Loading...
HomeMy WebLinkAboutWORK ORDER - REQUISITION - 17854EXHIBIT ''A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND ALLER-LINGLE ARCHITECTS, P.C. DATED: JULY 1, 2003 Work Order Number: Addendum toAl-04-2003 Purchase order Number: 3304186 Project Title: Canopy at Remington Street Parkmg Structure Commencement Date: October24,2003 Completion Date: December 0 1, 2003 Maximum Fee (time and reimbursable direct costs): $1,500.00 Project Description: Canopy over the Stahwayatthe RemmgtonStreet PadangStructure, Scope of Services: 2003. Provide design services for the canopy according to ARer Lingle Architect's letter, dated October 23, Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. PROVIDERSERVICE I Date: / / CC: Purchasing ACCEPTANCE USER The attached forms consisting of four (�J pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given - CITY OF FORT COLLINS By:A� Date: r24,2003 Director of Purchasing and Risk Management over $30,000. ALLER • LINGLE ARCHITECTS P.C. October 23, 2003 Mr. Jack Gianola City of Fort Collins Operations Services P. 0. Box 580 Fort Collins, CO 80522-0580 GJ 2 4 20M CITvO-�(,; RE: Proposal for Final Architectural Services Remington Parking Garage Canopy City of Fort Collins, Colorado Project No. 0337.07 Dear Jack: Aller•Lingle Architects P.C. is pleased to provide you with this Proposal for completion of the limited architectural services for adding a canopy structure at the City's Remington Street Parking Structure. This Proposal will supplement our original Proposal to Bruce Byrne, dated April 23, 2003, and our work completed to date. In response to our meetings with you and Parking Services, and the design approved at our meeting of August 18, 2003, we propose the following scope of services and associated fees to complete the project: Project Description Completion of the limited construction documents for a new canopy structure over the open south stairwell at the Remington Street Parking Structure in Fort Collins, Colorado. The canopy structure shall include a barrel vault roof and a three -sided glazed enclosure. Structural system and materials for the canopy shall be as shown in the approved design drawings dated July, 2003, consisting of tubular steel, flat seam metal roofing and Lexan sheeting. The construction will be managed by the City's Operations Services department, using preapproved City subcontractors; therefore, full construction documents and technical specif- ications will not be required. Scope of Basic Services The Scope of Basic Services shall be as follows: 1 . CAD Drawings: Completion of the limited CAD construction drawings already started as part of the original proposal, illustrating floor plan, elevations, sections and details as necessary for building permit application and construction by City crews. 712 WHALERS WAY BLDG. B, SUITE 100 • FORT COLLINS • COLORADO • 80525 (970) 223-1820 phone (970) 223-1833 fax • office@aller-lingle.com • w .alter-lingle.com IN Remington Parking Garage Canopy Page 2 2. Structural Review: Structural review and development of structural details for compliance with the City's wind and snow load criteria. 3. Presentation Documents: Colored CAD elevations of the design in support of an Administrative Review by the City of Fort Collins Current Planning Director, and presentation to the Downtown Development Authority for their Board's approval. Deliverables 1. One (1) set of reproducible vellum plots for use by the City in blueprinting or copying for bidding and construction. 2. Two (2) sets of colored CAD elevations. Work Not Included 1. Full construction drawings and technical specifications for competitively bidding the project to Contractors. 2. Cost estimating services. 3. Bidding/Negotiation and Construction Administration phase services. 4. Preparation of the application for Administrative Review, plus accompanying documentation other than the colored elevations indicated above. 5. 'Coordination and attendance at meetings with the Current Planning Director and the DDA Board. Fees Aller•Lingle Architects P.C. proposes to complete the Scope of Basic Services for fees on an hourly basis as follows: Aller•Lingle Architects P.C.: KL&A Inc.: Reimbursable Expenses Allowance: Total: Hourly -not -to -exceed: $1,000.00 Hourly -not -to -exceed: $ 400.00 $ 100.00 Not to exceed $1,500.00 Reimbursable Expenses In addition to Basic Services, the following expenses in connection with this project shall be reimbursable in accordance with our master contract, as itemized by the allowance above: 1. Blueprinting 2. Copying 3. Long distance telephone/FAX 4. Mileage and related travel expenses 5. Postage 6. Federal Express/Express Mail and other delivery services 7. Photography or other miscellaneous expenses 8. Plotting of CAD -generated drawings for City reviews and presentations Additional Services If the City requests additional services beyond those set forth in this Proposal, or for additional services as described elsewhere in this Proposal, such services shall be agreed to in writing between the City and the Architect and the fees adjusted accordingly per the following, current hourly rates: 1-1 Remington Parking Garage Canopy Page 3 Aller-Lingle Architects P.0 Principal $100.00/hour Sr. Project Manager/Architect $80.00/hour Project Manager/Architect $72.00/hour Intern Architect/CAD Tech. 2 $56.00/hour Draftsperson/CAD Tech. 1 $48.00/hour Clerical/Administration $35.00/hour KL&A Inc.: Principal $125.00/hour Project Engineer $95.00/hour Design Engineer $75.00/hour Engineering Intern $65.00/hour Senior CAD Drafter $65.00/hour Steel Detailer $65.00/hour CAD Drafter $50.00/hour Clerical $35.00/hour Contract Terms All terms of this Proposal shall be in accordance with our 2002 master contract with the City of Fort Collins. Schedule Scope of Basic Services for this project will be completed by December 1, 2003, assuming notice to proceed from the City of Fort Collins by November 1, 2003. Thank you for this opportunity to work with you on the proposed canopy structure. Please contact me if you have any questions concerning this Proposal. If acceptable, please issue a Work Order for this work. Sincerely, ALLER•LINGLE ARCHITECTS P.C. DBL:IIs ■