Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 5717 CONCRETE PROJECT PHASE IAdministrative Services Purchasing Division City of Fort Collins April 1, 2003 Vogel Concrete Inc. 1313 Blue Spruce Dr. Ft. Collins, CO 80524 Re: Bid #5717 Concrete Project -Phase I (Renewal for 2003) 1 have enclosed 3 copies of documents regarding the above captioned matter. Please sign the three (3) copies of the agreement, and return all copies to me along with the necessary bonds. After the signatures have been obtained, a copy of the agreement will be sent to you. Please contact John Stephen, CPPB, Senior Buyer, 970-221-6777, if you have questions. Sincerely, mer, B. O'Neill IL. CPPO, FNIGP it `tor of Purchasing and Risk Management enc JBO/jbe 215 \orlh Mason Street • 2nd FloOr • PC , Box 580 - Fort Colhn,, CC) 80�22-0�8(1 • (722(iC7 City of Fort Collins Administrative Services Purchasing Division LETTER OF TRANSMITTAL To: Ingrid Decker, Assistant City Attorney John Fischbach, City Manager Wanda Krajicek, City Clerk From: James B. O'Neill II, CPPO, FNIG Director of Purchasing & Risk Mana ement Date: April22, 2003 Re: Bid #5717 Concrete Project Phase I (renewal) Attached find three (3) sets of contract documents regarding the above -mentioned matter. Would you approve as to form and forward to the City Manager. The bidder received the award through the normal bid process. John, would you please sign the contract documents and forward them to the City Clerk. Wanda, please call Purchasing, Jim will come over, sign and initial the contracts and have you attest his signature. Would you call Purchasing when that is completed. Thank you. 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 John Stephen - Vogel Page 1 From: Christie White To: John Stephen Date: 4/14/03 8:14AM Subject: Vogel Engineering and Light & Power are participating on the Concrete Project. Engineering's req. #16371 L&P req. #16364 John Stephen - Vogel Renewal Page 1 From: Erika Keeton To: Christie White Date: 4/10/03 4:45PM Subject: Vogel Renewal Christie, please enter reqs for Vogel's 2003 Contract Renewal, Bid No. 5717: PMP $503,884.58 Ped Access $131,700.82 Minor Streets Capital $5754.00 Total 641, 339.40 CC: John Lang; John Stephen; Marc Anderson; Rick Richter F John Stephen - Fwd: W. Mulberry Concrete Est Page 1 From: Erika Keeton To: Bruce Vogel Date: 4/10/03 4:50PM Subject: Fwd: W. Mulberry Concrete Est Bruce, please find attached the original cost estimate for L&P's share of the Mulberry sidewalk. We have already renewed Vogel's contract, so this will be Change Order number one. Could you please enter a requisition to this contract for $24,273.52? The bid number is 5717. If you have any questions abou the req, please contact our financial coordinator Christie White. Thanks! Erika >>> Tracy Dyer 01 /27/03 08:56AM >>> Bruce: I've attached the spreadsheet that contains the estimated concrete cost along the north side of W. Mulberry for the Light and Power portion. I spoke with Rick R. last week and it sounds like all of the concrete repair will be done under his street rehab program with one of his inspectors. Last week I had "quoted" you an estimated cost based on a different contract (the pedestrian access contract), which is why there is a difference in cost. Feel free to contact me with any questions. Thanks Bruce! Tracy A. Dyer C.O.F.C. Engineering Construction Inspector 970.221.6605 office 970.222.0596 cell 970.221.6378 fax tdyer(a.fcgov.com CC: Christie White; John Stephen; Rick Richter