l�'�.E�j CAN CQET� SUBCONTRACTOR 5cHM I D1 Ftel-+ 6ull'oU5 NO2T#i Trip GcgUSS ;JCRRC 7/96 Section 00430 Page 1 COLORADO DEPARTMENT OF TRANSPORTATION PROJECT NO. ANTI -COLLUSION AFFIDAVIT LOCATION Fort Collins, Colorado I hereby attest that I am the person responsible within my firm for the final decision as to the price(s) and amount of this bid or, if not, that I have written authorization, enclosed herewith, from that person to make the statements set out below on his or her behalf and on behalf of my firm. I further attest that: 1. The price(s) and amount of this bid have been arrived at independently, without consultation, communication or agreement for the purpose or with'the effect of restricting competition with any other firm or person who is a bidder or potential prime bidder. 2A. Neither the price(s) nor the amount of this bid have been disclosed to any other firm or person who is a bidder or potential prime bidder on this project, and will not be so disclosed prior to bid opening. 2B. Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential prime bidder on this project have been disclosed to me or my firm. 3A. No attempt has been made to solicit, cause or induce any firm or person who is a bidder or potential prime bidder to refrain from bidding on this project, or to submit a bid higher than the bid of this firm, or any intentionally high or non- competitive bid or other form of complementary bid. 3B. No agreement has been promised or solicited for any other firm or person who is a bidder or potential prime bidder on this project to submit an intentionally high, noncompetitive or other form of complementary bid on this project. 4. The bid of my firm is made in good faith and not pursuant to any consultation, communication, agreement or discussion with, or inducement or solicitation by or from any firm or person to submit any intentionally high, noncom- petitive or other form of complementary bid. 5. My firm has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or services from any firm or person, or offered, promised or paid cash or anything of value to any firm or person, whether in connection with this or any other project, in consideration for an agreement or promise by any firm or person to refrain from bidding or to submit any intentionally high, noncompetitive or other form of complementary bid or agreeing or promising to do so on this project. 6. My firm has not accepted or been promised any subcontract or agreement regarding the sale of materials or services to any firm or person, and has not been promised or paid cash or anything of value by any firm or person, whether in connection with this or any other project, in consideration for my firm's submitting any intentionally high, noncompetitive or other form of complementary bid, or agreeing or promising to do so, on this project. 7. 1 have made a diligent inquiry of all members, officers, employees, and agents of my firm with responsibilities relating to the preparation, approval or submission of my firm's bid on this project and have been advised by each of them that he or she has not participated in any communication, consultation, discussion, agreement, collusion, or other conduct inconsistent with any of the statements and representations made in this affidavit. 8. 1 understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent concealment from the Colorado Department of Transportation, of the true facts relating to submission of bids for this contract. I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. Convectors firm or company name /' Ily _ /'1 / e i i Date R.C. Heath Construction Co. 2ne contractors firm a company name. (it join( venture.) Title Title Sworn to before me this �Vr 9r1 '�Q! f, TV4 � Zo03 Notary PuDAc��m- Bn��> , • EA RICKSON My commission expires NOTE: This document must CDOT Form #606 $193 COLORADO DEPARTMENT OF TRANSPORTATION CERTIFICATION OF EEO COMPLIANCE Instructions: Bidders and subcontractors must complete and submit this form with bid proposals for federally funded contracts greater than $10,000. This is required by the Equal Employment Opportunity Regulations 141 CFR 60-1.7(b) (1)]. The regulation also requires that if you have participated in a previous contract or subcontract and have not filed a Standard Form 100 (EEO- 1), you cannot be awarded this contract. You may file a report covering the delinquent period for consideration by the Federal Highway Administration or the Director of the Office of Federal Contract Compliance, U.S. Department of Labor. The Standard Form 100 (EEO-1) may be requested from the: Joint Reporting Committee P.O. Box 779 Norfolk, VA 23501 (757)461-1213 1. 1h Yes ❑ No I have developed and have on file at each establishment an affirmative action program as required by 41 CFR Chapter 60, Part 60-2. 2. 1Z Yes ❑ No I have participated in a previous contractisubcontract subject to the equal opportunity clause. 3. M Yes ❑ No I have fled with the Joint Reporting Committee, the Director, or the Equal Employment Opportunity Commission all reports due under the applicable filing requirements. r I declare under penalty of perjury in the second degree and any other applicable state or federal laws, that the state- ments made in this document are true and complete to the best of my knowledge. Company R.C. Heath Construction CQ. tx bidder ❑ proposed subcontractor BY: 4fk*v" Tdle: Date: President I 7/29/03 CDOT Form 0347 11194