Loading...
HomeMy WebLinkAboutWORK ORDER - GENERAL CORRESPONDENCE - 18246EXHIBIT ''A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND ALLER-LINGLE ARCHITECTS, P.C. DATED: JULY 1, 2003 Work Order Number: Al-09-2003 Purchase order Number: Project Title: New Police Facility- Masterplanning Commencement Date: November 19, 2003 Completion Date: December 15, 2003 Maximum Fee (time and reimbursable direct costs): $3,800.00 Project Description: Site Master Planning for the New Police Facility on Timberline Road Scope of Services: 2003 Provide master planning design services as per proposal from Affer-Lingle, dated November 24, Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. SERVICE PROVIDER c , By: Date: CC: Purchasing ACCEPTANCE USER The attached forms consisting of L-) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given - CITY OF FORT COLLINS By. u Dec r 01, 2003 Date: Director of Purchasing and Risk Management over $30,000. ALLER • LINGLE 1 `4 ARCHITECTS I l�l�F V t5 D P.C. 714 kJ-V 2 i:1003 CITYOFFOM C U" 'PMAMNS ERWM,4R November 24, 2003 Mr. Jack Gianola City of Fort Collins Operations Services P.O. Box 580 Fort Collins, CO 80522 RE: Proposal for Site Master Planning Police Services Facility City of Fort Collins, Colorado Project No. 0337.17 Dear Jack: Aller•Lingle Architects P.C. is pleased to provide you with this Proposal for site master planning for a new Police Services. Facility on Timberline Road in Fort Collins. In response to our meeting of November 19, 2003, we propose the following scope of services and associated fees: Project Description Site master planning for a new 3-story, 93,000 sq. ft. centralized Police Services Facility on Timberline Road, just south of the Timberline Church, in Fort Collins, Colorado. Services shall include the evaluation of two (2) site/building options on the current property, with conceptual site plans prepared for each, as follows: Option 1: Utilizing the existing church access road to Timberline Road, requiring an access easement across Lot 3 of the development. Option 2: Accommodating the proposed curvilinear church access road across the city's property (currently owned by CSU) to align with Sagebrush Drive. Each of these options will take into account the City's plans for Timberline Road street, intersection and median improvements, additional street right-of-way dedications, bufferyards and other requirements documented in the Conceptual Review comments dated October 28, 2003. Scope of Basic Services The Scope of Basic Services shall be as follows: 1. Conceptual Review: Review the staff comments from the City's Conceptual Review Meeting, documented in the memo from Ted Shepard dated October 28, 2003. 2. Site Master Planning: Develop conceptual site and building envelope designs for each of the two (2) design options for review by the City, evaluating each for potential impacts from the Conceptual Review requirements as well as the parking requirements for Police Services. 712 WHALERS WAY BLDG. B, SUITE 100 • FORT COLLINS • COLORADO • 80525 (970) 223-1820 phone (970) 223-1833 fax • office0aller-lingle.com • www.aller-lingle.com 1-1 Police Services Facility Site Master Planning Page 2 Work Not Included 1 . Conceptual design for the Police Services Facility, including development of floor plans and building elevations. 2. Planning, landscape architecture and other related services for taking the site master plan through the planned unit development or other site plan approval process with the City of Fort Collins. 3. Cost estimating services. 4. Title research or boundary survey to verify property limits, easements or rights -of -way. Owner -Provided Information 1 . Plats or other site plan documents for the affected site area, including existing GIS CAD files and other relevant documents. 2. Engineering drawings for the proposed Timberline Drive street, intersection and median improvements. These have been received. Fees Aller•Lingle Architects P.C. proposes to complete the Scope of Basic Services for fees on an hourly basis as follows: Aller•Lingle Architects P.C.: Hourly -not -to -exceed: $ 3,600.00 Reimbursable Expenses Allowance: Not -to -exceed: S 200.00 Total: Not -to -exceed: $ 3,800.00 Reimbursable Expenses In addition to Basic Services, the following expenses in connection with this project shall be reimbursable in accordance with our master contract, as itemized by the allowance above: 1. Blueprinting 2. Copying 3. Long distance telephone/FAX 4. Mileage and related travel expenses 5. Postage 6. Federal Express/Express Mail and other delivery services 7. Photography or other miscellaneous expenses 8. Plotting of CAD -generated drawings for City reviews and presentations Additional Services If the City requests additional services beyond those set forth in this Proposal, or for additional services as described elsewhere in this Proposal, such services shall be agreed to in writing between the City and the Architect and the fees adjusted accordingly per the following, current hourly rates: Aller•Lingle Architects P.C.: Principal $100.00/hour Sr. Project Manager/Architect $80.00/hour Project Manager/Architect $72.00/hour Intern Architect/CAD Tech. 2 $56.00/hour Draftsperson/CAD Tech. 1 $48.00/hour Clerical/Administration $35.00/hour ■