HomeMy WebLinkAboutWORK ORDER - GENERAL CORRESPONDENCE - 17221 A1 06 200308/13/2003 15:33 9702216534 FACILITIES PAGE 02 EXHIBIT " A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN µ THE CITY OF FORT COLLINS r AND nuU i 1G03' ALLER-LINGLE ARCHITECTS, P.C. DATED: JOLY 1, 2003 Work Order Number • AI-06-2003 Purcha3e ordcr Number: Project Title: EPIC Existing Ice Replacement Commencement Date: August 18, 2003 Completion Date: December 23, 2003 Maximum Fee (time and reimbursable direct costs) : $14,800.00 Project Description: Demolition of the existing concrete floor slabs and associated piping, construction of new sand base structure for new we, raised player boxes, new header trench on North end and installation of new steel and glass dasher board system, third compressor on mechanical skid, new high -intensity fluorescent lighting and low-e ceiling_ Scope of Services: Provide architectural services for the replacement of the exiting sheet of ice at EPIC per proposal 0337.12 dated August 7, 2003. Service Provider agrees to pe1:EQf1ci the services identified above and on the attached forms in accordance with the terms and conditions contained bore;n and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. SERVICE PROVIDER By: Q Date: CC: Purchasing ACCEPTANCE USER The attactAea foizna conaiatincj of three 0—) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given - CITY Or COLLINS By: Da t P _ August 13, 2003 Director of Purchasing and Risk ManagerneM over $30,000_ Aug• 8. 2003 9:39AM ALLER LINGLE ARCd ALLER • LINGLE ARCHITECTS P.C. August 7, 2003 Mr. Ron Kechter City of Fort Collins Operation Services P. 0. Box 580 Fort Collins, CO 80522-0580 RE: Proposal for Architectural Services EPIC Ice Rink Replacement City of Fort Collins, Colorado Project No. 0337.12 Dear Ron: No•2248 P. 1/3 Aller•Lingle Architects P,C. is pleased to provide you with this Proposal for architectural services for replacement of the original ice rink at the Edora Pool and Ice Center (EPIC). In response to our meeting of August 4, 2003, we propose: tine following scope of services and associated fees. Project Description Design and construction documents phase services for replacement of the original ice rink at EPIC, including the following components: 1. Demolition of the concrete floor slab beneath the original sheet of ice, exact extent to be determined, along with any associated piping systems not to be reused in the new ice system, 2. Construction of new sand base structure for the new ice sheet, along with associated reinforced concrete stem walis and patching back in the concrete floor slabs, 3. Construction of new raised player boxes. 4. Installation of new steel and glass dasher board system. 5. Construction of new header trench at the north and of the rink, along with extension of the piping stubbed out as part of the recent addition. 6. Installation of additional compressor in chiller room. 7. Installation of new high -intensity fluorescent lighting. 8. Installation of Low-E ceiling over the existing construction. The design and construction documents will be based upon the systems used in the 2002 EPIC ice rink addition and drawings created by the; Neenan Co., dated July 14, 2003 (record set). New ice surface and associated piping, mechanical (if any), plumbing and electrical systems or required upgrades will be provided as design/buildirig by subcontracts to the City of Fort Collins separate from this Proposal. No structural engineering services are anticipated as a part of the scope of work, No Bidding or Construction Administration phase services are included in this Proposal. The City intends to act as the general contractor for construction of the project. 712 WHALERS WAY BLDG. B, SUITE 100 • FORT COLLINS • COLORADO • oos2s (970) 223.1820 phone (97D) 223-1833 fax • office®alter-lingle.com - www.aller-Iingle.com ■ ug• 8- 2003 9:39AM ALLER LINGLE ARCd No•2248 P. 2/3 Proposal for Architectural/Engineering Services Page 2 Scope of Basic Services The Scope of Basic Services shall be as follows: 1. Record Documents: Field verification, field measurements and documentation of as -built conditions as required to verify the accuracy of the construction documents prepared by the Noonan Co., in order to proceed with the design phase of the project. 2. Design Phase: Develop a preliminary floor plan with notes to graphically describe the scope of work for review and approval by the City of Fort Collins. 3. Construction Documents Phase: Prepare construction drawings with materials and specifications notes for the City of Fort Collins and its subcontractors to construct the project. No technical specifications will be included. Extent of drawings will include: Title Shoat Demolition Floor Plan with notes New Construction Floor Plan with notes and dimensions Reflected Ceiling Plan with Totes Sections and Details as appropriate Construction drawings will be based on the systems and construction details developed by the Neenan Co. as a part of the 2002 EPIC aodition. Work Not Included 1. Full technical specifications, i3roject manual or "front end" bidding documents. 2. Ice system, plumbing, HVAC, electrical and security system design and engineering. These systems will be design/build by the City's subcontractors. 3. Cost estimating services. 4. Structural engineering services. 5. Bidding/Negotiation or Construction Administration Phase services. 6. Building inspection services as required by Chapter 17 of the Uniform Building Code IUBCI, current edition. 7. Asbestos, lead -based paint or other hazardous material testing or abatement. 8. Preparation of record documents upon completion of construction. Owner -Provided Information 1. Record drawings of the as -built conditions for the original EPIC construction and the 2002 addition. 2. Preparation of bidding documents, contract forms and "front end" specifications. 3. Blueprinting of construction documents will be provided by the City. We will furnish repro- ducible vellum copies of our construction documents for this purpose. 4. Bidding and Construction Administration phase services will be provided by the City of Fort Collins, including compliance with Chapter 17 of the UBC. Consultants Aller•Lingle Architects P.C. will not utilize outside consultants for this project. Fees Aller•Lingle Architects P.C. proposes to complete the Scope of Basic Services for the following hourly fees and reimbursable expenses: Professional Fees: Hourly -not -to -exceed $14,300.00 Reimbursable Expenses: Not -to -exceed $ 500.00 TOTAL: Not -to -exceed $14,750.00 71