Loading...
HomeMy WebLinkAboutWORK ORDER - GENERAL CORRESPONDENCE - 17471EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Advanced Roofing Technologies DATED: 8/31/02 Work Order Number: WQL-0903-1 Purchase Order Number: Project Title:Re-Roof of Water Quality Lab Garage and Center Roof Commencement Date: October 15, 2003 Completion Date: October 30, 2003 Maximum Fee: (time and reimbursable direct costs):$30, 400.00 Project Description: Reroof of existing Water Quality Lab Center roof and Garage Roof Scope of Services: Removal of existing roof ballast where applicable preparation of existing BUR installation of insulation, and installation of a fully adhered GenFlex 45 mil TPO membrane in accordance with Genflex Specifications. Remove and reinstall all coping material and drain rings Upon competion Provide owner with 15-year full systems warranty. (Also see attached scope) Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. The attached forms consisting of one (1) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. CC: Purchasing Contractor: Date: City of Fort Collins Submitted by: Reviewed by: Water Rpg Mate: -rY-O Z Approved by ��� /. Jet. Utilities General Manager te: 3 Approved by: Dir urchasing & Risk Mgt Date: 9-22 -03 ADVANCED ROOFING TEC 9704961814 09/16/08 09:S8am P. 002 2004 Heath Pk"., lkfl[ B Fod "We, Co WW4 September 16, 2003 City of Fort Collins Water Treatment Plant Attn: Link Mueller RE: Re -Roof Pricing Ad van ced Revjing Technologies LTD. Ph: 224-6039 Fax: 221-6619 970- r%7%.W 75 — Furnish material and labor to install a GenFlex 45 mil thermoplastic polyolefin membrane roofing system fully adhered to a single layer of GenFlex high -density wood fiberboard glued to the existing B.U.R. membrane. Remove and reinstall all coping metal and drain rings. This system meets U.L. Class A fire rating requirements and carries a manufacturer's 15-year full systems warranty with no dollar limit. The following pricing is in accordance with The City of Fort Collins City Services Contract. — Garage Roof Not to exceed $15,300.00. — Center roof section Not to exceed $15,100.00. PAUL MIERA M )PetZ4 /rt. mo, PROJECT ESTIMATOR