Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 16839 (2)Memorandum TO: John Stephen, Senior Buyer FROM: John Lang, Engineering and Design Manager DATE: May 13, 2003 RE: Anderson Consulting — Change Order CC: Cam McNair — City Engineer Christie White — Engineering Financial Coordinator Anderson Consulting (Anderson) was hired through the RFP process on the Building Community Choices "East Prospect — Poudre River to Summitview" project. Their scope of work was to perform a hydrologic evaluation of the Poudre River for this road project. During this evaluation a remnant of land, along the East bank of the Poudre River near the Timberline Road Bridge that separates the Poudre River from Riverbend Ponds Natural Area, was identified as "about to fail" during the next sizable rain/runoff event. For the sake of this memo we will call this remnant of land the "Timberline Berm". If the Timberline Berm is allowed to fail, Riverbend Ponds and Prospect Road would be wiped out as the Poudre River will have changed course from its existing path into this area. This situation has been discussed with senior members of Engineering, Natural Resources, and the Stormwater Utility. All three service areas agree in concept that we need to find out how to strengthen and protect this berm from the 100 year storm event and how much funding is needed. This is a difficult project because this area is where the Poudre River (FEMA floodplain), the City's Product 6 corridor, and a Natural Area all come together. Our group of Engineering, Natural Resources, and the Stormwater Utility all requested that we have Anderson perform a Preliminary Design to assess this issue so we will know the associated impacts and cost to protect this berm and keep the Poudre River in its existing channel. The cost of this Preliminary Design is to be split three -ways between the three service areas. Anderson was the hydraulic consultant on the Timberline Extension project, and the East Prospect Road Improvement project, and they have the best knowledge to perform this work. Anderson has scoped this work at a cost of $59,331.00. Since this is beyond the original scope of work, approval to authorize this change order and additional phase work (final design and construction drawing) is requested. Those additional phases of work will only be undertaken with the express approval and cost sharing of the three service areas. Attached is a proposal for this work. Christie White - Anderson Consulting Page 1 From: Christie White To: John Lang Date: 05/13/2003 3:00:00 PM Subject: Anderson Consulting Engineering paid $3,765.70 for additional analysis associated with the "extreme event' evaluation. The invoice should have been split 3 ways between Engineering - $1,255.24, Natural Resources - $1,255.23 & Stormwater Utilities - $1,255.23. The conceptual design associated with the "extreme event" evaluation is $59,331. The 3 way split between the department would be $19,777 each. However, in light that the 1st invoice should have been split, we are requesting that Natural Resources & Stormwater pick up the amount at this time. The split for the conceptual design would be as follows: Engineering - $19,777 - <2,510.46> = $17,266.54 Natural Resources - $19,777 + $1,255.23 = $21,032.23 Stormwater Utilities - $19,777 + $1,255.23 = $21,032.23 ` ANdERSON CONSULTING ENGINEERS, INC. Civil • Water Resources • Environmental April 10, 2003 Mr. John Lang City of Fort Collins Engineering Department 281 N. College Avenue Fort Collins, CO 80524 RE: Alternative Evaluation/Preliminary Design of LPATH Berm Protection Measures (ACE Project No. COFTCO2) Dear John: Anderson Consulting Engineers, Inc. is pleased to have the opportunity to provide engineering services in support of the "Alternative Evaluation/Preliminary Design of LPATH Berm Protection Measures." Attached is our Scope of Work proposed for the referenced project. Also attached is our proposed budget for this project. We propose to complete this evaluation and preliminary design effort by July 31, 2003 Please review the proposed scope of work, budget and schedule with respect to meeting your needs and expectations, and do not hesitate to call me with any questions or comments. Sincerely, ANDERSON CONSULTING E INEERS, INC Gre ry och, P.E. GJK/tlt Attachments C.1 a _ IVnrk In Aon ress�Pmecrn(-OFTC01 SOfV {VPD 1 orH 10. '003 772 Whalers Way. Suite '_00• Fort Collins. CO • 80525 Phone: (970) 226-0120 • Fax: (970) 226-0121 • www.acewater.com