Loading...
HomeMy WebLinkAboutWORK ORDER - GENERAL CORRESPONDENCE - WORK ORDER #4EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN NORTH FRONT RANGE TRANSPORTATION & AIR QUALITY PLANNING COUNCIL AND FELSBURG, HOLT & ULLEVIG DATED: 1 /31 /00 Work Order Number: No. 4 Purchase Order Numbers: FY03 portion: 33c 8� I FY04 portion: Project Title: Transit Services Commencement Date: 7/1/03 Completion Date: 9/30/04 Maximum Fee: (time and reimbursable direct costs): FY03 portion (7/1/03 thru 9/30/03) FY04 portion (10/1/03 thru 9/30/04) ** Note: the FY04 portions of the scope of work are contingent on funding being approved and therefore no FY04 work is to be started until a separate FY04 Notice to Proceed has been issued.) Project Description: See Attached Scope of Services: See Attached Acceptance: User Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. Professional By: /(A Date: W b 7 / 0-3 I The attached forms consisting of _ (_) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given only on the FY03 pieces indicated herein. $37,310 $12,630** North Front Range Transportation & Air Quality Planning Council: (� By: Date: Purchasing — City of Ft. Collins: By: Date:` l t7 North Front Range MPO Scone of Work for Transit Services SCOPE OF WORK FOR TRANSIT SERVICES The following scope is proposed to be completed by Felsburg, Holt and Ullevig, in conjunction with TransitPlus. Suzanne O'Neill will be the primary planner for the transit items and will be assisted by Holly Miller. In addition, North Front Range MPO will make available a staff member, Rick Hufnagel, to assist with the work and to learn from the process. Four separate projects are identified. They are, however inter -related and some build off of or are dependent on others. In identifying the time commitment that will be required, this proposal assumes that Suzanne O'Neill and often Holly Miller will attend monthly meetings of the Transit Advisory Group (TAG). It is assumed that each month the entire TAG will meet and then the members representing Larimer County will meet to address issues unique to Larimer County and the Transportation Management Area. Suzanne O'Neill will meet with the Larimer County members after the main Transit Advisory Group meeting. PROJECT 1: REGIONAL TRANSIT FRAMEWORK Purpose: Create a document to guide the NFR MPO in developing inter- and intra-regional transit services for the next twenty years. Key functions of the document will be to identify priorities and to provide a framework for the Regional Transit Element and other future planning activities. 1.1 Project Guidance 1.1.1 The Transit Advisory Group of the North Front Range Planning Council will provide primary guidance on the development of the Regional Transit Framework. The Transit Advisory Group will recommend a Regional Transit Framework to the Planning Council. 1.1.2 The Transit Advisory Group will be asked to review work at the following stages: - Project initiation; goal setting - Existing services and demand for regional services - Ideal system; constraints; priorities/objectives - Realistic system This will be done over a five month period, with the first meeting at the end of June and the project completed by the September meeting of the TAG. 1.1.3 Presentation of the recommended Regional Framework will be made to the Planning Council. 1.2 Goals/Objectives/Priorities 1.2.1 Develop a consensus on what entities in the region wish to achieve with the regional transit framework. How does each entity see their local service interfacing or working with the regional framework? What will the role of the regional transit framework be in the development of the Regional Transit Element? (June TAG Meeting) FELSBURG HOLT & ULLEVIG Page 2 Arorth Front Range MPO Scope of wor% for Transit services 1.2.2 After the ideal framework is described and the constraints have been identified, the Consultant team will describe changes in goals, priorities, and project evaluation criteria that would be useful in the development of regional services. These will be presented to the Transit Advisory Group and recommendations prepared on which to base the development of a realistic regional system. (August TAG Meeting) 1.3 Existing Systems 1.3.1 Describe the existing transit systems in the NFR region, planned service improvements, and connections to neighboring services. The consultant team will draw heavily on descriptions of public transit systems that are in existing documents, updating as needed. The emphasis will be on including updates and planned service improvements, incorporating information on regional services that are available through the private sector, and providing information on connections between systems, including connections to RTD in Longmont and Brighton. 1.4 Demand for Regional Services 1.4.1 Identify the demand for transit services between communities in the region and, at a more general level, demand to communities outside the region. The Consultant team will use the most recent traffic flow information from the demand model and travel survey. If released, the 2000 CTTP Journey to Work flows between Places will be used in demand estimations. The demand information will include work trips and other trips. The source data will determine the degree to which other trips can be broken down (such as by trip purpose or time of day). 1.4.2 Demand will be projected based on anticipated growth in the region over the next twenty years. The work prepared in Tasks 3 and 4 will be presented to the Transit Advisory Group at its July Meeting. 1.5 Ideal Regional Transit Framework 1.5.1 Identify the types of services and connections that would meet these travel needs. These services and connections may be oriented to varying markets (commute trips, student trips, trips for services (medical, personal business, etc.), or social/recreational trips). 1.5.2 Analyze how these services would fit or could be integrated with the existing services. What are the differences between the markets each system serves today and those that would be served through regional service? What connections would be needed in each local service in order to make services viable? What local changes might be needed to make the regional system viable? FELSBURG HOLT & ULLEVIG Page 3 North Front Range MPO Scope of Work for Transit .Services 1.5.3 Determine an ideal regional framework that is efficient, cost-effective, and provides a solid level of service, based on the findings of Tasks 2.4 and 2.6. Identify how the framework might develop over time and any phasing of components that would be appropriate. Determine basic characteristics such as cost, revenues, number of vehicles, and ridership. Identify the financial, political, and operational constraints that would affect the implementation of such a system. The information developed in this task will be documented in a technical memorandum and presented to the Transit Advisory Group for review at its August meeting. 1.6 Realistic Regional Transit Framework 1.6.1 Identify a realistic regional network based upon the existing constraints and recommended actions identified in Task 2.2. Detail the service, financial, institutional, and political parameters of the framework components. 1.6.2 Identify phasing and changes that need to be made in the region for the system to function effectively. Break out the functional components that would need to be implemented together or in a particular order to be effective. These components may include pieces of regional service, local service, or institutional / financial activities. Recommend priorities for development based on ridership, operational requirements, potential to implement, and goals of the region. 1.6.3 Present the draft regional transit framework to the Transit Advisory Group for review. Incorporate changes and present recommended Draft Final Regional Transit Framework to the Planning Council. 1.6.4 Prepare a final report that incorporates changes requested by the Planning Council. PROJECT 2: LARIMER COUNTY TRANSIT COORDINATION Purpose: Address integration or coordination of transit services funded through urban and rural programs. To address and gain consensus on allocation of Section 5307 funds on a multi -year basis throughout the urbanized area. 2.1 Allocation of 5307 Funding 2.1.1 Review current allocation formula. Compare formula to service levels, needs for local transit services, and needs for regional services. Develop allocation scenarios for future years based on these factors 2.1.2 Work with Larimer County portion of Transit Advisory Group to develop consensus on allocation formula for FY 2004 and future years. 2.2 Integration of 5307 and 5310/5311 Services 2.2.1 Describe opportunities to integrate services funded by 5307 and 5310/5311 dollars. Evaluate the overlap in services and the overlap in providers. Evaluate the ability of existing providers to serve all areas of County or the lack of providers in some areas. Evaluate needs and resources of major 5310 eligible entities in County. 2.2.2 Identify ways in which services could be integrated and the mechanisms for doing so. Present these to the Larimer County portion of the Transit Advisory Group and develop recommendations. 04 FELSBURG r1 HOLT & ULLEVI, Page 4 North Front Range MPO Scope of Work for Transit Services PROJECT 3: REGIONAL TRANSIT ELEMENT Purpose: Assist MPO staff in the preparation of the Regional Transit Element. The focus of this project will be to provide technical support and assist the MPO in building a foundation from which they can continue transit planning activities. The tasks listed in this project reflect only those items with which the consultant team will be involved. As feasible, MPO staff will assist in preparing the background data and testing scenarios as part of these tasks. 3.1 Demand Estimations and Projections 3.1.1 Identify a range of demand estimations based on different assumptions for service levels and funding. The demand will include local regional, and rural components. In addition, program transportation needs will be estimated. A variety of demand estimation techniques will be evaluated to see which are most appropriate for the various areas of the region. These may include those from TCRP Report 3, historical trends from existing providers, and mode share models based on projected trip -making and mode shares for similar services. (Note: development of regional demand is included in the Regional Transit Framework project.) The demand estimation will initially be based on current year numbers but also projected through 2030 based on growth projections. 3.1.2 The assumptions and demand numbers will be presented to the Transit Advisory Group for review and comment. Different communities or areas may chose to Based on different service level and funding assumptions, the demand that the alternatives will strive to meet may vary between different communities or types of service. 3.2 Performance Measures 3.2.1 Review existing services to determine performance measures that will reflect both the character and performance of the existing services operating in the region. 3.2.2 Develop a uniform set of performance measures for the services in the region. It is likely that different sets of measures will be needed for fixed route, demand response, and private non-profit services. 3.3 Assist in Developing Alternatives Analysis 3.3.1 The alternatives will be based on the projected demand, vision and goals adopted for the Regional Transportation Plan, existing services, projects submitted by Transit Advisory Group members, the Regional Transit Framework and other factors. The analysis of the alternatives will consist of: • Identifying scenarios for transit services through 2030. These scenarios will be set up to include the range of projects and strategies that are identified in the above activities. • Identifying criteria for evaluation, ones that both identify the relative effectiveness of transit service options and provide a measure of how well the alternative meets the regional goals. • Applying the evaluation criteria to the scenarios 3.4 Assist in Developing Financial Plan 3.4.1 Assist in developing 30 projections of revenues for funding transit services, including fare revenues and federal, local, and matching sources fund sources. 3.4.2 Assist in preparing/reviewing cost estimates for replacement of vehicles for existing services and projected vehicles. FELSBURG HOLT & ULLEVIG Page 5 North Front Mange MPO Scope of Worh for Transit Services 3.4.3 Assist in preparing the financial plan for constrained services, balancing revenues and expenses. 3.5 Other Technical Assistance 3.5.1 Assist with project prioritization 3.5.2 Present project prioritization to the Transit Advisory Group 3.5.3 Present and discuss Transit Element with Transit Advisory Group FELSBURG HOLT & ULLEVIG Page 6 S. H. Project 1 Regional Transit Framework O'Neill Miller Graphics Clerical Total Total 1$115 90 65 $60 r Hours Cost 1.1 Project Guidance 1.1.1 Transit Advisory Group Meetings (6) 24 12 8 2 1.1.2 Planning Council Meetings (1) 2 2 2 46 $4,480 2 8 $660 1.2 Goals/Objectives/Priorities 1.2.1 Develop initial goals and objectives 2 4 2 2 Refine goals; identify priorities and 10 $840 1.2.2 criteria 2 4 6 $590 1.3 Existing Systems Describe services, regional 1.3.1 connections 2 12 2 2 18 $1,560 1.4 Demand for Regional Services 1.4.1 Identify regional demand 12 12 24 $2,460 1.4.2 Demand projections 8 12 4 24 $2,240 1.5 Ideal Regional Transit Framework 1.5.1 Identification of basic service levels 16 12 28 $2 920 1.5.2 Integration with existing services 12 8 Description of framework with 20 $2,100 1.5.3 phasing 8 8 4 4 24 $2,140 1.6 Realistic Framework 1.6.1 Identify basic realistic framework 12 8 2 22 $2 220 1.6.2 Identify phasing and components 12 4 16 $1,740 1.6.3 Prepare draft documents; present 4 8 4 4 20 $1,680 1.6 4 Prepare final report 2 4 4 10 $830 .- w 1... Subtotal Project 1 118 110 22 26 ion 276 $26,460 Larimer County Transit S. H. Project 2 Coordination O'Neill Miller Graphics Clerical Total Total $115 $90 $65 $60 Hours Cost ':` ' .'''*i. .....x•.a,.L.:=- .':ram,-..s"..:➢:sr'.. E ..ems r,z.: 2.1 Allocation of 5307 Funding 2.1.1 Develop allocation scenarios Develop consensus among Larimer 2.1.2 Cty TAG 2.2 Integrate 5307 and 5310/5311 Services Evaluate opportunities to integrate 2.2.1 services Identify mechanisms to integrate 2.2.2 services i3. Subtotal Project 2 16 16 2 34 $3,410 10 8 2 4 24 $2,240 8 20 4 2 34 $3,100 20 $2,100 46 52 8 - 6 112 $10.850 Page 7 Project 3 Regional Transit Element 3.1 Demand Estimations and Projections 3.2 Performance Measures 3.3 Alternatives Analysis 3.4 Financial Plan 3.5 Other Technical Assistance Subtotal Project 3 S. H. O'Neill Miller Graphics Clerical Total Total $115 $90 $65 $60 Hours Cost 8 12 2 2 24 $2,250 8 12 4 24 $2,260 16 16 4 2 38 $3,660 12 12 2 26 $2,590 12 4 2 _ 18 $1,870 V!!� 14 4 130 $12,630 PROJECT TOTAL 220 218 44 36 ��u ego own Fiscal Year 2003: Project 1 0 ,46 $26 Project 2 $26,460 FY03 Total $37,310 Fiscal Year 2004: Project 3 $12,630 FY03 Total $12,630 Page 8