HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 3301034 CHANGE ORDER MULBERRY RIVERSIDECHANGE ORDER NO. 1
PROJECT TITLE: Alternative Evaluation for the Mulberry/Riverside Storm Sewer
Improvements
CONTRACTOR: Anderson Consulting Engineers, Inc.
P.O. NUMBER: 3:301034
VENDOR NUMBER: 143797
CHARGE NUMBER: 50450122.528180.1
DESCRIPTION
In preparing change orders show inorder as separate numbered paragraphs the
following:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time
1. Additional work requested by the City.
2. Conversion of design drawings to another format.
3. $1,100 (One Thousand One Hundred Dollars)
4. Not Applicable.
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
ADJUSTED CONTRACT COST
(Assuming all chance orders annr
ACCEPTED BY:
REVIEWED BY:
APPROVED BY:
APPROVED BY:
Representative)
Manager)
(Title)
(Purchasing Agent Over $15,000)
CC: City Clerk Purchasing
Contractor Project File
$18,900.00
$0.00
$0.00
$1,100.00
$20,000.00
DATE: S 30 Lo3
DATE: b 131 ca
DATE: ; G
DATE:
NOTE: Signature of Contractor indicates
agreement herewithin, including any adjustment
in contract sum or contract time.
mulberrydAlm
ANdERSON CONSULTING ENGINEERS, INC.
Civil • Water Resources • Environmental
May 16, 2003
Mr. Tim McTague
City of Fort Collins Utilities
700 Wood Street
P.O. Box 580
Fort Collins, CO 80522-0580
RE: Alternative Evaluation for the Proposed Mulberry/Riverside Storm Sewer Improvements
(ACE Project No. COFC2003.02)
Dear Tim:
At this point in Mulberry/Riverside project we find that we have incurred costs above those
anticipated by our original Scope of Work and Budget. These costs have arisen primarily due to the
conversion of our design drawings to a format suitable for inclusion directly into the State of
Colorado's plan set for Riverside Avenue. The coordination and drafting efforts required to produce
11 "x17" sheets using the State's title block, including re -drawing the profiles on the plan sheets to
provide; scalable drawings in the smaller format, have amounted to additional costs totaling $I,100.
Consequently, we respectfully request a change order in the amount of $1,100 to cover this
additional work effort.
If you have any questions or comments concerning this request, please do not hesitate to contact me.
Sincerely,
ANDERSO�NCONSULTING E INEERS, INC
rego,•' J ch, P.E.
Vice i nt
GJK/tlt
Attachment
P:IC'OFC20031021WPDOC'K'OFC2003-02 COImpd
Alm 16, 2003
772 Whalers Way, Suite 200• Fort Collins, CO. 80525
Phone: (970) 226-0120 • Fax: (970) 226-0121 • www.acewater.com