CHANGE ORDER NO. 1 u
(to Work Order #2)
PROJECT TITLE: Upper Front Range 2030 Regional Transportation Plan
CONTRACTOR: Felsburg, Holt & Ullevig
PROJECT NUMBER: 995-99503002.529290.0
PURCHASE ORDER M 3302695
DESCRIPTION: Change in Scope of Work
1. Reason for Change:
2. Description of Change:
3. Change in Contract Cost:
4. Change in Contract Time:
ORIGINAL CONTRACT COST:
Additional Public Involvement required on plan
See attached
$6,165.00
None
TOTAL APPROVED CHANGE ORDERS:
TOTAL PENDING CHANGE ORDERS:
TOTAL THIS CHANGE ORDER:
TOTAL % OF ORIGINAL CONTRACT. THIS C.O.:
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S.:
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY: J�
Contractor's Representative
ACCEPTED BY:
15roje6t M nager
REVIEWED BY:
Name / Title
APPROVED BY:
Name / Title
APPROVED BY:
Purchasing Agent over $30,000
cc: Purchasing
$ 53,870.00
$ 6,165.00
11.44%
11.44%
$ 60,035.00
DATE: _1 03
DATE: 7
DATE:
DATE:
DATE:
u:\forms\Change Order.xls 7/8/03
Upper Front Range 2030 Transportation Plan Addition to Scope of Work
UPPER FRONT RANGE 2030 REGIONAL TRANSPORTATION PLAN
ADDITION TO SCOPE OF WORK
The Upper Front Range TPR has determined that additional services will be necessary to
complete the 2030 Regional Transportation Plan. Felsburg Holt & Ullevig (FHU) has prepared
the following scope of services to address the additional needs of the region. The schedule has
also been revised in order to reflect the changes to the scope of work.
1. FIRST ROUND OF PUBLIC INVOLVEMENT
Scope:
It has been determined that five presentations and five public open houses will be needed to
fulfill the public outreach element of the Regional Transportation Plan for the first round of public
involvement. The presentations and open houses will be as follows:
Weld Countv
• Presentation at South Weld County Mayors meeting
• Presentation at US 85 Mayors meeting
• Presentation at 1-25 Mayors meeting
• Public Open House in Ault
• Public Open House at Weld County Service Center
Morgan County
• Presentation to either Brush or Fort Morgan City Council
• Public Open House in Brush or Fort Morgan
Larimer Countv
• Public Open House in Wellington
• Public Open House in Estes Park
• Presentation (Location to be determined)
The original scope of work included one public open house; the fee below is for five
presentations and four additional public open houses.
FELSBURG
HOLT &
ULLEVIG
Pagel
Upper Front Range 2030 Transportation Plan Addition to Scope of Work
Level of Effort.
Principal II
4 Hours @ $150
= $ 600
Engineer II
48 Hours @ $ 80
= $3,840
Graphics
8 Hours @ $ 65
= $ 520
Administrative
6 Hours @ $ 60
= $ 360
ODC (5%)
265
Total Budget
$5,585
Five Presentations = $3,045
Four Public Open Houses = $2,540
Total $5,585
2. SECOND ROUND OF PUBLIC INVOLVEMENT
Scope:
The second round of public involvement is planned to occur in December after a draft Preferred
Plan has been developed. We anticipate the need for three public open houses (one in each
county) to present the Preferred Plan and to solicit feedback. The original scope of work
included one public open house; the fee below is for two additional public open houses.
Level of Effort:
Principal II
0 Hours @ $150
= $ 0
Engineer II
12 Hours @ $ 80
= $ 960
Graphics
4 Hours @ $ 65
= $ 260
Administrative
4 Hours @ $ 60
= $ 240
ODC (5%)
75
Total Budget
$1,535
3. THIRD ROUND OF PUBLIC INVOLVEMENT
Scope:
The third round of public involvement is planned to occur in February 2004 after a preliminary
Financially Constrained Plan has been developed. We anticipate the need for three public open
houses (one in each county) to present the Financially Constrained Plan and to solicit feedback.
The original scope of work included one public open house; the fee below is for two additional
public open houses.
FELSHURG
HOLT &
ULLEVIG
Page 2
Upper Front Range logo Transportation Plan Addition to Scope of Work
Level of Effort:
Principal II
Engineer II
Graphics
Administrative
ODC (5%)
Total Budget
0 Hours @ $150 = $ 0
12 Hours @ $ 80 = $ 960
4 Hours @ $ 65 = $ 260
4 Hours @ $ 60 = $ 240
75
$1,535
4. ADDITIONAL RPC MEETING
Scope:
A third presentation to the Regional Planning Commission will be added in November, prior to
the second round of public open houses. This meeting will be used to present the draft
Preferred Plan to the Commission.
Level of Effort:
Principal II
6 Hours @ $150
= $ 900
Engineer II
8 Hours @ $ 80
= $ 640
Graphics
4 Hours @ $ 65
= $ 260
Administrative
2 Hours @ $ 60
= $ 120
CDC (5%)
95
Total Budget
$2,015
S. MODIFICATIONS TO ORIGINAL SCOPE
The original scope of work included maintaining a contact list and distributing mailings for the
three rounds of public involvement, as well as entering the RTP projects into CDOT's database.
CDOT will maintain the contact list and distribute the mailings for the second and third rounds of
public involvement. The NFRT&AQPC will enter the projects into CDOT's database. The cost
for these items has been subtracted from the additional scope of work, as indicated below.
Level of Effort:
Mailings
Database Entry
FELSBURG
HOLT &
ULLEVIG
- $ 500
960
- $1,460
Page 3
Upper Front Range 2o3o Transportation Plan Addition to Scope of Work
6. REVISED PLANNING GUIDEBOOK
Scope:
A Planning Guidebook was developed in 2001 for the communities in the Upper Front Range in
order to assist them in submitting projects for the Regional Transportation Plan. Since the
guidebook was developed, there have been several significant changes in the Regional and
Statewide Planning Processes. This task would involve revising the guidebook such that it is
compatible with the recent changes in the planning process. Production of the guidebooks is
included; however, it is anticipated that CDOT will distribute the guidebooks to the communities
in the Upper Front Range and will provide one-on-one direction to the communities. A Draft
Planning Guidebook will be developed for CDOT to distribute to the communities prior to the
Project Identification phase. The guidebook will be finalized later in the planning process in
order to incorporate any changes in the process that may occur as the plan is developed.
Level of Effort.
Principal II 8 Hours @ $150 = $1,200
Engineer II 24 Hours @ $ 80 = $1,920
Graphics 8 Hours @ $ 65 = $ 520
Administrative 16 Hours @ $ 60 = $ 960
ODC (Production) $1,000
Total Budget $5,600
SUMMARY
The following is a summary of the budget estimate for all of the above noted ta�ks. Tasks 1
through 4 have been grouped together, while Task 5 stands as a separate fee.
1. First Round of Public Involvement
2. Second Round of Public Involvement`
$
$
5,585 / _ `�
1,535
3. Third Round of Public Involvement
$
1,535
4. Additional RPC Meeting
$
2,015
5. Modifications to Original Scope
-
Total $
1,460 je<r5,PLA 61 Dw4
9,210 - �3,oNs = lc,l4os P o.
5. Revised Planning Guidebook
$
5,600 - EletA5 pd 67 00� n
iFELSBURG
HGLT &
ULLEVIC
Page 4