HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 18251AUTHORIZATION FOR ADDITIONAL SERVICES NO. 4
DATE: November 12, 2003
CLIENT: City of Fort Collins
PROJECT: Meter Shop Building
RE: Service Agreement between VaughrFrye Architects, P.C. and the Client dated 12f13102.
All provisions of referenced Agreement for Service remain in full force and effect except as modified
herein.
The Additional Services were initiated by: the Client.
ADDITIONAL SERVICES: 1) Provide revisions to the mechanical contract documents to reflect the
Owner's desire to add a stainless steel service sink, and rough -ins for an
ice machine, in the Mechanical Room 116. Revisions provided by
The CE Group.
2) Provide revisions to the Civil contract documents to reflect the Owner's
desire to add a 12" wide trench drain at the east end of the Outdoor
Storage Area 131, and to resolve utility line conflicts at the stone drain
and "Waterman" water supply intersection. Revisions provided by The
Sear -Brown Group.
3) Provide a finished ceiling at the exterior canopy areas. Materials to be
pre -finished metal panels, mounted directly to the steel joist roof
structure. Revisions provided by Vaught'Frye Architects. Additional
information re mounting of light fixtures by ESC.
COMPENSATION: Additional work will be based on a fixed fee, consisting of the following:
1) The CE Group (Mechanical) $550.00
2) The Sear -Brown Group (Civil) $500.00
3) VaughYFrye Architects $$�•00
ESC (Electrical)
$1,100.00
Total Additional Fee $2,150.00