Loading...
HomeMy WebLinkAboutWORK ORDER - GENERAL CORRESPONDENCE - 17790OCT-23-2003 THU 07:34 AM CFO ENG. FAX NO, 9702218378 P. 01 M EXHIBIT "A" Post -It" Fax Nole 7671 On y� �a i 3 p�u00`-y' To ,a.11pf pt. co WORK ORDER FORM - PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND DATED. Ip .746za Work Order Number: 19) • y0'l -O.a Purchuu.e Ordor PJumhor: Projr:rtTitle: �4�1F�L..(�S, u��l1Jn�• CommencrrmentDate: __..._._.�1�1_ o Complotion Date Maximurn F"! (time and reirnbursablo direct costs):c> OA SAS kA Project � Description: Scope of Services: __�T. r?-k•' *" C - __� Acceptance User Prefe5slonal agrees to pm1orm the services idontlfind above and on the attached forms in accordance with the terms and conditions contalned herein and in the Professional Sc(vicos Agreement between the parties. In the evont of a conflict between or ambiguity in the terins of the Professional Services Agroornont and this work order (including the attached forms) the Professional Services Agreement sh;,lt control. Tho aRached forms conslstiog ofrs.v ^ (h pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. City of Fort Collins By:ti Date: By: Director of Purchaslncd and Risk Management (over $30,000.00) Date: 2 W0115A 05/01. OCT-23-2003 THU 07:35 AM CFC ENG, FAX NO. 9702216378 P. 02 Exhibit A Attnchimirit 203-09 Shlcids Drainage - South of Wabash Street North Star Design, II►e,-203-09 City of fort Collins Struct 0vorsizing Eileen 1321ycns 110 flux 580 Volt ('nllins, COlorndo 80522.0580 Sumhlaty I of 2 "Tim protect will provide a design to modify an exisfing section of sidowalk between the two cxisling churches on the east side ol'Shiclds Street (south of Wabash Street), '1'hLte is an exising swale running from this area to the oast and the sidewalk may be too high to allow proper overflow drainage. 1. Topographie Survey - King Surveyors will provide a topographic survey of the cast half of Shields between the 2 drives, the existing drainage swale to the cast and the area north of the existing south church (approximately 1 acre). Utility One Call Service will be nntiGcd and tiny utilities that arc marked in the field will be [coaled. Estimated cost: $1,9110. 2, Drainage Research - Research existing drainage reports and plans for this area to determine what was the intenclecl design fur the drainage overflow. Estimated cost: $1,100 3. Irnprovcnrent Plan / bolter - Prepare a plan showing the proposed modifications to the axiating walk and Swale - existing and proposed grades Will be shown. PYel7are a letter dcseribing the r'casoning behind the design including reference to the drainage research otbeve. list,itnated cost: $2,600 d. lWrohorsahlo Expeuses - fistimated cost $300 Asa ItlITtl ins /. Iixclusigila:- 1, The final plan will he a one page grading plan. The City will CPn5trlrC1, 1,1115 prnjcot and no spocifications, detail sheets, or cover will be required. 2.. The City will he responsible for procuring easements for the construction and any other required approvidss, permissions, or permits. 3. No utility relocations or conflicts are anticipated. 4. This seopc does not include any services daring or alter construction (construction staking, obscrvntinn, record drawings, etc.). No Text