BID FORM
PROJECT: LEMAY AVENUE WIDENING PROJECT; BID NO. 5767
Place Fort Collins
Date 3/11/03
1. In compliance with your Invitation to Bid dated 2/1()/03
and subject to all conditions thereof, the undersigned
Tarco, Inc. a **(Corporation, Limited Liability Company,
I Partnership, Joint Venture, or Sole Proprietor)** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of Sa of Rid Amnnnt ($
Instructions to Bidders. in accordance with the Invitation To Bid and
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
St. Paul Fire and Marine Insurance Company
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR. under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through 1
7/56 Section 00300 Page 1
JEFF COPELAND
VICE PRESIDENT OF ADMINISTRATION I CONTROLLER
TARCO, INC.
PROFESSIONAL Mr. Copeland has twenty-seven years construction accounting experience with
EXPERIENCE: three different heavy/highway construction companies including multi -state
operations. He also has two years of direct field construction experience.
PRIOR • 1990 — Present TARCO, Inc.
EXPERIENCE: VP Administration / Controller
• 1985 -1990 Tricon Kent
Controller
• 1972 —1985 Interstate Highway Construction, Formerly Eisenhower
Construction Co.
Controller
RESPONSIBILITIES: . Coordinate all accounting functions and office administration
• Ensure timely and accurate financial reporting to owner, bonding company,
and other financial institutions
• Manage all annual audits, movement of cash is profitable manner
• Oversee corporate insurance program
ADDITIONAL B.A. Michigan State University
CREDENTIALS:
TARCO, Inc.
Partners for the Nest Generation
JOHN F. WEST
EXECUTIVE VICE PRESIDENT
TARCO, INC.
PROFESSIONAL Mr. West started with TARCO as an equipment operator and progressed
EXPERIENCE: through the roles of foreman, estimator, project manager, area manager,
operations manager, and finally Executive Vice President. John has gained
27 years of construction related experience.
PRIOR 1997 — Present TARCO, Inc.
EXPERIENCE: Executive Vice President
• 1983 -1997 Flatiron Structures Company, LLC
Operations Manager
• 1977 -1983 Flatiron Paving Company
Project Manager
RESPONSIBILITIES: • General management functions including oversight of work
procurement, production and overall company administration.
• Act in concert with the Company owners in developing and
implementing strategic plans, identifying and establishing new or
complementary markets, and instituting policies and procedures.
• Actively manage and preserve our current relationships with
clients, vendors, subcontractors, outside agencies and support
firms while developing new relationships as identified by our
strategic plans.
• Serve on behalf of the Owners as an initial point of contact with the
current TARCO management staff in the areas of performance
reviews, salary recommendations, grievances, training, promotions,
and termination's.
• Recruit and train new personnel in accordance with current
demands and in anticipation of strategic opportunities.
ADDITIONAL Mr. West has been involved in the following major projects:
CREDENTIALS: Bromley Lane, Colorado Dept. of Transportation
• Briargate Interchange, CDOT
• Prospect Street over Poudre River, Larimer County, Colorado
• Littleton Railroad Depression, CDOT
• Santa Fe Relief Route, New Mexico DOT
• Lawyer's Canyon Bridge, Idaho DOT
• 1-25 @ 58"' Avenue, Phase 11, III and IV, CDOT
• El Rancho Interchange, CDOT
• 20`h Street Depression and HOV Lanes, RTD
• MAC Line, Light Rail Corridor, Phase 11, RTD
• Denver International Airport, Pena Blvd. 401" to 64"' Avenue
TARCO, Inc.
Partners for the :Nett Generation
JAMES M. WEDDING
SENIOR MANGER, ENGINEERING & ESTIMATING
TARC0, INC.
PROFESSIONAL Mr. Wedding started with TARCO as a Project Manager and Estimator.
EXPERIENCE: After spending a short time with a firm in New York, James returned to
TARCO as our Senior Manager of Engineering and Estimating. Mr.
Wedding oversees a team of thirteen Project Managers/Estimators and two
Project Manager Assistants. James has gained 9 years of construction
related experience.
PRIOR 0 2001 - Present TARCO, Inc.
EXPERIENCE: Senior Manager Engineering and Estimating
• 2000 — 2001 Halmar Builders of New York
Project Manager
• 1998 — 2000 TARCO, Inc.
Project Manager/Estimator
• 1993 —1998 Flatiron Structures Company, LLC
Quality Control Manager/Project Engineer
RESPONSIBILITIES: • Responsible for over -site of estimating and project management for
Metro Denver public, private and commercial construction projects.
• Overall management of projects, owner negotiations, and coordination
between field and office functions.
• Training of company protocol and procedures, utilization of estimating
and financial software to team members.
• Negotiation of contracts and billings.
ADDITIONAL 0
B.S. - Civil Engineering — Colorado School of Mines 1996
CREDENTIALS: 0
Committee Member — Colorado Contractor/DOT Committee
•
Registered Engineer — State of Colorado
•
Certified in CPR and Adult First Aid
•
Completed OSHA 8 Hour Site Supervisor Training
•
Completed OSHA 10 hour Training
•
Completed OSHA Fall Protection Training
•
New York City Transit Track Safety Certification
Mr.
Wedding has been involved in the following major projects:
•
Staten Island Railroad Signal Modernization, NY
•
Eisenhower/Johnson Memorial Tunnel Relining, CO
•
E-470 Public Tollway, CO
•
Bill Emerson Memorial Bridge, MO
•
Casco Bay Bridge Replacement, ME
•
6`h Avenue Widening, CO
•
Stroh Ranch 7B Drainage Channel, CO
TARCO, Inc.
Partners for theNext Generation
JAMES M. WEDDING
SENIOR MANGER, ENGINEERING & ESTIMATING
TARCO, INC.
• Phil Long Southwest Autopark, CO
• Chatfield Green Pump Lift Station, CO
• SH 34 Bridge Replacement, CO
• U.S. 6 Bridge Removal, CO
• Lambert Ranch, Phase 1-III, CO
• Willow Springs 15, CO
• Saddle Rock Phase 2 & 3, CO
• Newlin Gulch, CO
• Design/Build E470 Public Tollway, CO
• 581h Avenue Interchange, CO
• Evergreen Parkway Flyover, CO
• 1-25 Over 62"d & D&RGW RR, CO
TARCO, Inc.
Partners for the ;Vest Generation
m
Northern Area Office
" ij t� �;7rI 7 4ir4r�r 1401 Riverside Ave., Suite 3
o
Frt Collins, CO 80524
r ...
(970) 493-9006 • FAX (970) 493-9022
LORING R. KNUTSON P.E,
CONSTRUCTION EXPERIENCE
POSITION: Northern Area Manager
CONSTRUCTION RELATED EXPERIENCE: 24 Years
RESPONSIBILITIES: General management functions of the Northern Area office including oversight of
work procurement, production and overall administration. Participation in the Senior Management Team to
develop and implement strategic plans, identify and establish new or complementary markets, and institute
Policies and procedures. Actively manage and preserve relationships with clients, vendors, and
subcontractors, outside agencies and support firms while developing new relationships as identified by our
strategic plan.
PRIOR EXPERIENCE: 1977 to 1979 Wyoming Highway Department
1979 to 1984 Corn Construction Co.
1984 to 2000 Lafarge
Wide range of experience including Project Engineer, Estimator, Project Manager, Division Manager, and
Regional Construction Specialist.
As Project Engineer for the State of Wyoming my duties included supervision of contractors operations to
verify conformance with plans and specifications. Also managed surveying and quality assurance
personnel.
Experience with private construction firms includes project cost development, schedulin
administration, budgeting, planning, and employee g, project
management.
MAJOR PROJECTS: Grand Junction Airport Runway and Taxiway Rehab
Various Subdivisions — Grand Junction Area
I-80 Rehab East and West of Laramie
Various Subdivisions — Fort Collins Area
Front Range Airport Runway and Taxiway Construction
I-25 Rehab — Colorado City North and South
I-25 Rehab — Owl Canyon to Wyoming Line
Eagle County Airport — Runway Rehab
1-70 Eagle to Colorado River
1-70 Eisenhower Tunnels to Silverthorn
An Equal Opportunity Employer
TARCO, Inc.
Major Completed Projects d
Vista Ridge Utilities - Filings L, M d N
(Ene. CO) TARCO, Inc. Project Manager- Gary Single
DR Horton
Vote Ridge Orders - This lob includes all the ufil'Ibes for filings 1, M. and N as wall as
Me storm sewer Thn contract is a ueay lob xnd Includes se00 LF of 8'sewer mom
wrlh a 4' uncommon 10MO LF of a- wale, main. 235 4saver semces. 236 -V.-
water seances. end 3020 LF of .form sewer varymg from ta- - 24' Sewer depots
va,v from 12 - 20'
This project is valued at.
Original Completion Date:
Anticipated Completion Date:
Latimer County Bridge Replacement
(Fort Collins. CO) TARCO Inc., Project Manager Northern Division
Project involves the removal of a 50-foot wide vehicular
e and replacing it with a box culvert,
This project is valued at.
Original Completion Date:
Anticipated Completion Date:
Joe Van
(303),
$1.538, 171,00
August 200:
September 200;
Bill Geiser
Todd Juergens
(970) 498-5711
Murphy Creek Filing 4, 5 & 66
(Brighton, CO) TARCO, Inc. Project Manager- Gary Single
DR Horton
Utilities, Storm, Sanitary, and Water (10,270+LF o16"-8" DIP
18,200+ LF of 4" - 12" PVC, and 5540 IF of Class it RCP).)
$149,827.00 I This project is valued at:
August 2002 Original Completion Date:
August 2002 Anticipated Completion Date:
Mlaatles Overlot 6 Frico Ditch Work
(Broomfield, CO) TARCO, Inc. Project Manager- James Wedding
The MldClties Metro District #1 Ken
Construction Management and General Contractor for Commercial (303) 6
Development of a business loop in Broomfield. The scope of work
included ovefPol grading, 72" RCP, water. sanitary and roadway
Joe
(303) 75
$1.345,278.00
November 200:
September 200:
estminster, CO) TARCO, Inc. Project Manager- Sundara Didde
e Well, Company Joseph
;o as subconbeged to The Weft Connor my
to do the ads uw ood, for the project. (303)
are Wiling in 42' RCP ppes, 38' RCP for storm prior, sanaary pipe and water
forth' building. The Voted requires coordination will, other contmdota working
e see and calk for good advance planning.
project is valued at $2.810 416.00 I This project is valued at:
nal Completion Date: June 1999 Original Completion Date.
ipated Completion Date: August 2002 Anticipated Completion Date:
;on for Schedule Change: Additions to scope of work by Chanae Order oe,.., r.., c_w_...,_
$223,472.50
July 2002
August 2002
Eagle View
Renaissance Suites at Flatiron
(Denver, CO) TARCO, Inc. Project Manager- Kevin Marsh
(Broomfield, CO) TARCO, Inc. Project Manager- James Wedding
Skyland Meadows
`Tum-keY
Bill Swalling
Turner Construction Company
That Voted as General Construction Services for a A1ega development
urplact Mat intludes ovedot graditg, wbexcavation. water, sanitary, and storm
(303) 858.0250
Todd
TI'• R^"•aa"• P°fal • • •'a owwmo-ran for e. Rw.�oe aesi w.m iwaco r a
sud:meamr m sw (303) 75
Jtllaes. and hard wrhpng for several hundred lok in Laed n.CO. TARCO
r cweacmr, Tum.r crosarcem sw..w•,wpvulp4 mr e,. an,y
Iaaa.a. sib upearamseeWeyq,kaeasiaest n, ea r.y.s,gyos lee aria.;,gale
•ssfsted in ddca,, preliminary designs In order to asset Me Owner in developw a
Mnoa:ap.g Them via vat N.rmy fear d.m,r mar.rssna, w.bY syalan. a,e.vuury
..forms for me p.,d,
•Mama. TN pb kraese ru,yliy 1paoo spirts yad ortres,irac. arp ayysgyzaem
project is valued at:
nal Completion Date:
ipated Completion Date:
State Farm
(Fort Collins, CO) TARCO, Inc. Northern Division - Bill Geiser
Holder Construction Company
The TARCO. Inc., NorMem Division a Sub -Contracted by Me Holder Construction
Company for Me see grading, Wilding excavation, bxkel and rock eacayetion of
ths printed. The srePe of work also inclW m the consbucedn of Me "Ifore isewer.
Water. and storm). Gmomi; and installation of Ag base, and Cum a owner are also
ncluded.
This project is valued at:
Original Completion Date:
Anticipated Completion Date:
Reason for Schedule rhanaa
$3,486,175,00 1 IThis project is valued at:
February 2002 Original Completion Date:
August 2002 Anticipated Completion Date.
$321 860.00
May 200:
August 200:
Main Street at Flatiron -
(Broomfield, CO) TARCO, Inc. Project Manager- James Wedding
Scott Sheller
Coalton Acres, LLC
ibbey
Tr-5620
(970) 350.0565
Infrastructure ImprovementsKen
- This project is directly tied into The
(307) 688-5620
jeect a
MitlCities CM/GC project and the MitlCiBes Ovetlot 8 Fnco Ditch Work
project. The three projects are separated due to different sources of
funding.
$1,374,58T00
This project is valued at:
$844,781.00
November 2002
Original Completion Date:
December 2001
August 2002
I
Anticipated Completion Date.
August 2002
t change order.
Reason for Schedule Chanae Change nrde, uerne s. oI L.,.h t ;.. I.__,_
Coyote Creek Filing 2 Coyote Creek Filing 3
(Fort Collins, CO) TARCO, Inc. Northern Division - Loring Knutson7353133ffl
(Fort Collins, CO) TARCO, Inc. Northern Division - Loring Knutson
Lifestyle Homes DLifestyle Homes Dan Gongloff
This is a 7um-Key project for a residential subdivision. The (97This is a TurrrKey project for a residential subdivision. The (970) 353.1331
scope of work incudes earthwork, utilizes, and Curb and gutter. scope of work includes earthwork, utilities, and curb and gutter
This project is valued at:
Original Completion Date:
Anticipated Completion Date:
for Schedule Change: Additions to scope of work
Willow Springs Filing 5-1
(Denver. CO) TARCO, Inc. Project Manager- Lonnie Bamhouse
Willow Springs, LLC
This project is a Turnkey Development Project consisting of 26
lots in a Residential Subdivision. The scope of work included
dirt and earthwork, utilities (water, sanitary 8 storm), structures
and asphalt oaving.
This project is valued at:
Original Completion Date:
Anticipated Completion Date.
Reason for Schedule Chanae'.
$966,247.00 I I This project is valued at:
October 2001 Original Completion Date:
August 2002 Anticipated Completion Date'.
ge Order Reason for Schedule Chanae
Bill Klass
(303)355-7706
$1.295.128
July 2002
July 2002,
$1.036.977.00
November 2001
August 2002
Northridge at Park Center
(Denver, CO) TARCO, Inc., Project Manager - Sundara Diode
Imprimis Corporation Marcus
mev,a.asativ,w.ylm.d -+aco iz .'re c..Iaa cavana., enae n d caw.. (714) 8
M m'n4 g,abp Iw'tl•'.:. 3 uM.. Iw n. d pyt
atl oanNs n.w.r-o"ne uo n'ao—vOtl l.uawva.n la 13. rout wn cmlLM.
IM WWip pwlmN pro EOlMdy Naa. :ups aYl.. ya w.yla,W..[hy per•rw,p
I,I[M✓9.Irvclua o•Va"N GM itu. @'�xn al..mll"ar[.n N. vC WwldJua 1L02
project is valued at:
nal Completion Date'
1pated Completion Date'.
$364,413.00
June 2002
July 2002
Punch list items.
TARCO, Inc.
Major Completed Projects
�i
is Sister Drainage Improvements
rewood, CO) TARCO, Inc. Project Manager- Gary Single
Horton Darwin
contract is for the drainage Improvements as well as cum. gutter (303) 79
sidewalk of approximately 40OLF at the Beers Sister Dairy There
are four residential driveway Improvements due to the now street
Th15 project is valued at. $140,832.00
Original Completion Date. May 2002
Anticipated Completion Date: July 2002
Reason for Schedule Change: Additions to scope of work by Change Order
(Cheyenne, WY) TARCO. Inc. Northern Division - Gene Mi
Laramie County Scott Cowley, AVI
This project Involves the construction of a 10-foot concrete (307) 637-B017
bikeway in the City of Cheyenne.
This project is valued at $481.310.00
Original Completion Date: July 2002
Anticipated Completion Date: July 2002,
Reason for Schedule Chang. ....
---- —"
(Cheyenne, WY) TARCO, Inc. Northern, Division - Gene Malone
CSU - Master Storm Drain Phase II
(Greeley CO) TARCO, Inc. Northern Division
EMJ Corp.
-Bill Geiser
EarthmOving, underground Utilities, 8 Concrete Structures
Drew
CSU - Purchasing Department
Jim Stoddard
(need detailed description)
(970) 580-1210
General Contracting services for large diameter stand dram improvemema arw
flood conlml improvements. QuantitiesInauded 3,500 feet
(970) 491-0138
of storm pi wain
sizes ranging from 27' up to 72' RACP. The work included two borings across
major arterial roadways on me campus.
This project is valued at:
$2,937,581,00
This project is valued at:
Original Completion Date.
February 2002
Original Completion Date:
00 $1,768,768.
8 GO
Anticipated Completion Date:
June 2002
Anticipated Completion Date:
January 02
Reason for Schedule Change _
Punch list items.
Reason for Schedule Cnanne� rnrernn e,ne„a-. ....:,_ �.___.:_.
June 2002
_._ .. _
castle Pines 932.J
(Castle Pines, CO) TARCO, Inc. Project Manager- Sundara Diode
Fidelity Castle Pines, Ltd. Lonnie Phelps
Grading for Road, snake and Erosion ConeoL Tarco has completed the earthwork (303) 68"00
n mar -sot gradi^g and erasion conow measures. We moved ...no 200,000 Cy of
1lrt wren our pmiea schedule. All the land development al Castle Pines Village [hat
nok pace m various phases was done by Term, Inc. We are also sending a
uoposal for curb and gutter valued at $115.01.
Project is valued at:
nal Completion Date:
Ipated Completion Date:
$286.349
June 200;
June 200;
Murphy Creek Curb & Gutter Filing 1,3, & 4 _
(Brighton, CO) TARCO, Inc., Project Manager- Ryan Calkins
Richmond Homes Kent
This project consists of approximately 25,450 If o1 cum and gutter (303)
128,740 SF of 4-foot sidewalk, 3100 SF of 5-toot sidewalk, 4100 SF of
10-toot sidewalk, and 12,650 SF of a 23-foot wide driveway.
This project is valued at:
Original Completion Date:
Anticipated Completion Date'.
(Colorado Springs, CO) TARCO, Inc. Southern Division -,Tim Rank
South West Affordable Housing Clayton
Multi Family Site- Sub -Ex and Import (need detailed description (719) 63
This project is valued at:
Original Completion Date:
Anticipated Completion Date:
Reason for Schedule Chanae
(Denver, CO) TARCO, Inc. Project Manager- Gary Single
Somerset Meadows
This project consists mainly of over lot grading of approximately
300,000 CY of material, it also includes 2 ponds and a cockle
channel.
$800,135.00 This project is valued at:
November 2001 Original Completion Date:
June 2002 Anticipated Completion Date:
Richmond. Reason for Schedule Change
Murphy Creek Mississippi Utilities
(Snghton, CO) TARCO, Inc., Project Manager- Ryan Calkins
Murphy Creek Metropolitan District Larry
Genera Cwesecting services for construction of 41 feet of deep sanitary, (303)
1 600 feel of water line, and several hundred feet of storm pipe that ranged tri
18- RCP up to 72' RCP, and miscellaneous eanhwork gems. The saniaryline
reached depths of up to 45' fmm road grade.
This project is valued at:
Original Completion Date:
Anticipated Completion Date:
Reason for Schedule r.hann.
canterberry Crossing Filing 24 & 26
(Denver, CO) TARCO, Inc., Project Manger - Gary Single
Canterberry Crossing Metropolitan District
Box Culvert & Storm Sewer - This was a 130LF x 10LF golf can
underpass with rock veneer facing: the storm sewer has been
put on hold at this stage.
$1,076.502.00 I (This project is valued at:
Nov-07 Original Completion Date:
Mai Anticipated Completion Date:
$893,814.00
June 2002
June 2002
NIA
John
(303).
$495,265.00
June 2002
June 2002
Tom Slagle
(303) 793-0220
$272,001
The Woodlands Filing 12
Epple Park Pond
(Castle Rock, CO) TARCO, Inc., Project Manager- Andrew Clem
(Greeley, CO) TARCO, Inc. Northern Division
Tembrook
Ovedot Grading
Gregg Epp
City Greeley
Bert Leautrand
This project is valued at:
(303) 706.7869
Removeve existing 4e' CMP a miles 14x6x128' Doubts CIP Box Culver
(970) 352-2801
Completion Date:
$234.1 75.00
This project is valued at:
$232,665,00
Anticipated Completion Date:
Moy-02
Original Completion Date:
May-02
Reason
Reason for schedule change
May-02
Anticipated Completion Date:
May-02
N/A
Reason for Schedule Ch e:
NIA
Murphy Creek Filing 10 & 11
ACT Dealer Account Center
(Brighton, CO) TARCO Inc., Project Manger - Ryan Calkins
(Aurora. CO) TARCO, Ic. Project Manager- Noel Palmer
Murphy Creek Metropolitan District
Earthwork
Larry Summers
Shockman Construction
Rodney Heitmann
This pro is valued at
(303) 770-0200
Earthwork, Paving, Utilities, & Curb & Gutter
(561) 750-8288
^act
Original Completion Date:
$295.017 .00
This project is valued at:
$1.923,060.00
Anticipated Completion Date:
Feb-02
Original Completion Date:
04102
Reason for Schedule Change
May-02
Anticipated Completion Date:
1-De
Reason for Schedule Change
Chan e Orders
TARCO, Inc.
on Lane. LLC
& Grub, Earthwork, & Utilities
970.00
ipated Completion 04/02
lal Comolebon. 1 1 /01
Lonnie Phelpsl I Farmers Highline Canal
f303)669-23141 I Box Culverts & Outlet Structure
Completion: 03/02
- Gary
Curt Aid
(303)451-
Cherry Creek Spillway Trail - Jim Turachak
Raleigh Ridge - Gamette Jackson
City of Aurora
Mike Miller
T.C. Properties
10' Bike Path
$407,647.50
(303) 739-716
Earthwork, sanitary, storm 8 water
Cy Butt
(303) 255-351
Anticipated Completion 04/02
$860,450.00
Original Completion 10101
Anticipated Completion: 03/02
Original Completion 08/01
Farmer's Highline Canal Lining Ph I - Gary Single
Eagle Ridge - Northern Division
Farmer's Highline Canal
Curt Aldstad
M.J. Gensch
GCL Lining of Canal
(303) 451-7604
Sanitary & Water
M.J. Gertscr
$511,344.00
$496 471 25
(303) 638-0651
Anticipated Completion 03/02
Anticipated Completion 02/02
Ori final Com letion 03/02
Original Completion, 11/01
Rock Creek #21 - Gary Single
Phase 1 Christensen Rd.
Richmond Homes
Kevin Berryhill
Cheyenne Leads
Subex for Lots
(303) 220-4403
Construct New Road
Jack Cr ews
$271,000.00
$512,570.00
(303) 637-601
Antici atetl Completion 02/02 Ori inal Com letion 03102
Completed 12/01
Willow Brook - Northem Division
Brian Groves
Lone Tree Apartments
Village Homes
Earth & Concrete Work
(303) 795-1976
Carmel Contractors. LLC
Ken Kuyk
$988.365.34
Commercial
(303) 691-3221
Anticipated Completion: 0
$687,987. 10
Original Completion 11/011
Completed: 11/01
Quail Valley
Castlewood Ranch #47
Melody Homes
Subdivision
Tim Kratz
Castlewood Ranch, LLC
Larry Reichert
$446.183.12
Scott Stordahl
Install Sanitary, Water, and Storm
(303) 773-288
(303) 466-1831
$575,515.25
Corn letetl: 12/01
Completed: 11/01
Circle Point Corporate Center
Romar West
Catellus
Earthwork
Gardiner Hammond
Romer Mirage LLC
Stephen Mimna ugh
$326,000.00
(303) 980-7726
$5,449,203. 85
(303) 986-222
Corn feted: 11/01
Completed: 11/01
Lambert Ranch Road Improvements Phase 3
Highlands Ranch Filing 122-T
Valley Development Group, LLC
Stan Brown
Ryland Homes
Road Improvements
(303) 972-0919
Sub -Excavation
Pat Quar anta
$314,535.00
(303) 220.023
Completed 11/01
$392,938.00
Completed: 10/01
Jewell Gardens
Big Dry Creek East of Huron
Cedar Crest
Overlot grading, Utilities, Asphalt paving
Tony Bourg
Westminster, City of
Sheila Beisse
$520,951.00
(303) 813-9979
Box Culvert & Excavation
(303) 430-24 00
Completed 10/01
$457.443.95
Completed 10/01
Skyline Estate Bridge
Turkey Creek Bridge
Melody Homes
Badge
Tim Kratz
Chimney Rock Metro Dist.
Bill Klaes
$376,236. 75
(303) 466-1831
Box Culvert
(303) 355-7706
Antici atetl Completed. 10/01
$360,348.50Completed:
10/01
Saddle Rock Ridge Filing #3, Phase 3
River Run Filing #4
U S. Homes
Utilities & Structures
Chad Hammel)
M Homes
Tim Kratz
$1,254,947.00
(303) 779-6100
Subdivision
sion
(303) 4661831
Corn feted: 10101
$353,08,80
Completed:
Corn letetl: 08/01
Willow Springs Filing #5&6
Washington Center
Willow Springs North. LLC
Turnkey Subdivision
Steve Kcmbrust
Carmel Construction, Inc.
Ken Kuyker,
513,50C 00 00 00
(303) 694-1992
Earthwork. Utilities & Structures
3031 69I-322
Co C
orn feted. 09/0t
$1, 896,134. 80
Completed 08/01
TARCO, Inc.
7
Major Completed Projects
savannah Castlewood Ranch Planning Area 28
Aelotly Homes Tim Kral Castlewood Ranch LLC
'subdivision (303) 466-1831 Utilities & Concrete Structures Larry F
366,842.52 .... ,,,,, -- (303) 77
Castlewood Ranch Area 44A
Murphy Creek Filing 5 Sub -Excavation
Castlewood Ranch LLC
Larry Reichert
Ryland Homes
Sanitary, Water, & Storm
(303) 773-2887
Sub -Excavation
Pat Ouarant
$446.000.00
$384.320.00
(303) 220.023
completed 08/01
Completed: 07101
Castlewood Ranch 38B Utilities
Murphy Creek Filings 1.8
Castlewood Ranch LLC
Larry Reichert
Alpert Companies
Utilities
(303) 773-2887
Overlot Grading
Larry Summers
$344,458.00
$897.950.00
(303) 525<
Completed 07101
Completed 07/01
Bayside Circle
Willow Springs 15 —Falcon Ridge
Construction
Greg Hughes
Moorcal Properties
Water
Wat, Sewer, Underdrain. Storm Sewer
(970) 674-0440
Turnkey Development
Wendell Tuck
$225,508.32
$829,482.00
(303) 763-577
Com leted: 07/01
Completed 07/01
Lambert Ranch Road Improvements Phase 1
Pace St Box Culvert
Valley Development Group, LLC
Stan Brown
Melody Homes
Road Improvements
(303) 972-491
Box Culvert
Tim Kraru
$390,405.25
$391.944.00
(303) 466-1831
Com Ietetl: 07/01
Completed: 07101
Westmoor Technology Infrastructure
Aurora Sports Park Phase II
Countrydale Metro Distinct
Dave Seagraves
Valley Crest
Site Development
892-1111
Eanhwork & Box Culverts
Tim Heartih(303)
$i 383,866.85
$412,108.00
(303) 841 -8400
Com Ietetl: 07/01
Completed 07101
Piney Creek Village
Rocking Horse Farms II
Piney Creek Village, LLC &Richmond Homes
Steve Prokopiak
Tuscany Properties, LLC
Earthwork 8 Erosion Control
Centre Land
Overlot Grading, Channel, & Utilities
Joe Ho pe
$1,003,781.30
(303) 573-0066
$1,122,144.00
(303) 216-2 443
Completed: 07/01
Completed: 07101
ambert Ranch Road Improvements Phase 11
Willow Run Shopping Center
alley Development Group. LLC
Stan Brown
RubloR / Willow Run LLC
[RoadImprovements
79,158.05
(303) 972-4919
Tumkey - Earthwork, Utilities, Landscaping, C&G, Asphalt
Tom Olden
Mark Campbel
leted: 07/01
$2,974,778.00om
(303) 5341
Completed, 07/01
Filing #27 Lynx Custom Lots
Sunrise Ridge Oftsite Phase I
North Pines Development, Inc.
Chris Fellows
U.S. Home
Turnkey
$1,600,000.00
(303) 795-990
Right of Way Road Improvements
Vamell Roberts
(303) 779-61 00
Com Ietetl: 07101
$1,557,764.00
Completion. 05101
Red Hawk Filing #2
Ridge @ West Meadows Campus
US Home Corporation
Vamell Roberts
Alliance Construction
Tumkey Subdivision
(303) 779-6100
Grading & Riprap
Scott Josli
$3,299, 916.20
m CoIetion: 05/01
$295 467.00
(970) 482-7722
Completion 02/01
Rock Creek Filing #22
Crotten Park
Richmond American Homes
Gerald Montgomery
Village Homes
Storm Sewer
$413.727.00
(303) 220-4403
Res. Overlot & Subexcavation
Ron Hetti nget
(303) 795-197
Correlation: 05/01
$821,814,18
Completion: 02/01
Stonegate Filing to
Warren Farms Infrastructure
W erlot a Stonegate
Grading
Phil Luna
Warren Farms Can Co., LLC
Burt Boothb
$963,436.30
$963,4
(303) 706-7862
Infrastructure
(303) 773 9009
Com Ietion. 02/01
$1.044,023.40
Completion: 01/01
Rock Creek Ranch Filing 21 & 23
Cherrywood Filing 3 & 5
Richmond American Homes
Overlot Grading
Geraid Montgomery
Richmond American Homes
Gerald Montgomery
(303) 220-4403
Overlot Grading
(303) 220-440
Com Ietion 01/01
$296,509.35
Completion. 01/01
TARCO, Inc.
Major Completed Projects
Vaterton Road Alignment
Hidden River Filing #12
sunset Management
Alan Fishman
Richmond Homes
Matt
)rading and Paving
(303) 904-1430
Earthwork, Concrete & Riprap
Jack Hi
623,810.00
i$604,505.90
7,
ompletlon01/01
1r_�__._.....
....
(303)
Castle Pines North Detention Pond
Castle Pines North Filing #14, Phase I & II
Continental Homes
Chris Boyd
Village Homes
Ron Heltinge
Heltin ei
Detention Pond & Channel Improvements
(303) 488-0061
Overlot Grading
$550.000,00
$342,487.52
(3Ro
76
Completion: 12/00
Completed. 11/00
Jefferson Corporate Center Filing 6
Meadows Filing 11, Parcel 6
Sunset Management
Alan Fishman
US Homes
Chad Hamel
Turnkey Commercial Site
(303) 904-1430
Utilities & Structures
(303) 779-6100
$863,341,00
$590 906 00
Completed 11100
Completed 11/00
Saddle Rock Ridge East Filing #3 — Phase 2
Bromley Park Filing #5
US Homes
Chad Hamel
The Bromley Company. LLC
Steve Sabe fi
Utilities
$592.492,00
(303) 779-6100
Overlot Grading
(303) 773-1005
$764,163.44
Completed: 11/00
Completed: 11/00
Old Tom Morris Road Extension (Murphy Creek)
Harvest Park Subdivision
Murphy Creek Metro. District
Larry Summers
Writer Homes
Jim Burcz k
Earthwork, Utilities & Structures
�303) 525-4566
$356,081.75
y
(303) 799-41 00
$1,379,746.47
Completed: 10/00
Completed: 11100
40th Ave. Phase 1
Preserve #7 & 8
Gateway Metropoliotan District
Mike Serra
Koelbel & Company
Keith Neale
Grading
$350,905.00
(303) 371-9000
Overlot Grading
(303) 758-35 00
Coin letion: 11/00
$329,368.60
Completed: 08/00
Sugar Creek
Castlewood Ranch Earthwork Area 38A, 388, & 39
Melody Homes
Overlot Grading
Tim Kratz
Castlewood Ranch LLC
Larry Reichert
$287,517.00
(303) 466-1831
Earthwork
(303) 773-2887
$297,197.50
Completed: 10/00
Completed: 07/00
Sunrise Ridge Clusters
Tallyn's Reach Filing #3
US Homes
Vamell Roberts
Came Dev.
Rick Hasse ll
Utilities
$397,733.00
(303) 779-6100
Subdivision Utilities
(303) 465-5591
Coin Ietetl'. 08100
$629,203,90
Completed: 06/00
Savory Farms
Parkwood Subex
BGD 11, Co
Bob Gerlofs
Melody Homes
Tim Kratz
Overlot Grading
(303) 795-307
Subexcavation
(303)466-1831
$318.012.00
$289,64,20
Completed 06/00
Completed:
Coin Ietetl: 06/00
Castle Pines Filing #16
Willow Springs #2
Village Homes
Overlot Grading
Ron Hettinger
Willow Springs Ranch, LLC
Steve Kombrus
$309.517.74
(303) 795-1976
Subdivision
(303) 694-1992
$378,338.00
Completed 06/00
Completed 05/00
U.S. Highway #6 In Merino
Word of Life Christian Center
Colorado Department of Transportation
Brad Pierce
Hector Johnson
Bob Cameron
Bridge Demolition & Rehabilitation
(970) 522-0481
Tumkey Overot
(303) 480-53 90
$2,441,956.42
$449,257.60
Completed: 05100
Completed: 05100
102" RCP — Phase 2 Drainage
Spyglass
City of Broomfield
Wally Abel
Writer
Joe Sewell
Sewell
Storm Drainage
$1.655,345,00
(303) 635-229
Over Excavating
(303)
Completed: 05/00
$396, 892.50
Com Ietetl: 04/00
Saddle Rock Ridge East #3 Phase 1
ARV Congregate Care Facility
U.S. Home
Subdivision — Utilities
Vamell Roberts
Adolfson & Peterson Construction
Don Lamphere
$1,264.043.00
(3030 779-6100
Sewer, Water & Storm
(303) 363-7101
Completed 05/00
$518,648.70
Completed: 04l00
TARCO, INC.
EAR'fH11*10VING CONTRACTOR
GENERAL CONTRACTOR
Northern Area Office
1401 Riverside Ave., Suite 3
Fort Collins, CO 80524
(970) 493-9006 • FAX (970) 493-9022
STATEMENT OF BIDDER'S QUALIFICATIONS
1. BIDDER: TARCO, Inc.
2. ADDRESS: 1401 Riverside Ave., Suite 3, Ft. Collins, Colorado 80524
3. HOME OFFICE: 4781 W. 58th Ave., Arvada, Colorado 80002
4. WHEN ORGANIZED: November 17, 1977
5. STATE OF CORPORATION: Colorado
6. YEARS IN CONTRACTING BUSINESS UNDER PRESENT FIRM NAME: 24 Years
7. CONTRACTS ON HAND: Please see attached "Major Work In Progress"
8. GENERAL CHARACTER OF WORK PERFORMED: Earthwork, underground utilities,
concrete structures, trucks and loaders.
9. HAVE YOU EVER FAILED TO COMPLETE ANY WORK AWARDED: No
10. HAVE YOU EVER DEFAULTED ON A CONTRACT: No
11. RECENTLY COMPLETED MAJOR PROJECT: Please see attached "Major Completed
Projects"
12. MAJOR EQUIPMENT AVAILABLE: Please see attached "Equipment List"
13. EXPERIENCE IN SIMILAR WORK: Please see attached "Sampling of Completed
Projects By Type"
14. BACKGROUND AND EXPERIENCE OF PRINCIPAL MEMBERS: Please see attached
resumes.
15. CREDIT AVAILABLE: $50 Million
16. BANK REFERENCES: Bank of Denver 572-3600 Warren Culpepper
Colo Natl. Bank 585-4180 Kelly Condon
17. LIST LICENCES CURRENTLY HELD: Please see attached "Schedule of Licenses and
Permits"
18. LIMITS OF PUBLIC LIABILITY: $2 Million aggregate; $1 Million occurrence
19. COMPANY'S BONDING LIMITS: $50 Million
An Equal Opportunity Employer
TARCO, Inc.
Major Completed Proiects � c)
Red Rocks Country Club
Eagle Valley Replat
Red Rocks Country Club Bill Klaes
Melody Homes
Golf Course Revisions (303) 355-7706
Earthwork Tim
$740,481.73
(303) 466
$433,536.00
Completed 04100
Tamarisk Filing #2
River Run III
City of Lakewood
Ron Hettinger
Melody Homes
Overtot Grading
(303) 795-197
Ovenot Grading
Tim Kra
$299,041.90
$303,150,25
(303) 466-1831
Com letetl: 02/00
Completed 01/00
Rocking Horse Farms
Properties, LLC
Westmoor Technology No. 7
OverTuscany
Grading, Channel 8 Utilities
Joe Hope, Neal
Calcon Construction
Jim
$557 6t
Reno Cappelli
Site Development
(303) 762-1554
2-155
Completed
Com letetl: 01/00
(303) 216-2443
$470,993,60
Completion: 12/00
1999 Storm Drainage - Wildcat Reserve Parkway & Culvert 20
Songbird
Highlands Ranch Metropolitan District
Forrest Dykstra
Skyland Development
Storm Drainage & Culvert
(303) 791-0430
Sub Excavation
Norm Montgomery
$411,869.00
$559,166.00
(303) 792-0102
Completed: 01/00
Completed: 12/00
Castlewood Ranch Filing 939
Stroh Ranch #9 Filing A
Castlewood Ranch, LLC
Larry Reiche
Melody Homes
Grading & Utilities
(303) 773288
Overtot Grading
Tim Kra
$1,302,477,50
$430.801.28
(303) 466-1831
Completion- 12100
Completion: 12100
RB-3 East & West Stream Stabilization
Singletree @ CIA Filing #12
Superior Metropolitan District #1
Chris Castelli
Richmond American Homes
Riprap & Structures for Stabilization
303-458-55
Earthwork & Erosion Control
Matt Dispel
$324,9
303-773-272
Com leted: etl: 12/99
$531,825.75
Completed: 11/99
40s' Avenue Phase 1
Sunrise Ridge Onslte Phase I
Sand Creek Metro District
Mike Sam
U.S. Home Corporation
G
Grading
31
Underground Utilities
Vamell Roberts
303-779-61 00
Completed:$350,905,0
Completed: 11/99
$1 270 364 00
Completion 10199
Big Dry Creek
City of Westminster
Eagle Ridge Subdivision
Earthwork & Concrete Structures
David Thalmerl
Genesee Company
Ron Skorka
$1,000,000.00
970-482-5922
Earthwork & Concrete Structures
(303) 526-9 000
Correlated: 11/99
81,281,364.53
Completed: 09/99
Saddle Rock East
Homes
Saddle Rock G.C. South Filing #5 Phase 1&2
OverloAlpert
t
Larry Summers
DeDecon
1,501
$1,501,882. 12
303-246-69
Utilities
Com letetl: 10/99
$539,05325
Completed 08/99
Saddle Rock Ridge Filing #3
Centre Realty & Development
Saddle Rock North Phase 2&3, Filing 3
Ovenot Grading
John MacDonald
Mooral Properties, Inc.
Wendell Tucke
$1,316,262.01
303-885-4058
Turnkey
303-763577
Completed 09199
$426,364.18
Completed 07199
Meadow Ranch Utilities - Phase III
Jefferson Properties, Inc.
Morrison-Knudsen Office Building
Sanitary, Water & Storm
Bill Biggi
Morrison-Knudsen
Don Duffy
$827,590.10
(303) 973-3344
Office Building
303904-143
Completed 08/99
$670,897,40Completed
06/99
The Farms 3,4 8 6
Richmond Homes
SH 34 Over Burlington Northern Railroad
Earthwork
Tim Johnson
Colorado Department of Transportation
Scott Ellis
8 35
303-773-2727
Remove 8 Replace Bridges
(970) 667-467
om l
Completed 06199
$2250.000.00
Completed 06/99
e
OlinERoadway
Mobile Denver Paving
Promontory Park Offsite Watermain
Reconstruction 8 Utilities
Brenda Shule
Canna Development c/o R.M. Hassett & Co.
Rick Hassell
$651,303-657-4000
65
i6' 8 24' Watermain
303-4655591
tl 06/99
$965645,00
Completed 03/99
TARCO, Inc.
Major Completed Projects
o
�—
Indlana Mount Sopris
Executive 9 Club Estates
Superior Metropolitan District #1
John Griffith
Champlin Land Company
New Box Culvert 8 Infrastructure
303-767-0959
Turnkey
Victor Chant pb
$1,673, 777.91
$360.869 20
Com feted 05/99
Completed 03199
Eagle Bend Phase I
Gateway Park if9
U.S. Home
Rusty Hansen
Sand Creek Metro District
Overlot Grading
(303) 779-6100
Overkill Grading
Mike Serra
$3,835,235.05
(303) 371-900
Com feted 03/99
$830,761.68
Completed 01/99
Meadow Ranch — Earthwork
Bill Biggi
Pelican Lakes Golf Courses Bridges
Jefferson Properties, LLC
(303) 973-3344
Pelican Lakes, LLC
Overlot
$2,678,555.00
3 Golf Cart and Mamt. Vehicle Bridge Abutments 8 Installation
Martin Lind
303-332-6702
Com feted 02/99
$350,000.00
Completed 12/98
ter City Park Phase III A
Med-Ved Parking Lot
stminster
Dan Blankenship
MEDVED Chrysler Plymouth
Turnkey
E$2.320,000
(3031 430-24
Parking Lot
John Medved
. 00
$560,4303-421-010
01/99
Completed 1
Com 12/98
Saddle Rock Golf Club Watermain
Sunrise Creek Phase 1,2,3
Alpert Company
Larry Summers
Melody Homes
24" Walermain
(303( 246-695
Ovefiot Grading
Scott Stortlahl
$457,983,00
303-466-1831
Com feted 12/98
$1,500,000.00
Completed 12198
Broomfield Country Club Filing #10
Meadow Ranch — Utilities #1
Eagle Trace III, LLC
Bob Gerlofs
Jefferson Properties, Inc.
Earthwork 8 Utilities
303-795-307
Sanitary Sewer 8 Storm Drainage
Bill Biggi
ill Big4
$796.064. 15
Com letetl 12/98
$879,304.70
303 -9
Completed 12/98
Manhattan Beach
Plum Creek Commercial Subdivision 92
Doug Solejack
Turnkey
Doug Bolejack
Plum Creek Metro District
Keith Worley
$440,407.79
303-799-0728
Infrastructure
303-660.220
Com feted 12/98
$373 225 50
Com feted 12/98
West Believlew Avenue Extension
Metzler Ranch
Chimney Rock Metro District
Steve Kornbrust
Keystone Development
Earthwork, Utilities, Concrete Structures
(30( 694-1992
Overlot Grading 8 Clearing
Greg Mclva
$775,180.03
$732,520.16
303-771-353
Com letetl 12/98
Completed 10198
Quail Ridge — Phases 1 8 II
Saddle Rock Ridge, Phase 1-8
Schuck Resitlenhal
Tumkey
Bill Schuck
Saddle Rock Ridge, LLC
John MacDonaltl
$o69
Grading 8 Erosion Control
303-573-006
completed 72/98
eted 12
$2.288,75&00
Completed 10/98
Rock Creek
Saddle Rock Ridge, Filing #1 Storm
Richmond Homes
Matt Diebel
Centre Development
John MacDonaid
$732,25Grading
303-773-272
Storm Drainage
303573-0066
Completed
Com letetl 10/98
1
$357,775.00
Completed 10/98
Willow Run Filing #S, Phase 5 8 6
Stroh Ranch 78 Drainage Channel
Gateway American Properties
Cherry Creek South Metro Distrct #1
Utilities
$418,376.90
EPatKra]me
30
Box Culverts 8 Drop Structures
Joe Hue
303-980-020
completed 10/98
$285,870.90
Completed 09/98
U.P.S. Facility
NDC Land Syndicate
Worldport Water 8 Sewer Line
Sewer 8 Water
Steve
D.I A. Airport Office Building
S761Gradinng,g.
J.E. Mem
Sewer 8 Water Installation
letetl475
Completed l
Com letetl 10/98
$467.761 00
Completed 09/98
Tuscany #3
Richmond Homes
The Farms at Arapahoe County #3
Grading 8 Erosion Control
Jim
Richmond! Homes
$396.770.00
303-773-2727
Grading 8 Erosion Control
Com letetl 09/98
$374,068.79
Completed 08198
TARCO, Inc.
Major Completed Projects
Phil Long Southwest Autopark
Kip Hampden, Ltd
Ovenot Grading & Asphalt Overlay
$266,909. 10
Com leted 08/98
Sunrise Creek Flling #4
Melody Homes
Overlot Grading & Subexcavation
$300.000.00
Com leted 08/98
Safeway- Meadow Ranch
Briarwood Properties
Mass Grading
$335.862,00
Completed 08198
Fairmont Drive/Pelican Point
Koelbel & Company
Street Improvements
$282.576.85
Completed 08/98
Cherry Creek Pointe
Marc Baffles
Turnkey
$542.577.62
Completed 08198
Village Self Storage
Kangaroo Equities, LLC
Turnkey
$360,075.00
Correlated 06/98
Jefferson Corporate Center
Sunset Management
Utilities
$767,500.00
Completed 06/98
CTC - Farmers Hlghline Canal
Golden Equities
Concrete Box Culvert & Utilities
$336.000.00
Completed 08/98
C.O.O.T. - NH 0341-038
Colorado Department of Transportation
Loveland Box Culverts
$1,470.779.17
Completed 08/98
Water Valley Utilities
TROLLCO, Inc.
Sewer & Storm
$2.673,932.00
Completed 08198
Westwoods Ridge
McIntyre Development Co., LLC
Tumkey Subdivision
$799,960.98
Completed 06198
Titan Road
Douglas County - Public Works
Pipe, Bridge Removal, Box Culvert
$437.147,76
Completed 06198
E
es Golf Course
s, LLC
00
6/98
Chatfield Bluffs Filing $4
Sunset Management
Turnkey
$1,210.000.00
Completed 05198
Red Hawk Structures
U.S. Home/Kombrust Development
Mesa Filing #1
Inlets & Retaining Walls
Richmond Homes
.34
Grading
g
Gradin80.34
Completed 06/98
$380,3Completed
03198
Tower Park
Continental Homes
DeDe
Denver Airpark
Ovenot Grading & Erosion Control
TDDevelopment
$285,193.00
New
ad8 ad ew Road Parking Lot
Completed 04/98
$592,
Completed 03/98
Water Valley Filing #2
T
Beachwood Estates
,Inc.
Ferguson Construction Company
Pan Y
$788,40345Tumkey
Completed 0
Completed 03/98
$345,031.50
Completed 03/98
Sunrise Gateway Sub, Filing 1 & 2
Gateway Sixty Nine, LLC
Encore At Seven Hills
Earthwork & Utilities
R.K.S. Development
$401,644.00
Import Fill
Import Fill
Completed 03/98
$259,
Completed 01/98
Plum Creek Commercial Filing #2
Halmby Leisure, LLC
Improvements to Jefferson County Airport
Subdivision
Jefferson County Airport Authority
$281Airport
& Highway Improvements
Completed 0,
te01/98
$891,965.72
Completed 01/98
Gateway Village Filing #2, Phase 2 & 3
Gateway American Properties
U.P.S. Utilities
Utilities
J.E. Merit Construction
$362,400.00
Utilities
Com letetl 01198
$725,152.90
Completed 01/98
TARCO, Inc.
Major Completed Projects ---��-
Fountaln Landfill
Rock Creek Phase II
of Colorado, Inc.
Richmond Homes, Inc.
Final
Fin
Grading
$J07,881 D
$1, 385,542. 00
Com leted etl 1 11/97
Completed 11/97
South Holly Self Storage
East Weld County Landfill
National Development Services, Inc.
Waste Management
Turnkey
$31 J,540.00
Landfill, Cell, Liner, Access Road
Com leted 11/97
$923,652.22
Completed 10197
Lincoln Avenue Widening
Willows Run Filing 4 & 5
Douglas County
Earthwork, Pipe, Paving
Gateway American Properties
$326.966.00
Utilities
Completed 11/97
$508.331.80
Completed 10197
92"" & Pierce Self Storage
Union Pacific Yard Extension
National Development Services, Inc.
Union Pacific Railway
Turnkey
Box Culvert, Retaining Wall
$804,963.98
Correlated
Com feted 10/97
Completed 10/97
Cherry Creek Drop Structure #19
Arapahoe County, Dept. of Highways
WesHestminster
ste Westminr Promenade
Dewatering, Channel Improvements
R.M. &Company
$379,31
Utilities
Com feteedd 10197
$499,769.60
Completed 09/97
Colorado Springs Airport Taxiway
Sterling Hills Filing #2, Phase 1 & 2
Interstate Highway Construction
Gateway American Properties
Pipe Removal. Storm Sewer
Sewer, Water, Storm
$569.166,50
$603.896.50
Com feted 10/97
Completed 09/97
72�Avenue &pucker
Canterberry Crossing Filings 7, 7A, 7B, 7C, & 8
City
City Arvada
Melody Homes
Streett Improvements
Overlot Grading
$
$287,323.08
Completed 0 09/97
Completed 08/97
Colorado Centre
Rampart Business Center
Richmond Homes
Imprimis, LLC
Grading & Channel Improvements
Grading, Drainage
$321,000.00
Completed 08/97
Completed ted 0
Completed 08/97
Diamond Ridge Estates Filing #2
Bromley Park #1.6
T.S.T., Inc.
The Bromley Company, Inc.
Earthwork, Waterline Services
Grading
$350,324.08
om letl
Cameleted 08/97
Completed 07197
Westminster Promenade
R.M. Hassett &CompanyOver
Red Hawk
t
Kombmst Development Group
S481 641
481,ed
Overlot Grading
Com letetl 07/97
$448.456.50
Completed 06/97
Country Hills Filing #6
Gateway American Properties
U.P.S. Denver South Facility
Utilities
E.M.I.
$298 124 10
Overlot Grading
Completed 06/97
$310,705.00Completed
06197
Northpark Plaza
Chatfield Bluffs Filing 2
Saunders Construction, Inc.
Sunset Management
Overlot Grading
Turnkey
$328,000.00
Completed 06/97
$969,006.05
M lnlw�.. 7.
Completed 04/97
_.
The Villas at Cherry 1
rlorado Department of Transportation Villas at Cherry Creek
Irthwork, Landscaping, Paving, Retaining Wall, 4 Lane Single Span Britlges, Box Culveq Turnkey Overlot
1_800 _000.00 Curb & Gutted 1$1,226.025.00
TARCO, Inc.
Major Completed Pro "ects
Stenmg Hills Filing 03
Gateway American Properties
Sky Sky M ark PBG
Sewer &Water
t
DelTurnkey
$253,5
Subdivision
Com leled 04/97
etl
$587,344.06
Completed 03/97
Plkas Peak International Raceway
Raceway Associates. LLC
Tanoa/Stagecoach Road AlberUon's
Earthwork, Utilities, Concrete Structures
Tradition Concepts, Inc.
$5 442.254.00
Earthwork
Completed 03/97
$1,174,124.00
Com letetl 11/96
Rock Creek #18, #19 & Coalton Road
Richmond Homes
Meadows at Westwoods
Grading, Erosion Control
Thompson Enterprises
Turnkey Subdivision
Com2l$1,423ted 06
Com letetl 02/97
$3.191.083.00
Com letetl 10/96
Arapahoe Ridge
Keystone Development
er
Overlot Grading
s
$405 001 00
EEarth�rk
Com leted 10196
709/96
Rampart Business Park #6
Imprimis, LLC
Conoco at Chatfield 8 Kipling
Grading, Stonn 8 Sanitary
Sunset Management Services, Inc
Earthwork, Utilities, Concrete Structures
Compl$589.6eted
Com letetl 09/96
3
$430.000,00
Com letetl 09/%
ChatfiBluffs Filing #1
Sunset M
Sunset Management Services, Inc.
Gateway Park #3 Utilities
Turnkey
Gateway
Gateway Park
02
Utilities, Concrete Structures
Completed 09/96
$366,353,79
Completed OB/%
Saddle Rock North Filing 1
U.S. Home
Goldsmith Gulch
Grading, Erosion Control
C
City and County of Denver
$518,0
Channel Improvements
Com leted
etl 08/%
$1.713,975.00
Completed 06/96
Cherry Creek South
Bcorp Polo Creek, LLC
Hiwan Filin 10
gSubdivision,
Roadway Improvements
d Development$438.815.87
[Earthwork,o" Piping, Concrete
P
Com letetl 07/%
/96
Village at Pinecrost
Walden Company
pahoe Comers
Turnkey
Comers
$415,130.00
[Arapahoia
erlot Channel Improvements, Utilities
Com letetl 04/96
6,546.60m
letetl 02/96
Bear Creek Filing #1
Village Homes
Saddle Rock
Overiot Grading, Tree Stump Removal
Alpert Development
$395,220,67
Subdivision Overlot Grading
Completed 03l96
$308,215.04
Completed 12/95
Saddle Rock Waterlines & Sanitary Sewer Outfall
CM of Aurora
n Boulevard Improvements Ph I
Water & Sewer Mains
Metro District
$546,003.80
EGrading,Utilities, Structures & Paving
Com letetl 02/96
14.00
d 11195
Centennial Valley Parcel H
HSG Louisville, LLC
40"' Avenue Utilities
Tumkey
Gateway Park
$810.917.65
Storm, Water & Sanitary
Com letetl 12/95
S432,431.00
Completed 10195
Blakeland Industrial Park
The AnsUutz Corporation
Denver Arapahoe Disposal 1995
Major Channel Improvements. Structures. Utilities & Earthwork
Waste Management
$772,114.35
Cell Construction for Landfill
Com feted 11/95
$1,172.890.00
Completed 10/95
10
TARCO, Inc.
Major Completed Projects
Villages at Heron Shores
Alton Street
Republic Investment Company
Mississippi Flats, LLC
Concrete inlets, Box Culvert & Channel
New Road
$368,032,10
S494, 345.00
Completed 10/95
Completed 10/95
Willow Springs Filing SA, Phase J
Westclitt 4 & S
High River Management
U.S. Home
Earthwork &Utilities
$468,2
Grading, Demolition & Erosion Control
Com fetteded 1 10/95
$346.188.60
Completed 07/95
Perry Park East Waterline
Centennial Valley Lot 3
Perry Park Water & Sanitation District
HSG Louisville, LLC
Waterline
Turnkey
Turnkey
$390,277.97
09.72
$486,1Completed
Com letetl 08/95
03195
Chaffee County Sanitary Landfill, Phase I
Mead's Crossing
Chaffee County
Mead's Capitol Corporation
Landfill Cell Construction
Overlot Grading, Utilities, Paving
$376,043.20
$1,259,508.00
Com leted 06l95
Completed 6/94
Highway 82 Superstructure
Hlllcrest Hydroelectric Powerhouse
Hansen Construction
Denver Board of Water Commissioners
Dirt, Utilities, Concrete
Water Pump Station
$1,088,337. 84
$1,900,000.00
Com letetl 10194
Completed 07/93
Contract F-129A, Airport Boulevard
Westwoods Golf Course
D. I. A. - City and County of Denver
City of Arvada
Taxiway Bridge to Terminal
Golf Course & Subdivision
$10,500,000.00
Compl$11,54eted1 /
Com letetl 70l93
Completed: 05193
Contract F-128A, E-470
Chambers Lake
City and Denver
Water Storage & Supply Company
Interchangege to to Taxiway Britlge
Dam Rehabilitation
$1,127,400.00
Comet ted0$8,683,037.00
Com letetl O6/93
Completed 08/92
Laidlaw Landfill Cell A
E470 #1 A06 & #1802
Laidlaw Waste Systems, Inc.
Edward Kramer & Sons, Inc./E-470 Authority
Landfill Cell
$1,406,616.00
Highway Widening - Section 1-25 to Parker Road
Completed 12/92
$1,382,255.00
Completed 03192
Yak Tunnel Operable Unit
C.D.O.T. #FCU 024-3 Colorado Springs
Res-ASARCO Joint Venture
Colorado Department of Transportation
Grading & Pump House
Highway 24
$2.167.750.00
$3,844,946.26
Com leted 05/92
Completed 10/91
NMSHTD Project DEJ-F-0107
E470 Project #1A01
New Mexico State Highway & Transportation Dept.
E-470 Partnership Authority
Highway Widening
$5,175,433.92
Highway Section 1-25 to Parker Road
Correlated 11/91
$7,813,084.32
Completed 12/90
Westerly Creek — Lowry Air Force Base
IXFU 470.1, CXIXFU 11-0470-09, FCU 470-1
U-S. Army Corps of Engineers
Colorado Department of Highways
Dam Embankment
$6.682,555.69
C-470 Ken Caryl to Beileview
Com letetl 06/91
$7,840,506,73
Completed 10/90
Owner
Contact Person Contact Phone Detailed Description (Paragraph) Value
Contract
Original
Anticipated
Amount Datet
Completion Date2
Completion Change
DR Horton
Joe Van Aelstyn (303) 210-7404 The job is a utility contract and includes 5000 LF of 8" sewer, 5300 LF 8' This
$ 996,310.00 Original
Date
Date
September 2002 Anticipated
October
water main, 120 - 4' sewer services, 120 - 3/.- water services, and 2140 project
Completion
Completion
2002 Reason
for
LF of storm sewer varying from 18" - 30". The sewer depths are all is
Date:
between 12-16' and include a 4" underdrain. valued
Date:
Schedule
at:
Change.
Snow Goose
Companies
John Cohagen (303) 661-0822 This is a commercial development that consists of water, sewer, strom This
$ 627,335.00 Original
July 2002 Anticipated
October 2002 Reason
sewer, approximately 6000LF of curb and gutter plus walk. There is also project
Completion
Completion
for
a 400LF widening of Ken Pratt Blvd. To accommodate a slip lane for the is
Date:
improvements. There is also approximately 12,000SY of asphalt
Date
Schedule
paving valued
to be done. This is a failry detailed project with a lot of coordination at:
Change.
between subcontractors.
Colorado
Department of
Everett Bauer (303) 263-5664 The project is the augmentation of an existing ramp on C470 of the This
Quebec interchange. The
$ 1,025,700.00 Original
August 2002 Anticipated
October 2002 Reason
Transportation
ramp was extended by approximately 3,000 project
linear feet. this work entailed the removal of approximately six thousand is I
Completion
Completion
for
square yards of old concrete pavement, the lowering of the ramp by valued
Date:
Date
Schedule
about four feet to create a better transition, twenty thousand yards of at:
Change:
earthwork, and the placement of seven thousand square yards of new
concrete pavement. There was some non -incidental electrical work that
COOT included in the contract to improve other messaging and traffic
signals in the vicinity of the project.
Tuscany Properties
Ned Boucher (303) 289-1992 This project is a Turn -Key construction project for the development of a This
$ 894,468.00 Original
June 2002 Anticipated
October
private site in Fort Collins. The scope of work includes over lot grading, project
Completion
Completion
2002 Reason
for
storm sewer, water, sanitary sewer, curb, gutter, sidewalk and roadway is
Date.
Date
sub -grade construction. valued
Schedule
at:
Change
Genesee Company
Ron Skarka (303) 526-9000 Tarco,lnc., is working on grading for overlot, construction of box culverts This
$ 1,846,525.00 Original
September 2002 Anticipated
October 2002 Reason
and Curb and Gutter. This project is divided into Phase 1A , 1 B, and project
Completion
Completion
for
Phase 2. We have completed the overlot grading for Phases 1A and 1 B is
Date:
ahead of the Schedule. The total quantity of dirt we are moving is valued
Date.
Schedule
630,000 CY. We are building two box culverts of 109' long each. The at:
Change
total length of curb and gutter is 39,000 LF,
Colorado
Department of
Duane John (719) 546-5440 TARCO. Inc., is the General Contractor on the replacement of two This
bridges on Business Highway 50 from Pueblo to Blende,
$ 9,962,318.00 Original
July 2002 Anticipated
October 2002 Reason
Transportation
CO. The firstproject
bridge is a 110' single span bridge over the Burlington Northern Santa is
Completion
Completion
for
Fe Railroad. The second is a 315' three -span bridge over Salt Creek. valued
Date:
Date
Schedule
Other construction consists of area improvements, which include over at.
Change.
50,000 square feet of Block MSE walls, landscaping, and the
construction of a pedestriantbike path. The scope of work also includes
utilities, Flatwork, earthwork, MSE wall construction, addition of
decorative medians, signalization, Type 10, and decorative pedestrian
railing. Great care was taken to minimize the impacts
on traffic for the duration of the project. This was achieved by clear
schedules, planning with COOT, and public information notices.
Parker Crossing.
LLC
John Bostic (303) 534-1200 844 LF of 8" PVC Sanitary sewer line, 1000+ LF of 8" C-900 waterline, This
$ 178,646.55 Original
September 2002 Anticipated
October
1440 LF of 30" curb and gutter, and 2700 SY of 6" asphalt paving. P p g project
Completion
Completion
2002 Reason
for
is
Date:
Date:
Schedule
valued
Change
Jefferson Center
Howard Lacyat
(303) 987-0835 Sanitary Sewer, water, storm, and inlets. (1200+ LF of Class III RCP 15" - This
$
Metropolitan District
48", 40 LF of 12" C-900, and 70 LF of 8" PVC). This is a publicjob with project
150.548.00 Original
Completion
September 2002 Anticipated
October 2002 Reason
critical items of storm sewer to be complete by September 10,2002. is
Date:
Completion
for
There are some change orders to be approved by the Owners. We also valued
Date.
Schedule
got the contract for grading portion. We are hoping to finish this job per at
Change
schedule subject to approval of the change orders by the Owners.
f ", a I
Owner
Contact Person Contact Phone Detailed Description (Paragraph)
Value
Contract
Original
Anticipated
Amount Datet
Completion Date2
Completion Change
Imprimis Corporation Marcus Gualter (714) 850-0966 Tarco is the General Contractor for this Turn -Key project. We've been
This
Date
Dat
involved since the design stage on this project. We offered
$ 1,679,820. 00 Original
September 2002 Anticipated
October 2002 Reason
our value
engineering input in the design of the project as well getting the
project
is
Completion
Date:
Completion
D
for
approvals from the relevant authorities. We used our GPS capabilities at valued
Date.
Schedule
various phases of the project to provide an accurate evaluation and
at
Change
application to the design process. This phase includes all the wet
utilities, curb and gutter, side walk and asphalt paving. We are also
building the spillways, water control structures and the fore bay in the
North Ridge reserve.
Castlewood Ranch,
I I. C
Larry Reichert 303-773-2887 Overlot grading project including slot trenching and rock excavation for
a This
$369,748.00 Original
Castlewood Ranch site with 5 parcels of development. When completed project
Completion
July 2002 Anticipated
October 2002 Reason
this project will provide lots for some 500 new homes.
is
Completion
for
Date:
Date:
Schedule
valued
Change.
dy of Broomfield
WallyAbel (303) 635-2299 This project is a Construction Management/General Contractor type of
at
This
$25,715,731.00 Original
December
project delivery under contract to the City of Broomfield. The Contractor
project
Completion
2000 Anticipated
October 2002 Reason
and the Designer are hired under separate contracts to the City, and
is
Date.
Completion
P
for
function as a design/build team. Funding for this project has been
valued
Date :
Sc
Schedule
provided to the project through the sale of bonds by local developers,
at:
Change
with a tax reimbursement agreement with the City for repayment over a
20-year period. TARCO commenced work on the
project in July 1999, assisting the design team with constructibility
reviews. The Project includes the construction of two pre -stressed
concrete girder bridges on US 36, adding one lane in each direction on
US 36 from the Interlocken exit to the Broomfield exit, in excess of
250,000 cy of site excavation, a pedestrian underpass, transit bridges for
a regional zip transit system, storm drainage, 5000 LF of 102- RCP,
detention ponds, masonry -faced retaining walls, landscaping, concrete
Hatwork, lighting, signage and pavement marking.
Schmidt
Leonard Miller (719) 392-4207 Sub -excavation of approxiamtely 75,000 CY of runway shoulders, finish
This
Construction
grade 3.5 million CY of dirt, demolition, and 3800+ LF of storm sewer,
P ro ect
$ 935,673.00 Original
October 2002 Anticipated
October 2002 Reason
1
Completion
Completion
for
is
Date:
Date.
Schedule
valued
Change.
Gon IoH
9
Investments
Dan Gongloff (970) 353-1331 Grading of approximately 7500 CY of dirt; utilities to include 560+ LF of
at:
This
$ 305,461.00 Original
October 2002 Anticipated
October
2" waterline, 325 LF of 8" PVC, 730 LF of 6-8" C-900, 80 LF of Class II
project P 1
Completion
2002 Reason
RCP; 2300+ LF of curb and gutter; 900 LF of 5-fool detached sidewalk;
is
Completion
for
and surfacing of 4300 SY of pavement.
valued
Date:
Date:
Schedule
Melody Homes
Scott Knight
g (303) 944-9442 Overlot grading for Residential Subdivision of approximately 130,000
at:
This
$
Change
CY.
193,270.00 Original
October 2002 Anticipated
October 2002 Reason
project
Completion P
Completion
for
is
Date:
Date:
Schedule
valued
Change.
Melody Homes
Scott Stordahl (303) 472-9509 This is a double 10x8 box culvert at the entry way to the Vista Pointe
at:
This
$359,040,00 Original
August
project The box is 216 lineal feet with wing walls and riprap on both the
project
2002 Anticipated
October 2002 Reason
upstream and down stream sides of the box.
Completion
Completion
for
is
Date:
Date:
Schedule
valued
Change
at:
Pcnidre School
D,ctr'ct
John Little (970) 490-3198 TARCO, Inc. is the general contractor for the phase 1 site work. The
This
$2,487,731.00 Original
September 2002 Anticipated
October
scope of work includes. Overlot grading of the 90+ Acre site,
ro ect
P 1
Completion
2002 Reason
Construction School Building Pad, Install over 20,000 LF of Utilities,
is
Completion
for
Construct a Double 16' x 6' x 82' CIP Box Culvert, Full Construction of
valued
Date:
Date
Schedule
Cambridge Avenue, Widening of Ziegler Avenue, Curb & Gutter, and
at
Change.
Paving of Cambridge and Ziegler.
Melody Homes
Scott Stordahl (303) 47 2-9509 The scope of work includes RCP pipe ranging from 15" to 54" along with
This
$467,743.00 Original
October
riprap, drop structures, pond outlet structures and storm manholes.
project
Completion
2002 Anticipated
November 2002 Reason
Completion
for
IS
Date:
Date.
Schedule
valued
hange
at
t'nqr k7
Owner Contact Person Contact Phone Detailed Description (Paragraph)
Value
Contract
Datel
Original
Anticipated
Amount
Completion Date2
Completion Change
Burfalo Run Mesa, David Boten
I LC
303-488-0061 TARCO, Inc. is the general contractor for the phase 1 site work. The
This
$2,199,831, 00 Original
Date
September 2002 Anticipated
Date
November 2002 Reason
scope of work includes: Overlot grading of the 90+Acre site,
project
ro
P 1
Completion
Completion
for
subexcavation for the building pads. We will also do the utilities and
is
Date:
paving for this sub -division once we complete the overlot grading.
valued
Date:
Schedule
at:
Change.
Melody Homes Scott Slordahl
(303) 472-9509 The Vista Pointe project for Melody is an excavation/sub-ex job of over 2 This
$ 2,452,565.00 Original
November 2002 Anticipated
November 2002 Reason
million yards. In addition to the earthwork there are some short runs of
project
Completion
Completion
for
temporary storm drains. Water will be a huge challenge for Tarco, Inc. as
is
Date:
the project progresses.
valued
Date:
Schedule
Cherry Creek School Mike Langlett
n,stnct No 5
720-554-4450 Earthwork, sanitary, water, storm, curb, gutter, and asphalt (Please
This
$ 2,143,017, 50 Original
November 2002 Anticipated
Changeat
November 2002 Reason
provide descriptive paragraph)
project
Completion
Completion
for
is
Date.
Dale:
Schedule
valued
Change
Fnr„ ty Concepts Les Johnson
(303) 721-7070 11,000 CY Cut/Fill Subexcavation and Utilities to consist of 1065 LF of 8"
at
This
$ 142,159.00 Original
November 2002 Anticipated
November 2002 Reason
DIP and approximately 100 LF of 1 B" - 24" RCP for a Storage facility that project
Completion
Completion
for
is being constructed in Aurora.
is
Date:
Date:
Schedule
valued
Change.
Melody Homes Annalee
Zrmbelman
303-472-9508 Ovedot grading for a Residential Subdivision. (Please provide
at
This
$ 330,791,00 Original
September 2002 Anticipated
November 2002 Reason
descriptive paragraph)
project
Completion
Completion P
for
is
Date:
Date:
Schedule
valued
Change.
at
M!dCities Ken Tnbbey
Metropolitan District
(303) 688-5620 TARCO is providing Construction Management and General Contractor
Services for this project. The MidCities development is on 160
This
$21,713,460.00 Original
December 2000 Anticipated
December 2002 Reason
acres of
generally undeveloped land. Several houses and an old shooting range
P j roect
is
Completion
Date:
Completion
for
have been demolished to make way for construction. TARCO has self-
valued
Date:
Schedule
performed all site grading, underground utilities, site drainage, concrete
at:
Change
structures and irrigation canal piping. Subcontracts managed by our
team include lime stabilization, paving, lighting, tieback and mechanically
stabilized retaining wall construction, signage and landscaping. TARCO
has coordinated the installation of dry utilities, area wide storm water
detention issues and building pad completion. TARCO has performed all
work on this project though a prime contract with the site developers.
Although a minor amount of work was initially managed through a
traditional general contract, the Owners recognized the need for a
Construction Manager. TARCO was selected for our site development
expertise and we moved a construction management team to an on -site
office prior to the commencement of any significant work. Through chang
JR Engineering Aaron Clutter
(303) 740-9393 Subcontractor to J.R. Engineering for Design/Build project for the City of
Aurora, Adams County, and the Schuck Corporation. This
This
$ 1,542,976.00 Original
December 2002 Anticipated
December 2002 Reason
is for the
construction of East-West connector between Front Range Airport and
project
is
Completion
Completion
for
DIA, which includes storm culverts, and roadway construction.
valued
Date:
Date.
Schedule
at:
Change.
Owner Contact Person Contact Phone Detailed Description (Paragraph) Value
Contract
Datet
Original Anticipated
Completion Date2 Completion
Amount
Change
Jefferson County Dixie Shear
(303) 271-8483 TARCO, Inc., is the General Contractor on this project. This is an This
$ 3,905,000.00 Original
ate
DeceDmber 2002 Anticipated DeceDmber 2002 Reason
infrastructure improvement project that incorporates the construction of a project
Completion
Completion for
single -span, spread -footing bridge, two pedestrian bridges and curved is
Date:
retaining walls as part of the intersection realignment. This intersection valued
Date: Schedule
is the main intersection in downtown Evergreen. The scope of work also at
Change.
includes signalization, roadway and pedestrian trail lighting, paving,
utilities, flatwork, Type 10 and Type 7 railing, pedestrian railing and
landscaping.
Special construction methods used during this project include
dewatering through the use of sheet piling and submersible pumps,
asbestos abatement, building demolition, temporary excavation support
using soil -nail walls, radius forms for retaining wall construction, form -
City of Westminster Dan
liner for retaining wall construction, building renovation, sanitary sewer
(303) 430-2400 TARCO, Inc, is the General Contractor for the City of Westminster This
Blankenship
on
this project. The project includes realignment of the existing Quail Creek
$ 1,553,623.00 Original
December 2002 Anticipated December 2002 Reason
project
and Bull Canal. The scope of work includes excavation of approximately is
Completion
Date:
Completion for
Date:
160,000 Cy of material, two lox culverts, one cast -in -place post valued
Schedule
tensioning bridge, wetland mitigation, 3000 SY of concrete sidewalk, at:
Change
2500 CY of channel lined rip -rap, and a partial measuring flume.
Farmers Highline Cynda Lower
Canal and Reservoir
(303) 451-7604 This contract consists of the regrading and realignment of 5000LF of This
$ 525,744,00 Original
January 2003 Anticipated January 2003 Reason
Company
existing canal. The canal also has to be lined with a geosynthefic clay project
Completion
Completion for
liner which will all be placed by TARCO and then finished off with a is
Date:
coconut erosion control blanket and seeding. At this stage the contract is valued
Date: Schedule
being built in two phases of which the first phase is complete. We expect at:
Change.
to return in November to complete the second phase.
City of Cheyenne Scott Cowley
(307) 637-6017 This project consists of roadway improvements to Campstool Road and This
$ 3,953,425,00 Original
January 2003 Anticipated January 2003 Reason
Christen Road in Cheyenne, Wyoming. The scope of work includes rip- project
Completion
Completion for
rap channelization, 16" water lines, two pre -cast box culverts, a concrete is
Date:
intersection, and an asphalt roadway. valued
Date: Schedule
Sunset Management Alan Fishman
at
(303) 904-1430 Chatfield Farms is a turnkey project for Sunset Management in the This
$ 3,268,315.00 Original 9
Change
October 2002 Anticipated February 2003 Reason
Roxborough area. Earthwork includes sub -excavation of over 750,000 project
Completion
Completion for
cubic yards. Both utility and structures crews will also have a share of is
Date:
the work. valued
Date: Schedule
at:
Change
C,ty of Colorado John Tracy
Spnngs
(719) 385-5607 Tarco, Inc., is the general contractor on this project. which is being This
$ 5,093,921.00 Original
April 2003 Anticipated April 2003 Reason
completed using City and State funds. The project is located in project
Completion P
Completion for
downtown Colorado Springs, and is designated as a Springs Community is
Date:
Improvement Project (SCIP). The SCIP designation means the local valued
Date: Schedule
community plays a role in the planning and approval of the project. at:
Change
Monthly meetings are held to discuss the ongoing projects and future
projects in the Colorado Springs area. The existing
Shooks Run currently flows through a series of box culverts and
archways that are inadequate to handle the flows expected every year.
The new Shooks Run will now flow through a four -cell box culvert under
Kiowa Street, and under a new bridge erected on Pikes Peak Avenue.
The bridge is a 103-foot span vehicular bridge, consisting of BT54 pre-
cast girders and deck panels. The remaining channel is all open cut with
nprap bank protection, and eddy pools to facilitate a wetland habitat.
Ne,lhwesl Gary Behlens
Metropolitan Distract with Carter
(303) 820-5240 This project includes the grading of the 1st phase of a new 3000 acre This
Metropolitan District in Northwestern Broomfield County. TARCO will be
$ 3,274,250.00 Original
May 2003 Anticipated May 2003 Reason
No 1 Burgess
9
project
moving 2,190,000 CY of dirt for future roadway construction. We will is
Completion
Date:
Completion
P for
also be doing the wetlands mitigation, lead (Gun Club) mitigation, and valued
Date. Schedule
wildlife mitigation and relocation. This project, in its entirety, will be going at.
Change
on for the next several years.
Pnpe 04
TARCO, Inc. o M
SCHEDULE OF LICENSES AND PERMITS
State of Colorado
Federal Employer ID: 84-1326421
Colorado Withholding: 10-29713
City of Arvada
General Municipal
L01-013
01/18/2003
City of Aurora
ROW Earthwork
2002 128063 00 CL
05/01/2003
ROW Trenching
A11164
10/01/2003
ROW Concrete
2002 142856 00 CL
11/01/2003
City of Brighton
Level D Contractor
167
10/18/2003
City/County of
Class A Contractor
A2002-3748
12/31/2002
Broomfield
Class C Contractor
C2002-1364
12/31/2002
City/County of Denver
Sewer
SC-0168
12/31/2002
Excavation
90424
12/31/2002
Town of Erie
General Contractor
2002-132
12/31/2002
Excavator
2002-133
12/31/2002
Town of Firestone
Class A
2002-A
07/30/2003
City of Fort Collins
ROW
Permanent
City of Golden
General
957
06/22/2003
City of Greenwood Village
Level A
02 — 00741
06/26/2003
City of Lakewood
Municipal
3430
06/21/2005
City of Littleton
Misc. D-15
D15045
05/21/2003
City of Louisville
General Excavator
00575
12/31/2002
City of Thornton
Earth moving/Utility
A01030493
03/21/2003
City of Westminster
Class D Contractor
60991
03/31/2003
State of Wyoming
Class D Earthwork 0309818 05/23/2003
Class C-2 Sewer/Water 0309820 05/23/2003
Class C-1/Structural Concrete 03 10580 10/30/2003
State of New Mexico Classification: GA-98, GF-1, 029378 03/30/2005
GF-2, GF-3, GF-4, GF-5,
GF-6, GF-8, GF-9
TARCO, Inc.
Partners Jor the .Vent Generation
Owner
Contact Person Contact Phone Detailed Description (Paragraph)
Value
Contract Original
Anticipated
Amount Datet Completion Date2
Completion Change
ierrabrook
Gre E
g pp (303) 706-7869 This project is a Turnkey development in Castle Rock including overlot
This
Date
$ 5,860,368.00 Original
Date
grading, 8"-24" diameter waterlines, all sanitary and storm sewer
July 2002 Anticipated
December 2003 Reason
installation, concrete structures, retaining walls and flatwork as well as
project
is
Completion
p Completion
Date:
for
asphalt paving. The project has eight phases of development that
valued
Date:
Schedule
includes preservation of the natural vegetation within most of the lots.
at
Change
The project includes a concrete acceleration & deceleration lane on
Founder's Parkway, three outlet structures, and two water quality
filtration basins. The first phase of the project will be complete in early
June 2002, the remaining phases will be ongoing until December 2003.
(IS Homes & The
I' •N Of Colorado
Pat Hartman. (719) 638-2940. This project included the new construction of two, 60' single span
US Homes, (719) 260-8874 bridges that were constructed side by side
This
$ 1,396,537.00 Original June 2002 Anticipated
On Hold Reason
,rungs
with a common abutment, project
Steve Tussler. and with a riprap drop structure underneath. The project scope included is
Completion
P Completion
for
Merrick 8 the bridges with BT 42 girders, Type 7 bridge rail, and several hundred
valued
Date: Date:
Schedule
Associates feet of 24" welded steel and DIP water line relocation. The project had
at:
Change
150-calendar day completion date with a good portion falling in the
winter months. Special Actions to handle time constraints:
TARCO. Inc. established a very detailed and clear schedule, which
incorporated alternate work plans for weather delays. The established
schedules and alternative plans enabled TARCO, Inc. to meet the
schedule for the project.
,% ,I Management
Cos
Gramm Dewitt (303) 940-6567 This project will be completed in phases with the Earthwork to be completed fist
This
$ 442,74T00 Original June 2002
and then the Utilities, Structures, 8 Box Culvert will follow as change orders are
project Is
Anticipated
tlon
On Hold Reason
Issued by the owner.
valued at:
Completion
Date:
Date:
for
Date:
Schedule
Change
Lo•.vey Economic
P.-development
Tom Berger (303) 360-5542 This contract consists of the building of an east and west access ramp
This
$ 466,791_00 Original September 2002 Anticipated
On Hold Reason
G•^up
over the existing Westerly Creek Dam. The total yardage of dirt to be
project
P 1
Completion
moved is approaximately 165,000CY. The ramps are going to be built on
is
Completion
Date:
for
a method based spec which includes using stockpile of rubble as well as
valued
Date:
Schedule
normal fill material placed in layers and certified.
at
Change:
Southwest
Affordable Housing
rig
Clayton Unruh 719-268-0994 This contract consits of Subexcavation on Multifamilysite to depth of 30
P
feet, import of 120000 cY o/ structural material, wet ulilites
This
$984,000.00 Original September 2002
On Hold Reason
work, and
drainage work includeing an outlet structure and 72" rcp at a depth of 45
project
is
Completion Completion
Completion
for
feet., sidewalks and C&G
valued
Date: Date:
Schedule
at:
Change:
Tarco, Inc. Equipment List
CLASS11 L DESCRIPTION I NUMBER
N FLEET I`
111
CAT 515B COMPACTOR
2
112
CAT 825B/C COMPACTOR
4
113
REX/CMI 335/355 PACTOR
8
116
CAT CP563 ROLLER
1
117
DYNAPAC CA151
1
120
BE GEE SCRAPER BOX
1
121
CAT 613B SCRAPER
3
122
CAT 623E SCRAPER
1
123
CAT 627F SCRAPER
8
124
CAT 631E SCRAPER
6
125
CAT 633C/D SCRAPER
11
126
CAT 633E SCRAPER
3
127
CAT 637D/E SCRAPER
20
140
ROME DISC
7
151
KOMATSU 400 EXCAVATOR
4
152
KOMATSU 300 EXCAVATOR
3
153
CAT 235C EXCAVATOR
1
154
CAT 2256/D
2
155
CAT 330 EXCAVATOR
2
156
CAT 325 EXCAVATOR
1
157
KOMATSU 220 EXCAVATOR
1
158
KOMATSU 600 EXCAVATOR
1
161
J D 710D BACKHOE
3
163 J D 41OD BACKHOE 3
164 J D 310E BACKHOE 1
165 KOMATSU'✓V150 BACKHOE 1
1 NO CAT 631 B/C;D `n/ATERWAGON 12
Tarco, Inc. Equipment List
CLASS 1 DESCRIPTION
II II
NFLEE•
201
1 R AIR COMPRESSOR
6
280
BROCE BROOM
1
320
PAVERS
3
370
KUBOTA L4200 TRACTOR
1
371
CAT 98OG LOADER
1
372
CAT 966D LOADER
2
373
J D 644G LOADER
2
374
CAT 950A/B/E/F
13
375
SKID STEER
7
376
CAT 963 TRACK LOADER
1
377
CAT IT14 LOADER
1
378
JOHN DEERE 624G LOADER
2
378
KOMATSU WA320 LOADER
1
•
379
VOLVO L120C LOADER
2
422
GROVE RT745 CRANE
2
480
LULL 844 RT FORKLIFT
1
920
LIGHT TRUCK/ PICKUP
102
930
FUEULUBE TRUCKS
7
931
SINGLE AXLE WATER TRK
2
932
TANDEM AXLE WATER TRK
9
933
MECHANIC TRUCKS
8
934
FLATBED/FORM TRUCKS
18
935
TRACTORS BELLY/END
9
936
TRACTORS LOWBOY
2
940
VAN TRAILERS
21
941
BELLY DUMP TRAILERS
5
942
END DUMP TRAILERS
3
Tarco, Inc. Equipment List
CLASS
DESCRIPTION
NUMBER
•
_
_ IN FLEET
943
LOWBOY TRAILERS
2
944
FUEL TRAILERS
5
947
CARGO/UTILITY TRAILERS
9
952
CAT D9N DOZER
1
953
CAT D81JR DOZER
3
954
CAT D6H DOZER
2
955
CAT D5H DOZER
2
956
CAT D10N/R DOZER
2
957
CAT D38 DOZER
1
961
CAT 824C WHEEL DOZER
1
962
J D 8960 TRACTOR
1
963
J D 9300 TRACTOR
4
981 CAT 140G/H MOTORGRADER 13
• 982 J D 772CH MOTORGRADER 1
983 CAT 14H MOTORGRADER 1
•
./
7FARC-0'; JINIC)
Wif 11 4781 West 58th Avenue
-4... .v..a.. t..s.y.�.�..-..`i4 t,...sJ`
Arvada, Colorado 80002-7009
(303) 429-2221 • FAX (303) 429-0051
EQUIPMENT RENTAL RATES 2002
EQUIPMENT DESCRIPTION RATE
COMPACTORS PER HOUR
CAT 815E Compactor 135.00
CAT 825B/825C Compactor 145.00
REX 3-35 Compactor 125.00
REX 3-55 Compactor 145.00
CAT CS-563 Smooth Drum Compactor 115.00
CAT CP-563 Padfoot Compactor 125.00
DYNAPAC CA151 PDB Compactor 110.00
PULL -BEHIND ROLLERS
SHEEPSFOOT Single -Drum Pull -Behind Roller 35.00
SHEEPSFOOT Double -Drum Pull -Behind Roller 45.00
FERGUSON 50 Ton Pull -Behind Proof Roller 45.00
• SCRAPERS
CAT 613E Elevating Scraper 115.00
CAT 623E Elevating Scraper 145.00
CAT 627F Twin Engine Scraper 170.00
CAT 631E Open Bowl Scraper 195.00
CAT 633C/633D Elevating Scraper 170.00
CAT 633E Elevating Scraper 190.00
CAT 637D/637E Twin Engine Scraper 205.00
DISCS
ROME Disc (Pull -Behind) 57.00
EXCAVATORS
CAT 225D Excavator with Thumb 175.00
CAT 225D Excavator 170.00
KOMATSU 220LC-6 Excavator 175.00
CAT 325L Excavator with Thumb 175.00
CAT 33OU3308LC Excavator 172.00
CAT 235C Excavator 205.00
CAT 235C Excavator with Hydraulic Hammer 325.00
KOMATSU PC300-5/PC300-6 Excavator 180.00
KOMATSU PC400-5/PC400-6 Excavator 215.00
KOMATSU PC60OLC-6 Excavator 240.00
RUBBER TIRE BACKHOE/LOADERS
• JOHN DEERE 310SE Backhoe/Loader 4WD 85.00
KOMATSU WB150 Backhoe/Loader 4WD 85.00
JOHN DEERE 41 OD Backhoe/Loader 4WD 85.00
JOHN DEERE 510C Backhoe/loader 4WD 95.00
JOHN DEERE 71OD Backhoe/Loader 4WD 105.00
P.O. BOX 1047 • ARVADA, COLORADO 80001-1047 2/6/2002
An Equal Opportunity Employer
rj
WATER TRUCKS/TANKERS
INTERNATIONAL 2000 Gallon Water Truck
•
INTERNATIONAL 2500 Gallon 6X6 Water Truck
75.00
FORD 3800 Gallon Water Truck
85.00
MACK 4000 Gallon Water Truck
100.00
CAT 6316 8000 Gallon Water Tanker
100.00
CAT 633C 8000 Gallon Water Tanker
130.00
CAT 631 D 10000 Gallon Water Tanker
135.00
135.00
COMPRESSORS/GEN-SETS
Ingersoll-Rand 185 Air Compressor
50.00
AMIDA 15KW Gen -Set
25.00
ONAN 30KW Gen -Set
35.00
. LIGHT TOWERS
AMIDA/MAXI-LITE/AHRENS-FOX Light Tower
38.00
PUMPS
FLYGHT 2" Sewage Pump
30.00
GORMAN-RUPP 2" Electric Submersible Pump
30.00
GORMAN-RUPP 3" Electric Submersible Pump
30.00
GORMAN-RUPP 4" Diesel/Gas Trash Pump
48.00
GORMAN-RUPP 6" Diesel Trash Pump
55.00
GORMAN-RUPP 10" Diesel Trash Pump
70.00
KLEIN/PUMPMASTER Hurricane Water Pump
57.00
PUTZMEISTER P30G
65.00
•
SPREADER BOXES
BE GE Spreader Box (Pull -Behind)
48.00
BROOMS/SWEEPERS
BROCE Broom/Tenant Sweeper
65.00
CONVEYORS
FELCO Bedding Conveyor
38.00
CLARK Concrete Conveyor
38.00
SCREENS
READ RD-90 Screen -All
90.00
FRONT-END LOADERS
CAT IT-18 Loader
95.00
CAT 950A/B/E Loader
105.00
JOHN DEERE 624H Loader
105.00
KOMATSU WA320 Loader
105.00
CAT 95OF Loader
115.00
JOHN DEERE 644G Loader
115.00
VOLVO L120 Loader
115.00
CAT 963 Track Loader
120.00
Utilizing Ripper
130.00
CAT 966D/E Loader
135.00
CAT 980G Loader
135.00
•
2/6/2002
FINISH GRADE TRACTORS
KUBOTA L4200 Landscape Tractor .00
CASE 1840 Skid Steer 8080.00
• CASE 1845C Skid Steer 85.00
GEHL 5635SXT Skid Steer 85.00
BOBCAT 773 Skid Steer 85.00
CRANES & FORKLIFTS
GROVE 18 Ton Rough Terrain Crane
GROVE 45 Ton Rough Terrain Crane
100.00
LULL 844C RT Forklift
165.00
95.00
LASERS
ROTATING Lasers
PIPE Lasers
25.00
25.00
ATTACHMENTS
PIPE Fork, Compaction Wheel, or Broom when
Used on Balderson Equipped Loader
32.00
SAFETY EQUIPMENT
SAFETY Trench Box
32.00
RADIODETECTOR/Locator
43.00
PICK-UPS/PERSONNEL
PICK-UP With Snow Plow
PICK-UP with Foreman
70.00
60.00
GRADE Checker
45.00
• LABORER
OVERTIME
38.00
48.00
TRACTORSiTRAILERS
MACK Tractor with End Dump/Bottom Dump Trailer 85.00
Hauling Concrete, Rock, Trash, Etc. 95.00
TANDEM Dump Truck 55.00
Hauling Concrete, Rock, Trash, Etc. 70.00
KENWORTH Tractor with 65 Ton Lowboy On request
TRACK DOZERS
CAT D38 Dozer with Ripper
90.00
CAT D5H Dozer with, Ripper
120.00
CAT D5H LGP Dozer with Winch
140.00
CAT D6H Dozer with Ripper
150.00
CAT 06H LGP Dozer with Ripper
170.00
CAT D8L Dozer with Ripper
240.00
CAT D9N Dozer with Ripper
280.00
CAT D10N Dozer with Ripper
320.00
CAT D10R Dozer with Ripper
320.00
RUBBER TIRE TRACTORS
CAT 824C Rubber Tired Dozer
145.00
JOHN DEERE 4WD Tractor
140.00
MOTORGRADERS
• CAT 140G Motorgrader 125.00
CAT 14H Motorgrader 140.00
JOHN DEERE 772CH Motorgrader 130.00
2/6/2002
I
SMALL TOOLS
CLIPPER AsphaWConcrete Saw
WATER Pressure/AirNacuum Test Units
WATER and Sewer Tapping Machines
DARDA 8S Rock Splitter
GRUNDOMAT 75ZS Moie
VERMEER 1250 Brush Chipper
Propane Forced Air Heaters
SMALL COMPACTION EQUIPMENT
JACKHAMMER with Air Compressor
WACKER Jumping Jack Per Day
Per Day
WACKER Double -Drum Walk -Behind Roller
Per Day
ARROW Hydra -Hammer
Per Day
Special Attachment:
Will be charged at an additional $20.00 over stated cost of equipment.
Rock Excavation:
Will be charged at an additional 20% over stated cost of equipment.
110.00
60.00
6000
25.00
25.00
50.00
10.00
100.00
25.00
30.00
100.00
A $10.00 per hour overtime premium will be added to the above prices for work performed on
Saturday, Sunday, holidays and anything over 8 hours per day.
All hourly equipment and labor rates stated will be further increased by $3.50 per hour for Time
and Material work performed on Davis -Bacon projects.
Minimum one (1) hour move -in will be charged for all self -propelled equipment that can be roaded
and permitted within the state of Colorado. Minimum charge for equipment moved by a lowboy
will be four (4) hours charged at the specific equipment charge -out rate. Over-the-rcad trucks
and tractor trailer units minimum move time charges will be one half (112) hour.
2/6/2002
SECTION 00430
SCHEDULE OF SUBCONTP.ACTORS
LiSr_ a-- subcontractors for the work items listed below and all subcOnt--
_aCtGrS
perforr.'ng over 15` of the contract.
SUBCONTRACTOR
Section 00430 Page 1
SECTION 00410
BID BOND
KNOW ALL
MEN By THESE PRESENTS:
that
we,
the undersigned
Tarco. Inc.
as Principal, and St. Paul Fire and Marine
Insurance Company
as
Surety, are
hereby held and firmly bound unto the
Cit
of Fort
Collins Colorado
as OWNER, in
the Sum of S Five Percent of * for
the
payment
of which, well and
truly to be
made, we hereby jointly and severally
bind
ourselves, successors, and
azi3i g n s.
*Total Amount Bid ----------- (------ 5%--------- )
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Callins, Colorado the accompanying aid and hereby
made a part hereof to enter into a Construction Agreement for the construction of
Fort Collins Project, AVENUE WIDENING PROJECT; BID NO. 5767.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
{b) If said Bid Shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons perfonninq
labor or furnishing materials in connection therewith, and shall in all
other respects perfo= the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same Shall .remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its;BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
7/96 Section 00410 Page 1
THE LINDEN COMPANY
February 2, 2001
RE: Tarco, Inc.
To Whom It May Concern:
We handle the surety bonds for Tarco, Inc. and feel they are one of the premier heavy contractors in the
Rocky Mountain Region. Tarco, Inc. is an efficiently run and financially solid organization. They enjoy an
excellent relationship with the owners, architects and suppliers with whom they have worked. We highly
recommend them as a very competent and reliable contractor.
Tarco, Inc. is capable of providing single bonds in excess of $20,000,000.00 with an aggregate program
of $60,000,000.00.
If we may be of further assistance or provide any additional information, please do not hesitate to contact
US.
Sincerely,
d'�Nt cx�
Florietta Acosta
Account Representative
00 East Mississippi Avenue
Suite 900
Denver, CO 80246
CO Lic.: RPA00099636
CA Lic.: OBI 8058
303-756-6700
303-756-7700 Fax
800-4374256
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this 11th day of March , 2403, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCIPAL
Name: Tarco, Inc.
Address: P.O. Box 1047
Arvada CO 80001
By: .._._
Title:
61/
ATTEST
By :
(SEAL)
7/96
SURETY
St. Paul Fire and Marine Insurance ComDanv
2000 S. Colorado Blvd., #2-480
Denver,
�CO�%��80222 ��/�
By:
Florketta Ac sta
Title: Attorney -In -Fact
{SEAL}
Section 00410 Page 2
1heSMUJ
POWER OF ATTORN El'
Power of Attorney No.
Seaboard Surey Company
St. Paul Fire and Marine Insurance Company
St. Pan[ Guardian huurance Company
St. Paul Iliercw c Insurance Grmp:uny
23399
United States Fidelity and Guarant%y Company
Fidelite and Guaranh Insurance Connpam
Fidelity and Guaranh Insurance Cuderw riters, Inc.
Certiicate No. 1586418
KNOF1 ALL MEN BY THESE PRESENTS: That Seahoard Surety Company is a corporation dull urgauized under the lairs of the State of Nest York, and that
St. Paul Fire and Marine inSnraneC C'unlpanv. St. Pard tntardia❑ Insurance Conipanland St. Paul NICICUry Insurance Company arc corporations duly organiaxd under
the lim s of the State of N1inncsota, and Ih:u United States Fidelity and Cuaranty Company is a corporation dal}' oigan¢ed under the laws of the State of 61aryland, and
that Pidelit. and Civaran(v II1cUr ante C'onipanp is t corpurati on dub, organizer) under the hm s of the State of logo, and that 11&1 ty ;tad Guaranis Insurance linder%k incrs.
Inc is it corpniation ciulNoo anized under the Imes of (he State o1 %kiscousin (herein cuilc<lireh c<dlyd the "( umpanrc- "), and thot the Companies do herehy make.
Constitute ;end uppoint
Frank C. Penn, DiLynn Guem, Pamela J. Hansen, Kevin W. McMahon, Don R. Broyles, Donald E. Appleby,
Gloria C. Blackburn, Florietta Acosta and Kristen L. McCormick
of the City of Denver Colorado
State_ , their It lie and lim lid \ttojIle%t,Im-Fief,
cacti in then vcpu.uc cap.icity if mote than our i, named abow. to sign its name us suede to, and to eweute. seal and acknoeicd,c any and ull bonds, undeltaking,_
contracts and other wrtneu inslruuicnts in the nature thereof on bchulf of the C'onipanics i❑ their holiness of 1"uarmitMln1 the fidelity of persons, guaranteeing the
perforniance of co itrucis and eseculine or gu,tiuntccing bonds and undertakings required or permitted in ant actions or prnccedinea allowed by lays:
IN NFITNESS WHEREOF. the Companies Itece caused this instrument to be signed and se;tletl this 19`h dac of November 2002
Seaboard Surety Company Uniled States Fidelih and Guaranh Compam
St. Paul I ire and )lariife Insurance CoIli pany Fidelity and Guai anti Insurance Company
St. Paul Guardian Insurance Compan'v Fidelity and Guaranty Insurance Undemi"ilers, Inc.
St. Paul Nicrcun Insurance Company
1927
Si ill sr SEAL' ✓. 1896 1977 g 1951 1 OF ryI-IL \{ C:AKV1rAN, A'ice I'rc.idcut
�YI 'z( n
ick„{ 1S` AN�J
State of Maldand
City of 13altinlorc 11IUh1AS f IIUIBR66TSi:, %,,i.,lam Srcrcn:n
(hi this 19� dun of November 2002 bcforC nie, the ❑n<I maned all deer, personalh appeared Petcr y','_ Carman nod
Thorius I`. Iluibic,i,e.. wh i wku,m led, ed Ihe'll-ke, ui he the Vice P eucient and assistant See clul\. n,peclii ely. of Scoho;nd Surery Company. St. Paul Fire and
Islarine Insurance Conip-tm. St. Paul Uuanli:w InInrallCC Comp:un, St. Paul Nici my Insurance C'onipam. l ailed States I idrlm and Guaranty Conipony. I idrlitc and
Guaranis Inswance Couipitm. and FidJitc and tatarnnh Insurance Lndei-oxriters. InC . and that the scab aptintl to the I„rceoinc instrunisnt are the corporate seu6 of
said C'onipuuics: and 01,11 Ili %. is such, being authorized so to do. executed the foregoing instnnnent Ibr the purposes therein cotttnined by signing the nano, of the
corporations by themselie; as dub :unhoiizrd officers.
In AFitness \i'hereoh. I hueunto let nn h;md ;md oll iciel scud. m p�TgRy ( eCtC
fly Commis. inn cruder, the Ist dui ot'I'll" _'tltlb �H �o kl li[( C:1 I::Atil.Ll'-UVnk,U.a. Vrir, Public
E �1TV
86203 Rev. 7-2002 Printed in U_S.A.
ACORQ CERTIFICATE OF LIABILITY INSURANC�guq DA10/( 21/02
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
W^terfield Insurance Agency HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
lnion Blvd . , Suite 630 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
L—ewood CO 80228
Phone: 303-716-4750 Fax: 303-716-4775 INSURERS AFFORDING COVERAGE
INSURER A: Safeco/American States
INSURER B: Lexington
rC0 I INSURERC: CO Compensation Ins. Auth.
Arada a CO 002 a�t� Avenue INSURER0: Gulf Insurance C y
80
Arvada
COVERAGES
i nc rvuVlw Vr IHaVHARUt: USIrV dtLUW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
_TR
TYPE OF INSURANCE
POLICY NUMBER
POLICY EfFecTme
DATE MMID
PO
DATE
LIMBS
B
D
GENERAL LIAMUrY
X COMMERCIAL GENERALLIABIUN
CLAIMS MADE O OCCUR
X Pollution Liao
-
1320384
GU2826388
-
10/01/02
10/01/02
10/01/03
10/01/03
EACH OCCURRENCE
$1 000 000
F1REDAMAGEurryamfim)
s 100 000
MED EXP (My am Dram)
s 5 000
PERSONAL a ACV INJURY
$l 000 000
GENERAL AGGREGATE
s 2 000 000
GEWL AGGREGATE Ls1ET APPLIES PER:
POLICY X Loc
PRODUCTS -COMPIOP AGG
s2 000 000
Pollution
1 000 000
A
AUTOMOSILE
LIABILRY
-
ANY AUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
HIRED AUTOS
NON -OWNED AUTOS
02-CD-144448-10
10/01/02
10/01/03
COMBINED,c 04GLE UMR
S1,000,000
X
BODILY I►L
(Pr Dram)
s
RY
(per aac Cdwd)
s
PROIPERTY )DAMAGE
s
GARAGE LIABILITY
ANYAU70
TO ONLY - EA ACCIDENT
s
HR THAN EA ACC
rALrrOSJONLY.*AGO
s
S
B
EXCESS L"Lrfv
X LCLAIMSMADE
LEss
XN 310000
5640789
10/01/02
10/01/03
EACH OCCURRENCE
S 1 000 OOO
AGGREGATE
s1000 000
S
C
WORKERS COMPENMT ON AND
EMPLOYERB'UABR.ITY
OTHER
4062018
10/01/02
10/01/03
X TORY LMITS ER
E.L. EACH ACCIDENT
$500000
EL DISEASE - EA EMPLOYEE
3500000
E.L. DISEASE - POLICY LIMIT
$500000
A Property 02-CD-144448-10 10/01/02 10/01/03
A j Inland Marine 02-CD-144446-10 10/01/02 10/01/03
ESCRIPTION OF OPERATION!I.00ATIONSjWgCLE,LE](CLUSIOl43 ADDED BY ENDORSEMENTISPECULL PROVISIONS
Widence Only
:FRnIPIrATC Zrm ntla .. _---_--
TARCO-1
Tarco, Inc.
4781 W. 58th Ave.
Arvada CO 90002
VM V CLLM 1 IV A
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EMRATIO
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 1,0_ DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
tMPOSE NO OBLIGAroN OR LIAMLr Y OF ANY RIND UPON THE INSURER, ITS AGENTS OR
REPRESENTATIVES,
00
CACORD CORPORATION 1988
TARCO, INC.
EARTHMOYING CONTRACTOR.
GENERAL CONYMCIOR
1
Northern Area Office
1401 Riverside Ave., Suite 3
Fort Collins, CO 80524
(970) 493-9006 • FAX (970) 493-9022
The full name, title, address, and telephone of the principle members of TARCO, Inc.
who are interested in this bid are:
Todd E. Thomas
President
V. Marc Thomas
CEO, Secretary/Treasurer
John West
Executive Vice President
5513 Salvia Ct., Golden, CO 80403
(303) 277-1541
2438 Keystone Dr., Evergreen, CO 80439
(303) 670-0353
14716 Osage Ct., Westminster, CO 80020
(303)255-9477
! Alan Copeland 6717 W. 951h Place, Westminster, CO 80021
V.P. Operations (303) 430-9816
Jeff Copeland
V.P. Admin./Controller
Loring Knutson
Northern Area Manager
5506 S. Olathe Lane, Aurora, CO 80015
(303)699-9288
4625 Regency Dr., Fort Collins, CO 80526
(970) 226-5164
Please see the attached resumes with employment history and qualifications for the
above officers.
An Equal Opportunity Employer
V. MARC THOMAS
CHIEF EXECUTIVE OFFICER, SECRETARY, & TREASURER
TARCO, INC.
PROFESSIONAL Mr. Thomas was originally hired at TARCO as an equipment oiler. He was
EXPERIENCE: later promoted to an operator, a foreman, a manager, and over time to Vice
President/Secretary/Treasurer, where his primary responsibility was to
direct marketing and estimating efforts for the company. At the time of
transition of the company from his father, Mr. Thomas was named the
Chief Executive Officer, Secretary, and Treasurer. Overall, Marc has
gained 25 years of construction related experience.
PRIOR 1977 — Present TARCO, Inc.
EXPERIENCE: Chief Executive Officer, Secretary, and Treasurer
RESPONSIBILITIES: • Including, but not limited to: finances, marketing, client relations,
estimates, project management, and purchasing.
• Direct the day-to-day operations of the company formulating plans and
policies to achieve overall corporate objectives, insuring profitable
growth, and fulfilling company's commitment to the community.
• Create, approve and implement broad corporate policies, procedures,
and organizational structure.
• Establish and monitor short-term and long-range plans consistent with
overall profit and growth objectives.
• Provide key management direction to top executive and supervisory
personnel motivating managers to function as a cohesive organization.
• Provide advice, guidance, and direction to carry out major plans and
procedures consistent with Board established policies.
• Monitor and analyze operating results of the company relative to
established objectives and insure that corporate performance is
satisfactorily maintained.
• Insure the adequacy and soundness of the company's financial
structure, taking appropriate steps to correct unsatisfactory conditions.
• Encourage the development of dynamic company spirit, exemplifying
fairness, creativity, integrity, and healthy aggressiveness while
producing maximum benefit to the employees, clients, and the
community
• Manage $60 - $65 million per year.
TARCO, Inc.
Partners for the :Vest Generation
TODD E. THOMAS
PRESIDENT AND CHIEF OPERATING OFFICER
TARCO, INC.
PROFESSIONAL Mr. Thomas was originally hired at TARCO as mechanic's helper. He was
EXPERIENCE: later promoted to oiler, equipment operator, foreman, General
Superintendent of Earthmoving, and over time he worked his way up the
ladder to the Vice President of Production and Maintenance/Operations.
At the time of transition of the company from his father, Mr. Thomas was
named President and COO. Overall, Todd has gained 27 years of
construction related experience.
PRIOR. 1978 — Present TARCO, Inc.
EXPERIENCE: President and Chief Officer of Operations
• 1977 —1978 Conley, Lott, and Nichols
Parts Department
• 1975 —1976 Stanley Structures
Concrete Beds and Laborer, Form Shop and Carpenter
RESPONSIBILITIES: . Direct the day-to-day operations of the company formulating plans
and policies to achieve overall corporate objectives, insuring
profitable growth, and fulfilling company's commitment to the
community.
• Create, approve and implement broad corporate policies,
procedures, and organizational structure.
• Establish and monitor short-term and long-range plans consistent
with overall profit and growth objectives.
• Provide key management direction to top executive and
supervisory personnel motivating managers to function as a
cohesive organization.
• Provide advice, guidance, and direction to carry out major plans
and procedures consistent with Board established policies.
• Monitor and analyze operating results of the company relative to
established objectives and insure that corporate performance is
satisfactorily maintained.
• Insure the adequacy and soundness of the company's financial
structure, taking appropriate steps to correct unsatisfactory
conditions.
• Encourage the development of dynamic company spirit,
exemplifying fairness, creativity, integrity, and healthy
aggressiveness while producing maximum benefit to the
employees, clients, and the community.
• Manage $60 - $65 million per year.
TARCO, Inc.
Partners fir the Nevi Generation
ALAN COPELAND
VICE PRESIDENT OF OPERATIONS
TARCO, INC.
PROFESSIONAL Mr. Copeland started with TARCO as our Trucks and Loaders
EXPERIENCE: Superintendent and his worked his way up the corporate ladder to become
our Vice President of Operations in 1994. Other positions Mr. Copeland
has held include Utility Superintendent, and Project Manger for the D.I.A.
Project. Alan has gained 32 years of construction related experience.
PRIOR 0 1984 — Present TARCO, Inc.
EXPERIENCE: Vice President of Operations
• 1982 —1984 Eagle Construction
Superintendent
• 1970 —1982 Watts Brothers, Inc.
Foreman
RESPONSIBILITIES: • Schedule work, materials, equipment, labor
• Coordinate events with clients; train and direct work
• Train managers in company policies and procedures.
ADDITIONAL •
B.S. — Business Administration — University of No. Colorado 1968
CREDENTIALS: Mr. Copeland has been involved in the following major projects:
•
Denver International Airport
•
E-470
•
C-470
•
Highway 93 Bypass
•
Evergreen Parkway
•
Melody Homes
•
Pulte Homes
•
Richmond Homes
•
Meadows at Westwood
•
Waste Management Landfills
•
B.F.I. Landfills
TARCO, Inc.
Partners for the Next Generation