Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 18277DEC-05-2003 FRI 01:43 PN CFC ENG. FAX NO. 9702216378 Change Order Form tity of XoYt Oo3f3ns YW..i+r'NFlhl a YWotlY.sc� F\O.II CT TI tL E.�~ r R2003 Streot Wlhttenance, Program PROJI' CT NUWER: 30522131.E (('all Conrrcte Project- Bid #5747) CONTRACTOR: VoOcl Comet,-) (PO #3306145) (;FIANC,4- ORDER NUMBER: 1 "initrr.,ionnn P •rvnnn nr: /.rc a ni in nre .3r at caa•fara n niun pre. nnranran 4 MX n nwinn' 1, Reo,, on for chontJc, 2. DerxNption of change. 3. Chango in contrnct cost, 4. Chong; in contract time. 1,&2. Soo att=oh,ed lirioico for details The corar,lct cost will increase by $it 8,450.88 4. Thr;m will bo 6 clays added to tha contract time. P. 01 ORIGINAL CONTRACT COST $246,844,60 Tool. APPROvc-n CHANCE ORDE'ttS $0.00 TOTAL PENDING CFIANGr ORDEN'S $0.00 "I"OTAL. T HIS CHANGE ORDER TOTAL % OF Tl-It$ CHANGE ORDER 1.47% TOTAL_ C,U, % OF ORIGINAL CONTI;ACT , 7.47% AI).1E,lSTI:J) CONTRACT COST $265,295.48 ArCF PTKD BY' /ran �'F..n4nr'mAJa..rneavJ �i n,a\ / ACCPPTc,'.n BY: REVIEWED DY; -__ (Project Manager) (Engineer) (D-paitment Head) APPROW'D BY. .---.... _._. . ^__.......—..___. (PurchrisIng A;tcntover $30,000) Cc, Ac-rnunlin0 ihuGrasm9 Caiirrachr Project Pita DATE: - ��._e, DATE: DATE: 1.2 - 5 ' e,9.9 DATE: Fn;irtu rtn,r lyepartment • aB1 North Colieae <kvenuQ * P,D, Box 380 • Fort Collins, CO 80522-0380 • (303) 221-6605 DEC-05-2003 FRI 01143 PM CFC ENG, FAX N0, 9702216378 P. 02 City of Fort Collins 403 Fall Concrete Project Vogel Concrete • Bid No. 5717 Change Ordor No: 1 itule: 11f.?Fu03 1. Ro.,umn For Chnngo: a, UJImporvid concrote (opair5 w0ro requirod IhM were not Included in the original Contrael. b. i)urnp fees were oncounir:rod ihnt were not covered by any other ilern. O. Thona Is no lino itom for SZwcdttinrg or n3moval only. d, Thnro Is no limn itm, for the rrunrated Dome Pnno15. 2, Description Or Chariot a. InarG nuo quanlities of conerot❑ repairs rind U'aitic control as described below, 1). Puy for additional Dump 1`005, lump sum. C. I'ay for &awe using and fomnw.l on Mz1d taws, sump sum. d Aid lino ilcm for Truncalod Douro Panels, material only, 3, Chanao In Contract Arnounl, City Unit Coat per Unit Total Coat a. 1108.10 Vertical Curb & (3ultcr - No Sidewalk 125 LF $ 25,60 $ 3,187,50 008.17 Hollywood Curb, Guilor & Drive Approach 120 LF $ 33.00 $ 3,960.00 GWAQ ilighback CurU & Gutter - No Sldowalk 150 LF $ 32.00 $ 4.800,00 40F1,26 5" Flatwnrk - ROMOve & ROPIAN 300 5F $ 5.50 $ 2,145.00 614.16 TrafFIC CuAU•ol 51.1prarvicor 75 1 IR $ 31,50 S 2.812.50 $ 16,905.00 b. OUobor Dump F00 - Mdllu:w,g 1 LS $ 50.25 $ 60.25 r„ M202..06 Sowcut COncndnlAnphaalt b" - 8" 35 LF $ 3.64 $ 127,40 M202,01 Removo CnncretolAcphalt 103 SF $ 2.41 $ 2AR.23 375.63 d. 608.33 Trunoated 00ma Pau01- M410601 Only 8 EA $ 140.00 $ 1,120.00 TOTAL CHANGE IN CONTRACT AMOUNT $ 18,450.88 4. chango In Contract Turin 0 days a. Thorr. I^ n0 ch:m0n in uonb;ut time_ b, Tl ore is no cllzrngP. in contrnrt tune. c. Thtry Is nn nhange In cunlr.'�at Iinw. it, Thuro Is no chnngu In roolrart ttmo, 11 J26103