Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 17304 CHANGE ORDER 2CHANGE ORDER NO.2 PROJECT TITLE: Mosquito Surveillance CONTRACTOR: Colorado Mosquito Control, Inc. DESCRIPTION: 1. Reason for change: Catch Basin Inspection & Treatment 2. Description of Change: CMC will inspect a representative number of open -street storm -water catchbasins in each City of Fort Collins designated service area for the presence of Culex and other mosquito larval development. These catchbasins have been shown in some areas to be a significant source of Culex disease vector mosquito production in residential areas. If indeed these CB's aree producing significant numbers of mosquitoes, CMC will make appropriate control applications of Bacillus sphaencus as needed. CMC shall bill on a per cycle basis. There shall be no more than three treatment cycles approximately 30 days apart. The City shall provide three copies of the storm -water catch basins in the designated service area. The designated service area shall be bordered by the following streets: Taft Hill Road on the west; Vine Drive on the north; Lemay Avenue on the east; Prospect Road on the south. The catchbasins on these border roads shall be included in the designated service area. 3. Change in Contract Cost: Increase of $6687.45 4. Change in Contract Time: ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O.% OF ORIGNINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) BY BY $ 25,000.00 $ - 700.00 $ 6687.45 27.5 $ 30,987.45 AC CEPT r v DATE: O Contra t s pres ntative CCEPTED � � � 4i DATE:11711 �/ �� Project -Manager