Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - BACKWASH RECYCLE PROJECT UV EQUIPMENT (2)Hydro Construction Co., Inc.
02-01-001 FCWP - UV PURCHASE
4316 W LAPORTE AVENUE
FORT COLLINS, CO 80521
For the accounting period ending:09-30-2003
1-1-01-002 Bonds 6 Insurances
EM Expendable Material
EQO Equipment - Owned
EQR Equipment - Rental
L Labor
LB Labor - Burden
PM Permanent Material
S Subcontract
Cost Code Totals:
1-1-01-999 General Conditions
EM Expendable Material
EQO Equipment - Owned
EQR Equipment - Rental
L Labor
LB Labor - Burden
PM Permanent Material
S Subcontract
Cost Code Totals:
2-3-16-201 Site Investigation
EM Expendable Material
EQO Equipment - Owned
EQR Equipment - Rental
L Labor
LB Labor - Burden
PM Permanent Material
S Subcontract
Cost Code Totals:
11-3-20-110 U. V. Equipment
EM Expendable Material
SOO Equipment - Owned
EQR Equipment - Rental
L Labor
LB Labor - Burden
PM Permanent Material
S Subcontract
Cost Code Totals:
Variance by Category
as of a Specific Date
Project Manager: JIM EURICH
JTD Variance 9
Budget Cost to Date Comp
2,738.00
2,738.00*
53.00
150.00
5,993.00
100.00
6,296.00*
250.00
785.00
1,222.00
2,257.00*
1,913.00
1,913.00*
725.53
1,000.00
258.87
4,251.18
1,402.89
7,638.47*
617.40
2,022.15
1,132.60
373.76
4,145.91*
214.00 56.00
18.48
139,500.00 119,687.63
139,714.00* 119,762.11*
825.00 100
100
100
100
100
100
100
825.00*
-672.53 100
-11000.00 100
-108.87 100
1,741.82 100
-1,402.89 100
100.00 100
100
-1,342.47*
-367.40 100
100
-1,237.15 100
89.40 100
-373.76 100
100
100
-1, 888.91*
100
100
100
158.00 100
-18.48 100
19,812.37 100
100
19,951.89*
Cost to Estimated
Complete Variance
825.00
Do* 825.00*
-672.53
-1,000.00
-108.87
1,741.82
-1,402.89
100.00
00*-1,342.47*
-367.40
-1,237.15
89.40
-373.76
00*-11888.91*
158.00
-18.48
19,812.37
00* 19, 951.89*
Page 1
Record Security: Disabled
Cost Rec'd
Commited Against
Cost Commitments
00* .00*