Loading...
HomeMy WebLinkAboutRFP - P867 SUSTAINABILITY MANAGEMENT SYSTEM 15004REQUEST FOR PROPOSAL CITY OF FORT COLLINS SUSTAINABILITY MANAGEMENT SYSTEM PROPOSAL DATE: November 25, 2002 2:30PM (Our Clock) payment, the Professional shall provide the City with reproducible drawings of the project containing accurate information on the project as constructed. Drawings shall be of archival quality, prepared on stable mylar base material using a non -fading process to prove for long storage and high quality reproduction. 9. Monthly Report. Commencing thirty (30) days after the date of execution of this Agreement and every thirty (30) days thereafter, Professional is required to provide the City Representative with a written report of the status of the work with respect to the Scope of Services, Work Schedule, and other material information. Failure to provide any required monthly report may, at the option of the City, suspend the processing of any partial payment request. 10. Independent Contractor. The services to be performed by Professional are those of an independent contractor and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Professional's compensation hereunder for the payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose. 11. Personal Services. It is understood that the City enters into this Agreement based on the special abilities of the Professional and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Professional shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City. 12. Acceptance Not Waiver. The City's approval of drawings, designs, plans, specifications, reports, and incidental work or materials furnished hereunder shall not in any way relieve the Professional of responsibility for the quality or technical accuracy of the work. The City's approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement. PSA 05/01 5 13. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default. 14. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees and costs incurred because of the default. 15. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 16. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. PSA 05/01 6 17. Special Provisions. [Optional] Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit "_", consisting of ( ) page[s], attached hereto and incorporated herein by this reference. THE CITY OF FORT COLLINS, COLORADO M John F. Fischbach City Manager By: James B. O'Neill II, CPPO, FNIGP Director of Purchasing & Risk Management DATE: ATTEST: City Clerk APPROVED AS TO FORM: Assistant City Attorney [Insert Professional's name] or [Insert Partnership Name] or [Insert individual's name] Doing business as [insert name of business] Title: CORPORATE PRESIDENT OR VICE PRESIDENT Date: ATTEST: Corporate Secretary PSA 05/01 W (Corporate Seal) REQUEST FOR PROPOSAL Proposal Number P-867 The City of Fort Collins Natural Resources Department ("NRD") is seeking assistance from qualified consultants to design and implement a Sustainability Management System ("SMS"). Written proposals, four(4) will be received at the City of Fort Collins' Purchasing Division, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80521. Proposals will be received before 2:30 pm. (our clock), November 25, 2002. Proposal No. P-867. If delivered, they are to be sent to 215 North Mason Street, 2"d Floor, Fort Collins, Colorado 80521. If mailed, the address is P.O. Box 580, Fort Collins, 80522-0580. Questions concerning the scope of the project should be directed to Project Manager, Michelle Pawar Natural Resources Director (970) 221-6263. Questions regarding proposals submittal or process should be directed to James B. O'Neill II, CPPO, FNIGP at (970) 221-6775. A copy of the Proposal may be obtained as follows: 1. Call the Purchasing Fax -line, 970-416-2033 and follow the verbal instruction to request document #30867. 2. Download the Proposal/Bid from the Purchasing Webpage, www.fcqov.com/purchasing. 3. Come by Purchasing at 215 North Mason St., 2°d floor, Fort Collins, and request a copy of the Bid. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision -making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Sincerely, ,Jam s B. O' eill II, CPPO, FNIGP i ctor of Purchasing & Risk Management 2 REQUEST FOR PROPOSALS FOR CITY OF FORT COLLINS NATURAL RESOURCES DEPARTMENT SUSTAINABILITY MANAGEMENT SYSTEM I. SCOPE The City of Fort Collins Natural Resources Department ("NRD") is seeking assistance to design and implement a Sustainability Management System ("SMS"). The SMS should provide the City with a systematic approach to integrate the management of sustainability and provide a roadmap to the City so that it can ultimately integrate ongoing regulatory, economic, fiscal, growth and environmental changes. The NRD will seek guidance from the consultant to apply the SMS in the following ways: ■ To develop a systematic approach to implement sustainable practices within the City, using the 1992 Framework for Environmental Action (a comprehensive policy document for the NRD), the City's Sustainability Inventory, and the City's existing Environmental Management System ("EMS") as the baseline, and; ■ To provide the City with the design and foundation to implement a SMS. II. BACKGROUND Sustainability is a frequently used and often differently applied concept. The NRD aims to establish a standard definition of sustainability within the City based on three fundamentals —the environment, quality of life/social aspects and the economy. The City has done some work that provides a foundation for developing an SMS. Existing City documents and programs include: Framework For Environmental Action — This 1992 policy document provided general direction and a 5 year implementation work plan to support environmentally sound management practices with the City organization; ■ Sustainability Inventory — In the final stage of completion, this is a comprehensive inventory that, using specific indicators, identifies the impacts of the City's programs and operations. ■ Draft Environmental Management System ("EMS")- The draft EMS was completed in 2001. The City seeks to develop a more comprehensive and integrated system to ensure City policies and operations apply sustainability principles. III. APPROACH The Consultant should define and describe a proposed approach to the project. Options identified by staff include the following, though applicants are encouraged to provide additional approaches: 3 1. Upgrading the existing EMS and Framework for Environmental Action to achieve operative principles of sustainability; 2. Establishing an original design of an SMS that complements existing initiatives and policies that can be deployed throughout the organization; or, 3. Designing a phased approach of the SMS so that implementation can be pursued by degree. IV. SUSTAINABILITY MANAGEMENT SYSTEM ("SMS") OBJECTIVES This SMS should achieve the following objectives: 1. The SMS should provide the City with a systematic approach to identify opportunities within operations, management, policies and programs where the three cornerstones of sustainability can be considered providing context and balance. 2. The SMS should provide the City with a tool to take into consideration potential future impacts and aspects to maximize opportunities for balance of priorities (i.e., economic, environmental and social). 3. The SMS should bridge the gap between the acknowledged improvements that have been realized by the existing EMS, and the missed opportunities for even greater organizational change that can result from a comprehensive analysis of improvement and integration opportunities. 4. The SMS should significantly enhance the City's ability to anticipate and respond to the changes brought on by growth. 5. The SMS should include procedures and measures that can be applied and maintained programmatically to provide ongoing feedback to monitor the City's progress. 4 V. REVIEW AND ASSESSMENT Professional firms will be evaluated on the following criteria. These criteria will be the basis for review of the written proposals and interview session. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and 5 being an outstanding rating. WEIGHTING QUALIFICATION STANDARD FACTOR 2.0 Scope of Proposal Does the proposal show an understanding of the project objective, methodology to be used and results that are desired from theproject? 2.0 Assigned Personnel Do the persons who will be working on the project have the necessary skills? Are sufficient people of the requisite skills assigned to theproject? 1.0 Availability Can the work be completed in the necessary time? Can the target start and completion dates be met? Are other qualified personnel available to assist in meeting the project schedule if required? Is the project team available to attend meetings as required by the Scope of Work? 1.0 Motivation Is the firm interested and are they capable of doing the work in the required time frame? 2.0 Cost and Do the proposed cost and work hours Work Hours compare favorably with the project Manager's estimate? Are the work hours presented reasonable for the effort required in each project task orphase? 2.0 Firm Capability Does the firm have the support capabilities the assigned personnel require? Has the firm done previous projects of this type and scope? 5 Reference evaluation (Top Ranked Firm) The project Manager will check references using the following criteria. The evaluation rankings will be labeled Satisfactory/Unsatisfactory. QUALIFICATION STANDARD Overall Performance Would you hire this Professional again? Did they show the skills required by this project? Timetable Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? Completeness Was the Professional responsive to client needs; did the Professional anticipate problems? Were problems solved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge a) If a study, did it meet the Scope of work? b) If Professional administered a construction contract, was the project functional upon completion and did it operate properly? Were problems corrected quickly and effectively? 1 PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and , [insert either a corporation, a partnership or an individual, doing business as 1, hereinafter referred to as "Professional'. W ITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Professional agrees to provide services in accordance with the scope of services attached hereto as Exhibit "A", consisting of ( ) page[s], and incorporated herein by this reference. 2. The Work Schedule. [Optional] The services to be performed pursuant to this Agreement shall be performed in accordance with the Work Schedule attached hereto as Exhibit "B", consisting of ( ) page[s], and incorporated herein by this reference. 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated within ( ) days following execution of this Agreement. Services shall be completed no later than . Time is of the essence. Any extensions of the time limit set forth above must be agreed upon in writing by the parties hereto. 4. Early Termination by City. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. PSA 05/O1 2 All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following addresses: Professional: City: With Copy to: In the event of any such early termination by the City, the Professional shall be paid for services rendered prior to the date of termination, subject only to the satisfactory performance of the Professional's obligations under this Agreement. Such payment shall be the Professional's sole right and remedy for such termination. 5. Design, Project Indemnity and Insurance Responsibility. The Professional shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by the Professional, including but not limited to designs, plans, reports, specifications, and drawings and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold harmless the City, its officers and employees in accordance with Colorado law, from all damages whatsoever claimed by third parties against the City; and for the City's costs and reasonable attorneys fees, arising directly or indirectly out of the Professional's negligent performance of any of the services furnished under this Agreement. The Professional shall maintain commercial general liability insurance in the amount of $500,000 combined single limits, and errors and omissions insurance in the amount of 6. Compensation. [Use this paragraph or Option 1 below.] In consideration of the services to be performed pursuant to this Agreement, the City agrees to pay Professional a fixed fee in the amount of ($ ) plus reimbursable direct costs. All such fees and costs shall not exceed ($ ). Monthly partial payments based upon the PSA 05/O1 3 Professional's billings and itemized statements are permissible. The amounts of all such partial payments shall be based upon the Professional's City -verified progress in completing the services to be performed pursuant hereto and upon the City's approval of the Professional's actual reimbursable expenses. Final payment shall be made following acceptance of the work by the City. Upon final payment, all designs, plans, reports, specifications, drawings, and other services rendered by the Professional shall become the sole property of the City. 6. Compensation. [Option 1] In consideration of the services to be performed pursuant to this Agreement, the City agrees to pay Professional on a time and reimbursable direct cost basis according to the following schedule: Hourly billing rates: Reimbursable direct costs: with maximum compensation (for both Professional's time and reimbursable direct costs) not to exceed ($ ). Monthly partial payments based upon the Professional's billings and itemized statements of reimbursable direct costs are permissible. The amounts of all such partial payments shall be based upon the Professional's City -verified progress in completing the services to be performed pursuant hereto and upon the City's approval of the Professional's reimbursable direct costs. Final payment shall be made following acceptance of the work by the City. Upon final payment, all designs, plans, reports, specifications, drawings and other services rendered by the Professional shall become the sole property of the City. 7. City Representative. The City will designate, prior to commencement of work, its project representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the project. All requests for contract interpretations, change orders, and other clarification or instruction shall be directed to the City Representative. 8. Project Drawings. [Optional] Upon conclusion of the project and before final PSA 05/01 4