Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 2202988 CHANGE ORDER 2507/25/2003 FRI 14:12 FAX 970 221 6586 CITY OF FT COLLINS CLRS
Ia 001/001
CHANGE ORDER NO. #25
PROJECT TITLE:
FOSSIL CREEK COMMUNITY PARK PHASE 18
CONTRACTOR:
Clark Construction Company, Inc.
PROJECT NUMBER:
5681
PURCHASE ORDER NO.:
2202988
DESCRIPTION:
A Modihcations @ Fuel Tank Pad
9. Add Valley Flashing
C. Change petitions to solid plastic
D. Add power for Eleetric Hair Dryers
E. Add Electrical work to water feature vault
1. Reason for change: A. Design Omission
B. Design Omission
C. Design Error
D. Design Omission
E. Design Error
F. Design Omission
G. Phase I error
H. Design Revisions
I. Design Omission
2. Descrlptlon of Change: A. Modifications @ Fuel Tank Pad
0. Add Valley Flashing
C. Change partitions to solid plastic
D. Add power for Elea& Hair Dryers
E. Add Electrical work to water feature vault
F. Add Ilghtening preotecljdn to Water Feature Vault
G. Water line and Valve repairs
H. Chhnge Seed Variety for Seed Type 1
I. Add Wall Occupancy Sensors
3. Change in Contract Cost: $24,538,00
4, Change In Contract Time: 0 days
TOTAL APPROVED CHANGE ORDER
TOTAL PENDING CHANGE ORDER
TOTAL THIS CHANGE ORDER
TOTAL % OF ORIGINAL CONTRACT, THIS C.O.
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S
ADJUSTED CONTRACT COST
ACCEPTED BY:
Contractor's Representative
ACCEPTED BY:
Project Manager
REVIEWED BY:
Title:
Jahn Req
11 o TI
DATE: 124 3-
DATE: 7' !sF' O -j
DATE:
APPROVED BY: DATE:
Titre: "
APPROVED BY: DATE:
Purchasing Agent over $30.000
c City Clerk Architect
Contractor Englnear
Project File Purchasing