HomeMy WebLinkAboutRESPONSE - BID - 5795 NORTH COLLEGE AVE JEFFERSON ST RIVERSIDE AVE (2)R.C. Heath Construction Co.
SECTION 00300
BID FORM
PROJECT: NORTH COLLEGE AVENUE AND JEFFERSON STREET/RIVERSIDE AVENUE
IMPROVEMENTS; BID NO. 5795
Place City of Fort Collins
Date July 29, 2003
1. In compliance with your Invitation to Bid dated June 27, 2003
and subject to all conditions thereof, the undersigned
R-C_ Heath Construction Co a **(Corporation, 3rirrted-iiabi�zrty C'rn�r�anp,
Pam �e slri r,-�osnt-t1lee,--ar cTr�-PTagYI�YbY) ** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of SA of total hid ($
Instructions to Bidders. in accordance with the Invitation To Bid and
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
Employers Mutual Casualty Compay
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through
7/96 Section 00300 Page 1
Attachment 1
BUY AMERICA REQUIREMENTS -49 U.S.C. 53230) - 49 CFR Part 661
Certification requirement for procurement of steel, iron, or manufactured products.
Certificate of Compliance with 49 U.S.C. 53236)(1)
The bidder or offeror hereby certifies that it will meet the requirements of 49 U.S.C. 53230)(1)
and the applicable regulations in 49 CFR Part 661.
Date
RandYl J. DeMario
Company Name R.C. Heath Construction Co.
Title President
Page 27
Attachment 4
Certification Regarding Lobbying
Certification for Contracts, Grants, Loans, and Cooperative Agreements
(To be submitted with each bid or offer exceeding $100,000)
The undersigned [Contractor] certifies, to the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to
any person for influencing or attempting to influence an officer or employee of an agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection
with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal
loan, the entering into of any cooperative agreement, and the extension, continuation, renewal,
amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for
making lobbying contacts to an officer or employee of any agency, a Member of Congress, an officer or
employee of Congress, or an employee of a Member of Congress in connection with this Federal
contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit
Standard Form—LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions
[as amended by "Government wide Guidance for New Restrictions on Lobbying," 61 Fed. Reg.
1413 (1/19/96). Note: Language in paragraph (2) herein has been modified in accordance with
Section 10 of the Lobbying Disclosure Act of 1995 (P.L. 104-65, to be codified at 2 U.S.C. 1601,
at seq .)]
(3) The undersigned shall require that the language of this certification be included in the
award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts
under grants, loans, and cooperative agreements) and that all subrecipients shall certify and
disclose accordingly. This certification is a material representation of fact upon which reliance
was placed when this transaction was made or entered into. Submission of this certification is a
prerequisite for making or entering into this transaction imposed by 31, U.S.C.0 1352 (as amended by
the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be
subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
[Note: Pursuant to 31 U.S.C.1352(c)(1)-(2)(A), any person who makes a prohibited expenditure or fails
to file or amend a required certification or disclosure form shall be subject to a civil penalty of not less
than $10,000 and not more than $100,000 for each such expenditure or failure.]
The Contractor, R.C. Heath Construction Co, certifies or affirms the
Truthfi.1kisps and accuracy of each statement of its certification and disclosure, if any. In addition, the
Contr ct understa,l s and agrees that the provisions of 31 U.S.C. A 3801, of seq., apply to this
July 29, 2003 Date
Signature of Contractor's Authorized Official
Name and Title of Contractor's Authorized Official
Page 1
COLORADO DEPARTMENT OF TRANSPORTATION Project #
UNDERUTILIZED DBE BID 5795
CONDITIONS ASSURANCE Location
Fort Collins, Colorado
Instructions: Contractor - Complete and submit this form with vour bid. Report onlv UndenrtilvPri nRi= ri
tion which qualifies under the contract goal specification for this project
, ram.......,...
POLICY
It is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have
maximum opportunity to participate in the performance of contracts financed with federal, state or local entity funds.
INTENDED UNDERUTILIZED DBE PARTICIPATION
1) Will your company's intended Underutilized DBE (UDBE) participation meet contract goals? ❑ yes no
2) Total intended Underutilized DBE (UDBE) participation: 0. % Meets cont ct goals
❑ yes ❑ no
3) List the UDBE firms you intend to use for your UDBE participation
Name of UDBE firm(s) Certification Intended item(s)
expiration date of work
I understand that, if my company is determined to be the low bidder for the contract on this product, I must submit a
completed CDOT Form #715 CERTIFICATION OF UNDERUTILIZED DBE PARTICIPATION to the Transportation
Department by 4:00 pm the day after the bids are opened. In addition, if my company does not meet the intended
contract goals, I must submit a completed CDOT Form #718 DBE GOOD FAITH EFFORT DOCUMENTATION before
the above stated deadline.
I understand my obligation to abide by the policy stated above. I shall not discriminate on the basis of race, color, age,
sex, national origin, or handicap in the bidding process or the performance of contracts.
I DECLARE UNDER PENALITY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE
STATE OR FEDERAL LAWS, THAT THE STATEMENTS MADE IN THIS DOCUMENT ARE TRUE AND COMPLETE
TO THE BEST OF MY KNOWLEDGE.
Company name
Date
R.C.th Construction Co.
July 29 2003
Company ff' r sig re
Title
1 Randall J. DeMario
IA,Wv
President
rrev:ous editions are obsolete and may not be used CDOT Form #714a 6/02
R.C. Heath Construction Co.
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: R.C. Heath Construction Co.
2
3
4
5
Permanent main office address: 141 Ra
When organized: July 29, 1977
tte Drive, Fort Collins, CO 80524
If a corporation, where incorporated: Colorado
How many years have you been engaged in the contracting business under your
present firm or trade name? 26 years
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
See Attached "Contracts on hand"
7. General character of Work performed by your company:
Job Site Supervision, Structural Concrete, Rough and finish Carpentry,
General Field Labor, Steel Erection
8. Have you ever failed to complete any Work awarded to you? No
If so, where and why?
9. Have your ever defaulted on a contract? No
If so, where and why?
10. Are you debarred by any government agency? No
If yes list agency name.
7/96 Section 00420 Page 1
R.C. Heath Construction Co.
11. List the more important projects recently completed by your company, stating
the approximate cost of each, and the month and year completed, location
and type of construction.
See Attached "Selected Recently Completed Projects"
12. List your major equipment available for this contract.
Dump trucks, boom trucks, flatbed trucks, bobcats forklifts tractor,
backhoe and additional equipment leased as needed.
13. Experience in construction Work similar in importance to this
project:
See Attached "Similar Protects"
14. Background and experience of the principal members of your organization,
including officers:
See Attached Key Personnel Resumes
15. Credit available: $800,000
16. Bank reference:
First National Bank, 205 West Oak St., Fort Collins, CO 80522
Contact: Todd Campbell, V.P., (970) 482-4861
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the Owner? Yes
18. Are you licensed as a General Contractor? Yes
If yes, in what city, county and state? Fort Collins, CO, Larimer, Colorado
What class, license and numbers? Class A, License #A-1
19. Do you anticipate subcontracting Work under this Contract? Yes
If yes, what percent of total contract? 90%
And to whom? See Subcontractor List.
20. Are any lawsuits pending against you or your firm at this time? No
If yes, DETAIL
7/96 Section 00420 Page 2
R.C. Heath Construction Co.
21. What are the limits of your public liability? Detail:
Public Liability: $1,000,000
Property Damage: $1,000,000
Employer's Liability: $ 500,000
What Company? Travelers Insurance
22. What are your company's bonding limitations? $10,000,000+.
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at 141 Racquette Drive this 29th day of July, 2003
R.C. Heath Construction Co.
Name of Bidder
By: Randall J. DeMarioAt-9
r1`i�
Title: President
State of Colorado
County of Larimer
Randall J. DeMario being duly sworn deposes and says that he is President
of R.C. Heath Construction Co. and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to bef e�Y
2095. .60
Notary Public
My commission expires
woo annwMon
1* -03 day of
S. s
Mot 3.200E
7/96 Section 00420 Page 3
1102 R.C. err
HEATH]
CONSTRUCTION MANAGEMENT
RC. HEATH CONSTRUCTION CO.
P.O. DRAWER H • 141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 2214195 FAX (970) 221-2907
Contracts on Hand
Date
Contract
Comp.
Project Name/Type
Location
Amount $
Owner/Contact
Phone
Architect/Contact
Phone
07/03
CSU Library Water Archives
Fort Collins, CO
336,275
Colorado State University
970-491-0159
Colorado State University
970-491-0159
New Facility
Brian Hood
Brian Hood
08/03
Downtown Enhancement Project
Fort Collins, CO
835,250
City of Fort Collins
970-221-6798
bha design, inc.
970-223-7577
Streetscape Project
Rick Richter
Jennifer Torrey
08/03
General Air
Fort Collins, CO
392,147
General Air
303-892-7003
Architectural Resource Group
970-484-0126
New Pre-engineered Steel Facility
Gary Armstrong
Larry Trampe
08/03
Windsor Field House & Bus Barn
Windsor, CO
915,800
Weld County School Dist. RE-4
970-686-5695
Architecture One
970-669-9060
Two New Facilities
RLH Engineering (Owner's Rep)
Al Hauser
Dick Huwa
08/03
George T. Sanders Company Warehouse
Brighton, CO
475,685
George T. Sanders Company
303423-9660
Acklam & Associates, Inc.
303-659-8546
New Distribution Facility
Gary Sanders
Jan Pyle
09/03
Liquor Max Retail Store
Loveland, CO
491,335
Loveland Liquor Max
970-690-8299
Architectural Resource Group
970-484-0126
New Retail Facility
Hal & Kathy Rogers
Larry Trampe
11/03
CSU Lory Student Center
Fort Collins, CO
1,800,000
Colorado State University
970-491-0160
Oz Architecture
303-861-5704
Food Service Renovation
Tom Moss
Kelly Yamasaki
11/03
Akron Prairie Vista
Akron, CO
1,264,292
Housing Authority of the
970-345-6538
Architecture One
970-669-9060
New Assisted Living Facility
Town of Akron
Al Hauser
Donna Butz
12/03
Redeemer Lutheran Church
Fort Collins, CO
3,626,052
Redeemer Lutheran Church
970-225-9020
Mark Belford Architects
970-407-0070
New Facility
Pastor Tim Runtsch
Mark Belford
12/03
Loveland Public Safety Building
Loveland, CO
974,700
City of Loveland
970-962-2635
Kenney & Associates
970-663-0548
Facility Renovations
Ken Cooper
Catherine Scott
05/04
Thunder Mountain Harley Davidson
Loveland, CO
5,779,834
Thunder Mountain Harley Davidson
970-493-3137
Thorp Associates P.C.
970-586-9528
New Retail Facility
Todd & Shellie Erdmann
Roger Thorp
2004
CSU BioEnvironmental Research Building
Fort Collins, CO
7,339,000
Colorado State University
970491-0160
FWA Group
704-332-7004
Facility Expansion Project
Tom Moss
Randy Larsen
www.HEATHCONSTRUCTION.com
R.C_
HEATH
CONSTRUCTION MANAGEMENT
R.C. HEATH CONSTRUCTION CO.
P.O. DRAWER R -141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 221-4195 FAX (970) 221.2907
Randy DeMario
President
Randy is a graduate of Southern Illinois University with a degree in Structural Engineering.
Eight years in the aerospace industry with Rockwell International and McDonnell Douglas were
instrumental in Randy's abilities to deal with complex systems and schedules. With Heath
Construction since 1992, Randy has managed a variety of complex projects and has developed an
intimate knowledge of the processes necessary to move from a conceptual plan to actual
construction. As President, Randy oversees and guides all strategic and operational functions of
the company.
Education
1988 —1992
University of Southern California, Los Angeles, CA
Classes toward Master of Science, Civil Engineering
1981 —1985
Southern Illinois University, Carbondale IL
Bachelor of Science, Structural Engineering
Professional Experience
1992 - Present
R.C. Heath Construction Co., Fort Collins, CO
President
1988 - 1992 McDonnell Douglas Corporation, Huntington Beach, CA
Manager - Structural Analysis, Advanced Launch Vehicles
1985 - 1988 Rockwell International, Downey, CA
Structural Design/Analysis, US Space Station
www.BEATHCONSTRUCTTON.com
RL.
HEATH
CONSTRUCTION MANAGEMENT
R.C. HEATH CONSTRUCTION CO.
P.O. DRAWER H • 141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 2214195 FAX (970) 221-2907.
Leon J. McCauley
Vice President
Leon is a graduate of Colorado State University with a degree in Mechanical Engineering. He has
considerable field experience in heavy industrial and commercial construction projects ranging
from large scale power, chemical and mining projects to commercial and luxury residential
development and construction. Leon has personally managed most of Heath Construction's recent
complex projects. As Vice President he is responsible for our project management systems and
staff.
Education
1987 - 1991 Colorado State University, Fort Collins, CO
Bachelor of Science Mechanical Engineering
Professional Experience
1997 — Present R.C. Heath Construction Co., Fort Collins, CO
Vice President
1995 - 1997 The Commercial Division, Inc., Steamboat Springs, CO
Project Superintendent
1991 - 1995 The Industrial Company, Steamboat Springs, CO
Project Engineer
www.HEATHCONSTRUCTION.com
R.C.
FHEATH
CONSTRUCTION MANAGEMENT
R.C. HEATH CONSTRUCTION CO.
P.O. DRAWER H • 141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 221-4195 FAX (970) 221-2907
Selected Recently Completed Projects
Page 1 of 3
Date
Contract
Comp.
ProjectName/Type
Location
Amount
Owner/Contact
Phone
Architect/Contact
Phone
2003
Yancey's Food Service Company
Loveland, CO
7,237,196
Yancey's Food Service Company
970-484-3123
Bozich Architects
913-342-8120
New Office/Distribution Facility
Greg Yancey
Don Bozich
2003
EPURA Performance Park
Estes Park, CO
1,019,592
Estes Park Urban Renewal Authority
970-577-3704
Thorp Associates P.C.
970-586-9528
New Amphitheater and Park Facility
Will Smith
Roger Thorp
2003
Poudre Fire Authority
Fort Collins, CO
1,397,433
Poudre Fire Authority
970416-2895
Vaught -Frye Architects
970-224-1191
New Fire Station #14
Bob Poncelow
Joe Frye
2003
Dell Range Showtime Video
Cheyenne, WY
814,800
Bumvood, LLC
303466-2482
Allred & Associates
303-465-4306
New Facility
Shannon Wood
Brent Allred, AIA
2002
Ridgeview Classical School
Fort Collins, CO
1,073,517
Ridveview Classical School
303-589-5511
Zeiler -Pennock Architects
303-455-3322
Facility Addition
Michael Tashman
Jeanne Fielding
2002
Front Range Community College
Fort Collins, CO
3,974,800
Front Range Community College
303-466-8811
Davis Partnership Architects
303-861-8555
Mt Antero/Blanca Peak Buildings Renovations
Bob Rizzuto
Edward Ehrmarm
2002
Poudre Health Services Dental Offices
Fort Collins, CO
1,423,800
Poudre Health Services
970-224-5209
CCMK
970-493-1220
New Facility
Chris Sheafor
Sylvie Glass
2002
Interstate Honda Motorsports
Fort Collins, CO
958,333
Loveland Motor Sports
970-667-0224
Architectural Resource Group
970-484-0126
New Dealership Facility
Marshall Van Thorre
Larry Trampe
2002
First United Presbyterian Church
Greeley, CO
1,895,453
First Presbyterian Church
970-352-6565
Lee Architects
303-989-4500
Facility Addition
John Trull
Scott Boduch
2002 Adams County Parks/CSU Extension Building Henderson, CO 2,088,600 Adams County, CO
New Facility Pat Myers
2002 Windsor/Severence Fire Station
New Facility
2002 Ogallala High School
Facility Addition
2002 Good Samaritan J/P. Martinez Apartments
New Facility
Windsor, CO 1,719,241 Windsor/Severence Fire
Protection District
Chief Jerry Ward
Ogallala, NE 1,090,807 Ogallala School District
Don Bartling
Greeley, CO 2,577,069 Evangelical Lutheran
Good Samaritan Society
Leonard Kemnitz
303-654-6002 Bley & Associates 970-330-3322
Lauren Bley
970-686-9596 Vaught -Frye Architects 970-224-1191
Joe Frye
308-284-6751 Baker & Associates 308-632-3123
Clint Taylor
605-362-3193 Landmark Engineering Ltd 970-667-6287
Bruce Meyer
2001 Timberline Branch, Home State Bank Fort Collins, CO 1,234,133 Home State Bank 970-622-7188 RB+B Architects 970-484-0117
New Facility Steve Forbes George Brelig
ww%v HEATHCONSTRUCTION.com
R.C_ HeA Construction Co.
CONTRAC /O
BY:
Randall J. DeMario, President
ADDRESS: P.O. Drawer H
Fort Collins, CO 80522
8. BID SCHEDULE (Base Bid)
PLEASE USE THE ATTACHED BID SCHEDULE WHEN SUBMITTING YOUR BID.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the total Agreement Price.
(Seal
Attest:
Leon J.
IP C FULL SU$�IITTED:
July 29, 2003
Sig ature Ball DeMario Date
President
Title
P.O_ Drawer H
Fort Collins CO 80522
Telephone (970) 221-4195
7/96 Section 00300 Page 2
HrM
EATH
CONSTRUCTION MANAGEMENT
R.C. HEATH CONSTRUCTION CO.
P.O. DRAWER H • 141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 221-4195 FAX (970) 221-2907
Selected Recently Completed Projects
Page 2 of 3
Date
Contract
Comp.
Project Name/Type
Location
Amount S
Owner/Contact
Phone
Architect/Contact
Phone
2001
General Care Health Services Medical Clinic
Fort Collins, CO
1,275,064
General Care Health Services, Inc.
970-482-6620
Architecture One
970-669-9060
New Facility
Charles Hatchette
Al Hauser
2001
McCoy Sales Office/Warehouse
Louisville, CO
1,054,589
McCoy Sales Corporation
303-762-8012
Richard C. Lubischer & Asso.
303-778-6369
New Facility
Tom Gee
Richard Lubischer
2001
George T. Sanders Company
Wheat Ridge, CO
2,432,819
George T. Sanders Company
303-423-9660
David Langley Architects
970-223-1512
Facility Addition
Gary Sanders
David Langley
2001
Rocky Mountain Shambhala Center
Red Feather Lakes, CO
2,059,762
Rocky Mountain Shambhala Center
303-545-0092
Richard Rice Architect
303443-8540
New Housing Facility and
Jeff Waltcher
Jim Logan Architects
303-449-3274
New Concrete Water Tank & Distribution System
2000
Town of Frederick Police Department
Frederick, CO
1,092,722
Town of Frederick
303-833-2388
Roth -Shepard Architects
303-534-7007
New Facility
Linda Glantz
Craig Friedman
2000
Centaurus High School
Lafayette, CO
1,261,398
Boulder Valley School District RE-2
303-447-5167
C.M. Yon Architects
303-691-8000
Facility Addition
Shawn Ropp
Carmen Yon
2000
CSU BioEnvironmental Hazard Research Bldg Fort Collins, CO
6,188,063
Colorado State University
970-206-0947
Randall E. Larsen Architects
704-947-6150
New Facility
Bill Kraus
Randy Larsen
1999
Lyons MiddWSenior High School
Lyons, CO
3,787,791
St. Vrain Valley School District
303-682-7250
Hutton Ford Architects
303-773-2845
Facility Addition
Jeff Medwetz
Todd Vandenburg
1999
Colorado State Patrol Building
Fort Collins, CO
1,010,357
State of Colorado
303-239-4646
Roth & Shepard Architects
303-534-7007
New Facility
Robert Dimberger
Suzanne Lanyi
1999
Wal-Mart RDC 6019 Expansion
Loveland, CO
5,009,998
Wal-Mart Stores, Inc.
501-271-0286
Carter & Burgess, Inc.
817-222-8500
Facility Addition
Rick Williams
Mike Latz
1999
Adams City High School
Commerce City, CO
3,518,324
Adams City School District #14
303-289-3947
RB+B Architects
970-484-0117
Facility Remodel
Jim Garguilo
George Brelig
1999
Union Colony Fire Station #5
Greeley, CO
1,172,130
City of Greeley
970-350-9795
Pahl -Pahl -Pahl
303-861-7147
New Facility
William Sterling
Robert Grubb
1999
Dupont Elementary School
Commerce City, CO
1,174,634
Adams City School District #14
303-289-3947
RB+B Architects
970-484-0117
Facility Remodel
Jim Garguilo
Charles fielder
1999
Adams City Middle School
Commerce City, CO
1,707,143
Adams City School District #14
303-289-3947
RB+B Architects
970-484-0117
Facility Remodel
Jim Garguilo
Charles fielder
w .HEATHCONSTRUCTION.com
FH
RC. HEATH CONSTRUCTION CO.
EATH F.O. DRAWERS, • CO0522 (8 524) DR,
FORT COLLINS, O 80522 (80524)
(970) 221 3195 FAX (970) 221-2907
CONSTRUCTION MANAGEMENT
Selected Recently Completed Projects
Page 3 of 3
Date
Contract
Comp.
Project Name/Type
Location
Amount S
Owner/Contact
Phone
Architect/Contact
Phone
1999
Fort Collins Yamaha Suzuki Sea-Doo
Fort Collins, CO
1,015,665
Fort Collins Yamaha
970498-8858
Architectural Resource Group
970-484-0126
New Motorcycle Dealership Facility
Brian Harris
Larry Trampe
1999
Pawnee High School
Grover, CO
1,660,535
Pawnee RE-12 School District
970-895-2222
MCB Architects, AIA
303-758-7858
Addition/Remodel
Gery Reins
John Chaney, AIA
1999
Providence Ice Centre
Windsor, CO
1,601,891
Windsor Ice House, LLC
970-686-9552
Architecture One
970-669-9060
New Recreation Facility
Chris Ruff
Al Hauser
1998
Fiberlok Building
Fort Collins, CO
1,245,974
Fiberlok, Inc.
970-221-1200
Architecture One
970-669-9060
Addition/Remodel
Bob Angliss
At Hauser
1998
PFA Fire Station No. 12
Fort Collins, CO
1,025,924
Poudre Fire Authority
970-221-6581
Vaught*Frye Architects
970-224-1191
New Facility
Mel Carlson
Joe Frye
1998
CSU Rockwell Hall
Fort Collins, CO
3,208,769
Colorado Sate University
970-491-0145
Michael Barber Architects
303-595-7070
Addition/Remodel
Tom Moss
Bart Hams
1998
Mawson Block/Home State Bank
Fort Collins, CO
2,842,793
Home State Bank
970-622-7188
RB+B Architects
970-484-0117
New Faciltiy
Steve Fobes
George Brelig
1998
Templed Hills Retreat
Woodland Park, CO
1,034,525
Rocky Mountain Conference
719-687-9038
David A. Langley Architects
719-687-3415
New Facility
Gary Conover
David Langley
1998
Windsor Joint Use Maintenance Facility
Windsor, CO
1,200,604
Weld Co. School Dist. RE-4
970-686-2963
Architecture One
970-669-9060
New Facility
John Moore
Al Hauser
1998
F.R. Comm. College/Harmony Library
Fort Collins, CO
3,418,294
Front Range Community College
303-404-5408
Davis Partnership, PC
303-861-8555
New Facility
David Beset
Curtis Cox
1997
John's Harley Davidson
Fort Collins, CO
1,179,185
RCK LLC
970-282-3464
Architecture Resource Group
970-484-0126
New Facility
John Cockson
Lary Trampe
1997
High Country Beverage Corporation
Loveland, CO
1,270,637
High Country Beverage Corp.
970-353-1520
Architecture Resource Group
970484-0126
New Building
Dave Nichols
Larry Trampe
1997
_C.S.U. Lory Student Center
Fort Collins, CO
1,549,547
Colorado State University
970-491-0151
Aller*Lingle Architects
970-223-1820
Additon/Remodel
Tom Moss
Mick Alter
1997
Windsor Schools
Windsor, CO
1,013,072
Weld Co. School Dist. RE-4
970-686-7441
Hagen -Cameron Architects
719-448-0883
Addition/Remodel
John Moore
Tim Hodges
www.HEATHCONSTRUCTION.cott
HEATH
CONSTRUCTION MANAGEMENT
R.C. HEATH CONSTRUCTION CO.
P.O. DRAWER H -141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 2214195 FAX (970) 221-2907
Similar Projects
Page 1 of 3
Date
Contract
Comp.
Project Name/Type
Location
Amount $ Owner/Contact
Phone
Architect/Contact
Phone
City
of Fort Collins
2003
Downtown Enhancement Project
Fort Collins, CO
835,250 City of Fort Collins
970-221-6798
bha design, inc.
970-223-7577
Streetscape Project
Rick Richter
Jennifer Torrey
2003
Poudre Fire Authority
Fort Collins, CO
1,397,433 Poudre Fire Authority
970-416-2895
Vaught -Frye Architects
970-224-1191
New Fire Station #14
Bob Poncelow
Joe Frye
2002
Boxelder Sanitation District Maintenance Building
Fort Collins, CO
310,909 Boxelder Sanitation District
970498-0604
Architectural Resource Group
970.484-0126
New Facility
Ravindra Srivastava
Larry Trampe
2002
Southridge Golf Course Storage Building
Fort Collins, CO
161,173 City of Fort Collins
970-221-6273
Aller-Lingle
970-223-1820
New Facility
Steve White
Mick Aller
2000
Clearview Channel Phase I
Fort Collins, CO
402,942 City of Fort Collins Utilities
970-221-6884
Anderson Consulting Engineers
970-226-0120
Flood Control Structure
Keith Meyer
Greg Koch
1999
Colorado State Patrol Building
Fort Collins, CO
1,010,357 State of Colorado
303-239-4646
Roth & Shepard Architects
303-534-7007
-
New Facility
- Robert Dimberger -
Suzanne Lanyi
1998
Fire Station No. 12
Fort Collins, CO
1,025,924 Poudre Fire Authority
970-221-6581
Vaught•Frye Architects
970-224-1191
New Facility
Mel Carlson
Aubrey Carson
1998
FRCC Harmony Library
Fort Collins, CO
3,418,294 City of Fort Collins Public Library
303-404-5408
Davis Partnership, PC
303-861-8555
New Facility
David Besel
Curtis Cox
1998
Poudre Fire Station No. 9
Fort Collins, CO
430,048 Poudre Fire Authority
970-221-6273
Vaught -Frye Architects
970-224-1191
New Facility
Steve White
Joe Frye
1995
Poudre Fire Authority Training Center
Fort Collins, CO
1,755,233 Poudre Fire Authority
970-221-6273
Architecture Plus
970-493-1220
New Facility .
Steve White
Tom Kalert
1994
Fire Station No. 10
Fort Collins, CO
714,646 Poudre Fire Authority
970-212-6611
Vaught•Frye Architects PC
970-224-1191
New Facility
Steve White
Joe Frye
1992
Water Treatment Plant #2 -
Fort Collins, CO
942,934 City of Fort Collins
970-221-6775
RB+B Architects
970-484-0117
New Facility
-
Jim ONeill
George Brelig
1991
Water Quality Lab Expansion
Fort Collins, CO
718,000 City of Fort Collins
970-221-6500
Black & Veatch
303-671-4200
Facility Addition
Terry Robinson
John Ezell
1991
Rogers Park
Fort Collins, CO
515,615 City of Fort Collins
970-221-6500
City of Fort Collins Engineering
970-221-6500
New Park
Leslie Bryson
Leslie Bryson
1984
Old Town Plaza/Square
Fort Collins, CO
528,355 Downtown Development Authority
970.484-2020
SLP, A Professional Corp.
303-623-7031
www.HEATHCONSTRUCTION.com
R.C-
HEATH
CONSTRUCTION MANAGEMENT
RC. HEATH CONSTRUCTION CO.
P.O. DRAWER H -141 RACQUETTE DR.
FORT COLLINS, CO 80522 (80524)
(970) 221-4195 FAX (970) 221-2907
Similar Projects
Page 2 of 3
Date
Contract
Comp.
Project Name/Type
Location
Amount S Owner/Contact
Phone
Architect/Contact
Phone
Town of Estes Park
2003
EPURA Performance Park
Estes Park, CO
1,019,592 Estes Park Urban Renewal Authority
970-577-3704
Thorp Associates P.C.
970-586-9528
New Amphitheater and Park Facility
Will Smith
Roger Thorp
2002
Estes Park Municipal Building
Estes Park, CO
816,123 Town of Estes Park
970-586-4464
Thorp Associates, PC
970-586-9528
Facility Remodel and Addition
Richard Widmer
Roger Thorp
2002
Estes Park Public Library
Estes Park, CO
689,205 Estes Valley Public Library District
970-586-8116
Thorp Associates, PC
970-586-9528
Facility Addition
Ed Volz
Roger Thorp
2000
Estes Park Medical Center Imaging Expansion
Estes Park, CO
440,600 Estes Park Medical Center
970-586-2317
H&L Architecture Ltd, AIA
303-244-9350
Facility Improvements
Andrew Wills
Rob Davidson
2000
Estes Park HydroElectric Plant
Estes Park, CO
415,597 Town of Estes Park
970-586-5331
Long Hoeft Architects
303-569-2456
Historic Renovation
Michael Mangelsen
Gary Long
1996
Dannels Fire Station
Estes Park, CO
1,012,105 Town of Estes Park
970-586-4464
Thorp Associates, PC
970-586-9528
New Facility
Richard Widmer
Roger Thorpe
1995
Estes Park Walkway Phase 11
Estes Park, CO
170,451 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, Inc.
303-623-3465
Streetscape Renovation
Art Anderson
Jeffrey Joyce
1995
Estes Park Finishes
Estes Park, CO
156,557 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, Inc.
303.623-3465
Riverwalk Extension
Art Anderson
Jeffrey Joyce
1994
Estes Park Medical Center
Estes Park, CO
1,796,006 Estes Park Medical Center
970-586-9513
Fischer, Reece & Johnson
303-777-0407
Facility Addition
Andrew Wills
John Reece
1991
EPURA Parking Lot
Estes Park, CO
111,383 Estes Park Urban Renewal Authority
970-586-5331
Estes Park Urban Renewal Authority
970-586-5331
New Parking Lot
Art Anderson
Art Anderson
1990
Big Thompson Riverwalk Phase B
Estes Park, CO
496,681 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, Inc.
303-623-3465
Riverwalk Extension
Art Anderson
Jeffrey Joyce
1990
Estes Park Medical Center
Estes Park, CO -
5775960 Estes Park Medical Center
970-586-9513
Fischer, Reece & Johnson
303-777-0407
Addition
Andrew Wills
John Reece
1990
Estes Park Medical Center
Estes Park, CO
577,960 Estes Park Medical Center
970-586-9513
Fischer, Reece & Johnson
303-777-0407
Addition
Andrew Wills
John Reece
1989
Estes Park Streetscape 4
Estes Park, CO
83,721 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, Inc.
303-623-3465
Art Anderson
Jefrrey Joyce
1988
Confluence Riverfmnt Park
Estes Park, CO
755,873 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, Inc.
303-623-3465
Art Anderson
Jeffrey Joyce
www.HEATHCONSTRUCTION.com
PM R.G.
HEATH RC. HEATH CONSTRUCTION CO.
P.O. DRAWER H • 141 RACQUETTE DR
FORT COLLINS, CO 80522 (80524)
(970) 221-4195 FAX (970) 221-2907
CONSTRUCTION MANAGEMENT
Similar Projects
f '
Page 3 of 3
Date
Comp. Project Name/Type
Location
Contract
Amount S Owner/Contact
Phone
Architect/Contact
Phone
Town of Estes Park (Continued)
1987 Estes Park Parking Lot Improvements
Estes Park, CO
200,134 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, Inc.
303-623-3465
Art Anderson
Jeffrey Joyce
1987 Estes Park Streetscape, Phase 3
Estes Park, CO
489,609 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, Inc.
303-623-3465
Art Anderson
Jeffrey Joyce
1985 Estes Park Streetscape, Phase 2
Estes Park, CO
590,809 Estes Park Urban Renewal Authority
970-586-5331
Design Studios West, Inc.
303-623-3465
Art Anderson
Jeffrey Joyce
City of Loveland
12/03 Loveland Public Safety Building
Loveland, CO
974,700 City of Loveland
970-962-2635
Kenney & Associates
970-663-0548
Facility Renovations
Ken Cooper
Catherine Scott
1998 Fire Station No. 5
Loveland, CO
567,285 City of Loveland
970-962-2670
Architecture One
970-669-9060
New Facility
Don Williams
Al Hauser
1996 Loveland Public Library
Loveland, CO
379,147 City of Loveland
970-962-2670
Architecture One
970-669-6090
Facility Addition
Don Williams
Al Hauser
Town of Windsor
2002 Windsor/Severence Fire Station
Windsor, CO
1,709,633 Windsor/Severence Fire
970-686-9596
Vaught -Frye Architects
970-224-1191
New Facility
Protection District
Joe Frye
Chief Jerry Ward
1998 Windsor Joint Use Maintenance Facility
Windsor, CO
1,200,604 Weld Co. School Dist. RE-4
970-686-2963
Architecture One
970-669-9060
New Facility
John Moore
Al Hauser
1988 Windsor Municipal Pool
Windsor, CO
713,833 Town of Windsor
970-686-7476
ARIX Corporation, P.C.
970-356-3930
New Facility
John Voulo
Bob Shreve
City of Golden
1992 Golden Streetscape
Golden, CO
1,701,000 City of Golden Public Works
303-279-5602
TST Inc. Consulting Engineers
303-792-0557
Streetscape Renovation
Dan Hartman
John Cotton
www.HEATHCONSTRUCTION.com
9
SECTION 00410
BID BOND
RKNOW ALL MEN BY THESE PRESENTS:
i`nnafrHe�&hn C.as Principal, and Employers Mutual
Surety, are hereby held and firmly bound unto the
as OWNER, in the sum of $ 5% of total bid-- for
truly to be made, we hereby jointly and severally
assigns.
that we; the undersigned
Casualty Company as
Citv of Fort Collins, Colorado,
the payment of which, well and
bind ourselves, successors, and
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction of
Fort Collins Project, NORTH COLLEGE AVENUE AND JEFFERSON STREEWRIVER5IDE AVENUE
IMPROVEMENTS; BID NO. 5795.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials 'in connection therewith, and shall in all
other respects, perform the'Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect,' it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to trahsact business in the
State of Colorado and be accepted by the OWNER.
7/96 Section 00410 Page 1
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this 28th day of July 2003, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by .their proper officers, the day, and year first set forth
above.
PRINCIPAL.
Name: R. C. HeathConstruction Co.
Address: P.O. Drawer H
Fort lins CO 35
Ry :
(SEAL)
SURETY
Employers Mutual Casualty Company
P.O. Box 441098
Auror-a-. CO $OQ44
BY: JA JUL
Title: Attorney -in -Fact_
(SEAL)
7/96 Section 00410 Page 2
No Text
North College Avenue and Jefferson Street/Riverside Avenue Improvements
Bid No 5795
Bid Tabulation
R.C. Heath Construction Co.
P.O. Drawer H
Fort Collins, Colorado 80522
(970) 221-4195
ITEM
ITEM DESCRIPTION
UNIT
QUANTITYNIPRICE
PRICE
201-00000
Clearing & Grubing
LS
1
8,585.92
8,585.92
202-00010
Removal of Tree
EACH
2
392.00
10,192.00
202-00001
Removal of structure
EACH
1,268.96
3,806.88
202-00033
Removal of Pipe
EACH
6,517.28
26,069.12
202-00036
Removal of inlet
EACH
11
788.48
10,250.24
202-00190
Removal of Conc Median Cover
SY
614
15.12
9,253.44
202-00200
Removal of Sidewalk
SY
2,15
15.12
32,628.96
202-00201
Removal of Curb
LF
1,474
7.84
11,556.16
202-00203
Removal of Curb & Gutter
LF
2,270
8.96
20,339.20
202-00205
Removal of Wheel Stop
EACH
20
53.65
1,072.96
202-002xx
Removal of Composite Pavement
SY
12,723
4.48
56,999.04
202-00210
Removal of conc Pavement
SY
192
15.12
2,903.04
202-00220
Removal of Asphalt Mat
SY
5,92q
5.60
33,196.80
202-002xx
Removal of Composite pavemt (planing)
SY
14,140
5.60
79,217.60
202-00240
Removal of Asphalt Mat( Planing)
SY
12,65q
7.48
94,656.80
202-00250
Removal of Pavement markings
SF
2,00
1.85
3.696.00
202-01000
Removal of Fence
LF
2
6.87
1,374.24
202-04001
Plug Culvert
EACH
11
850.08
11,901.12
202-04002
Clean Culvert
EACH
1,355.20
10.841.60
203-00010
Unclassified Excavation (Complete in Place)
CY
5,781
3.23
18,660.32
230-00100
Muck excavation
CY
25q
6.38
1,593.76
203-01597
Potholing
HR
8
165.48
13,238.40
207-00205
Topsoil
CY
630
13.44
8,467.20
208-00045
Concrete Washout Structure
EACH
1
884.80
884.80
208-00020
Silt Fence
LF
1,806
1.86
3,352.16
208-00070
Stabilized Construction Entrance
EACH
2
1,120.00
2,240.00
208-00100
Sediment Removal and Disposal
LS
1
560.00
560.00
208-00200
Erosion Control Supervisor
LS
1
9,178.40
9,178.40
210-00050
Reset Fire Hydrant
EACH
1
1,601.60
1,601.60
210-01050
Reset Chain Link Fence
LF
510
8.52
4,346.72
210-XXXXX
Adjust Water meter
EACH
1
505.12
505.12
210-XXXXX
Adjust Fire Hydrant
EACH
1
616.00
616.00
210-01710
Adjust Value
EACH
91
2O6.95
1,862.56
210-04010
Adjust Manhole
EACH
1
332.30
3,323.04
210-04020
Modify inlet
EACH
1,064.00
3,192.00
212-00006
Seeding ( Native)
ACRE
0.3
896.00
268.80
213-00000
Landscape maintenance
LS
1
1,680.00
1,680.00
213-00003
Mulching (Weed Free)
ACRE
0.3
1,456.00
436.80
213-00008
Mulching (Wood Chip)
CF
4,319
1.87
8,078.56
213-00070
Mulch Tackifier
LB
50
7.84
392.00
213-00705
Landscape boulder(Special)(12'x12'x12')
EACH
47
28.00
1,316.00
213-00705
LandscapBouldegSpecial)(18'x18'x18')
EACH
9
95.20
9,139.20
213-00705
Landscape Boulder (Special)(24'x24N24')
EACH
4
190.40
8,948.80
214-00225
Deciduous tree (2.5 Inch Caliper)
EACH
1
364.00
5,824.00
Page 1 of 4
North College Avenue and Jefferson StreeNRiverside Avenue Improvements
Bid No 5795
Bid Tabulation
R.C. Heath Construction Co.
P.O. Drawer H
Fort Collins, Colorado 80522
(970) 221.4195
REM
REM DESCRIPTION
UNIT
QUANTITY
UNIT
PRICE
PRICE
214-00230
Deciduous Tree (3 Inch caliper
Each
10
420.00
4,200.00
214-00235
Deciduous Tree (3.5 Inch caliper
Each
19
504.00
9,576.00
214-00350
Deciduous Shrub (5 Gal Container)
Each
103
28.00
2,884.00
214-00650
Evergreen Shrub (5 Gal Container)
Each
377
33.60
12,667.20
214-00950
Perennials (1 Gal Container)
Each
41
11.20
459.20
215-xxxxx
Transplant Tree (3 to 6 Inch)
Each
4
224.00
896.00
250-00100
Environmental health & Safety Management
LS
1
22,400.00
22,400.00
304-06000
Aggregate Base Course (Class 6)
TON
5,773
15.12
87,287.20
403-00720
Hot Bituminous Pavement ( Patching)( Asphalt)
TON
519
140.00
71,400.00
403-33851
Hot Bituminous Pavement (Grading S)(100)(PG 64-28)
TON
6,563
51.52
338,125.76
412-00600
Concrete Pavement (6 Inch)
SY
892
36.98
32,989.60
412-01152
Concrete Pavement It1-1/2Inch)
SY
3,742
60.83
227,622.08
412-01152
Concrete Pavement (11-112 Inch)(Fast Track)(24 Hour)
SY
3,233
72.66
234,896.48
412-01152
Concrete pavement (11-1/21nch)(FastTrack)(48Hour)
SY
6,151
69.67
428,561.28
603-01150
15 Inch Reinforced Concrete Pipe
LF
ill
40.65
4,512.48
603-01180
18 Inch Reinforced Concrete Pipe
LF
677
41.89
28,358,40
603-01240
24 Inch Reinforced Concrete Pipe
LF
254
46.82
11,891.04
603-01300
30 Inch Reinforced Concrete Pipe
LF
70
65.30
4,570.72
603-01360
36 Inch Reinforced Concrete Pipe
LF
424
118.27
50,146.88
603-01420
42 Inch Reinforced Concrete Pipe
LF
303
135.52
41,062.56
603-02420
53x34 Inch reinforced Concrete Pipe Ellipyical
LF
195
271.04
52,852.80
603-07240
24 inch reinforced Concrete pipe (Jacked)
LF
68
689.92
46,914.56
603-07360
36 inch reinforced Concrete pipe (Jacked)
LF
64
874.72
55,982.08
604-00310
Inlet type C (10 Foot)
Each
1
3.203.20
3,203.20
604-16005
Inlet type 16 (Single) (5 Foot)
Each
5
3,141.60
15,708.00
604-16505
Inlet type 16 (Double) (5 Foot)
Each
1
4,188.80
4,188.80
604-16510
Inlet type 16 (Double) (10 Foot)
Each
1
6,776.00
6,776.00
604-19105
Inlet Type R L5 (5 Foot)
Each
5
4,188.80
20,944.00
604-19110
Inlet Type R L5 (10 Foot)
Each
3
5,297.60
15,892.80
604-19205
Inlet Type R L10 (5 Foot)
Each
1
5,667.20
5,667.20
604-30005
Manhole (Slab Base)(5Foot)
Each
1
5,109.44
5,109.44
604-30010
Manhole (Slab Base)(10Foot)
Each
5
7,229.60
36,148.00
604-30015
Manhole (Slab Base)(15Foot)
Each
1
12,085.92
12,085.92
604-31005
Manhole (box Base)(5Foot)
Each
1
8,747.20
8,747.20
604-31010
Manhole (box Base)(10Foot)
Each
4
9,461.76
18,923.52
605-xxxxx
4 inch Non -Perforated pipe Underdrain
LF
134
18.48
2,550.24
608-xxxxx
Tree Grate
Each
1
1,376.13
26,146.40
608-00000
Concrete Sidewalk
SY
1,35
32.84
44,338.56
608-00005
Concrete Pavement ( Colored 7 Stamped)
SY
270
84.13
22,714.72
608-0000x
Concrete Pavement (11-1/021nch)(Special)
SY
535
77.24
41,325.76
608-00010
Concrete Curb Ramp
SY
6
240.43
1,442.56
608-000lx
Curb Ramp (Type 4)
Each
3
999.04
2,997.12
608-000lx
Curb Ramp (Special)
Each
13
910.99
11,842.88
608-xxxxx
Truncated Domes
SF
34118.96
3,082.24
Page 2of4
North College Avenue and Jefferson StzeetlRiverside Avenue Improvements
Bid No 5795
Bid Tabulation
R.C. Heath Construction Co.
P.O. Drawer H
Fort Collins, Colorado 80522
(970) 221-4195
REM
ITEM DESCRIPTION
UNIT
QUANTITY
UNIT
PRICE
PRICE
608-0005x
Concrete Pavers
SY
235
100.81
23,691.36
608-00350
Concrete Sidewalk (Colored Type A)
SY
605
35.63
21,554.40
608-00350
Concrete Sidewalk (Colored Type B)
SY
1,615
36.90
59,597.44
608-07000
Concrete Retaining Wall
SY
4q
723.74
32,568.48
608-xxxxx
Splash plate
SY
22
49.01
10,781.12
608-xxxxx
Median Drainage Material
SY
84
17.25
14.574.56
608-xxxxx
Median Drainage Pipe
LF
60q
5.05
3,030.72
609-20010
Curb Type 2 (Section B)
LF
491
22.57
11,082.40
609-200xx
Curb Type 2 (Section M)(Special)
LF
17
24.95
4,466.56
609-21010
Curb and Gutter Type 2 (Section I-8)
LF
1,734
12.49
21,640.64
609-21020
Curb and Gutter Type 2 (Section II-B)
LF
3,322
14.73
48,928.32
609-21900
Curb and gutter type 2 (Special)
LF
220
20.34
4,474.40
609-21xxx
Curb and gutter type 2 (8 Inch Vertical)
LF
277
18.08
5,008.64
609-24004
Gutter Type 2 ( 4 Foot)
LF
140
20.36
2,850.40
609-24010
Gutter type 2 (10 Foot)
LF
101
50.68
5,118.40
609-xxxxx
Drive -Over Curb and Gutter
LF
403
14.77
5,951.68
610-00020
Median Cover materia I(Pattemed Concrete)
SF
881
11.67
10,282.72
613-00100
1 Inch Electrical Conduit
LF
1,015
5.72
5,803.84
613-00200
2 Inch Electrical Conduit
LF
2,267
9.37
21,244.16
613-10000
Wiring
LS
1
3,608.64
3.608.64
613-16010
L' ht Standard and Luminaire (Deoora6ve)
Each
2q
2,537.50
73,587.36
613-40010
L'ght Standard Foundation
Each
21
222.22
6,444.48
613-50100
LghtControl Center
Each
4
1,470.56
5,882.24
619-xxxxx
4' Waterline
LF
165
96.10
15,855.84
619-xxxxx
6" Waterline
LF
95
98.56
9,363.20
619-xxxxx
8" Waterline
LF
80
104.72
8,377.60
620-00005
Field Office (Special)
Each
1
22,628.48
22,628.48
623-xxxxx
1Inch Plastic Pipe
LF
4,101
1.46
5,970.72
623-xxxxx
1-114 Inch Plastic Pipe
LF
48
1.56
75.04
623-xxxxx
1-112 Inch plastic Pipe
LF
a
1.68
13.44
623-xxxxx
2 Inch Plastic pipe
LF
2,241
2.24
5,019.84
623-xxxxx
4 Inch Plastic Pipe
LF
654
8.40
5,493.60
623-00156
Irrigation Bubbler
Each
39
13.44
524.16
623-00212
12 Inch Pop-up Spray Sprinkler
Each
354
22.40
7,929.60
623-01708
1 Inch Backflow Preventor
Each
4
3,024.00
6,048.00
623-03108
1 Inch Automatic control Valve
Each
20
224.00
4.480.00
623-04000
Control Wire 24 Volt
LF
6156
0.11
736.96
623-04008
1 Inch Quick Coupler Valve
Each
8
168.00
1,344.00
623-05016
2 Inch Gate Valve
Each
3
56.00
168.00
623-08112
12 Station Aurtomatic Controller
Each
1
2,128.00
2,128.00
623-08116
16 Station Automatic Controller
Each
1
2,800.00
2,800.00
623-xxxxx
Irrigation Boring Under Railroad
LF
68
24.64
1,675.52
623-xxxxx
Irrigation Boring Under Road
LF
80
24.64
1,971.20
626-00000
Mobilization
LS 1
11
380,236.56 11
380,236.56
Page 3of4
North College Avenue and Jefferson StreetlRiverside Avenue Improvements
Bid No 5795
Bid Tabulation
R.C. Heath Construction Co.
P.O. Drawer H
Fort Collins, Colorado 80522
(970) 221.4195
ITEM
REM DESCRIPTION
UNIT
QUANTITY
UNIT
PRICE
PRICE
627-00001
Pavement Marking Paint
Gal
35
40.32
14,112.00
630-00000
Flagging
HR
18
22.40
4,032.00
630-00002
Traffic Control Officer
DAY
15
347.20
52,080.00
630-00003
lUniformed Traffic Control
HR
4q
33.60
1,344.00
630-00007
Traffic Control Inspection
DAY
115
112.00
16,800.00
630-80001
Flashing Beacon (Portable)
EACH
1,120.00
6,720.00
630-80336
Barricade (Type 3 M-B)(Temp)
EACH
280.00
2,240.00
630.80341
Construction Traffic Sign (Panel Size A)
EACH
7
56.00
4,368.00
630-80342
Construction Traffic Sign (Panel Size B)
EACH
4
112.00
4,928.00
630-80343
Constuction Traffic Sign (panel Size C)
EACH
1
145.60
1,456.00
630-80344
Construction Traffic Sign (Special)
SF
46
15.68
7,353.92
630-80358
Flash Arrow Panel (C TY)
EACH
6
1,680.00
10,080.00
630-80365
Portable Message Sign Panel
EACH
2
6,160.00
12,320.00
630-80370
Concrete Barrier (Temp)
LF
200
27.05
5,409.60
630-80390
Channelizing Device (Special)
EACH
300
44.80
13,440.00
630-80510
Mobile Pavement Marking Zone
LS
1
0.00
0.00
630.86800
Traffic Signal (Temporary)
LS
1
99,568.00
99,568.00
630-xxxxx
Traffic Signal Tecnician
HR
20
72.80
14,560.00
OTAL BID PRICE I=E::=l
j
3,774,162.48
10 DOLLARS ` $3,774,162.48
Page 4 of 4
R.C. Heath Construction Co.
M
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 10% of the contract.
ITE{Mj
�Oc�'CI�7J�Q(t T V1.i'll.l�'�.E�j
CAN CQET�
SUBCONTRACTOR
5cHM I D1 Ftel-+ 6ull'oU5
NO2T#i Trip GcgUSS ;JCRRC
7/96 Section 00430 Page 1
COLORADO DEPARTMENT OF TRANSPORTATION PROJECT NO.
ANTI -COLLUSION AFFIDAVIT LOCATION
Fort Collins, Colorado
I hereby attest that I am the person responsible within my firm for the final decision as to the price(s) and amount of this
bid or, if not, that I have written authorization, enclosed herewith, from that person to make the statements set out below on
his or her behalf and on behalf of my firm.
I further attest that:
1. The price(s) and amount of this bid have been arrived at independently, without consultation, communication or
agreement for the purpose or with'the effect of restricting competition with any other firm or person who is a bidder
or potential prime bidder.
2A. Neither the price(s) nor the amount of this bid have been disclosed to any other firm or person who is a bidder or
potential prime bidder on this project, and will not be so disclosed prior to bid opening.
2B. Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential prime bidder on
this project have been disclosed to me or my firm.
3A. No attempt has been made to solicit, cause or induce any firm or person who is a bidder or potential prime bidder to
refrain from bidding on this project, or to submit a bid higher than the bid of this firm, or any intentionally high or non-
competitive bid or other form of complementary bid.
3B. No agreement has been promised or solicited for any other firm or person who is a bidder or potential prime bidder
on this project to submit an intentionally high, noncompetitive or other form of complementary bid on this project.
4. The bid of my firm is made in good faith and not pursuant to any consultation, communication, agreement or
discussion with, or inducement or solicitation by or from any firm or person to submit any intentionally high, noncom-
petitive or other form of complementary bid.
5. My firm has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or
services from any firm or person, or offered, promised or paid cash or anything of value to any firm or person,
whether in connection with this or any other project, in consideration for an agreement or promise by any firm or
person to refrain from bidding or to submit any intentionally high, noncompetitive or other form of complementary bid
or agreeing or promising to do so on this project.
6. My firm has not accepted or been promised any subcontract or agreement regarding the sale of materials or
services to any firm or person, and has not been promised or paid cash or anything of value by any firm or person,
whether in connection with this or any other project, in consideration for my firm's submitting any intentionally high,
noncompetitive or other form of complementary bid, or agreeing or promising to do so, on this project.
7. 1 have made a diligent inquiry of all members, officers, employees, and agents of my firm with responsibilities
relating to the preparation, approval or submission of my firm's bid on this project and have been advised by each of
them that he or she has not participated in any communication, consultation, discussion, agreement, collusion, or
other conduct inconsistent with any of the statements and representations made in this affidavit.
8. 1 understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent
concealment from the Colorado Department of Transportation, of the true facts relating to submission of bids for this
contract.
I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR
FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST
OF MY KNOWLEDGE.
Convectors firm or company name /' Ily _ /'1
/ e i i Date
R.C. Heath Construction Co.
2ne contractors firm a company name. (it join( venture.)
Title
Title
Sworn to before me this �Vr 9r1 '�Q! f, TV4 � Zo03
Notary PuDAc��m- Bn��> , • EA
RICKSON
My commission expires
NOTE: This document must
CDOT Form #606 $193
COLORADO DEPARTMENT OF TRANSPORTATION
CERTIFICATION OF EEO COMPLIANCE
Instructions: Bidders and subcontractors must complete and submit this form with bid proposals for federally funded contracts
greater than $10,000. This is required by the Equal Employment Opportunity Regulations 141 CFR 60-1.7(b) (1)]. The regulation
also requires that if you have participated in a previous contract or subcontract and have not filed a Standard Form 100 (EEO-
1), you cannot be awarded this contract. You may file a report covering the delinquent period for consideration by the Federal
Highway Administration or the Director of the Office of Federal Contract Compliance, U.S. Department of Labor.
The Standard Form 100 (EEO-1) may be requested from the:
Joint Reporting Committee
P.O. Box 779
Norfolk, VA 23501
(757)461-1213
1. 1h Yes ❑ No I have developed and have on file at each establishment an affirmative action program as
required by 41 CFR Chapter 60, Part 60-2.
2. 1Z Yes ❑ No I have participated in a previous contractisubcontract subject to the equal opportunity
clause.
3. M Yes ❑ No I have fled with the Joint Reporting Committee, the Director, or the Equal Employment
Opportunity Commission all reports due under the applicable filing requirements.
r
I declare under penalty of perjury in the second degree and any other applicable state or federal laws, that the state-
ments made in this document are true and complete to the best of my knowledge.
Company
R.C. Heath Construction CQ. tx bidder ❑ proposed subcontractor
BY: 4fk*v"
Tdle:
Date:
President
I
7/29/03
CDOT Form 0347 11194