Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 18251AUTHORIZATION FOR ADDITIONAL SERVICES NO. 4 DATE: November 12, 2003 CLIENT: City of Fort Collins PROJECT: Meter Shop Building RE: Service Agreement between VaughrFrye Architects, P.C. and the Client dated 12f13102. All provisions of referenced Agreement for Service remain in full force and effect except as modified herein. The Additional Services were initiated by: the Client. ADDITIONAL SERVICES: 1) Provide revisions to the mechanical contract documents to reflect the Owner's desire to add a stainless steel service sink, and rough -ins for an ice machine, in the Mechanical Room 116. Revisions provided by The CE Group. 2) Provide revisions to the Civil contract documents to reflect the Owner's desire to add a 12" wide trench drain at the east end of the Outdoor Storage Area 131, and to resolve utility line conflicts at the stone drain and "Waterman" water supply intersection. Revisions provided by The Sear -Brown Group. 3) Provide a finished ceiling at the exterior canopy areas. Materials to be pre -finished metal panels, mounted directly to the steel joist roof structure. Revisions provided by Vaught'Frye Architects. Additional information re mounting of light fixtures by ESC. COMPENSATION: Additional work will be based on a fixed fee, consisting of the following: 1) The CE Group (Mechanical) $550.00 2) The Sear -Brown Group (Civil) $500.00 3) VaughYFrye Architects $$�•00 ESC (Electrical) $1,100.00 Total Additional Fee $2,150.00 ACCEPTANCE AND AUTHORITY: A