HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 3301034 CHANGE ORDER MULBERRY RIVERSIDECHANGE ORDER NO. 1 PROJECT TITLE: Alternative Evaluation for the Mulberry/Riverside Storm Sewer Improvements CONTRACTOR: Anderson Consulting Engineers, Inc. P.O. NUMBER: 3:301034 VENDOR NUMBER: 143797 CHARGE NUMBER: 50450122.528180.1 DESCRIPTION In preparing change orders show inorder as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time 1. Additional work requested by the City. 2. Conversion of design drawings to another format. 3. $1,100 (One Thousand One Hundred Dollars) 4. Not Applicable. (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER ADJUSTED CONTRACT COST (Assuming all chance orders annr ACCEPTED BY: REVIEWED BY: APPROVED BY: APPROVED BY: Representative) Manager) (Title) (Purchasing Agent Over $15,000) CC: City Clerk Purchasing Contractor Project File $18,900.00 $0.00 $0.00 $1,100.00 $20,000.00 DATE: S 30 Lo3 DATE: b 131 ca DATE: ; G DATE: NOTE: Signature of Contractor indicates agreement herewithin, including any adjustment in contract sum or contract time. mulberrydAlm ANdERSON CONSULTING ENGINEERS, INC. Civil • Water Resources • Environmental May 16, 2003 Mr. Tim McTague City of Fort Collins Utilities 700 Wood Street P.O. Box 580 Fort Collins, CO 80522-0580 RE: Alternative Evaluation for the Proposed Mulberry/Riverside Storm Sewer Improvements (ACE Project No. COFC2003.02) Dear Tim: At this point in Mulberry/Riverside project we find that we have incurred costs above those anticipated by our original Scope of Work and Budget. These costs have arisen primarily due to the conversion of our design drawings to a format suitable for inclusion directly into the State of Colorado's plan set for Riverside Avenue. The coordination and drafting efforts required to produce 11 "x17" sheets using the State's title block, including re -drawing the profiles on the plan sheets to provide; scalable drawings in the smaller format, have amounted to additional costs totaling $I,100. Consequently, we respectfully request a change order in the amount of $1,100 to cover this additional work effort. If you have any questions or comments concerning this request, please do not hesitate to contact me. Sincerely, ANDERSO�NCONSULTING E INEERS, INC rego,•' J ch, P.E. Vice i nt GJK/tlt Attachment P:IC'OFC20031021WPDOC'K'OFC2003-02 COImpd Alm 16, 2003 772 Whalers Way, Suite 200• Fort Collins, CO. 80525 Phone: (970) 226-0120 • Fax: (970) 226-0121 • www.acewater.com