Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 5735 CABLE 27 STUDIO PHASE II0 I 03/18/03 TUE 14:56 FAa 970 482 4537 SINNETT BUILDERS INC Z 001 D i702 r FACILITIES c 62 h�F,'_'.=r �INUL� AR�H CHANGE ORDER NO, 1 PROJECT TITLE: Cable 27 SUM10 — p hasa CONTRACTOR Sinneft t IBufldem, Inc PROJECT NUMBER: Bid 05735 � 0 C' I DESCRIPT10N: lnberior INeaea kmz and Illjetcharliea1 Systems for Cabin 2.7 Stadio In preparing change orders show in order as separarte numbered paragraphs the following: Z. Reason for change: Misc:elhiowous candAned'srmall changes In efectricai and interior fitttsh 2- Description of change: Sae atbiched back-up Information supplied by Contractor and approved by Architect 3_ Change in contract cost: Yes 4. Change in contract t7me: No Attar# additional Gheet I as Mauro i ORIGINAL. CONTRACT COST $ 168,903.0 ) TOTAL APPROVED CHANGE ORDERS .00 TOTAL PENDING CHANCE ORDER$ 00 TOTAL THIS CHANGE ORDER $ 4,307.00 ADJUSTED CONTRACT COST S 173,212,00 ACc$PTED Fly: REVIEWED SY:, RE"MEWED APPROVED BY: Brian BlqV46, Project Manager, sinned Sift leWZ �r PMPD Supervisor �- . Shaun Seefeld° CCC:A Gc: City Clerk Prnjeat File Contractor /Purchasing Engineer ewer-Lingla ArahiteCts, P.C. C!- Manager Date 3 ,�4-03 Date !S1 1 6/ 6):3 Da Date CONSTRUCTION OWNER ❑ CHANGE ARCHITECT ❑x— DIRECTIVE CONTRACTOR ❑ FIELD ❑ AIA DOCLlAfENT G714 - ELBCTRONICFORMAT OTHER ❑ (Thisdocumen[rep/aces AIA DocumentG7lj Construction Change Authorization.) COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT Daw. PROJECT: Cable 27Studio Phase 2 DIRECTIVE NO.: ONE 300 Laporte Ave.(Name, address) Ft. Collins. CO 80522 DATE: March 5. 2003 TO CONTRACTOR: Sinnett Builders, Inc. 2926 East Mulberry ARCHITECT'S PROJECT NO: Bid NO. 5753 Ft. Collins. CO 80524(Name, address) CONTRACT DATED: January 8. 2003 CONTRACT FOR: General Construction You are hereby directed to make the following change(s) in this Contract: The following change are based on the attached memos provided by Sinnett Builders Inc. PROPOSED ADJUSTMENTS 1. The proposed basis of adjustment to the Contract Sum or Guaranteed Maximum Price is: [x ] Lump Sum (increase) ( of S 4,307.00 [ ] Unit Price of s per [ ] as provided in Subparagraph 7.3.6 of AIA Document A201, 1987 edition. [ ] as follows: The Contract Time is proposed to (be d) (remain unchanged). The proposed adjustment, if any, is (an inerease ef- When signed by the Owner and Architect and received by the Contractor, this document becomes effective IMMEDIATELY as a Construction Change Directive (CCD), and the Contractor shall proceed with the change(s) described above. Aller' Lingle Architects City Of Ft. Collins ARCHITECT OWNER 712 Whalers Way 117 N. Mason Street Ft. Collins. CO 80525 Ft. Collins. CO 80522 - Address Address BY9 BY: DATE: DATE: 33 Signature by the Contractor indicates the Contractors agreement with the proposed adjustments in Contract Sum and Contract Time set forth in this Construction Change Directive. Sinnett Builders, Inc. CONTRACTOR 2926 E. Mulberry Ft. Collins. CO 80524 Address BY: D E: - O © 1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006-5292. AIA DOCUMENT G714 - CONSTRUCTION CHANGE DIRECTIVE - 1987 EDITION - AIA® - WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. User Document: g714 - cable 27.aia -- 3/6/2003. AIA License Number 1000327, which expires on 2/15/2004. Electronic Format G714 - 1987 1 To: Shaun, Aller*Lingle Architects From: Brian, Sinnett Builders, Inc. Date: February 4, 2003 Fax: 1 Pages Subject: Cable 27 Studio - Replace Acoustical Ceiling Below is the cost of the removal and replacement of the acoustical ceiling. The relocating of the existing lights was already being covered under the base bid and any work with the fire protection system will be by the owner. We can place this work on the "open" change order #1. If you have any questions give me a call. Acoustical Ceiling $300.00 Demolition and Haul $163.00 Builders Risk $ 8.00 SBI O&P at 7% $ 34.00 Total $505.00 C.C. Steve, City of Ft. Collins To: Shaun, Aller * Lingle Architects From: Brian, Sinnett Builders, Inc. Date: February 18, 2003 Fax: 1 pages Subject: Cable 27 Studio - Electrical Conduit Work Below is the cost of the conduit work that was requested by City of Ft. Collins and LRB Associates. If you have any questions give me a call. 1) One 1 1/4" conduit for the non -plenum rated wires for the City of Fort Collins. Electrical $230.00 Builders Risk $ 4.00 SBI O&P 7% $ 16.00 Total $250.00 2) Add five 2" conduites from a 12"x12" junction box in the middle of the studio. Electrical $1,200.00 Builders Risk $ 20.00 SBI O&P 7% $ 85.00 Total $1,305.00 C.C. Steve, City of Ft. Collins To: Shaun, Aller * Lingle Architects From: Brian, Sinnett Builders, Inc. Date: February 24, 2003 Fax: 2 Pages Subject: Cable 27 Studio - Changes to work & Change Order # 1 Below is the pricing for the remaining items that have been field approved by Steve and will be changes to the contract for the electrician. 1) Reroute and maintain power to the exterior lighting and sign. Electrical $275.00 Bond & Builders Risk $ 6.00 SBI 7% fee $ 20.00 Total $301.00 2) Install Conduit to exterior with J-box to carry all wiring for CU -1, 2, 3 (future), 4, & 5 (High Plains Mechanical's CU). Electrical $380.00 Bond & Builders Risk $ 6.00 SBI 7% Fee $ 27.00 Total $413.00 3) Install Ceiling mounted exit light in corridor B01 west of the stairs to 1st floor. Electrical $130.00 Bond & Builders Risk $ 2.00 SBI 7 % Fee $ 9.00 Total $141.00 4) Reroute existing 1 '/2' conduit (phase 1) for RTU from MDP to panel HBA. Electrical $455.00 Bond & Builders Risk $ 8.00 SBI 7% Fee $ 32.00 Total $495.00 The changes that I will be billing on the first billing for change order # 1 are as followed. Memo Dated February 4, 2003 $ 505.00 Memo dated February 18, 2003 $ 1,555.00 Above item # 1 $ 301.00 Above Item # 2 $ 413.00 Above Item # 4 $ 495.00 Total Change Order #1 $ 3,269.00 Contract Amount $168,903.00 New Contract Amount $172,172.00 If you have any questions regarding these changes please feel free to give me a call. Thank you. C. C. Steve, City of Ft. Collins To: Shaun, Aller * Lingle Architects From: Brian, Sinnett Builders, Inc. Date: February 25, 2003 Fax: 1 Page Subject: Cable 27 Studio - Insulation Price To provide and install the insulation and vapor barrier on the four exterior foundation walls. If you have any questions give me a call. Thank you. Applied Drywall $823.00 Bond & Builders Risk $ 14.00 SBI 7 % Fee $ 60.00 Total $897.00 C.C. Steve, City of Ft. Collins