HomeMy WebLinkAboutRFP - P872 PFA GENERAL CONTRACTOR ANNUALCity of Fort Collins
Administrative Services
Purchasing Division
REQUEST FOR PROPOSAL
CITY OF FORT COLLINS
POUDRE FIRE AUTHORITY
GENERAL CONTRACTOR FOR
FIRE STATION EXPANSION AND RENOVATION PROJECTS
PROPOSAL NO. P-872
PROPOSAL DATE: JANUARY 14, 2003, 3:00 p.m. (our clock)
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
CONTRACTOR REVIEW AND ASSESSMENT
Construction firms will be evaluated on the following qualification criteria. Criteria will form the
basis for rating of written proposals as well as oral interviews.
Rating scale will be from 1 to 5 (or 10, depending on maximum possible points), with 1 being a
poor rating, and the maximum possible points being an outstanding rating.
POSSIBLE
QUALIFICATION
STANDARD
POINTS
MAX -MIN
10 - 1
Scope of Proposal
Does the proposal show an understanding of the scope
of the project, methodology to be used in the design
and construction phases and the results that are
desired from the project?
10 - 1
Assigned Project
Does the proposed team have the necessary skills and
Team
experience to fulfill the requirements of the project?
Are the key staff available to do the work?
5-1
Safety Record
"OSHA Illness/Injury Rate", "OSHA Lost Work Day
Incidence Rate" and Workman's Comp Experience
Modification Rate Insurance multiplier.
10 - 1
Firm Experience
Has the firm worked on projects similar in scope to this
--Design
project? Has partnering been used as a basis in
--Construction
design and construction of other projects? Was this
work of a high quality in nature?
5-1
Design Phase Cost
Are the proposed design cost rates reasonable and
competitive?
10 - 1
Construction Cost
Do the proposed construction cost factors compare
Factors
favorably with industry standards and other firms'
construction cost factors?
10 - 1
Firm Capability
Does the firm have experience, equipment, manpower
and finances to complete the work?
10 - 1
Construction
Do the referenced projects reflect favorably in respect
Performance
to completion within the contract schedule, cost and
number of change orders and claims?
5-1
Motivation
Has the firm shown an interest in work and a
commitment to the successful completion of the
project?
E7
Reference Evaluation
The City of Fort Collins will check references for overall performance, timetable, completeness,
budget and job knowledge of selected projects/references. A satisfactory/unsatisfactory rating
shall be given to each reference contacted.
We
SERVICES AGREEMENT
WORK ORDER TYPE
THIS AGREEMENT made and entered into the day and year set forth below, by and
between POUDRE FIRE AUTHORITY acting through its agent THE CITY OF FORT COLLINS,
COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and
hereinafter referred to as "Service Provider".
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed
by and between the parties hereto as follows:
1. Services to be Performed.
a. This Agreement shall constitute the basic agreement between the parties for
services for
The conditions set forth herein shall apply to all
services performed by the Service Provider on behalf of the City and particularly described in
Work Orders agreed upon in writing by the parties from time to time. Such Work Orders, a
sample of which is attached hereto as Exhibit "A", consisting of (_ ) page[s], and
incorporated herein by this reference, shall include a description of the services to be
performed, the location and time for performance, the amount of payment, any materials to be
supplied by the City and any other special circumstances relating to the performance of
services. No workorder shall exceed $ . The only services authorized under this
agreement are those which are performed after receipt of such Work Order, except in
emergency circumstances where oral work requests may be issued. Oral requests for
emergency actions will be confirmed by issuance of a written Work Order within two (2) working
days.
b. The City may, at any time during the term of a particular Work Order and without
invalidating the Agreement, make changes within the general scope of the particular services
WOSA 10/97
assigned and the Service Provider agrees to perform such changed services.
2. Changes in the Work. The City reserves the right to independently bid any
services rather than issuing work to the Service Provider pursuant to this Agreement. Nothing
within this Agreement shall obligate the City to have any particular service performed by the
Service Provider.
3. Time of Commencement and Completion of Services The services to be
performed pursuant to this Agreement shall be initiated as specified by each written Work Order
or oral emergency service request. Oral emergency service requests will be acted upon without
waiting for a written Work Order. Time is of the essence.
4. Contract Period. [Option 1] This Agreement shall commence upon the date of
execution shown on the signature page of this Agreement and shall continue in full force and
effect for one (1) year, unless sooner terminated as herein provided. In addition, at the option of
the City, the Agreement may be extended for an additional period of one (1) year at the rates
provided with written notice to the professional mailed no later than 90 days prior to contract
end.
4. Contract Period. [Option 2] This Agreement shall commence 199_, and
shall continue in full force and effect until , 199_, unless sooner terminated as herein
provided. In addition, at the option of the City, the Agreement may be extended for additional
one year periods not to exceed _ (_) additional one year periods. 'Pricing changes shall be
negotiated by and agreed to by both parties and may not exceed the Denver - Boulder CPI-U as
published by the Colorado State Planning and Budget Office. Written notice of renewal shall be
provided to the Service Provider and mailed no later than 90 days prior to contract end.
5. Delay. If either party is prevented in whole or in part from performing its
obligations by unforeseeable causes beyond its reasonable control and without is fault or
negligence, then the party so prevented shall be excused from whatever performance is
WOSA 10/97
prevented by such cause. To the extent that the performance is actually prevented, the Service
Provider must provide written notice to the City of such condition within fifteen (15) days from
the onset of such condition.
6. Early Termination by City/Notices. Notwithstanding the time periods contained
herein, the City may terminate this Agreement at any time without cause by providing written
notice of termination to the Service Provider. Such notice shall be mailed at least fifteen (15)
days prior to the termination date contained in said notice unless otherwise agreed in writing by
the parties. All notices provided under this Agreement shall be effective when mailed, postage
prepaid and sent to the following address:
City Department Copy: Service Provider
In the event of early termination by the City, the Service Provider shall be paid for
services rendered to the termination date, subject only to the satisfactory performance of the
Service Provider's obligations under this Agreement. Such payment shall be the Service
Provider's sole right and remedy for such termination.
7. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed
price. The actual amount of work to be performed will be stated on the individual Work Orders.
The City makes no guarantee as to the number of Work Orders that may be issued or the actual
amount of services which will in fact be requested. No Work Order of or more shall be
issued.
8. Payments. a. The City agrees to pay and the Service Provider agrees to accept
as full payment for all work done and all materials furnished and for all costs and expenses
incurred in performance of the work the sums set forth for the hourly labor rate and material
costs, with markups, stated within the Bid Schedule Proposal Form, attached hereto as Exhibit
WOSA 10/97
"B", consisting of (_) page[s], and incorporated herein by this reference.
b. Payment shall be made by the City only upon acceptance of the work by the City and
upon the Service Provider furnishing satisfactory evidence of payment of all wages, taxes,
supplies and materials, and other costs incurred in connection with the performance of such
work.
9. City Representative. The City's representative will be shown on the specific
Work Order and shall make, within the scope of his or her authority, all necessary and proper
decisions with reference to the work requested. All requests concerning this Agreement shall
be directed to the City Representative.
10. Independent Contractor. It is agreed that in the performance of any services
hereunder, the Service Provider is an independent contractor responsible to the City only as to
the results to be obtained in the particular work assignment and to the extend that the work shall
be done in accordance with the terms, plans and specifications furnished by the City.
11. Personal Services. It is understood that the City enters into the Agreement
based on the special abilities of the Service Provider and that this Agreement shall be
considered as an agreement for personal services. Accordingly, the Service Provider shall
neither assign any responsibilities nor delegate any duties arising under the Agreement without
the prior written consent of the city.
12. Acceptance Not Waiver. The City's approval or acceptance of, or payment for
any of the services shall not be construed to operate as a waiver of any rights under the
Agreement or of any cause of action arising out of the performance of this Agreement.
13. Warranty.
(a) Service Provider warrants that all work performed hereunder shall be
performed with the highest degree of competence and care in accordance
with accepted standards for work of a similar nature.
(b) Unless otherwise provided in the Agreement, all materials and equipment
WOSA 10/97
incorporated into any work shall be new and, where not specified, of the
most suitable grade of their respective kinds for their intended use, and all
workmanship shall be acceptable to City.
(c) Service Provider warrants all equipment, materials, labor and other work,
provided under this Agreement, except City -furnished materials,
equipment and labor, against defects and nonconformances in design,
materials and workmanship/workwomanship for a period beginning with
the start of the work and ending twelve (12) months from and after final
acceptance under the Agreement, regardless whether the same were
furnished or performed by Service Provider or by any of its subcontractors
of any tier. Upon receipt of written notice from City of any such defect or
nonconformances, the affected item or part thereof shall be redesigned,
repaired or replaced by Service Provider in a manner and at a time
acceptable to City.
14. Default. Each and every term and condition hereof shall be deemed to be a
material element of this Agreement. In the event either party should fail or refuse to perform
according to the terms of this agreement, such party may be declared in default thereof.
15. Remedies. In the event a party has been declared in default, such defaulting
party shall be allowed a period of ten (10) days within which to cure said default. In the event
the default remains uncorrected, the party declaring default may elect to (a) terminate the
Agreement and seek damages; (b) treat the Agreement as continuing and require specific
performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting
party commences legal or equitable actions against the defaulting party, the defaulting party
shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees
and costs incurred because of the default.
16. Binding Effect. This writing, together with the exhibits hereto, constitutes the
entire agreement between the parties and shall be binding upon said parties, their officers,
employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs,
personal representative, successors and assigns of said parties.
17. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save
harmless the City, its officers, agents and employees against and from any and all actions,
WOSA 10/97
suits, claims, demands or liability of any character whatsoever, brought or asserted for injuries
to or death of any person or persons, or damages to property arising out of, result from or
occurring in connection with the performance of any service hereunder.
b. The Service Provider shall take all necessary precautions in performing the work
hereunder to prevent injury to persons and property.
c. Without limiting any of the Service Provider's obligations hereunder, the Service
Provider shall provide and maintain insurance coverage naming the City as an additional
insured under this Agreement of the type and with the limits specified within Exhibit "D",
consisting of ( ) page[s], attached hereto and incorporated herein by this reference.
The Service Provider before commencing services hereunder, shall deliver to the City's Director
of Purchasing and Risk Management, 250 N. Mason, Fort Collins, Colorado 80524 one copy of
a certificate evidencing the insurance coverage required from an insurance company acceptable
to the city.
18. Entire Agreement. This Agreement, along with all Exhibits and other documents
incorporated herein, shall constitute the entire Agreement of the parties. Covenants or
representations not contained in this Agreement shall not be binding on the parties.
19. Law/Severability. This Agreement shall be governed in all respect by the laws of
the State of Colorado. In the event any provision of this Agreement shall be held invalid or
unenforceable by any court of competent jurisdiction such holding shall not invalidate or render
unenforceable any other provision of this Agreement.
20. Special Provisions. [Optional] Special provisions or conditions relating to the
services to be performed pursuant to this Agreement are set forth in Exhibit _, consisting of
( ) page[s], attached hereto and incorporated herein by this reference.
WOSA 10/97
POUDRE FIRE AUTHORITY
THE POUDRE FIRE AUTHORITY ACTING
BOARD OF DIRECTORS
THROUGH ITS AGENT
CITY OF FORT COLLINS, COLORADO
BY:
a municipal corporation
Dick Rayner
Chairman
By:
James B. O'Neill II, CPPO
Director of Purchasing and Risk Management
Date:
ATTEST:
City Clerk
APPROVED AS TO FORM:
Assistant City Attorney
[INSERT CORPORATIONS NAME] or
[Insert Partnership name] or
[Insert individual's name]
Doing business as [Insert name of business]
A
PRINT NAME
CORPORATE PRESIDENT OR VICE PRESIDENT
Date:
ATTEST:
CORPORATE SECRETARY
WOSA 10/97
(Corporate Seal)
EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
DATED:
Work Order Number:
Purchase Order Number:
Project Title:
Commencement Date:
Completion Date:
Maximum Fee: (time and reimbursable direct costs):
Project Description:
Scope of Services:
Acceptance
User
Service Provider agrees to perform the services The attached forms consisting of _ (� pages
identified above and on the attached forms in are hereby accepted and incorporated herein by
accordance with the terms and conditions this reference, and Notice to Proceed is hereby
contained herein and in the Services Agreement given.
between the parties. In the event of a conflict
between or ambiguity in the terms of the
Services Agreement and this work order
(including the attached forms) the Services
Agreement shall control.
Service Provider
By:
Date:
WOSA 10/97
City of Fort Collins
By:
Date:
TABLE OF CONTENTS
Request for Proposal Pages 1-2
Project Requirements Pages 3-4
Proposal Guidelines Pages 4-7
Contractor Review and Assessment Page 1
Reference Evaluation Page 2
Professional Services Agreement Pages 1-6
REQUEST FOR PROPOSAL
CITY OF FORT COLLINS
POUDRE FIRE AUTHORITY
FIRE STATION EXPANSION AND RENOVATION PROJECTS
PROPOSAL NO. P-872
The City of Fort Collins is requesting proposals from qualified construction contractors for work
on improvements to new and existing Poudre Fire Authority facilities in Fort Collins. The
selected contractor will assist Vaught -Frye Architects and Poudre Fire Authority (PFA) staff in
addressing constructability issues during preparation of final design(s), and at the City's option,
to perform the construction of multiple projects on a negotiated price basis. The selected
contractor may be retained for multiple phases of the work over the next five years. The City of
Fort Collins may utilize the selected contract for similar projects required in the next five years,
but not specifically listed.
A copy of the Proposal may be obtained by calling the City of Fort Collins Purchasing
Office at (970) 221-6775 or by accessing our web page at www.fcgov.com/purchasing.
Proposals, five copies (5) copies, will be received at the City of Fort Collins Purchasing Division,
P. O. Box 580, 80522, or delivered to 215 N. Mason, 2"d floor, Fort Collins, Colorado 80524, on
or before 3:00 p.m. (our clock), January 14, 2003. Proposal number P-872.
A pre -proposal meeting is going to be held at 1:00 pm at 3400 West Vine, PFA Training Facility,
on December 9, 2002. 3400 West Vine is west of Overland Trail.
The City is planning to select a qualified general contractor to assist the design team with cost
estimating, methods and approach evaluations, construction sequencing and scheduling and
other construction considerations during design. The contractor will be part of the design team
and will be compensated for this participation. Following the preparation of final design
drawings and construction specifications, the City expects to negotiate separate guaranteed
maximum price contract(s) with the selected contractor for construction of the improvements.
The final price negotiation(s) will be subject to outside review and auditing. Contractor will be
required to sign the City's standard Construction Contract which is available for review in the
Purchasing Office. If negotiations cannot be successfully completed, the City will bid the work.
The schedule for the work anticipates selection of a contractor by January 2003
Selection of the contractor will be based upon the submittal of detailed information required in
the proposals, including experience, past performance, suitability of key staff and proposed cost
parameters. It is of utmost importance that the requested data be submitted with your proposal.
The selection criteria are detailed in the request for proposals. Following review of proposals,
the City anticipates interviewing three or more contractors to determine the selected firm.
Questions about the scope of the work should be directed to Bob Poncelow, PFA Project
Manager, at (970) 416-2895.
Questions regarding proposal submittal or process should be directed to John Stephen, CPPB,
Senior Buyer at (970)-221-6775.
Sales prohibited/conflict of interest: No officer, employee, or their dependent or person residing
in and sharing the expenses of their household, shall have a financial interest in the sale to the
City of any real or personal property, equipment, material, supplies, or services. This rule also
applies to subcontracts with the City. This shall not apply to members of any authority, board,
committee or commission of the City, other than the members of the City Council. Soliciting or
accepting any gift, gratuity favor, entertainment, kick -back or any items of monetary value from
any person who has or is seeking to do business with the City of Fort Collins is prohibited. Any
vendor knowing of this type of activity is encouraged to report in confidence to the Director of
Purchasing and Risk Management, Director of Finance, City Attorney or City Manager so the
matter can be dealt with.
The City of Fort Collins reserves the right to reject any and all proposals and to waive any
irregularities or informalities.
Sincerely,
Lotf --
q4Ms B. O'Neill ll, CPPO, FNIGP
Director of Purchasing & Risk Management
2
PROJECT REQUIREMENTS
A formal Partnering Session will be held with the selected contractor, PFA team members and
Vaught -Frye Architects as soon as the selection process is completed.
During the design phase(s), the contractor will be part of the design team with PFA and Vaught -
Frye Architects, participating in the final design effort by assisting in the following areas:
Review of designs for constructability
Estimating costs of different alternatives and components
° Providing opinions and recommendations on suitable methods and approaches
to accomplishing the work
Provide input on construction sequences and schedules
° Offer value engineering suggestions to accomplish the desired objectives in the
most cost-effective manner possible.
Provide on -going cost status of the project to the design team as the project
proceeds.
The contractor is required to commit key staff members to assist the project team by attending
regularly scheduled project meetings and preparing information or responses to issues in
advance of meetings. Normally, attendance will be required by the contractor's project manager
and superintendent. In the event key technical functions are subcontracted, the subcontractor
shall assist the general contractor firm in fulfilling its responsibilities under the agreement during
the design phase(s), including participation in design discussions.
The PFA staff works very closely with the Architect/Engineer (Vaught -Frye Architects) and the
contractor on a day to day basis as part of a team during design and construction of projects.
Traditional adversarial roles are not an acceptable way of doing business. You are encouraged
to call or visit to discuss further or to ask any questions that you have about the process.
The Poudre Fire Authority utilizes the services of a general contractor on an as needed basis.
The type and complexity of the work varies, dependent upon the specific needs of the PFA at
any given time. Several projects including a 25,000 gallon Pump Test Pit, a major addition to
the administrative offices, additional fire stations and significant remodels and additions to
existing fire stations and the replacement of the burn building are all possible during the terms of
any agreement.
Currently none of these projects has approval, so in an effort to clarify the potential scope,
several recent projects are listed below for reference and to help define the scope of services
3
desired.
• Prototype Fire Stations (Stations 12 & 14) --—10,500 sq foot fire stations with living
quarters, apparatus bays, community rooms, offices and support areas, typically located
on 1 to 1.5 acre sites. 2 of these facilities completed in last 6 years.
• Training Center Facilities ----13,000 sq ft classroom facility with offices for training staff
added to the 27 acre training site.
• Breathing Apparatus Service Center — Significant remodel of existing space to
accommodate a state of the art service and repair facility for self contained breathing
apparatus.
• Remodel Fire Station 7 — Complete remodel of an existing facility. Included replacement
of all interior finish, new HVAC duct work, all new electrical service, addition of a fire
sprinkler system and a new roof structure.
• Live Fire Training building — Significant repairs to this structure to extend its useful life.
• Flag Poles — The installation of Flag Poles at several facilities.
• Computer Room Remodel — A remodel of space at the administrative offices to
accommodate a computer room and small conference area.
This list of projects is not exhaustive of the projects completed under the current agreement and
is no guarantee of similar projects in the future. Most of these projects were completed using a
team approach with the Authorities design firm, however some projects were strictly design
build by the contractor and others a combination of design build and design team approaches.
PROPOSAL GUIDELINES
Qualified general contractors interested in the work described in this request should submit a
minimum of the following information to the City:
Describe your approach to this project.
1. General information.
Name of firm, contact person for this proposal, title, phone number, fax number,
street and mailing addresses, any previous names of firm in last 10 years, and
date established.
2. Key project staffing.
Names and resumes of key project staff, including proposed project manager,
construction superintendent, and project cost estimator. Indicate pertinent work
experience and any post high school construction management or engineering
education. Include references from owners and consulting engineers for the last
a]
3 projects for each assigned person, and similar references for work on recent
similar building projects for each (if not among last three projects). Detail the
availability of staff assigned.
3. General company resources.
Indicate the resources available for cost estimating, construction approach and
methods, construction sequencing and scheduling. Provide descriptions,
resumes, organization charts and/or other indications of the degree expertise and
qualifications available to this project. Indicate location if not based in the office
location in item 1 above.
4. Project experience.
Provide brief summary of similar construction project work performed by the firm
in the last 5 years. Highlight any participation by key staff proposed for this
project. Provide data on:
Bid cost
Cost at completion and number of change orders
° Contractor, subcontractor or owner initiated claims and
their resolution
° Contract time for completion when bid.
Actual completion time.
Brief discussion of any unusual factor is encouraged (e.g. owner initiated delays,
additions to the work, etc.). Provide both an owner reference and consulting
engineer reference for cited projects.
5. Partnering experience.
Describe any experience by the firm or key staff with similar
owner/engineer/contractor teams. Describe the firm's experience in Partnering,
both formal and informal. Highlight any Partnering experience by key staff
proposed for this project. Provide references for cited experience.
6. Safety record.
Provide the firm's OSHA reportable accident rate and current workman's
compensation insurance multiplier for the last 3 years. Provide the OSHA
reportable accident rate on projects managed by the proposed superintendent or
project manager over the three year period (depending on who is assigned site
safety responsibility in the contractor organization).
5
7. Subcontractors.
Based on the description of the work in this request, describe which portions of
the work will be performed by subcontractors.
8. Design phase cost.
Provide hourly rates to be applied to the proposed key staff (and subcontractors
if necessary) for assistance to the owner/engineer design team during the design
phase. Anticipated hours and schedule are outlined in the Project Requirements
above. Identify how expenses related to providing this assistance will be
charged.
9. Construction cost factors.
Establish in detail the factors which will be used in determining the negotiated
maximum construction price. These factors shall be comprehensive in
establishing all costs to be applied to direct project labor and materials in
determining the construction cost. Commitments shall include:
Overhead and profit (combined) margin for general office activities on the
base bid cost
Overhead and profit (combined) margin for field office activities on the
base bid cost
° Subcontractor markup on base bid cost to General Contractor
Materials and equipment markup on base bid cost
Any additional factors applied to project labor or materials to determine
the base bid cost
Change order markup, including supervision allowance, labor and
material markups, and overhead and profit percentages, as a percent of
labor and materials cost for any changes in the work following contract
award
10. Financial statement.
Provide a recent financial statement (audited if possible) including balance sheet
and income statement showing:
° Current assets
Other assets
Current liabilities
C
° Other liabilities
° Fixed assets and equipment
11. Banking reference.
Provide the name, address and phone number of the firm's banking reference.
12. Bonding company.
Provide the name, address and phone number of the firm's bonding agent.
Provide a letter from the bonding agent indicating the firm's bonding capacity is
adequate to undertake this work.
13. Insurance company.
Provide the name, address and phone number of the firm's insurance agent(s).
Provide certificate of insurance outlining coverage and policy limits. Can this
coverage be extended for work on this project? Can coverage be increased?
Can City be listed as an additional insured? Are there any current claims that will
affect coverage limits available to the City for this project?
14. List three (3) current references of similar work. Include firm name, address, and
telephone number.
15. Prior to Construction the contractor will be required to sign the City of Fort
Collins' Standard Construction Contract. This document is available for review in
the Purchasing Office.
7