Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5767 LEMAY AVENUE WIDENING PROJECT (17)SECTION 00300 BID FORM PROJECT: LEMAY AVENUE WIDENING PROJECT; BID NO. 5767 Place Fort Collins Date 3/11/03 1. In compliance with your Invitation to Bid dated 2/1()/03 and subject to all conditions thereof, the undersigned Tarco, Inc. a **(Corporation, Limited Liability Company, I Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of Sa of Rid Amnnnt ($ Instructions to Bidders. in accordance with the Invitation To Bid and 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: St. Paul Fire and Marine Insurance Company 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR. under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through 1 7/56 Section 00300 Page 1 JEFF COPELAND VICE PRESIDENT OF ADMINISTRATION I CONTROLLER TARCO, INC. PROFESSIONAL Mr. Copeland has twenty-seven years construction accounting experience with EXPERIENCE: three different heavy/highway construction companies including multi -state operations. He also has two years of direct field construction experience. PRIOR • 1990 — Present TARCO, Inc. EXPERIENCE: VP Administration / Controller • 1985 -1990 Tricon Kent Controller • 1972 —1985 Interstate Highway Construction, Formerly Eisenhower Construction Co. Controller RESPONSIBILITIES: . Coordinate all accounting functions and office administration • Ensure timely and accurate financial reporting to owner, bonding company, and other financial institutions • Manage all annual audits, movement of cash is profitable manner • Oversee corporate insurance program ADDITIONAL B.A. Michigan State University CREDENTIALS: TARCO, Inc. Partners for the Nest Generation JOHN F. WEST EXECUTIVE VICE PRESIDENT TARCO, INC. PROFESSIONAL Mr. West started with TARCO as an equipment operator and progressed EXPERIENCE: through the roles of foreman, estimator, project manager, area manager, operations manager, and finally Executive Vice President. John has gained 27 years of construction related experience. PRIOR 1997 — Present TARCO, Inc. EXPERIENCE: Executive Vice President • 1983 -1997 Flatiron Structures Company, LLC Operations Manager • 1977 -1983 Flatiron Paving Company Project Manager RESPONSIBILITIES: • General management functions including oversight of work procurement, production and overall company administration. • Act in concert with the Company owners in developing and implementing strategic plans, identifying and establishing new or complementary markets, and instituting policies and procedures. • Actively manage and preserve our current relationships with clients, vendors, subcontractors, outside agencies and support firms while developing new relationships as identified by our strategic plans. • Serve on behalf of the Owners as an initial point of contact with the current TARCO management staff in the areas of performance reviews, salary recommendations, grievances, training, promotions, and termination's. • Recruit and train new personnel in accordance with current demands and in anticipation of strategic opportunities. ADDITIONAL Mr. West has been involved in the following major projects: CREDENTIALS: Bromley Lane, Colorado Dept. of Transportation • Briargate Interchange, CDOT • Prospect Street over Poudre River, Larimer County, Colorado • Littleton Railroad Depression, CDOT • Santa Fe Relief Route, New Mexico DOT • Lawyer's Canyon Bridge, Idaho DOT • 1-25 @ 58"' Avenue, Phase 11, III and IV, CDOT • El Rancho Interchange, CDOT • 20`h Street Depression and HOV Lanes, RTD • MAC Line, Light Rail Corridor, Phase 11, RTD • Denver International Airport, Pena Blvd. 401" to 64"' Avenue TARCO, Inc. Partners for the :Nett Generation JAMES M. WEDDING SENIOR MANGER, ENGINEERING & ESTIMATING TARC0, INC. PROFESSIONAL Mr. Wedding started with TARCO as a Project Manager and Estimator. EXPERIENCE: After spending a short time with a firm in New York, James returned to TARCO as our Senior Manager of Engineering and Estimating. Mr. Wedding oversees a team of thirteen Project Managers/Estimators and two Project Manager Assistants. James has gained 9 years of construction related experience. PRIOR 0 2001 - Present TARCO, Inc. EXPERIENCE: Senior Manager Engineering and Estimating • 2000 — 2001 Halmar Builders of New York Project Manager • 1998 — 2000 TARCO, Inc. Project Manager/Estimator • 1993 —1998 Flatiron Structures Company, LLC Quality Control Manager/Project Engineer RESPONSIBILITIES: • Responsible for over -site of estimating and project management for Metro Denver public, private and commercial construction projects. • Overall management of projects, owner negotiations, and coordination between field and office functions. • Training of company protocol and procedures, utilization of estimating and financial software to team members. • Negotiation of contracts and billings. ADDITIONAL 0 B.S. - Civil Engineering — Colorado School of Mines 1996 CREDENTIALS: 0 Committee Member — Colorado Contractor/DOT Committee • Registered Engineer — State of Colorado • Certified in CPR and Adult First Aid • Completed OSHA 8 Hour Site Supervisor Training • Completed OSHA 10 hour Training • Completed OSHA Fall Protection Training • New York City Transit Track Safety Certification Mr. Wedding has been involved in the following major projects: • Staten Island Railroad Signal Modernization, NY • Eisenhower/Johnson Memorial Tunnel Relining, CO • E-470 Public Tollway, CO • Bill Emerson Memorial Bridge, MO • Casco Bay Bridge Replacement, ME • 6`h Avenue Widening, CO • Stroh Ranch 7B Drainage Channel, CO TARCO, Inc. Partners for theNext Generation JAMES M. WEDDING SENIOR MANGER, ENGINEERING & ESTIMATING TARCO, INC. • Phil Long Southwest Autopark, CO • Chatfield Green Pump Lift Station, CO • SH 34 Bridge Replacement, CO • U.S. 6 Bridge Removal, CO • Lambert Ranch, Phase 1-III, CO • Willow Springs 15, CO • Saddle Rock Phase 2 & 3, CO • Newlin Gulch, CO • Design/Build E470 Public Tollway, CO • 581h Avenue Interchange, CO • Evergreen Parkway Flyover, CO • 1-25 Over 62"d & D&RGW RR, CO TARCO, Inc. Partners for the ;Vest Generation m Northern Area Office " ij t� �;7rI 7 4ir4r�r 1401 Riverside Ave., Suite 3 o Frt Collins, CO 80524 r ... (970) 493-9006 • FAX (970) 493-9022 LORING R. KNUTSON P.E, CONSTRUCTION EXPERIENCE POSITION: Northern Area Manager CONSTRUCTION RELATED EXPERIENCE: 24 Years RESPONSIBILITIES: General management functions of the Northern Area office including oversight of work procurement, production and overall administration. Participation in the Senior Management Team to develop and implement strategic plans, identify and establish new or complementary markets, and institute Policies and procedures. Actively manage and preserve relationships with clients, vendors, and subcontractors, outside agencies and support firms while developing new relationships as identified by our strategic plan. PRIOR EXPERIENCE: 1977 to 1979 Wyoming Highway Department 1979 to 1984 Corn Construction Co. 1984 to 2000 Lafarge Wide range of experience including Project Engineer, Estimator, Project Manager, Division Manager, and Regional Construction Specialist. As Project Engineer for the State of Wyoming my duties included supervision of contractors operations to verify conformance with plans and specifications. Also managed surveying and quality assurance personnel. Experience with private construction firms includes project cost development, schedulin administration, budgeting, planning, and employee g, project management. MAJOR PROJECTS: Grand Junction Airport Runway and Taxiway Rehab Various Subdivisions — Grand Junction Area I-80 Rehab East and West of Laramie Various Subdivisions — Fort Collins Area Front Range Airport Runway and Taxiway Construction I-25 Rehab — Colorado City North and South I-25 Rehab — Owl Canyon to Wyoming Line Eagle County Airport — Runway Rehab 1-70 Eagle to Colorado River 1-70 Eisenhower Tunnels to Silverthorn An Equal Opportunity Employer TARCO, Inc. Major Completed Projects d Vista Ridge Utilities - Filings L, M d N (Ene. CO) TARCO, Inc. Project Manager- Gary Single DR Horton Vote Ridge Orders - This lob includes all the ufil'Ibes for filings 1, M. and N as wall as Me storm sewer Thn contract is a ueay lob xnd Includes se00 LF of 8'sewer mom wrlh a 4' uncommon 10MO LF of a- wale, main. 235 4saver semces. 236 -V.- water seances. end 3020 LF of .form sewer varymg from ta- - 24' Sewer depots va,v from 12 - 20' This project is valued at. Original Completion Date: Anticipated Completion Date: Latimer County Bridge Replacement (Fort Collins. CO) TARCO Inc., Project Manager Northern Division Project involves the removal of a 50-foot wide vehicular e and replacing it with a box culvert, This project is valued at. Original Completion Date: Anticipated Completion Date: Joe Van (303), $1.538, 171,00 August 200: September 200; Bill Geiser Todd Juergens (970) 498-5711 Murphy Creek Filing 4, 5 & 66 (Brighton, CO) TARCO, Inc. Project Manager- Gary Single DR Horton Utilities, Storm, Sanitary, and Water (10,270+LF o16"-8" DIP 18,200+ LF of 4" - 12" PVC, and 5540 IF of Class it RCP).) $149,827.00 I This project is valued at: August 2002 Original Completion Date: August 2002 Anticipated Completion Date: Mlaatles Overlot 6 Frico Ditch Work (Broomfield, CO) TARCO, Inc. Project Manager- James Wedding The MldClties Metro District #1 Ken Construction Management and General Contractor for Commercial (303) 6 Development of a business loop in Broomfield. The scope of work included ovefPol grading, 72" RCP, water. sanitary and roadway Joe (303) 75 $1.345,278.00 November 200: September 200: estminster, CO) TARCO, Inc. Project Manager- Sundara Didde e Well, Company Joseph ;o as subconbeged to The Weft Connor my to do the ads uw ood, for the project. (303) are Wiling in 42' RCP ppes, 38' RCP for storm prior, sanaary pipe and water forth' building. The Voted requires coordination will, other contmdota working e see and calk for good advance planning. project is valued at $2.810 416.00 I This project is valued at: nal Completion Date: June 1999 Original Completion Date. ipated Completion Date: August 2002 Anticipated Completion Date: ;on for Schedule Change: Additions to scope of work by Chanae Order oe­,.., r.., c_w_...,_ $223,472.50 July 2002 August 2002 Eagle View Renaissance Suites at Flatiron (Denver, CO) TARCO, Inc. Project Manager- Kevin Marsh (Broomfield, CO) TARCO, Inc. Project Manager- James Wedding Skyland Meadows `Tum-keY Bill Swalling Turner Construction Company That Voted as General Construction Services for a A1ega development urplact Mat intludes ovedot graditg, wbexcavation. water, sanitary, and storm (303) 858.0250 Todd TI'• R^"•aa"• P°fal • • •'a owwmo-ran for e. Rw.�oe aesi w.m iwaco r a sud:meamr m sw (303) 75 Jtllaes. and hard wrhpng for several hundred lok in Laed n.CO. TARCO r cweacmr, Tum.r crosarcem sw..w•,wpvulp4 mr e,. an,y Iaaa.a. sib upearamseeWeyq,kaeasiaest n, ea r.y.s,gyos lee aria.;,gale •ssfsted in ddca,, preliminary designs In order to asset Me Owner in developw a Mnoa:ap.g Them via vat N.rmy fear d.m,r mar.rssna, w.bY syalan. a,e.vuury ..forms for me p.,d, •Mama. TN pb kraese ru,yliy 1paoo spirts yad ortres,irac. arp ayysgyzaem project is valued at: nal Completion Date: ipated Completion Date: State Farm (Fort Collins, CO) TARCO, Inc. Northern Division - Bill Geiser Holder Construction Company The TARCO. Inc., NorMem Division a Sub -Contracted by Me Holder Construction Company for Me see grading, Wilding excavation, bxkel and rock eacayetion of ths printed. The srePe of work also inclW m the consbucedn of Me "Ifore isewer. Water. and storm). Gmomi; and installation of Ag base, and Cum a owner are also ncluded. This project is valued at: Original Completion Date: Anticipated Completion Date: Reason for Schedule rhanaa $3,486,175,00 1 IThis project is valued at: February 2002 Original Completion Date: August 2002 Anticipated Completion Date. $321 860.00 May 200: August 200: Main Street at Flatiron - (Broomfield, CO) TARCO, Inc. Project Manager- James Wedding Scott Sheller Coalton Acres, LLC ibbey Tr-5620 (970) 350.0565 Infrastructure ImprovementsKen - This project is directly tied into The (307) 688-5620 jeect a MitlCities CM/GC project and the MitlCiBes Ovetlot 8 Fnco Ditch Work project. The three projects are separated due to different sources of funding. $1,374,58T00 This project is valued at: $844,781.00 November 2002 Original Completion Date: December 2001 August 2002 I Anticipated Completion Date. August 2002 t change order. Reason for Schedule Chanae Change nrde, uerne s. oI L.,.h t ;.. I.__,_ Coyote Creek Filing 2 Coyote Creek Filing 3 (Fort Collins, CO) TARCO, Inc. Northern Division - Loring Knutson7353133ffl (Fort Collins, CO) TARCO, Inc. Northern Division - Loring Knutson Lifestyle Homes DLifestyle Homes Dan Gongloff This is a 7um-Key project for a residential subdivision. The (97This is a TurrrKey project for a residential subdivision. The (970) 353.1331 scope of work incudes earthwork, utilizes, and Curb and gutter. scope of work includes earthwork, utilities, and curb and gutter This project is valued at: Original Completion Date: Anticipated Completion Date: for Schedule Change: Additions to scope of work Willow Springs Filing 5-1 (Denver. CO) TARCO, Inc. Project Manager- Lonnie Bamhouse Willow Springs, LLC This project is a Turnkey Development Project consisting of 26 lots in a Residential Subdivision. The scope of work included dirt and earthwork, utilities (water, sanitary 8 storm), structures and asphalt oaving. This project is valued at: Original Completion Date: Anticipated Completion Date. Reason for Schedule Chanae'. $966,247.00 I I This project is valued at: October 2001 Original Completion Date: August 2002 Anticipated Completion Date'. ge Order Reason for Schedule Chanae Bill Klass (303)355-7706 $1.295.128 July 2002 July 2002, $1.036.977.00 November 2001 August 2002 Northridge at Park Center (Denver, CO) TARCO, Inc., Project Manager - Sundara Diode Imprimis Corporation Marcus mev,a.asativ,w.ylm.d -+aco iz .'re c..Iaa cavana., enae n d caw.. (714) 8 M m'n4 g,abp Iw'tl•'.:. 3 uM.. Iw n. d pyt atl oanNs n.w.r-o"ne uo n'ao—vOtl l.uawva.n la 13. rout wn cmlLM. IM WWip pwlmN pro EOlMdy Naa. :ups aYl.. ya w.yla,W..[hy per•rw,p I,I[M✓9.Irvclua o•Va"N GM itu. @'�xn al..mll"ar[.n N. vC WwldJua 1L02 project is valued at: nal Completion Date' 1pated Completion Date'. $364,413.00 June 2002 July 2002 Punch list items. TARCO, Inc. Major Completed Projects �i is Sister Drainage Improvements rewood, CO) TARCO, Inc. Project Manager- Gary Single Horton Darwin contract is for the drainage Improvements as well as cum. gutter (303) 79 sidewalk of approximately 40OLF at the Beers Sister Dairy There are four residential driveway Improvements due to the now street Th15 project is valued at. $140,832.00 Original Completion Date. May 2002 Anticipated Completion Date: July 2002 Reason for Schedule Change: Additions to scope of work by Change Order (Cheyenne, WY) TARCO. Inc. Northern Division - Gene Mi Laramie County Scott Cowley, AVI This project Involves the construction of a 10-foot concrete (307) 637-B017 bikeway in the City of Cheyenne. This project is valued at $481.310.00 Original Completion Date: July 2002 Anticipated Completion Date: July 2002, Reason for Schedule Chang. .... ---- —" (Cheyenne, WY) TARCO, Inc. Northern, Division - Gene Malone CSU - Master Storm Drain Phase II (Greeley CO) TARCO, Inc. Northern Division EMJ Corp. -Bill Geiser EarthmOving, underground Utilities, 8 Concrete Structures Drew CSU - Purchasing Department Jim Stoddard (need detailed description) (970) 580-1210 General Contracting services for large diameter stand dram improvemema arw flood conlml improvements. QuantitiesInauded 3,500 feet (970) 491-0138 of storm pi wain sizes ranging from 27' up to 72' RACP. The work included two borings across major arterial roadways on me campus. This project is valued at: $2,937,581,00 This project is valued at: Original Completion Date. February 2002 Original Completion Date: 00 $1,768,768. 8 GO Anticipated Completion Date: June 2002 Anticipated Completion Date: January 02 Reason for Schedule Change _ Punch list items. Reason for Schedule Cnanne� rnrernn e,ne„a-. ....:,_ �.___.:_. June 2002 _._ .. _ castle Pines 932.J (Castle Pines, CO) TARCO, Inc. Project Manager- Sundara Diode Fidelity Castle Pines, Ltd. Lonnie Phelps Grading for Road, snake and Erosion ConeoL Tarco has completed the earthwork (303) 68"00 n mar -sot gradi^g and erasion conow measures. We moved ...no 200,000 Cy of 1lrt wren our pmiea schedule. All the land development al Castle Pines Village [hat nok pace m various phases was done by Term, Inc. We are also sending a uoposal for curb and gutter valued at $115.01. Project is valued at: nal Completion Date: Ipated Completion Date: $286.349 June 200; June 200; Murphy Creek Curb & Gutter Filing 1,3, & 4 _ (Brighton, CO) TARCO, Inc., Project Manager- Ryan Calkins Richmond Homes Kent This project consists of approximately 25,450 If o1 cum and gutter (303) 128,740 SF of 4-foot sidewalk, 3100 SF of 5-toot sidewalk, 4100 SF of 10-toot sidewalk, and 12,650 SF of a 23-foot wide driveway. This project is valued at: Original Completion Date: Anticipated Completion Date'. (Colorado Springs, CO) TARCO, Inc. Southern Division -,Tim Rank South West Affordable Housing Clayton Multi Family Site- Sub -Ex and Import (need detailed description (719) 63 This project is valued at: Original Completion Date: Anticipated Completion Date: Reason for Schedule Chanae (Denver, CO) TARCO, Inc. Project Manager- Gary Single Somerset Meadows This project consists mainly of over lot grading of approximately 300,000 CY of material, it also includes 2 ponds and a cockle channel. $800,135.00 This project is valued at: November 2001 Original Completion Date: June 2002 Anticipated Completion Date: Richmond. Reason for Schedule Change Murphy Creek Mississippi Utilities (Snghton, CO) TARCO, Inc., Project Manager- Ryan Calkins Murphy Creek Metropolitan District Larry Genera Cwesecting services for construction of 41 feet of deep sanitary, (303) 1 600 feel of water line, and several hundred feet of storm pipe that ranged tri 18- RCP up to 72' RCP, and miscellaneous eanhwork gems. The saniaryline reached depths of up to 45' fmm road grade. This project is valued at: Original Completion Date: Anticipated Completion Date: Reason for Schedule r.hann. canterberry Crossing Filing 24 & 26 (Denver, CO) TARCO, Inc., Project Manger - Gary Single Canterberry Crossing Metropolitan District Box Culvert & Storm Sewer - This was a 130LF x 10LF golf can underpass with rock veneer facing: the storm sewer has been put on hold at this stage. $1,076.502.00 I (This project is valued at: Nov-07 Original Completion Date: Mai Anticipated Completion Date: $893,814.00 June 2002 June 2002 NIA John (303). $495,265.00 June 2002 June 2002 Tom Slagle (303) 793-0220 $272,001 The Woodlands Filing 12 Epple Park Pond (Castle Rock, CO) TARCO, Inc., Project Manager- Andrew Clem (Greeley, CO) TARCO, Inc. Northern Division Tembrook Ovedot Grading Gregg Epp City Greeley Bert Leautrand This project is valued at: (303) 706.7869 Removeve existing 4e' CMP a miles 14x6x128' Doubts CIP Box Culver (970) 352-2801 Completion Date: $234.1 75.00 This project is valued at: $232,665,00 Anticipated Completion Date: Moy-02 Original Completion Date: May-02 Reason Reason for schedule change May-02 Anticipated Completion Date: May-02 N/A Reason for Schedule Ch e: NIA Murphy Creek Filing 10 & 11 ACT Dealer Account Center (Brighton, CO) TARCO Inc., Project Manger - Ryan Calkins (Aurora. CO) TARCO, Ic. Project Manager- Noel Palmer Murphy Creek Metropolitan District Earthwork Larry Summers Shockman Construction Rodney Heitmann This pro is valued at (303) 770-0200 Earthwork, Paving, Utilities, & Curb & Gutter (561) 750-8288 ^act Original Completion Date: $295.017 .00 This project is valued at: $1.923,060.00 Anticipated Completion Date: Feb-02 Original Completion Date: 04102 Reason for Schedule Change May-02 Anticipated Completion Date: 1-De Reason for Schedule Change Chan e Orders TARCO, Inc. on Lane. LLC & Grub, Earthwork, & Utilities 970.00 ipated Completion 04/02 lal Comolebon. 1 1 /01 Lonnie Phelpsl I Farmers Highline Canal f303)669-23141 I Box Culverts & Outlet Structure Completion: 03/02 - Gary Curt Aid (303)451- Cherry Creek Spillway Trail - Jim Turachak Raleigh Ridge - Gamette Jackson City of Aurora Mike Miller T.C. Properties 10' Bike Path $407,647.50 (303) 739-716 Earthwork, sanitary, storm 8 water Cy Butt (303) 255-351 Anticipated Completion 04/02 $860,450.00 Original Completion 10101 Anticipated Completion: 03/02 Original Completion 08/01 Farmer's Highline Canal Lining Ph I - Gary Single Eagle Ridge - Northern Division Farmer's Highline Canal Curt Aldstad M.J. Gensch GCL Lining of Canal (303) 451-7604 Sanitary & Water M.J. Gertscr $511,344.00 $496 471 25 (303) 638-0651 Anticipated Completion 03/02 Anticipated Completion 02/02 Ori final Com letion 03/02 Original Completion, 11/01 Rock Creek #21 - Gary Single Phase 1 Christensen Rd. Richmond Homes Kevin Berryhill Cheyenne Leads Subex for Lots (303) 220-4403 Construct New Road Jack Cr ews $271,000.00 $512,570.00 (303) 637-601 Antici atetl Completion 02/02 Ori inal Com letion 03102 Completed 12/01 Willow Brook - Northem Division Brian Groves Lone Tree Apartments Village Homes Earth & Concrete Work (303) 795-1976 Carmel Contractors. LLC Ken Kuyk $988.365.34 Commercial (303) 691-3221 Anticipated Completion: 0 $687,987. 10 Original Completion 11/011 Completed: 11/01 Quail Valley Castlewood Ranch #47 Melody Homes Subdivision Tim Kratz Castlewood Ranch, LLC Larry Reichert $446.183.12 Scott Stordahl Install Sanitary, Water, and Storm (303) 773-288 (303) 466-1831 $575,515.25 Corn letetl: 12/01 Completed: 11/01 Circle Point Corporate Center Romar West Catellus Earthwork Gardiner Hammond Romer Mirage LLC Stephen Mimna ugh $326,000.00 (303) 980-7726 $5,449,203. 85 (303) 986-222 Corn feted: 11/01 Completed: 11/01 Lambert Ranch Road Improvements Phase 3 Highlands Ranch Filing 122-T Valley Development Group, LLC Stan Brown Ryland Homes Road Improvements (303) 972-0919 Sub -Excavation Pat Quar anta $314,535.00 (303) 220.023 Completed 11/01 $392,938.00 Completed: 10/01 Jewell Gardens Big Dry Creek East of Huron Cedar Crest Overlot grading, Utilities, Asphalt paving Tony Bourg Westminster, City of Sheila Beisse $520,951.00 (303) 813-9979 Box Culvert & Excavation (303) 430-24 00 Completed 10/01 $457.443.95 Completed 10/01 Skyline Estate Bridge Turkey Creek Bridge Melody Homes Badge Tim Kratz Chimney Rock Metro Dist. Bill Klaes $376,236. 75 (303) 466-1831 Box Culvert (303) 355-7706 Antici atetl Completed. 10/01 $360,348.50Completed: 10/01 Saddle Rock Ridge Filing #3, Phase 3 River Run Filing #4 U S. Homes Utilities & Structures Chad Hammel) M Homes Tim Kratz $1,254,947.00 (303) 779-6100 Subdivision sion (303) 4661831 Corn feted: 10101 $353,08,80 Completed: Corn letetl: 08/01 Willow Springs Filing #5&6 Washington Center Willow Springs North. LLC Turnkey Subdivision Steve Kcmbrust Carmel Construction, Inc. Ken Kuyker, 513,50C 00 00 00 (303) 694-1992 Earthwork. Utilities & Structures 3031 69I-322 Co C orn feted. 09/0t $1, 896,134. 80 Completed 08/01 TARCO, Inc. 7 Major Completed Projects savannah Castlewood Ranch Planning Area 28 Aelotly Homes Tim Kral Castlewood Ranch LLC 'subdivision (303) 466-1831 Utilities & Concrete Structures Larry F 366,842.52 .... ,,,,, -- (303) 77 Castlewood Ranch Area 44A Murphy Creek Filing 5 Sub -Excavation Castlewood Ranch LLC Larry Reichert Ryland Homes Sanitary, Water, & Storm (303) 773-2887 Sub -Excavation Pat Ouarant $446.000.00 $384.320.00 (303) 220.023 completed 08/01 Completed: 07101 Castlewood Ranch 38B Utilities Murphy Creek Filings 1.8 Castlewood Ranch LLC Larry Reichert Alpert Companies Utilities (303) 773-2887 Overlot Grading Larry Summers $344,458.00 $897.950.00 (303) 525< Completed 07101 Completed 07/01 Bayside Circle Willow Springs 15 —Falcon Ridge Construction Greg Hughes Moorcal Properties Water Wat, Sewer, Underdrain. Storm Sewer (970) 674-0440 Turnkey Development Wendell Tuck $225,508.32 $829,482.00 (303) 763-577 Com leted: 07/01 Completed 07/01 Lambert Ranch Road Improvements Phase 1 Pace St Box Culvert Valley Development Group, LLC Stan Brown Melody Homes Road Improvements (303) 972-491 Box Culvert Tim Kraru $390,405.25 $391.944.00 (303) 466-1831 Com Ietetl: 07/01 Completed: 07101 Westmoor Technology Infrastructure Aurora Sports Park Phase II Countrydale Metro Distinct Dave Seagraves Valley Crest Site Development 892-1111 Eanhwork & Box Culverts Tim Heartih(303) $i 383,866.85 $412,108.00 (303) 841 -8400 Com Ietetl: 07/01 Completed 07101 Piney Creek Village Rocking Horse Farms II Piney Creek Village, LLC &Richmond Homes Steve Prokopiak Tuscany Properties, LLC Earthwork 8 Erosion Control Centre Land Overlot Grading, Channel, & Utilities Joe Ho pe $1,003,781.30 (303) 573-0066 $1,122,144.00 (303) 216-2 443 Completed: 07/01 Completed: 07101 ambert Ranch Road Improvements Phase 11 Willow Run Shopping Center alley Development Group. LLC Stan Brown RubloR / Willow Run LLC [RoadImprovements 79,158.05 (303) 972-4919 Tumkey - Earthwork, Utilities, Landscaping, C&G, Asphalt Tom Olden Mark Campbel leted: 07/01 $2,974,778.00om (303) 5341 Completed, 07/01 Filing #27 Lynx Custom Lots Sunrise Ridge Oftsite Phase I North Pines Development, Inc. Chris Fellows U.S. Home Turnkey $1,600,000.00 (303) 795-990 Right of Way Road Improvements Vamell Roberts (303) 779-61 00 Com Ietetl: 07101 $1,557,764.00 Completion. 05101 Red Hawk Filing #2 Ridge @ West Meadows Campus US Home Corporation Vamell Roberts Alliance Construction Tumkey Subdivision (303) 779-6100 Grading & Riprap Scott Josli $3,299, 916.20 m CoIetion: 05/01 $295 467.00 (970) 482-7722 Completion 02/01 Rock Creek Filing #22 Crotten Park Richmond American Homes Gerald Montgomery Village Homes Storm Sewer $413.727.00 (303) 220-4403 Res. Overlot & Subexcavation Ron Hetti nget (303) 795-197 Correlation: 05/01 $821,814,18 Completion: 02/01 Stonegate Filing to Warren Farms Infrastructure W erlot a Stonegate Grading Phil Luna Warren Farms Can Co., LLC Burt Boothb $963,436.30 $963,4 (303) 706-7862 Infrastructure (303) 773 9009 Com Ietion. 02/01 $1.044,023.40 Completion: 01/01 Rock Creek Ranch Filing 21 & 23 Cherrywood Filing 3 & 5 Richmond American Homes Overlot Grading Geraid Montgomery Richmond American Homes Gerald Montgomery (303) 220-4403 Overlot Grading (303) 220-440 Com Ietion 01/01 $296,509.35 Completion. 01/01 TARCO, Inc. Major Completed Projects Vaterton Road Alignment Hidden River Filing #12 sunset Management Alan Fishman Richmond Homes Matt )rading and Paving (303) 904-1430 Earthwork, Concrete & Riprap Jack Hi 623,810.00 i$604,505.90 7, ompletlon01/01 1r_�__._..... .... (303) Castle Pines North Detention Pond Castle Pines North Filing #14, Phase I & II Continental Homes Chris Boyd Village Homes Ron Heltinge Heltin ei Detention Pond & Channel Improvements (303) 488-0061 Overlot Grading $550.000,00 $342,487.52 (3Ro 76 Completion: 12/00 Completed. 11/00 Jefferson Corporate Center Filing 6 Meadows Filing 11, Parcel 6 Sunset Management Alan Fishman US Homes Chad Hamel Turnkey Commercial Site (303) 904-1430 Utilities & Structures (303) 779-6100 $863,341,00 $590 906 00 Completed 11100 Completed 11/00 Saddle Rock Ridge East Filing #3 — Phase 2 Bromley Park Filing #5 US Homes Chad Hamel The Bromley Company. LLC Steve Sabe fi Utilities $592.492,00 (303) 779-6100 Overlot Grading (303) 773-1005 $764,163.44 Completed: 11/00 Completed: 11/00 Old Tom Morris Road Extension (Murphy Creek) Harvest Park Subdivision Murphy Creek Metro. District Larry Summers Writer Homes Jim Burcz k Earthwork, Utilities & Structures �303) 525-4566 $356,081.75 y (303) 799-41 00 $1,379,746.47 Completed: 10/00 Completed: 11100 40th Ave. Phase 1 Preserve #7 & 8 Gateway Metropoliotan District Mike Serra Koelbel & Company Keith Neale Grading $350,905.00 (303) 371-9000 Overlot Grading (303) 758-35 00 Coin letion: 11/00 $329,368.60 Completed: 08/00 Sugar Creek Castlewood Ranch Earthwork Area 38A, 388, & 39 Melody Homes Overlot Grading Tim Kratz Castlewood Ranch LLC Larry Reichert $287,517.00 (303) 466-1831 Earthwork (303) 773-2887 $297,197.50 Completed: 10/00 Completed: 07/00 Sunrise Ridge Clusters Tallyn's Reach Filing #3 US Homes Vamell Roberts Came Dev. Rick Hasse ll Utilities $397,733.00 (303) 779-6100 Subdivision Utilities (303) 465-5591 Coin Ietetl'. 08100 $629,203,90 Completed: 06/00 Savory Farms Parkwood Subex BGD 11, Co Bob Gerlofs Melody Homes Tim Kratz Overlot Grading (303) 795-307 Subexcavation (303)466-1831 $318.012.00 $289,64,20 Completed 06/00 Completed: Coin Ietetl: 06/00 Castle Pines Filing #16 Willow Springs #2 Village Homes Overlot Grading Ron Hettinger Willow Springs Ranch, LLC Steve Kombrus $309.517.74 (303) 795-1976 Subdivision (303) 694-1992 $378,338.00 Completed 06/00 Completed 05/00 U.S. Highway #6 In Merino Word of Life Christian Center Colorado Department of Transportation Brad Pierce Hector Johnson Bob Cameron Bridge Demolition & Rehabilitation (970) 522-0481 Tumkey Overot (303) 480-53 90 $2,441,956.42 $449,257.60 Completed: 05100 Completed: 05100 102" RCP — Phase 2 Drainage Spyglass City of Broomfield Wally Abel Writer Joe Sewell Sewell Storm Drainage $1.655,345,00 (303) 635-229 Over Excavating (303) Completed: 05/00 $396, 892.50 Com Ietetl: 04/00 Saddle Rock Ridge East #3 Phase 1 ARV Congregate Care Facility U.S. Home Subdivision — Utilities Vamell Roberts Adolfson & Peterson Construction Don Lamphere $1,264.043.00 (3030 779-6100 Sewer, Water & Storm (303) 363-7101 Completed 05/00 $518,648.70 Completed: 04l00 TARCO, INC. EAR'fH11*10VING CONTRACTOR GENERAL CONTRACTOR Northern Area Office 1401 Riverside Ave., Suite 3 Fort Collins, CO 80524 (970) 493-9006 • FAX (970) 493-9022 STATEMENT OF BIDDER'S QUALIFICATIONS 1. BIDDER: TARCO, Inc. 2. ADDRESS: 1401 Riverside Ave., Suite 3, Ft. Collins, Colorado 80524 3. HOME OFFICE: 4781 W. 58th Ave., Arvada, Colorado 80002 4. WHEN ORGANIZED: November 17, 1977 5. STATE OF CORPORATION: Colorado 6. YEARS IN CONTRACTING BUSINESS UNDER PRESENT FIRM NAME: 24 Years 7. CONTRACTS ON HAND: Please see attached "Major Work In Progress" 8. GENERAL CHARACTER OF WORK PERFORMED: Earthwork, underground utilities, concrete structures, trucks and loaders. 9. HAVE YOU EVER FAILED TO COMPLETE ANY WORK AWARDED: No 10. HAVE YOU EVER DEFAULTED ON A CONTRACT: No 11. RECENTLY COMPLETED MAJOR PROJECT: Please see attached "Major Completed Projects" 12. MAJOR EQUIPMENT AVAILABLE: Please see attached "Equipment List" 13. EXPERIENCE IN SIMILAR WORK: Please see attached "Sampling of Completed Projects By Type" 14. BACKGROUND AND EXPERIENCE OF PRINCIPAL MEMBERS: Please see attached resumes. 15. CREDIT AVAILABLE: $50 Million 16. BANK REFERENCES: Bank of Denver 572-3600 Warren Culpepper Colo Natl. Bank 585-4180 Kelly Condon 17. LIST LICENCES CURRENTLY HELD: Please see attached "Schedule of Licenses and Permits" 18. LIMITS OF PUBLIC LIABILITY: $2 Million aggregate; $1 Million occurrence 19. COMPANY'S BONDING LIMITS: $50 Million An Equal Opportunity Employer TARCO, Inc. Major Completed Proiects � c) Red Rocks Country Club Eagle Valley Replat Red Rocks Country Club Bill Klaes Melody Homes Golf Course Revisions (303) 355-7706 Earthwork Tim $740,481.73 (303) 466 $433,536.00 Completed 04100 Tamarisk Filing #2 River Run III City of Lakewood Ron Hettinger Melody Homes Overtot Grading (303) 795-197 Ovenot Grading Tim Kra $299,041.90 $303,150,25 (303) 466-1831 Com letetl: 02/00 Completed 01/00 Rocking Horse Farms Properties, LLC Westmoor Technology No. 7 OverTuscany Grading, Channel 8 Utilities Joe Hope, Neal Calcon Construction Jim $557 6t Reno Cappelli Site Development (303) 762-1554 2-155 Completed Com letetl: 01/00 (303) 216-2443 $470,993,60 Completion: 12/00 1999 Storm Drainage - Wildcat Reserve Parkway & Culvert 20 Songbird Highlands Ranch Metropolitan District Forrest Dykstra Skyland Development Storm Drainage & Culvert (303) 791-0430 Sub Excavation Norm Montgomery $411,869.00 $559,166.00 (303) 792-0102 Completed: 01/00 Completed: 12/00 Castlewood Ranch Filing 939 Stroh Ranch #9 Filing A Castlewood Ranch, LLC Larry Reiche Melody Homes Grading & Utilities (303) 773288 Overtot Grading Tim Kra $1,302,477,50 $430.801.28 (303) 466-1831 Completion- 12100 Completion: 12100 RB-3 East & West Stream Stabilization Singletree @ CIA Filing #12 Superior Metropolitan District #1 Chris Castelli Richmond American Homes Riprap & Structures for Stabilization 303-458-55 Earthwork & Erosion Control Matt Dispel $324,9 303-773-272 Com leted: etl: 12/99 $531,825.75 Completed: 11/99 40s' Avenue Phase 1 Sunrise Ridge Onslte Phase I Sand Creek Metro District Mike Sam U.S. Home Corporation G Grading 31 Underground Utilities Vamell Roberts 303-779-61 00 Completed:$350,905,0 Completed: 11/99 $1 270 364 00 Completion 10199 Big Dry Creek City of Westminster Eagle Ridge Subdivision Earthwork & Concrete Structures David Thalmerl Genesee Company Ron Skorka $1,000,000.00 970-482-5922 Earthwork & Concrete Structures (303) 526-9 000 Correlated: 11/99 81,281,364.53 Completed: 09/99 Saddle Rock East Homes Saddle Rock G.C. South Filing #5 Phase 1&2 OverloAlpert t Larry Summers DeDecon 1,501 $1,501,882. 12 303-246-69 Utilities Com letetl: 10/99 $539,05325 Completed 08/99 Saddle Rock Ridge Filing #3 Centre Realty & Development Saddle Rock North Phase 2&3, Filing 3 Ovenot Grading John MacDonald Mooral Properties, Inc. Wendell Tucke $1,316,262.01 303-885-4058 Turnkey 303-763577 Completed 09199 $426,364.18 Completed 07199 Meadow Ranch Utilities - Phase III Jefferson Properties, Inc. Morrison-Knudsen Office Building Sanitary, Water & Storm Bill Biggi Morrison-Knudsen Don Duffy $827,590.10 (303) 973-3344 Office Building 303904-143 Completed 08/99 $670,897,40Completed 06/99 The Farms 3,4 8 6 Richmond Homes SH 34 Over Burlington Northern Railroad Earthwork Tim Johnson Colorado Department of Transportation Scott Ellis 8 35 303-773-2727 Remove 8 Replace Bridges (970) 667-467 om l Completed 06199 $2250.000.00 Completed 06/99 e OlinERoadway Mobile Denver Paving Promontory Park Offsite Watermain Reconstruction 8 Utilities Brenda Shule Canna Development c/o R.M. Hassett & Co. Rick Hassell $651,303-657-4000 65 i6' 8 24' Watermain 303-4655591 tl 06/99 $965645,00 Completed 03/99 TARCO, Inc. Major Completed Projects o �— Indlana Mount Sopris Executive 9 Club Estates Superior Metropolitan District #1 John Griffith Champlin Land Company New Box Culvert 8 Infrastructure 303-767-0959 Turnkey Victor Chant pb $1,673, 777.91 $360.869 20 Com feted 05/99 Completed 03199 Eagle Bend Phase I Gateway Park if9 U.S. Home Rusty Hansen Sand Creek Metro District Overlot Grading (303) 779-6100 Overkill Grading Mike Serra $3,835,235.05 (303) 371-900 Com feted 03/99 $830,761.68 Completed 01/99 Meadow Ranch — Earthwork Bill Biggi Pelican Lakes Golf Courses Bridges Jefferson Properties, LLC (303) 973-3344 Pelican Lakes, LLC Overlot $2,678,555.00 3 Golf Cart and Mamt. Vehicle Bridge Abutments 8 Installation Martin Lind 303-332-6702 Com feted 02/99 $350,000.00 Completed 12/98 ter City Park Phase III A Med-Ved Parking Lot stminster Dan Blankenship MEDVED Chrysler Plymouth Turnkey E$2.320,000 (3031 430-24 Parking Lot John Medved . 00 $560,4303-421-010 01/99 Completed 1 Com 12/98 Saddle Rock Golf Club Watermain Sunrise Creek Phase 1,2,3 Alpert Company Larry Summers Melody Homes 24" Walermain (303( 246-695 Ovefiot Grading Scott Stortlahl $457,983,00 303-466-1831 Com feted 12/98 $1,500,000.00 Completed 12198 Broomfield Country Club Filing #10 Meadow Ranch — Utilities #1 Eagle Trace III, LLC Bob Gerlofs Jefferson Properties, Inc. Earthwork 8 Utilities 303-795-307 Sanitary Sewer 8 Storm Drainage Bill Biggi ill Big4 $796.064. 15 Com letetl 12/98 $879,304.70 303 -9 Completed 12/98 Manhattan Beach Plum Creek Commercial Subdivision 92 Doug Solejack Turnkey Doug Bolejack Plum Creek Metro District Keith Worley $440,407.79 303-799-0728 Infrastructure 303-660.220 Com feted 12/98 $373 225 50 Com feted 12/98 West Believlew Avenue Extension Metzler Ranch Chimney Rock Metro District Steve Kornbrust Keystone Development Earthwork, Utilities, Concrete Structures (30( 694-1992 Overlot Grading 8 Clearing Greg Mclva $775,180.03 $732,520.16 303-771-353 Com letetl 12/98 Completed 10198 Quail Ridge — Phases 1 8 II Saddle Rock Ridge, Phase 1-8 Schuck Resitlenhal Tumkey Bill Schuck Saddle Rock Ridge, LLC John MacDonaltl $o69 Grading 8 Erosion Control 303-573-006 completed 72/98 eted 12 $2.288,75&00 Completed 10/98 Rock Creek Saddle Rock Ridge, Filing #1 Storm Richmond Homes Matt Diebel Centre Development John MacDonaid $732,25Grading 303-773-272 Storm Drainage 303573-0066 Completed Com letetl 10/98 1 $357,775.00 Completed 10/98 Willow Run Filing #S, Phase 5 8 6 Stroh Ranch 78 Drainage Channel Gateway American Properties Cherry Creek South Metro Distrct #1 Utilities $418,376.90 EPatKra]me 30 Box Culverts 8 Drop Structures Joe Hue 303-980-020 completed 10/98 $285,870.90 Completed 09/98 U.P.S. Facility NDC Land Syndicate Worldport Water 8 Sewer Line Sewer 8 Water Steve D.I A. Airport Office Building S761Gradinng,g. J.E. Mem Sewer 8 Water Installation letetl475 Completed l Com letetl 10/98 $467.761 00 Completed 09/98 Tuscany #3 Richmond Homes The Farms at Arapahoe County #3 Grading 8 Erosion Control Jim Richmond! Homes $396.770.00 303-773-2727 Grading 8 Erosion Control Com letetl 09/98 $374,068.79 Completed 08198 TARCO, Inc. Major Completed Projects Phil Long Southwest Autopark Kip Hampden, Ltd Ovenot Grading & Asphalt Overlay $266,909. 10 Com leted 08/98 Sunrise Creek Flling #4 Melody Homes Overlot Grading & Subexcavation $300.000.00 Com leted 08/98 Safeway- Meadow Ranch Briarwood Properties Mass Grading $335.862,00 Completed 08198 Fairmont Drive/Pelican Point Koelbel & Company Street Improvements $282.576.85 Completed 08/98 Cherry Creek Pointe Marc Baffles Turnkey $542.577.62 Completed 08198 Village Self Storage Kangaroo Equities, LLC Turnkey $360,075.00 Correlated 06/98 Jefferson Corporate Center Sunset Management Utilities $767,500.00 Completed 06/98 CTC - Farmers Hlghline Canal Golden Equities Concrete Box Culvert & Utilities $336.000.00 Completed 08/98 C.O.O.T. - NH 0341-038 Colorado Department of Transportation Loveland Box Culverts $1,470.779.17 Completed 08/98 Water Valley Utilities TROLLCO, Inc. Sewer & Storm $2.673,932.00 Completed 08198 Westwoods Ridge McIntyre Development Co., LLC Tumkey Subdivision $799,960.98 Completed 06198 Titan Road Douglas County - Public Works Pipe, Bridge Removal, Box Culvert $437.147,76 Completed 06198 E es Golf Course s, LLC 00 6/98 Chatfield Bluffs Filing $4 Sunset Management Turnkey $1,210.000.00 Completed 05198 Red Hawk Structures U.S. Home/Kombrust Development Mesa Filing #1 Inlets & Retaining Walls Richmond Homes .34 Grading g Gradin80.34 Completed 06/98 $380,3Completed 03198 Tower Park Continental Homes DeDe Denver Airpark Ovenot Grading & Erosion Control TDDevelopment $285,193.00 New ad8 ad ew Road Parking Lot Completed 04/98 $592, Completed 03/98 Water Valley Filing #2 T Beachwood Estates ,Inc. Ferguson Construction Company Pan Y $788,40345Tumkey Completed 0 Completed 03/98 $345,031.50 Completed 03/98 Sunrise Gateway Sub, Filing 1 & 2 Gateway Sixty Nine, LLC Encore At Seven Hills Earthwork & Utilities R.K.S. Development $401,644.00 Import Fill Import Fill Completed 03/98 $259, Completed 01/98 Plum Creek Commercial Filing #2 Halmby Leisure, LLC Improvements to Jefferson County Airport Subdivision Jefferson County Airport Authority $281Airport & Highway Improvements Completed 0, te01/98 $891,965.72 Completed 01/98 Gateway Village Filing #2, Phase 2 & 3 Gateway American Properties U.P.S. Utilities Utilities J.E. Merit Construction $362,400.00 Utilities Com letetl 01198 $725,152.90 Completed 01/98 TARCO, Inc. Major Completed Projects ---��- Fountaln Landfill Rock Creek Phase II of Colorado, Inc. Richmond Homes, Inc. Final Fin Grading $J07,881 D $1, 385,542. 00 Com leted etl 1 11/97 Completed 11/97 South Holly Self Storage East Weld County Landfill National Development Services, Inc. Waste Management Turnkey $31 J,540.00 Landfill, Cell, Liner, Access Road Com leted 11/97 $923,652.22 Completed 10197 Lincoln Avenue Widening Willows Run Filing 4 & 5 Douglas County Earthwork, Pipe, Paving Gateway American Properties $326.966.00 Utilities Completed 11/97 $508.331.80 Completed 10197 92"" & Pierce Self Storage Union Pacific Yard Extension National Development Services, Inc. Union Pacific Railway Turnkey Box Culvert, Retaining Wall $804,963.98 Correlated Com feted 10/97 Completed 10/97 Cherry Creek Drop Structure #19 Arapahoe County, Dept. of Highways WesHestminster ste Westminr Promenade Dewatering, Channel Improvements R.M. &Company $379,31 Utilities Com feteedd 10197 $499,769.60 Completed 09/97 Colorado Springs Airport Taxiway Sterling Hills Filing #2, Phase 1 & 2 Interstate Highway Construction Gateway American Properties Pipe Removal. Storm Sewer Sewer, Water, Storm $569.166,50 $603.896.50 Com feted 10/97 Completed 09/97 72�Avenue &pucker Canterberry Crossing Filings 7, 7A, 7B, 7C, & 8 City City Arvada Melody Homes Streett Improvements Overlot Grading $ $287,323.08 Completed 0 09/97 Completed 08/97 Colorado Centre Rampart Business Center Richmond Homes Imprimis, LLC Grading & Channel Improvements Grading, Drainage $321,000.00 Completed 08/97 Completed ted 0 Completed 08/97 Diamond Ridge Estates Filing #2 Bromley Park #1.6 T.S.T., Inc. The Bromley Company, Inc. Earthwork, Waterline Services Grading $350,324.08 om letl Cameleted 08/97 Completed 07197 Westminster Promenade R.M. Hassett &CompanyOver Red Hawk t Kombmst Development Group S481 641 481,ed Overlot Grading Com letetl 07/97 $448.456.50 Completed 06/97 Country Hills Filing #6 Gateway American Properties U.P.S. Denver South Facility Utilities E.M.I. $298 124 10 Overlot Grading Completed 06/97 $310,705.00Completed 06197 Northpark Plaza Chatfield Bluffs Filing 2 Saunders Construction, Inc. Sunset Management Overlot Grading Turnkey $328,000.00 Completed 06/97 $969,006.05 M lnlw�.. 7. Completed 04/97 _. The Villas at Cherry 1 rlorado Department of Transportation Villas at Cherry Creek Irthwork, Landscaping, Paving, Retaining Wall, 4 Lane Single Span Britlges, Box Culveq Turnkey Overlot 1_800 _000.00 Curb & Gutted 1$1,226.025.00 TARCO, Inc. Major Completed Pro "ects Stenmg Hills Filing 03 Gateway American Properties Sky Sky M ark PBG Sewer &Water t DelTurnkey $253,5 Subdivision Com leled 04/97 etl $587,344.06 Completed 03/97 Plkas Peak International Raceway Raceway Associates. LLC Tanoa/Stagecoach Road AlberUon's Earthwork, Utilities, Concrete Structures Tradition Concepts, Inc. $5 442.254.00 Earthwork Completed 03/97 $1,174,124.00 Com letetl 11/96 Rock Creek #18, #19 & Coalton Road Richmond Homes Meadows at Westwoods Grading, Erosion Control Thompson Enterprises Turnkey Subdivision Com2l$1,423ted 06 Com letetl 02/97 $3.191.083.00 Com letetl 10/96 Arapahoe Ridge Keystone Development er Overlot Grading s $405 001 00 EEarth�rk Com leted 10196 709/96 Rampart Business Park #6 Imprimis, LLC Conoco at Chatfield 8 Kipling Grading, Stonn 8 Sanitary Sunset Management Services, Inc Earthwork, Utilities, Concrete Structures Compl$589.6eted Com letetl 09/96 3 $430.000,00 Com letetl 09/% ChatfiBluffs Filing #1 Sunset M Sunset Management Services, Inc. Gateway Park #3 Utilities Turnkey Gateway Gateway Park 02 Utilities, Concrete Structures Completed 09/96 $366,353,79 Completed OB/% Saddle Rock North Filing 1 U.S. Home Goldsmith Gulch Grading, Erosion Control C City and County of Denver $518,0 Channel Improvements Com leted etl 08/% $1.713,975.00 Completed 06/96 Cherry Creek South Bcorp Polo Creek, LLC Hiwan Filin 10 gSubdivision, Roadway Improvements d Development$438.815.87 [Earthwork,o" Piping, Concrete P Com letetl 07/% /96 Village at Pinecrost Walden Company pahoe Comers Turnkey Comers $415,130.00 [Arapahoia erlot Channel Improvements, Utilities Com letetl 04/96 6,546.60m letetl 02/96 Bear Creek Filing #1 Village Homes Saddle Rock Overiot Grading, Tree Stump Removal Alpert Development $395,220,67 Subdivision Overlot Grading Completed 03l96 $308,215.04 Completed 12/95 Saddle Rock Waterlines & Sanitary Sewer Outfall CM of Aurora n Boulevard Improvements Ph I Water & Sewer Mains Metro District $546,003.80 EGrading,Utilities, Structures & Paving Com letetl 02/96 14.00 d 11195 Centennial Valley Parcel H HSG Louisville, LLC 40"' Avenue Utilities Tumkey Gateway Park $810.917.65 Storm, Water & Sanitary Com letetl 12/95 S432,431.00 Completed 10195 Blakeland Industrial Park The AnsUutz Corporation Denver Arapahoe Disposal 1995 Major Channel Improvements. Structures. Utilities & Earthwork Waste Management $772,114.35 Cell Construction for Landfill Com feted 11/95 $1,172.890.00 Completed 10/95 10 TARCO, Inc. Major Completed Projects Villages at Heron Shores Alton Street Republic Investment Company Mississippi Flats, LLC Concrete inlets, Box Culvert & Channel New Road $368,032,10 S494, 345.00 Completed 10/95 Completed 10/95 Willow Springs Filing SA, Phase J Westclitt 4 & S High River Management U.S. Home Earthwork &Utilities $468,2 Grading, Demolition & Erosion Control Com fetteded 1 10/95 $346.188.60 Completed 07/95 Perry Park East Waterline Centennial Valley Lot 3 Perry Park Water & Sanitation District HSG Louisville, LLC Waterline Turnkey Turnkey $390,277.97 09.72 $486,1Completed Com letetl 08/95 03195 Chaffee County Sanitary Landfill, Phase I Mead's Crossing Chaffee County Mead's Capitol Corporation Landfill Cell Construction Overlot Grading, Utilities, Paving $376,043.20 $1,259,508.00 Com leted 06l95 Completed 6/94 Highway 82 Superstructure Hlllcrest Hydroelectric Powerhouse Hansen Construction Denver Board of Water Commissioners Dirt, Utilities, Concrete Water Pump Station $1,088,337. 84 $1,900,000.00 Com letetl 10194 Completed 07/93 Contract F-129A, Airport Boulevard Westwoods Golf Course D. I. A. - City and County of Denver City of Arvada Taxiway Bridge to Terminal Golf Course & Subdivision $10,500,000.00 Compl$11,54eted1 / Com letetl 70l93 Completed: 05193 Contract F-128A, E-470 Chambers Lake City and Denver Water Storage & Supply Company Interchangege to to Taxiway Britlge Dam Rehabilitation $1,127,400.00 Comet ted0$8,683,037.00 Com letetl O6/93 Completed 08/92 Laidlaw Landfill Cell A E470 #1 A06 & #1802 Laidlaw Waste Systems, Inc. Edward Kramer & Sons, Inc./E-470 Authority Landfill Cell $1,406,616.00 Highway Widening - Section 1-25 to Parker Road Completed 12/92 $1,382,255.00 Completed 03192 Yak Tunnel Operable Unit C.D.O.T. #FCU 024-3 Colorado Springs Res-ASARCO Joint Venture Colorado Department of Transportation Grading & Pump House Highway 24 $2.167.750.00 $3,844,946.26 Com leted 05/92 Completed 10/91 NMSHTD Project DEJ-F-0107 E470 Project #1A01 New Mexico State Highway & Transportation Dept. E-470 Partnership Authority Highway Widening $5,175,433.92 Highway Section 1-25 to Parker Road Correlated 11/91 $7,813,084.32 Completed 12/90 Westerly Creek — Lowry Air Force Base IXFU 470.1, CXIXFU 11-0470-09, FCU 470-1 U-S. Army Corps of Engineers Colorado Department of Highways Dam Embankment $6.682,555.69 C-470 Ken Caryl to Beileview Com letetl 06/91 $7,840,506,73 Completed 10/90 Owner Contact Person Contact Phone Detailed Description (Paragraph) Value Contract Original Anticipated Amount Datet Completion Date2 Completion Change DR Horton Joe Van Aelstyn (303) 210-7404 The job is a utility contract and includes 5000 LF of 8" sewer, 5300 LF 8' This $ 996,310.00 Original Date Date September 2002 Anticipated October water main, 120 - 4' sewer services, 120 - 3/.- water services, and 2140 project Completion Completion 2002 Reason for LF of storm sewer varying from 18" - 30". The sewer depths are all is Date: between 12-16' and include a 4" underdrain. valued Date: Schedule at: Change. Snow Goose Companies John Cohagen (303) 661-0822 This is a commercial development that consists of water, sewer, strom This $ 627,335.00 Original July 2002 Anticipated October 2002 Reason sewer, approximately 6000LF of curb and gutter plus walk. There is also project Completion Completion for a 400LF widening of Ken Pratt Blvd. To accommodate a slip lane for the is Date: improvements. There is also approximately 12,000SY of asphalt Date Schedule paving valued to be done. This is a failry detailed project with a lot of coordination at: Change. between subcontractors. Colorado Department of Everett Bauer (303) 263-5664 The project is the augmentation of an existing ramp on C470 of the This Quebec interchange. The $ 1,025,700.00 Original August 2002 Anticipated October 2002 Reason Transportation ramp was extended by approximately 3,000 project linear feet. this work entailed the removal of approximately six thousand is I Completion Completion for square yards of old concrete pavement, the lowering of the ramp by valued Date: Date Schedule about four feet to create a better transition, twenty thousand yards of at: Change: earthwork, and the placement of seven thousand square yards of new concrete pavement. There was some non -incidental electrical work that COOT included in the contract to improve other messaging and traffic signals in the vicinity of the project. Tuscany Properties Ned Boucher (303) 289-1992 This project is a Turn -Key construction project for the development of a This $ 894,468.00 Original June 2002 Anticipated October private site in Fort Collins. The scope of work includes over lot grading, project Completion Completion 2002 Reason for storm sewer, water, sanitary sewer, curb, gutter, sidewalk and roadway is Date. Date sub -grade construction. valued Schedule at: Change Genesee Company Ron Skarka (303) 526-9000 Tarco,lnc., is working on grading for overlot, construction of box culverts This $ 1,846,525.00 Original September 2002 Anticipated October 2002 Reason and Curb and Gutter. This project is divided into Phase 1A , 1 B, and project Completion Completion for Phase 2. We have completed the overlot grading for Phases 1A and 1 B is Date: ahead of the Schedule. The total quantity of dirt we are moving is valued Date. Schedule 630,000 CY. We are building two box culverts of 109' long each. The at: Change total length of curb and gutter is 39,000 LF, Colorado Department of Duane John (719) 546-5440 TARCO. Inc., is the General Contractor on the replacement of two This bridges on Business Highway 50 from Pueblo to Blende, $ 9,962,318.00 Original July 2002 Anticipated October 2002 Reason Transportation CO. The firstproject bridge is a 110' single span bridge over the Burlington Northern Santa is Completion Completion for Fe Railroad. The second is a 315' three -span bridge over Salt Creek. valued Date: Date Schedule Other construction consists of area improvements, which include over at. Change. 50,000 square feet of Block MSE walls, landscaping, and the construction of a pedestriantbike path. The scope of work also includes utilities, Flatwork, earthwork, MSE wall construction, addition of decorative medians, signalization, Type 10, and decorative pedestrian railing. Great care was taken to minimize the impacts on traffic for the duration of the project. This was achieved by clear schedules, planning with COOT, and public information notices. Parker Crossing. LLC John Bostic (303) 534-1200 844 LF of 8" PVC Sanitary sewer line, 1000+ LF of 8" C-900 waterline, This $ 178,646.55 Original September 2002 Anticipated October 1440 LF of 30" curb and gutter, and 2700 SY of 6" asphalt paving. P p g project Completion Completion 2002 Reason for is Date: Date: Schedule valued Change Jefferson Center Howard Lacyat (303) 987-0835 Sanitary Sewer, water, storm, and inlets. (1200+ LF of Class III RCP 15" - This $ Metropolitan District 48", 40 LF of 12" C-900, and 70 LF of 8" PVC). This is a publicjob with project 150.548.00 Original Completion September 2002 Anticipated October 2002 Reason critical items of storm sewer to be complete by September 10,2002. is Date: Completion for There are some change orders to be approved by the Owners. We also valued Date. Schedule got the contract for grading portion. We are hoping to finish this job per at Change schedule subject to approval of the change orders by the Owners. f ", a I Owner Contact Person Contact Phone Detailed Description (Paragraph) Value Contract Original Anticipated Amount Datet Completion Date2 Completion Change Imprimis Corporation Marcus Gualter (714) 850-0966 Tarco is the General Contractor for this Turn -Key project. We've been This Date Dat involved since the design stage on this project. We offered $ 1,679,820. 00 Original September 2002 Anticipated October 2002 Reason our value engineering input in the design of the project as well getting the project is Completion Date: Completion D for approvals from the relevant authorities. We used our GPS capabilities at valued Date. Schedule various phases of the project to provide an accurate evaluation and at Change application to the design process. This phase includes all the wet utilities, curb and gutter, side walk and asphalt paving. We are also building the spillways, water control structures and the fore bay in the North Ridge reserve. Castlewood Ranch, I I. C Larry Reichert 303-773-2887 Overlot grading project including slot trenching and rock excavation for a This $369,748.00 Original Castlewood Ranch site with 5 parcels of development. When completed project Completion July 2002 Anticipated October 2002 Reason this project will provide lots for some 500 new homes. is Completion for Date: Date: Schedule valued Change. dy of Broomfield WallyAbel (303) 635-2299 This project is a Construction Management/General Contractor type of at This $25,715,731.00 Original December project delivery under contract to the City of Broomfield. The Contractor project Completion 2000 Anticipated October 2002 Reason and the Designer are hired under separate contracts to the City, and is Date. Completion P for function as a design/build team. Funding for this project has been valued Date : Sc Schedule provided to the project through the sale of bonds by local developers, at: Change with a tax reimbursement agreement with the City for repayment over a 20-year period. TARCO commenced work on the project in July 1999, assisting the design team with constructibility reviews. The Project includes the construction of two pre -stressed concrete girder bridges on US 36, adding one lane in each direction on US 36 from the Interlocken exit to the Broomfield exit, in excess of 250,000 cy of site excavation, a pedestrian underpass, transit bridges for a regional zip transit system, storm drainage, 5000 LF of 102- RCP, detention ponds, masonry -faced retaining walls, landscaping, concrete Hatwork, lighting, signage and pavement marking. Schmidt Leonard Miller (719) 392-4207 Sub -excavation of approxiamtely 75,000 CY of runway shoulders, finish This Construction grade 3.5 million CY of dirt, demolition, and 3800+ LF of storm sewer, P ro ect $ 935,673.00 Original October 2002 Anticipated October 2002 Reason 1 Completion Completion for is Date: Date. Schedule valued Change. Gon IoH 9 Investments Dan Gongloff (970) 353-1331 Grading of approximately 7500 CY of dirt; utilities to include 560+ LF of at: This $ 305,461.00 Original October 2002 Anticipated October 2" waterline, 325 LF of 8" PVC, 730 LF of 6-8" C-900, 80 LF of Class II project P 1 Completion 2002 Reason RCP; 2300+ LF of curb and gutter; 900 LF of 5-fool detached sidewalk; is Completion for and surfacing of 4300 SY of pavement. valued Date: Date: Schedule Melody Homes Scott Knight g (303) 944-9442 Overlot grading for Residential Subdivision of approximately 130,000 at: This $ Change CY. 193,270.00 Original October 2002 Anticipated October 2002 Reason project Completion P Completion for is Date: Date: Schedule valued Change. Melody Homes Scott Stordahl (303) 472-9509 This is a double 10x8 box culvert at the entry way to the Vista Pointe at: This $359,040,00 Original August project The box is 216 lineal feet with wing walls and riprap on both the project 2002 Anticipated October 2002 Reason upstream and down stream sides of the box. Completion Completion for is Date: Date: Schedule valued Change at: Pcnidre School D,ctr'ct John Little (970) 490-3198 TARCO, Inc. is the general contractor for the phase 1 site work. The This $2,487,731.00 Original September 2002 Anticipated October scope of work includes. Overlot grading of the 90+ Acre site, ro ect P 1 Completion 2002 Reason Construction School Building Pad, Install over 20,000 LF of Utilities, is Completion for Construct a Double 16' x 6' x 82' CIP Box Culvert, Full Construction of valued Date: Date Schedule Cambridge Avenue, Widening of Ziegler Avenue, Curb & Gutter, and at Change. Paving of Cambridge and Ziegler. Melody Homes Scott Stordahl (303) 47 2-9509 The scope of work includes RCP pipe ranging from 15" to 54" along with This $467,743.00 Original October riprap, drop structures, pond outlet structures and storm manholes. project Completion 2002 Anticipated November 2002 Reason Completion for IS Date: Date. Schedule valued hange at t'nqr k7 Owner Contact Person Contact Phone Detailed Description (Paragraph) Value Contract Datel Original Anticipated Amount Completion Date2 Completion Change Burfalo Run Mesa, David Boten I LC 303-488-0061 TARCO, Inc. is the general contractor for the phase 1 site work. The This $2,199,831, 00 Original Date September 2002 Anticipated Date November 2002 Reason scope of work includes: Overlot grading of the 90+Acre site, project ro P 1 Completion Completion for subexcavation for the building pads. We will also do the utilities and is Date: paving for this sub -division once we complete the overlot grading. valued Date: Schedule at: Change. Melody Homes Scott Slordahl (303) 472-9509 The Vista Pointe project for Melody is an excavation/sub-ex job of over 2 This $ 2,452,565.00 Original November 2002 Anticipated November 2002 Reason million yards. In addition to the earthwork there are some short runs of project Completion Completion for temporary storm drains. Water will be a huge challenge for Tarco, Inc. as is Date: the project progresses. valued Date: Schedule Cherry Creek School Mike Langlett n,stnct No 5 720-554-4450 Earthwork, sanitary, water, storm, curb, gutter, and asphalt (Please This $ 2,143,017, 50 Original November 2002 Anticipated Changeat November 2002 Reason provide descriptive paragraph) project Completion Completion for is Date. Dale: Schedule valued Change Fnr„ ty Concepts Les Johnson (303) 721-7070 11,000 CY Cut/Fill Subexcavation and Utilities to consist of 1065 LF of 8" at This $ 142,159.00 Original November 2002 Anticipated November 2002 Reason DIP and approximately 100 LF of 1 B" - 24" RCP for a Storage facility that project Completion Completion for is being constructed in Aurora. is Date: Date: Schedule valued Change. Melody Homes Annalee Zrmbelman 303-472-9508 Ovedot grading for a Residential Subdivision. (Please provide at This $ 330,791,00 Original September 2002 Anticipated November 2002 Reason descriptive paragraph) project Completion Completion P for is Date: Date: Schedule valued Change. at M!dCities Ken Tnbbey Metropolitan District (303) 688-5620 TARCO is providing Construction Management and General Contractor Services for this project. The MidCities development is on 160 This $21,713,460.00 Original December 2000 Anticipated December 2002 Reason acres of generally undeveloped land. Several houses and an old shooting range P j roect is Completion Date: Completion for have been demolished to make way for construction. TARCO has self- valued Date: Schedule performed all site grading, underground utilities, site drainage, concrete at: Change structures and irrigation canal piping. Subcontracts managed by our team include lime stabilization, paving, lighting, tieback and mechanically stabilized retaining wall construction, signage and landscaping. TARCO has coordinated the installation of dry utilities, area wide storm water detention issues and building pad completion. TARCO has performed all work on this project though a prime contract with the site developers. Although a minor amount of work was initially managed through a traditional general contract, the Owners recognized the need for a Construction Manager. TARCO was selected for our site development expertise and we moved a construction management team to an on -site office prior to the commencement of any significant work. Through chang JR Engineering Aaron Clutter (303) 740-9393 Subcontractor to J.R. Engineering for Design/Build project for the City of Aurora, Adams County, and the Schuck Corporation. This This $ 1,542,976.00 Original December 2002 Anticipated December 2002 Reason is for the construction of East-West connector between Front Range Airport and project is Completion Completion for DIA, which includes storm culverts, and roadway construction. valued Date: Date. Schedule at: Change. Owner Contact Person Contact Phone Detailed Description (Paragraph) Value Contract Datet Original Anticipated Completion Date2 Completion Amount Change Jefferson County Dixie Shear (303) 271-8483 TARCO, Inc., is the General Contractor on this project. This is an This $ 3,905,000.00 Original ate DeceDmber 2002 Anticipated DeceDmber 2002 Reason infrastructure improvement project that incorporates the construction of a project Completion Completion for single -span, spread -footing bridge, two pedestrian bridges and curved is Date: retaining walls as part of the intersection realignment. This intersection valued Date: Schedule is the main intersection in downtown Evergreen. The scope of work also at Change. includes signalization, roadway and pedestrian trail lighting, paving, utilities, flatwork, Type 10 and Type 7 railing, pedestrian railing and landscaping. Special construction methods used during this project include dewatering through the use of sheet piling and submersible pumps, asbestos abatement, building demolition, temporary excavation support using soil -nail walls, radius forms for retaining wall construction, form - City of Westminster Dan liner for retaining wall construction, building renovation, sanitary sewer (303) 430-2400 TARCO, Inc, is the General Contractor for the City of Westminster This Blankenship on this project. The project includes realignment of the existing Quail Creek $ 1,553,623.00 Original December 2002 Anticipated December 2002 Reason project and Bull Canal. The scope of work includes excavation of approximately is Completion Date: Completion for Date: 160,000 Cy of material, two lox culverts, one cast -in -place post valued Schedule tensioning bridge, wetland mitigation, 3000 SY of concrete sidewalk, at: Change 2500 CY of channel lined rip -rap, and a partial measuring flume. Farmers Highline Cynda Lower Canal and Reservoir (303) 451-7604 This contract consists of the regrading and realignment of 5000LF of This $ 525,744,00 Original January 2003 Anticipated January 2003 Reason Company existing canal. The canal also has to be lined with a geosynthefic clay project Completion Completion for liner which will all be placed by TARCO and then finished off with a is Date: coconut erosion control blanket and seeding. At this stage the contract is valued Date: Schedule being built in two phases of which the first phase is complete. We expect at: Change. to return in November to complete the second phase. City of Cheyenne Scott Cowley (307) 637-6017 This project consists of roadway improvements to Campstool Road and This $ 3,953,425,00 Original January 2003 Anticipated January 2003 Reason Christen Road in Cheyenne, Wyoming. The scope of work includes rip- project Completion Completion for rap channelization, 16" water lines, two pre -cast box culverts, a concrete is Date: intersection, and an asphalt roadway. valued Date: Schedule Sunset Management Alan Fishman at (303) 904-1430 Chatfield Farms is a turnkey project for Sunset Management in the This $ 3,268,315.00 Original 9 Change October 2002 Anticipated February 2003 Reason Roxborough area. Earthwork includes sub -excavation of over 750,000 project Completion Completion for cubic yards. Both utility and structures crews will also have a share of is Date: the work. valued Date: Schedule at: Change C,ty of Colorado John Tracy Spnngs (719) 385-5607 Tarco, Inc., is the general contractor on this project. which is being This $ 5,093,921.00 Original April 2003 Anticipated April 2003 Reason completed using City and State funds. The project is located in project Completion P Completion for downtown Colorado Springs, and is designated as a Springs Community is Date: Improvement Project (SCIP). The SCIP designation means the local valued Date: Schedule community plays a role in the planning and approval of the project. at: Change Monthly meetings are held to discuss the ongoing projects and future projects in the Colorado Springs area. The existing Shooks Run currently flows through a series of box culverts and archways that are inadequate to handle the flows expected every year. The new Shooks Run will now flow through a four -cell box culvert under Kiowa Street, and under a new bridge erected on Pikes Peak Avenue. The bridge is a 103-foot span vehicular bridge, consisting of BT54 pre- cast girders and deck panels. The remaining channel is all open cut with nprap bank protection, and eddy pools to facilitate a wetland habitat. Ne,lhwesl Gary Behlens Metropolitan Distract with Carter (303) 820-5240 This project includes the grading of the 1st phase of a new 3000 acre This Metropolitan District in Northwestern Broomfield County. TARCO will be $ 3,274,250.00 Original May 2003 Anticipated May 2003 Reason No 1 Burgess 9 project moving 2,190,000 CY of dirt for future roadway construction. We will is Completion Date: Completion P for also be doing the wetlands mitigation, lead (Gun Club) mitigation, and valued Date. Schedule wildlife mitigation and relocation. This project, in its entirety, will be going at. Change on for the next several years. Pnpe 04 TARCO, Inc. o M SCHEDULE OF LICENSES AND PERMITS State of Colorado Federal Employer ID: 84-1326421 Colorado Withholding: 10-29713 City of Arvada General Municipal L01-013 01/18/2003 City of Aurora ROW Earthwork 2002 128063 00 CL 05/01/2003 ROW Trenching A11164 10/01/2003 ROW Concrete 2002 142856 00 CL 11/01/2003 City of Brighton Level D Contractor 167 10/18/2003 City/County of Class A Contractor A2002-3748 12/31/2002 Broomfield Class C Contractor C2002-1364 12/31/2002 City/County of Denver Sewer SC-0168 12/31/2002 Excavation 90424 12/31/2002 Town of Erie General Contractor 2002-132 12/31/2002 Excavator 2002-133 12/31/2002 Town of Firestone Class A 2002-A 07/30/2003 City of Fort Collins ROW Permanent City of Golden General 957 06/22/2003 City of Greenwood Village Level A 02 — 00741 06/26/2003 City of Lakewood Municipal 3430 06/21/2005 City of Littleton Misc. D-15 D15045 05/21/2003 City of Louisville General Excavator 00575 12/31/2002 City of Thornton Earth moving/Utility A01030493 03/21/2003 City of Westminster Class D Contractor 60991 03/31/2003 State of Wyoming Class D Earthwork 0309818 05/23/2003 Class C-2 Sewer/Water 0309820 05/23/2003 Class C-1/Structural Concrete 03 10580 10/30/2003 State of New Mexico Classification: GA-98, GF-1, 029378 03/30/2005 GF-2, GF-3, GF-4, GF-5, GF-6, GF-8, GF-9 TARCO, Inc. Partners Jor the .Vent Generation Owner Contact Person Contact Phone Detailed Description (Paragraph) Value Contract Original Anticipated Amount Datet Completion Date2 Completion Change ierrabrook Gre E g pp (303) 706-7869 This project is a Turnkey development in Castle Rock including overlot This Date $ 5,860,368.00 Original Date grading, 8"-24" diameter waterlines, all sanitary and storm sewer July 2002 Anticipated December 2003 Reason installation, concrete structures, retaining walls and flatwork as well as project is Completion p Completion Date: for asphalt paving. The project has eight phases of development that valued Date: Schedule includes preservation of the natural vegetation within most of the lots. at Change The project includes a concrete acceleration & deceleration lane on Founder's Parkway, three outlet structures, and two water quality filtration basins. The first phase of the project will be complete in early June 2002, the remaining phases will be ongoing until December 2003. (IS Homes & The I' •N Of Colorado Pat Hartman. (719) 638-2940. This project included the new construction of two, 60' single span US Homes, (719) 260-8874 bridges that were constructed side by side This $ 1,396,537.00 Original June 2002 Anticipated On Hold Reason ,rungs with a common abutment, project Steve Tussler. and with a riprap drop structure underneath. The project scope included is Completion P Completion for Merrick 8 the bridges with BT 42 girders, Type 7 bridge rail, and several hundred valued Date: Date: Schedule Associates feet of 24" welded steel and DIP water line relocation. The project had at: Change 150-calendar day completion date with a good portion falling in the winter months. Special Actions to handle time constraints: TARCO. Inc. established a very detailed and clear schedule, which incorporated alternate work plans for weather delays. The established schedules and alternative plans enabled TARCO, Inc. to meet the schedule for the project. ,% ,I Management Cos Gramm Dewitt (303) 940-6567 This project will be completed in phases with the Earthwork to be completed fist This $ 442,74T00 Original June 2002 and then the Utilities, Structures, 8 Box Culvert will follow as change orders are project Is Anticipated tlon On Hold Reason Issued by the owner. valued at: Completion Date: Date: for Date: Schedule Change Lo•.vey Economic P.-development Tom Berger (303) 360-5542 This contract consists of the building of an east and west access ramp This $ 466,791_00 Original September 2002 Anticipated On Hold Reason G•^up over the existing Westerly Creek Dam. The total yardage of dirt to be project P 1 Completion moved is approaximately 165,000CY. The ramps are going to be built on is Completion Date: for a method based spec which includes using stockpile of rubble as well as valued Date: Schedule normal fill material placed in layers and certified. at Change: Southwest Affordable Housing rig Clayton Unruh 719-268-0994 This contract consits of Subexcavation on Multifamilysite to depth of 30 P feet, import of 120000 cY o/ structural material, wet ulilites This $984,000.00 Original September 2002 On Hold Reason work, and drainage work includeing an outlet structure and 72" rcp at a depth of 45 project is Completion Completion Completion for feet., sidewalks and C&G valued Date: Date: Schedule at: Change: Tarco, Inc. Equipment List CLASS11 L DESCRIPTION I NUMBER N FLEET I` 111 CAT 515B COMPACTOR 2 112 CAT 825B/C COMPACTOR 4 113 REX/CMI 335/355 PACTOR 8 116 CAT CP563 ROLLER 1 117 DYNAPAC CA151 1 120 BE GEE SCRAPER BOX 1 121 CAT 613B SCRAPER 3 122 CAT 623E SCRAPER 1 123 CAT 627F SCRAPER 8 124 CAT 631E SCRAPER 6 125 CAT 633C/D SCRAPER 11 126 CAT 633E SCRAPER 3 127 CAT 637D/E SCRAPER 20 140 ROME DISC 7 151 KOMATSU 400 EXCAVATOR 4 152 KOMATSU 300 EXCAVATOR 3 153 CAT 235C EXCAVATOR 1 154 CAT 2256/D 2 155 CAT 330 EXCAVATOR 2 156 CAT 325 EXCAVATOR 1 157 KOMATSU 220 EXCAVATOR 1 158 KOMATSU 600 EXCAVATOR 1 161 J D 710D BACKHOE 3 163 J D 41OD BACKHOE 3 164 J D 310E BACKHOE 1 165 KOMATSU'✓V150 BACKHOE 1 1 NO CAT 631 B/C;D `n/ATERWAGON 12 Tarco, Inc. Equipment List CLASS 1 DESCRIPTION II II NFLEE• 201 1 R AIR COMPRESSOR 6 280 BROCE BROOM 1 320 PAVERS 3 370 KUBOTA L4200 TRACTOR 1 371 CAT 98OG LOADER 1 372 CAT 966D LOADER 2 373 J D 644G LOADER 2 374 CAT 950A/B/E/F 13 375 SKID STEER 7 376 CAT 963 TRACK LOADER 1 377 CAT IT14 LOADER 1 378 JOHN DEERE 624G LOADER 2 378 KOMATSU WA320 LOADER 1 • 379 VOLVO L120C LOADER 2 422 GROVE RT745 CRANE 2 480 LULL 844 RT FORKLIFT 1 920 LIGHT TRUCK/ PICKUP 102 930 FUEULUBE TRUCKS 7 931 SINGLE AXLE WATER TRK 2 932 TANDEM AXLE WATER TRK 9 933 MECHANIC TRUCKS 8 934 FLATBED/FORM TRUCKS 18 935 TRACTORS BELLY/END 9 936 TRACTORS LOWBOY 2 940 VAN TRAILERS 21 941 BELLY DUMP TRAILERS 5 942 END DUMP TRAILERS 3 Tarco, Inc. Equipment List CLASS DESCRIPTION NUMBER • _ _ IN FLEET 943 LOWBOY TRAILERS 2 944 FUEL TRAILERS 5 947 CARGO/UTILITY TRAILERS 9 952 CAT D9N DOZER 1 953 CAT D81JR DOZER 3 954 CAT D6H DOZER 2 955 CAT D5H DOZER 2 956 CAT D10N/R DOZER 2 957 CAT D38 DOZER 1 961 CAT 824C WHEEL DOZER 1 962 J D 8960 TRACTOR 1 963 J D 9300 TRACTOR 4 981 CAT 140G/H MOTORGRADER 13 • 982 J D 772CH MOTORGRADER 1 983 CAT 14H MOTORGRADER 1 • ./ 7FARC-0'; JINIC) Wif 11 4781 West 58th Avenue -4... .v..a.. t..s.y.�.�..-..`i4 t,...sJ` Arvada, Colorado 80002-7009 (303) 429-2221 • FAX (303) 429-0051 EQUIPMENT RENTAL RATES 2002 EQUIPMENT DESCRIPTION RATE COMPACTORS PER HOUR CAT 815E Compactor 135.00 CAT 825B/825C Compactor 145.00 REX 3-35 Compactor 125.00 REX 3-55 Compactor 145.00 CAT CS-563 Smooth Drum Compactor 115.00 CAT CP-563 Padfoot Compactor 125.00 DYNAPAC CA151 PDB Compactor 110.00 PULL -BEHIND ROLLERS SHEEPSFOOT Single -Drum Pull -Behind Roller 35.00 SHEEPSFOOT Double -Drum Pull -Behind Roller 45.00 FERGUSON 50 Ton Pull -Behind Proof Roller 45.00 • SCRAPERS CAT 613E Elevating Scraper 115.00 CAT 623E Elevating Scraper 145.00 CAT 627F Twin Engine Scraper 170.00 CAT 631E Open Bowl Scraper 195.00 CAT 633C/633D Elevating Scraper 170.00 CAT 633E Elevating Scraper 190.00 CAT 637D/637E Twin Engine Scraper 205.00 DISCS ROME Disc (Pull -Behind) 57.00 EXCAVATORS CAT 225D Excavator with Thumb 175.00 CAT 225D Excavator 170.00 KOMATSU 220LC-6 Excavator 175.00 CAT 325L Excavator with Thumb 175.00 CAT 33OU3308LC Excavator 172.00 CAT 235C Excavator 205.00 CAT 235C Excavator with Hydraulic Hammer 325.00 KOMATSU PC300-5/PC300-6 Excavator 180.00 KOMATSU PC400-5/PC400-6 Excavator 215.00 KOMATSU PC60OLC-6 Excavator 240.00 RUBBER TIRE BACKHOE/LOADERS • JOHN DEERE 310SE Backhoe/Loader 4WD 85.00 KOMATSU WB150 Backhoe/Loader 4WD 85.00 JOHN DEERE 41 OD Backhoe/Loader 4WD 85.00 JOHN DEERE 510C Backhoe/loader 4WD 95.00 JOHN DEERE 71OD Backhoe/Loader 4WD 105.00 P.O. BOX 1047 • ARVADA, COLORADO 80001-1047 2/6/2002 An Equal Opportunity Employer rj WATER TRUCKS/TANKERS INTERNATIONAL 2000 Gallon Water Truck • INTERNATIONAL 2500 Gallon 6X6 Water Truck 75.00 FORD 3800 Gallon Water Truck 85.00 MACK 4000 Gallon Water Truck 100.00 CAT 6316 8000 Gallon Water Tanker 100.00 CAT 633C 8000 Gallon Water Tanker 130.00 CAT 631 D 10000 Gallon Water Tanker 135.00 135.00 COMPRESSORS/GEN-SETS Ingersoll-Rand 185 Air Compressor 50.00 AMIDA 15KW Gen -Set 25.00 ONAN 30KW Gen -Set 35.00 . LIGHT TOWERS AMIDA/MAXI-LITE/AHRENS-FOX Light Tower 38.00 PUMPS FLYGHT 2" Sewage Pump 30.00 GORMAN-RUPP 2" Electric Submersible Pump 30.00 GORMAN-RUPP 3" Electric Submersible Pump 30.00 GORMAN-RUPP 4" Diesel/Gas Trash Pump 48.00 GORMAN-RUPP 6" Diesel Trash Pump 55.00 GORMAN-RUPP 10" Diesel Trash Pump 70.00 KLEIN/PUMPMASTER Hurricane Water Pump 57.00 PUTZMEISTER P30G 65.00 • SPREADER BOXES BE GE Spreader Box (Pull -Behind) 48.00 BROOMS/SWEEPERS BROCE Broom/Tenant Sweeper 65.00 CONVEYORS FELCO Bedding Conveyor 38.00 CLARK Concrete Conveyor 38.00 SCREENS READ RD-90 Screen -All 90.00 FRONT-END LOADERS CAT IT-18 Loader 95.00 CAT 950A/B/E Loader 105.00 JOHN DEERE 624H Loader 105.00 KOMATSU WA320 Loader 105.00 CAT 95OF Loader 115.00 JOHN DEERE 644G Loader 115.00 VOLVO L120 Loader 115.00 CAT 963 Track Loader 120.00 Utilizing Ripper 130.00 CAT 966D/E Loader 135.00 CAT 980G Loader 135.00 • 2/6/2002 FINISH GRADE TRACTORS KUBOTA L4200 Landscape Tractor .00 CASE 1840 Skid Steer 8080.00 • CASE 1845C Skid Steer 85.00 GEHL 5635SXT Skid Steer 85.00 BOBCAT 773 Skid Steer 85.00 CRANES & FORKLIFTS GROVE 18 Ton Rough Terrain Crane GROVE 45 Ton Rough Terrain Crane 100.00 LULL 844C RT Forklift 165.00 95.00 LASERS ROTATING Lasers PIPE Lasers 25.00 25.00 ATTACHMENTS PIPE Fork, Compaction Wheel, or Broom when Used on Balderson Equipped Loader 32.00 SAFETY EQUIPMENT SAFETY Trench Box 32.00 RADIODETECTOR/Locator 43.00 PICK-UPS/PERSONNEL PICK-UP With Snow Plow PICK-UP with Foreman 70.00 60.00 GRADE Checker 45.00 • LABORER OVERTIME 38.00 48.00 TRACTORSiTRAILERS MACK Tractor with End Dump/Bottom Dump Trailer 85.00 Hauling Concrete, Rock, Trash, Etc. 95.00 TANDEM Dump Truck 55.00 Hauling Concrete, Rock, Trash, Etc. 70.00 KENWORTH Tractor with 65 Ton Lowboy On request TRACK DOZERS CAT D38 Dozer with Ripper 90.00 CAT D5H Dozer with, Ripper 120.00 CAT D5H LGP Dozer with Winch 140.00 CAT D6H Dozer with Ripper 150.00 CAT 06H LGP Dozer with Ripper 170.00 CAT D8L Dozer with Ripper 240.00 CAT D9N Dozer with Ripper 280.00 CAT D10N Dozer with Ripper 320.00 CAT D10R Dozer with Ripper 320.00 RUBBER TIRE TRACTORS CAT 824C Rubber Tired Dozer 145.00 JOHN DEERE 4WD Tractor 140.00 MOTORGRADERS • CAT 140G Motorgrader 125.00 CAT 14H Motorgrader 140.00 JOHN DEERE 772CH Motorgrader 130.00 2/6/2002 I SMALL TOOLS CLIPPER AsphaWConcrete Saw WATER Pressure/AirNacuum Test Units WATER and Sewer Tapping Machines DARDA 8S Rock Splitter GRUNDOMAT 75ZS Moie VERMEER 1250 Brush Chipper Propane Forced Air Heaters SMALL COMPACTION EQUIPMENT JACKHAMMER with Air Compressor WACKER Jumping Jack Per Day Per Day WACKER Double -Drum Walk -Behind Roller Per Day ARROW Hydra -Hammer Per Day Special Attachment: Will be charged at an additional $20.00 over stated cost of equipment. Rock Excavation: Will be charged at an additional 20% over stated cost of equipment. 110.00 60.00 6000 25.00 25.00 50.00 10.00 100.00 25.00 30.00 100.00 A $10.00 per hour overtime premium will be added to the above prices for work performed on Saturday, Sunday, holidays and anything over 8 hours per day. All hourly equipment and labor rates stated will be further increased by $3.50 per hour for Time and Material work performed on Davis -Bacon projects. Minimum one (1) hour move -in will be charged for all self -propelled equipment that can be roaded and permitted within the state of Colorado. Minimum charge for equipment moved by a lowboy will be four (4) hours charged at the specific equipment charge -out rate. Over-the-rcad trucks and tractor trailer units minimum move time charges will be one half (112) hour. 2/6/2002 SECTION 00430 SCHEDULE OF SUBCONTP.ACTORS LiSr_ a-- subcontractors for the work items listed below and all subcOnt-- _aCtGrS perforr.'ng over 15` of the contract. SUBCONTRACTOR Section 00430 Page 1 SECTION 00410 BID BOND KNOW ALL MEN By THESE PRESENTS: that we, the undersigned Tarco. Inc. as Principal, and St. Paul Fire and Marine Insurance Company as Surety, are hereby held and firmly bound unto the Cit of Fort Collins Colorado as OWNER, in the Sum of S Five Percent of * for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and azi3i g n s. *Total Amount Bid ----------- (------ 5%--------- ) THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Callins, Colorado the accompanying aid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, AVENUE WIDENING PROJECT; BID NO. 5767. NOW THEREFORE, (a) If said Bid shall be rejected, or {b) If said Bid Shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons perfonninq labor or furnishing materials in connection therewith, and shall in all other respects perfo= the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same Shall .remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its;BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 1 THE LINDEN COMPANY February 2, 2001 RE: Tarco, Inc. To Whom It May Concern: We handle the surety bonds for Tarco, Inc. and feel they are one of the premier heavy contractors in the Rocky Mountain Region. Tarco, Inc. is an efficiently run and financially solid organization. They enjoy an excellent relationship with the owners, architects and suppliers with whom they have worked. We highly recommend them as a very competent and reliable contractor. Tarco, Inc. is capable of providing single bonds in excess of $20,000,000.00 with an aggregate program of $60,000,000.00. If we may be of further assistance or provide any additional information, please do not hesitate to contact US. Sincerely, d'�Nt cx� Florietta Acosta Account Representative 00 East Mississippi Avenue Suite 900 Denver, CO 80246 CO Lic.: RPA00099636 CA Lic.: OBI 8058 303-756-6700 303-756-7700 Fax 800-4374256 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 11th day of March , 2403, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL Name: Tarco, Inc. Address: P.O. Box 1047 Arvada CO 80001 By: .._._ Title: 61/ ATTEST By : (SEAL) 7/96 SURETY St. Paul Fire and Marine Insurance ComDanv 2000 S. Colorado Blvd., #2-480 Denver, �CO�%��80222 ��/� By: Florketta Ac sta Title: Attorney -In -Fact {SEAL} Section 00410 Page 2 1heSMUJ POWER OF ATTORN El' Power of Attorney No. Seaboard Surey Company St. Paul Fire and Marine Insurance Company St. Pan[ Guardian huurance Company St. Paul Iliercw c Insurance Grmp:uny 23399 United States Fidelity and Guarant%y Company Fidelite and Guaranh Insurance Connpam Fidelity and Guaranh Insurance Cuderw riters, Inc. Certiicate No. 1586418 KNOF1 ALL MEN BY THESE PRESENTS: That Seahoard Surety Company is a corporation dull urgauized under the lairs of the State of Nest York, and that St. Paul Fire and Marine inSnraneC C'unlpanv. St. Pard tntardia❑ Insurance Conipanland St. Paul NICICUry Insurance Company arc corporations duly organiaxd under the lim s of the State of N1inncsota, and Ih:u United States Fidelity and Cuaranty Company is a corporation dal}' oigan¢ed under the laws of the State of 61aryland, and that Pidelit. and Civaran(v II1cUr ante C'onipanp is t corpurati on dub, organizer) under the hm s of the State of logo, and that 11&1 ty ;tad Guaranis Insurance linder%k incrs. Inc is it corpniation ciulNoo anized under the Imes of (he State o1 %kiscousin (herein cuilc<lireh c<dlyd the "( umpanrc- "), and thot the Companies do herehy make. Constitute ;end uppoint Frank C. Penn, DiLynn Guem, Pamela J. Hansen, Kevin W. McMahon, Don R. Broyles, Donald E. Appleby, Gloria C. Blackburn, Florietta Acosta and Kristen L. McCormick of the City of Denver Colorado State_ , their It lie and lim lid \ttojIle%t,Im-Fief, cacti in then vcpu.uc cap.icity if mote than our i, named abow. to sign its name us suede to, and to eweute. seal and acknoeicd,c any and ull bonds, undeltaking,_ contracts and other wrtneu inslruuicnts in the nature thereof on bchulf of the C'onipanics i❑ their holiness of 1"uarmitMln1 the fidelity of persons, guaranteeing the perforniance of co itrucis and eseculine or gu,tiuntccing bonds and undertakings required or permitted in ant actions or prnccedinea allowed by lays: IN NFITNESS WHEREOF. the Companies Itece caused this instrument to be signed and se;tletl this 19`h dac of November 2002 Seaboard Surety Company Uniled States Fidelih and Guaranh Compam St. Paul I ire and )lariife Insurance CoIli pany Fidelity and Guai anti Insurance Company St. Paul Guardian Insurance Compan'v Fidelity and Guaranty Insurance Undemi"ilers, Inc. St. Paul Nicrcun Insurance Company 1927 Si ill sr SEAL' ✓. 1896 1977 g 1951 1 OF ryI-IL \{ C:AKV1rAN, A'ice I'rc.idcut �YI 'z( n ick„{ 1S` AN�J State of Maldand City of 13altinlorc 11IUh1AS f IIUIBR66TSi:, %,,i.,lam Srcrcn:n (hi this 19� dun of November 2002 bcforC nie, the ❑n<I maned all deer, personalh appeared Petcr y','_ Carman nod Thorius I`. Iluibic,i,e.. wh i wku,m led, ed Ihe'll-ke, ui he the Vice P eucient and assistant See clul\. n,peclii ely. of Scoho;nd Surery Company. St. Paul Fire and Islarine Insurance Conip-tm. St. Paul Uuanli:w InInrallCC Comp:un, St. Paul Nici my Insurance C'onipam. l ailed States I idrlm and Guaranty Conipony. I idrlitc and Guaranis Inswance Couipitm. and FidJitc and tatarnnh Insurance Lndei-oxriters. InC . and that the scab aptintl to the I„rceoinc instrunisnt are the corporate seu6 of said C'onipuuics: and 01,11 Ili %. is such, being authorized so to do. executed the foregoing instnnnent Ibr the purposes therein cotttnined by signing the nano, of the corporations by themselie; as dub :unhoiizrd officers. In AFitness \i'hereoh. I hueunto let nn h;md ;md oll iciel scud. m p�TgRy ( eCtC fly Commis. inn cruder, the Ist dui ot'I'll" _'tltlb �H �o kl li[( C:1 I::Atil.Ll'-UVnk,U.a. Vrir, Public E �1TV 86203 Rev. 7-2002 Printed in U_S.A. ACORQ CERTIFICATE OF LIABILITY INSURANC�guq DA10/( 21/02 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE W^terfield Insurance Agency HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR lnion Blvd . , Suite 630 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. L—ewood CO 80228 Phone: 303-716-4750 Fax: 303-716-4775 INSURERS AFFORDING COVERAGE INSURER A: Safeco/American States INSURER B: Lexington rC0 I INSURERC: CO Compensation Ins. Auth. Arada a CO 002 a�t� Avenue INSURER0: Gulf Insurance C y 80 Arvada COVERAGES i nc rvuVlw Vr IHaVHARUt: USIrV dtLUW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. _TR TYPE OF INSURANCE POLICY NUMBER POLICY EfFecTme DATE MMID PO DATE LIMBS B D GENERAL LIAMUrY X COMMERCIAL GENERALLIABIUN CLAIMS MADE O OCCUR X Pollution Liao - 1320384 GU2826388 - 10/01/02 10/01/02 10/01/03 10/01/03 EACH OCCURRENCE $1 000 000 F1REDAMAGEurryamfim) s 100 000 MED EXP (My am Dram) s 5 000 PERSONAL a ACV INJURY $l 000 000 GENERAL AGGREGATE s 2 000 000 GEWL AGGREGATE Ls1ET APPLIES PER: POLICY X Loc PRODUCTS -COMPIOP AGG s2 000 000 Pollution 1 000 000 A AUTOMOSILE LIABILRY - ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON -OWNED AUTOS 02-CD-144448-10 10/01/02 10/01/03 COMBINED,c 04GLE UMR S1,000,000 X BODILY I►L (Pr Dram) s RY (per aac Cdwd) s PROIPERTY )DAMAGE s GARAGE LIABILITY ANYAU70 TO ONLY - EA ACCIDENT s HR THAN EA ACC rALrrOSJONLY.*AGO s S B EXCESS L"Lrfv X LCLAIMSMADE LEss XN 310000 5640789 10/01/02 10/01/03 EACH OCCURRENCE S 1 000 OOO AGGREGATE s1000 000 S C WORKERS COMPENMT ON AND EMPLOYERB'UABR.ITY OTHER 4062018 10/01/02 10/01/03 X TORY LMITS ER E.L. EACH ACCIDENT $500000 EL DISEASE - EA EMPLOYEE 3500000 E.L. DISEASE - POLICY LIMIT $500000 A Property 02-CD-144448-10 10/01/02 10/01/03 A j Inland Marine 02-CD-144446-10 10/01/02 10/01/03 ESCRIPTION OF OPERATION!I.00ATIONSjWgCLE,LE](CLUSIOl43 ADDED BY ENDORSEMENTISPECULL PROVISIONS Widence Only :FRnIPIrATC Zrm ntla .. _---_-- TARCO-1 Tarco, Inc. 4781 W. 58th Ave. Arvada CO 90002 VM V CLLM 1 IV A SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EMRATIO DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 1,0_ DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL tMPOSE NO OBLIGAroN OR LIAMLr Y OF ANY RIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES, 00 CACORD CORPORATION 1988 TARCO, INC. EARTHMOYING CONTRACTOR. GENERAL CONYMCIOR 1 Northern Area Office 1401 Riverside Ave., Suite 3 Fort Collins, CO 80524 (970) 493-9006 • FAX (970) 493-9022 The full name, title, address, and telephone of the principle members of TARCO, Inc. who are interested in this bid are: Todd E. Thomas President V. Marc Thomas CEO, Secretary/Treasurer John West Executive Vice President 5513 Salvia Ct., Golden, CO 80403 (303) 277-1541 2438 Keystone Dr., Evergreen, CO 80439 (303) 670-0353 14716 Osage Ct., Westminster, CO 80020 (303)255-9477 ! Alan Copeland 6717 W. 951h Place, Westminster, CO 80021 V.P. Operations (303) 430-9816 Jeff Copeland V.P. Admin./Controller Loring Knutson Northern Area Manager 5506 S. Olathe Lane, Aurora, CO 80015 (303)699-9288 4625 Regency Dr., Fort Collins, CO 80526 (970) 226-5164 Please see the attached resumes with employment history and qualifications for the above officers. An Equal Opportunity Employer V. MARC THOMAS CHIEF EXECUTIVE OFFICER, SECRETARY, & TREASURER TARCO, INC. PROFESSIONAL Mr. Thomas was originally hired at TARCO as an equipment oiler. He was EXPERIENCE: later promoted to an operator, a foreman, a manager, and over time to Vice President/Secretary/Treasurer, where his primary responsibility was to direct marketing and estimating efforts for the company. At the time of transition of the company from his father, Mr. Thomas was named the Chief Executive Officer, Secretary, and Treasurer. Overall, Marc has gained 25 years of construction related experience. PRIOR 1977 — Present TARCO, Inc. EXPERIENCE: Chief Executive Officer, Secretary, and Treasurer RESPONSIBILITIES: • Including, but not limited to: finances, marketing, client relations, estimates, project management, and purchasing. • Direct the day-to-day operations of the company formulating plans and policies to achieve overall corporate objectives, insuring profitable growth, and fulfilling company's commitment to the community. • Create, approve and implement broad corporate policies, procedures, and organizational structure. • Establish and monitor short-term and long-range plans consistent with overall profit and growth objectives. • Provide key management direction to top executive and supervisory personnel motivating managers to function as a cohesive organization. • Provide advice, guidance, and direction to carry out major plans and procedures consistent with Board established policies. • Monitor and analyze operating results of the company relative to established objectives and insure that corporate performance is satisfactorily maintained. • Insure the adequacy and soundness of the company's financial structure, taking appropriate steps to correct unsatisfactory conditions. • Encourage the development of dynamic company spirit, exemplifying fairness, creativity, integrity, and healthy aggressiveness while producing maximum benefit to the employees, clients, and the community • Manage $60 - $65 million per year. TARCO, Inc. Partners for the :Vest Generation TODD E. THOMAS PRESIDENT AND CHIEF OPERATING OFFICER TARCO, INC. PROFESSIONAL Mr. Thomas was originally hired at TARCO as mechanic's helper. He was EXPERIENCE: later promoted to oiler, equipment operator, foreman, General Superintendent of Earthmoving, and over time he worked his way up the ladder to the Vice President of Production and Maintenance/Operations. At the time of transition of the company from his father, Mr. Thomas was named President and COO. Overall, Todd has gained 27 years of construction related experience. PRIOR. 1978 — Present TARCO, Inc. EXPERIENCE: President and Chief Officer of Operations • 1977 —1978 Conley, Lott, and Nichols Parts Department • 1975 —1976 Stanley Structures Concrete Beds and Laborer, Form Shop and Carpenter RESPONSIBILITIES: . Direct the day-to-day operations of the company formulating plans and policies to achieve overall corporate objectives, insuring profitable growth, and fulfilling company's commitment to the community. • Create, approve and implement broad corporate policies, procedures, and organizational structure. • Establish and monitor short-term and long-range plans consistent with overall profit and growth objectives. • Provide key management direction to top executive and supervisory personnel motivating managers to function as a cohesive organization. • Provide advice, guidance, and direction to carry out major plans and procedures consistent with Board established policies. • Monitor and analyze operating results of the company relative to established objectives and insure that corporate performance is satisfactorily maintained. • Insure the adequacy and soundness of the company's financial structure, taking appropriate steps to correct unsatisfactory conditions. • Encourage the development of dynamic company spirit, exemplifying fairness, creativity, integrity, and healthy aggressiveness while producing maximum benefit to the employees, clients, and the community. • Manage $60 - $65 million per year. TARCO, Inc. Partners fir the Nevi Generation ALAN COPELAND VICE PRESIDENT OF OPERATIONS TARCO, INC. PROFESSIONAL Mr. Copeland started with TARCO as our Trucks and Loaders EXPERIENCE: Superintendent and his worked his way up the corporate ladder to become our Vice President of Operations in 1994. Other positions Mr. Copeland has held include Utility Superintendent, and Project Manger for the D.I.A. Project. Alan has gained 32 years of construction related experience. PRIOR 0 1984 — Present TARCO, Inc. EXPERIENCE: Vice President of Operations • 1982 —1984 Eagle Construction Superintendent • 1970 —1982 Watts Brothers, Inc. Foreman RESPONSIBILITIES: • Schedule work, materials, equipment, labor • Coordinate events with clients; train and direct work • Train managers in company policies and procedures. ADDITIONAL • B.S. — Business Administration — University of No. Colorado 1968 CREDENTIALS: Mr. Copeland has been involved in the following major projects: • Denver International Airport • E-470 • C-470 • Highway 93 Bypass • Evergreen Parkway • Melody Homes • Pulte Homes • Richmond Homes • Meadows at Westwood • Waste Management Landfills • B.F.I. Landfills TARCO, Inc. Partners for the Next Generation