HomeMy WebLinkAboutRESPONSE - BID - 5791 CHEMICAL STORAGE BUILDING (5)BID PROPOSAL
BID #5791
CHEMICAL STORAGE BUILDING
BID OPENING: MAY 29, 2003, 3:00p.m., (our clock)
WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS REQUIREMENTS FOR
CHEMICAL STORAGE BUILDING PER THE BID INVITATION AND ANY REFERENCED
SPECIFICATIONS:
The City Of Fort Collins is requesting bids for one chemical storage building with 2 hour fire
rating for Natural Resources Department located at Nix Farm, 1745 Hoffman Mill Road, Ft
Collins, CO. per the attached specifications. All shipping must be FOB Destination and included
in the lump sum bid.
Any questions regarding this bid should be directed to John Stephen, CPPB, Senior Buyer at
(970) 221-6775.
BID SCHEDULE
Provide one non-combustible storage locker shipped completely built, including freight, per
attached specifications:
LUMP SUM $_ 23 , 032 . 00
Firm Name & A SHEET METAL PRODUCTS,
Signatur 1 Printed Nam
Addres 5 22 90JRTH STATE ROAD 39, LA
Telephone # (888) 326-7890
Fax# (219)326-8738
INC.
e KIMBERLY K. BIEGE
PORTE, IN 46350
3
SPECIFICATIONS
General
1. Minimum Inside Dimensions: 10'0" wide X 14'0" long X 7'0" high
2. Construction: 12 and 12 gauge steel with continuous seam welds continuously on all sides to
eliminate crevice corrosion or equal. All weld procedures are in conformance with AWS D1.1,
fully approved and all welding is performed by certified structural welders. Must meet 110 mph
wind load and 40 psf snow load.
3. Doors: Minimum of 54" wide opening with chrome plated, 3-pt locking hardware
and heavy duty stainless load bearing surfaces ball hinges or equal. The door(s) shall be
equipped with a sealing system comprised of a primary outer seal and a secondary inner seal or
equal. Must include one door retainer for each door if more than one.
4. Primary Floor: Floor load rating of 350 pounds per square foot and equipped with galvanized,
non slip grating or equal.
5. Containment sump: Minimum 350 gallons capacity. Sumps shall be hydro tested for a full 24
hour period.
6. Seismic restraint: Shall be equipped with seismic restraint tie downs on all four corners.
7. Grounding: Shall include one (or as needed) grounding lug for entire building.
8. Finish: Shall be chemical and weather resistive finish inside and out such as resistant
enamel or equal.
9. DOT & 704-M placards.
10. One year warranty.
11. Vendor must provide shop drawings for approval prior to manufacturing.
Options to be Included in Package:
2.
3.
4.
5.
6.
7.
two explosion proof interior lights
one ex losion roof ventilation f n 12" A
lJ"
p p a ia)
one hazard location heater (220 volt)
one thermal insulation package (min R-11)
one standard loading ramp (min 48" W x 71" L)
three rows of adjustable shelving (min 120" long x 15"-1/2" deep) or equal
three rows of adjustable shelving (min 168" long x 15"-1/2" deep) or equal
rd
SECURALLO
Safety Storage Equipment
www.securalli)roducts.com
manufactured by
A & A Sheet Metal Products, Inc.
5122 N. State Road 39, La Porte, IN 46350
Phone(888)326-7890 Fax (219) 326-8738
Quotation*
CB5449 Contact Person:
Job Description:
Chemical Storage Building Company:
Date:
05/12/03 Street:
Quoted By:
Kimberly Biege City & State:
Government Sales Representative Phone:
GSA Contract No.
GS-28F-0010B Fax:
MODEL # QUANTITY DESCRIPTION
BL8.5x15x11xFR2 1 Custom Chem. Storage Bldg
OP0001 1 Interior Explosion Proof Light with Switch
OP0001A 1 Additional Interior Explosion Proof Light
OP0013 1 Explosion Proof Exhaust System
OP006-25
BR70
OP0022 Special
City of Fort Collins
215 North Mason Street, 2nd Floor
Fort Collins, CO 80524
970-221-6775
970-221-6707
COST/UNIT
$ 13,645.00
$ 579.00
$ 321.00
$ 1,154.00
1 Explosion Proof Heater 25,938 BTU $ 1,857.00
1 Diamond Plated Ramp 44" x 88" $ 422.00
78 Shelves, 16" Deep, (price per linear foot) $ 29.00
Building & Accessory Total:
Freight via Trans -United:
Total Cost:
EXTENDED COST
$
13,645.00
$
579.00
$
321.00
$
1,154.00
$
1,857.00
$
422.00
$
2,262.00
$
20,240.00
$
3,062.00
$
23,302.00
Special Features
* Removable galvanized steel grating with extra floor supports. 350 Ibs per sq. ft capacity.
* DOT & 704-M Placards.
* Two 60"W x 80"H, double doors with a 3 point locking system.
* Sump to be hydrostatically tested for a 24 hour period.
Standard Features
* Building has double wall, welded construction, 3" airspace with 1 layer 3/41' gypsum
panel and R-11 Insulation.
* Exterior walls are 12-gauge galvanneal steel. Interior walls 20-gauge cold roll.
* 12 Gauge steel sump.
* Removable galvanized steel Safety Plank flooring.
* Heavy Gauge forklift channels with open-end construction.
* Load center is 120/240 Volt Single Phase, NEMA 3111
* Bolt -down plates (4) with 7/8" diameter holes for wind and seismic bracing.
* Multiple static grounding connections.
* Inlet vents for natural ventilation, with fire dampers.
* Explosion relief panels (2) located in the rear wall of the building (48" x 48")
* Complies to NFPA Code 30.
* Building Factory Mutual approved, and UL listed accessories.
* Finish is a two-part chemical resistant urethane.
Exterior Dims: 8' 6" H x 14' W x 10' D Weight: 10,100 Ibs
Lead Time: 8 weeks after drawing approval FOB: Fort Collins, CO
Sump Capacity: 543 gallons
Customer is responsible for the off-loading of the building once it arrives at the destination.
Credit Terms: Master Card/Visa Accepted
NET 30 Terms available