HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 3301450 CHANGE ORDER STORM DRAINAGE RIVERSIDECHANGE ORDER NO. 1 PROJECT TITLE: Final Design of Storm Drainage Improvements along Riverside Avenue and Jefferson Street CONTRACTOR: Anderson Consulting Engineers, Inc. P.O. NUMBER: 3301450 VENDOR NUMBER: 143797 CHARGE NUMBER: 50450122.528180.1 DESCRIPTION In preparing change orders show inorder as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time 1. Additional work requested by the City. 2. Revise design drawings and prepare custom details. 3. $3,100 (Three Thousand One Hundred Dollars) 4. Not Applicable:. (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER ADJUSTED CONTRACT COST (Assuming all change orders annro- ACCEPTED BY: REVIEWED BY: APPROVED BY: APPROVED BY: Representative) ect Manager) (Title) (Purchasing Agent Over $15,000) CC: City Clerk Purchasing Contractor Project File $20,118.00 $0.00 $0.00 $3,100.00 $23,218.00 DATE: 4 3n d DATE: (41 3 103 DATE: 6 [J DATE: NOTE: Signature of Contractor indicates agreement herewithin, including any adjustment in contract sum or contract time. rivjefftim ANdERSON CONSULTING ENGINEERS, INC. Civil • Water Resources • Environmental May 16, 2003 Mr. Tim McTague City of Fort Collins Utilities 700 Wood Street P.O. Box 580 Fort Collins, CO 80522-0580 RE: Final Design of Stone Drainage Improvements along Riverside Avenue and Jefferson Street (ACE Project No. COFC2003.04) Dear Tim: At this point in the Jefferson/Riverside project we find that we have incurred costs above those anticipated by our original Scope of Work and Budget. These costs have arisen primarily due to the need to: (a) revise design drawings and prepare custom details for one of the inlets at the Jefferson/Chestnut intersection; (b) revise design drawings and prepare custom details for the connection between the existing 54" RCP and the two proposed 36" RCPs at the Riverside/Whedbee intersection; and (c) revise the analysis and design of both triple inlets at the Riverside/Whedbee intersection to accommodate anticipated construction techniques that differ from those assumed in our Scope of Work and reflected in our initial design. The engineering, drafting, and coordination efforts required to make the changes at Jefferson/Chestnut and at Riverside/Whedbee have amounted to additional costs of $900 and $2,200, respectively. Consequently, we respectfully request a change order in the amount of $3,100 to cover this additional work effort. If you have any questions or comments concerning this request, please do not hesitate to contact me. Sincerely, ANDERSON CONSULTING ENGINEERS, INC. 'Gre go'ch, P.E. Vicnt GWO: Attachment P: ICOFC2003104I WPD0CIC0FC2003-04_C01. n pd Alm 16, 2003 772 Whalers Way, Suite 200 • Fort Collins, CO. 80525 Phone: (970) 226-0120 • Fax: (970) 226-0121 • www.acewater.com