HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - 3302207JUL - 3 2003 Change Order Form c� City of F /9" 7 PROJECTTITLE: Downtown Enhancement Project 5—/75z� PROJECT NUMBER: 30534000.6 CONTRACTOR: RC Heath Construction (PO #3301431) L Q.�j . #� 3 30 10 7) CHANGE ORDER NUMBER: 3 n preparing change orders Show In order as separate numbered paragraphs the tollowing 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by $3,851.51 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) Contractor's Representative APPROVED BY: U / A Department Head (Street Oversizing) APPROVED BY: Al' 1 Department Head (Parks) APPROVEDBY: NSA Department Head (Pedestrian Access) APPROVED BY: Al 1A Department Head (Street ai�ntenance APPROVED BY: Dgrtment I-Tead (Utilities -Water) APPROVED BY: (Purchasing Agent over $30,000) 0.46 % 6.01 % $835,427.03 $46,349.49 $0.00 $3,851.51 $885,628.03 DATE: DATE: DATE: DATE: DATE: b 11 i DATE: cc: Purchasing Street Oversizing . $0.00 Accounting Parks $0.00 Contractor Pedestrian Access $0.00 Project File Street Maintenance $0.00 Water Utilities $3,851.51 Engineering Department - 281 North College avenue - P.O. Box 380 - Fort Collins, CO 80522.0580 - (303) 221-6605 Downtown Enhancement Project - Bid No. 5759 R.C. Heath Construction Repairs for Water Utility - West Mountain Date: 06/12/2003 1. Reason For Change: a. Additional concrete patching is required over utility repairs on Mountain west of College b. Additional concrete patching is required over utility repairs on Mountain east of College 2. Description Of Change: a. Revise the contract quantities to reflect the modifications to the work 3. Change In Contract Amount: a. Water Utility Repairs - Patrick Hodges 202.01 Remove Concrete Pavement (8"-10") 202.03 Remove Concrete Sidewalk, Asphalt Sidewalk and Access Ramps 202.06 Remove Standard Concrete Curb and Gutter 202.11 Remove Driveway 412.02 Concrete Pavement (8") 608.05 Concrete Driveway & Approach (8") 608.02 Concrete Sidewalk 4" 609.01 Vertical Curb+Gutter-30" (see detail) b. Water Utility Repairs - Dean Grogan 202.03 Remove Concrete Sidewalk, Asphalt Sidewalk and Access Ramps 608.22 Exposed Aggregate Concrete 4" 412.04 Hi -Early Concrete - 3000psi @ 24 Hours 412.05 Hi -Early Concrete - 3000psi @ 12 Hours TOTAL CHANGE IN CONTRACT AMOUNT Water 4. Change In Contract Time There is no change in contract time City Unit Unit Cost Total Cost 285.30 SF $ 0.96 $ 273.89 20 SF $ om $ 19.60 5 LF $ 7.72 $ 38,60 108 SF $ 1.00 $ 108.00 31.7 SY $ 40.06 $ 1,269.90 108 SF $ 6.53 $ 705.24 20 SF $ 2.81 $ 56.20 5 LF $ 12.60 $ 63.00 $ 2,534.43 30 SF $ 0.98 $ 29.40 30 SF $ 2.61 $ 78.30 32.13 CY $ 27.00 $ 867.38 9.00 CY $ 38.00 $ 342.00 $ 1,317.08 $ 3,651.61 $ 3,851.51 0 Days