CITY OF FORT COLLINS
ADDENDUM No. 1
BID NO. 5783
SHELDONLAKE LANDSCAPE `IMPROVEMENTS
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5783 Sheldon Lake Landscape Improvements
OPENING DATE: April 17, 2003, 3:00 P.M. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
GENERAL CLARIFICATIONS —
1) Grimm is the General Contractor for Sheldon Lake Stormwater Improvements. Construction
schedules will need to be coordinated with other contractors on the job site. Sidewalk
construction that is part of the Stormwater Improvements project must be completed before
irrigation and landscape work may begin. The tentative schedule is as follows:
a) South shore sidewalk — mid April
b) East pool driveway — end of April
c) West shore driveway — mid May
2) Irrigation sleeves will be installed during sidewalk construction.
3) All irrigation pipe to be class 200 including mainline.
4) Ametek valve boxes are allowed for irrigation system.
5) Mainline connection and 2" nonrising gate valve will be in place before start of this project.
6) City of Fort Collins Parks will purchase, install and connect irrigation controller.
7) City of Fort Collins Parks will schedule watering for seed establishment on east shore.
8) The only barricade for planting will be 940 I.f. of construction fence on south shore.
9) Soil preparation on east shore includes adding soil amendment and tilling but no rock removal.
10) Most areas are inaccessible to drill seed equipment. Broadcast seed, hydraulic mulch and
hydraulic seeding are acceptable. Please refer to Specification notes. Do not use hydraulic
seeding or mulching where top soil is placed over erosion control fabric.
11) 12 trees and 321 shrubs are to be purchased and installed for this contact the remaining plants
listed in the plant schedule are by others.
12) Construction fencing shall be removed by City of Fort Collins Parks.
BID SCHEDULE
Please use the attached ADDENDUM #1 BID SCHEDULE when submitting your bid.
SPECIFICATIONS
1. Division 1, Section 01800 — Definition of Bid Items
Bid Item 8 — Top Soil
Contractor shall purchase and place 6" amended top soil on top of existing erosion control
fabric (9800 square feet) on west shore. Quality of top soil shall be governed by Grass
specification section 02920 page 4, 2.2.
2. Division 2, Section 02920 pg. 7, Grasses
Delete 3.4 E. I (No straw mulch crimping.)
Add 3.4 F Hydraulic SeeotIra and Mulching Option
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 9 FAX (970) 221-6707
P. 01
TRANSACTION REPORT
APR-17-03
THU 07:26 AM
SEND(M)
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
Md DP
APR-17 07:25 AM 96869528
1108" 4 SEND
( M) OK
125
>K
�
TOTAL
1M 8S PAGES.
4
City of Port Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
BID NO. 5783
SHELDON LAKE LANDSCAPE IMPROVEMENTS
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5783 She±don Lake Landscape Improvements
OPENING DATE: April 17, 2003, 3:00 P.M. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
GENERAL CLARIFICATIONS —
1) Grimm is the General Contractor for Sheldon Lake Stormwater Improvements. Construction
schedules will need to be coordinated with other contractors on the job site, Sidewalk
construction that is part of the Stormwater Improvements project must be completed before
irrigation and landscape work may begin. The tentative schedule is as follows:
a) South shore sidewalk — mid April
b` East pool driveway -- end of April
c) West shore driveway —mid May
2) Irrigation sleeves wiii be irstalled during sidewalk construction,
3) All irrigation pipe to be class 200 including mainline.
4) Ametek valve boxes are allowed for irrigation system.
5) Mainline connection and 2" nonrising gate valve will be in place before start of t";s project.
6) City of Fort Collins Parks will purchase, install and connect irrigation controller.
a. Where areas to be seeded are too steep or inaccessible for equipment,
Contractor shall seed, fertilize and or mulch by hydraulic spray
equipment. Seed is required at double the rate specified and wood
cellulose fiber mulch is required to be applied at a rate of one ton per
acre.
b. Combine seed with water to provide a slurry. Perform hydraulic
application in such a manner that the liquid carrier will uniformly
distribute the material over the entire area to be seeded at rates not
less than specified. Do not compact hydraulically seeded areas
following application. If seed and mulch are applied in a single
application the rate of seed application shall be doubled.
Delete 3.5 B (No barricades and signs except for 940 I.f. of construction fence)
If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
SHELDON LAKE LANDSCAPE IMPROVEMENTS
ADDENDUM #1 BID SCHEDULE (BASE BID)
Bid items are described in Specification Section 01800
BID
ESTIMATED
UNIT
ITEM
ITEM # DESCRIPTION
QUANTITY
UNIT
PRICE
TOTAL
1 Mobilization
1
LS
$
$
2 Irrigation System
1
LS
$
$
3 Soil Preparation and Fine Grading
30,000
SF
$
$
4 Seed Mixes
A Dryland grass
18,800
SF
$
$
B Dryland grass w/ wild flowers
9,000
SF
$
$
C Dryland grass w/ wild flowers
2,350
SF
$
$
5 Tree Plantings
1
LS
$
$
6 Shrub Plantings
321
EA
$
$
7 Fence
940
LF
$
$
8 Top Soil
180
CY
$
$
TOTAL OF BASE BID
(written)
ALTERNATE BID ITEM 1
1 Shrub Plantings with #1 containers 321 EA
(written)
Figure
Figure
April 11, 2003
CITY OF FORT COLLINS
PLANHOLDERS LIST FOR
BID #5783
Sheldon Lake Landscape Improvements
A & M LANDSCAPING
2417 E. MULBERRY
FORT COLLINS, CO 80524
PH 970-224-5469
FAX 970-224-1755
L & M ENTERPRISES
PO BOX W
BERTHOUD, CO 80513
PH 970-532-3706
FAX 303-442-2231
BATH INC
2000 E. PROSPECT
FORT COLLINS, CO 80525
PH 970-484-5022
FAX 970-484-3718
AQUTIC & WETLAND CO
999 WELD CTY RD 25
FORT LUPTON, CO 80624-9307
PH 303-442-4766
FAX 303-857-2455
WESTERN STATES RECLAMATION
3756 IMPERIAL ST
FREDERICKS, CO 80516
PH 303-833-1986
FAX 303-835-4447
LAND TECH
525 N LAREDO ST
AURORA, CO 80011
PH 303-344-4465
FAX 303-344-1518
WIMMER CONSTRUCTION
7124 WCR 17
FORT LUPTON, CO 80621
PH 303-252-1420
FAX 303-833-3656
KORBY
PO BOX 989
WELLINGTON, CO 80549
PH 970-568-7633
FAX 970-568-7635
MILL BROTHERS LANDSCAPE
6121 E. HARMONY RD
FORT COLLINS, CO 80528
PH 970-493-3883
FAX 970-493-4943
K L I LANDSCAPE CONSTRUCTION
1975 ASPEN CIRCLE
PUEBLO, CO 81006
PH 719-545-8189
FAX 719-545-8190
P. 01
TRANSACTION
REPORT
APR-11-03
FRI 01:50 PM
BROADCAST
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
M# DP
APR-11 01:30
PM
92241755
1108"
4
SEND
( M)
OK
099
01:45
PM
913034422231
1'24"
4
SEND
( M)
OK
099
01:32
PM
94843718
1108"
4
SEND
( M)
OK
099
01:34
PM
913038572455
1110"
4
SEND
( M)
OK
099 K
01:50
PM
913038354447c4
**1**"
0
SEND
( M)
BUSY
099
01:36
PM
913033441518
1109"
4
SEND
( M)
OK
099
01:38
PM
913038333656
1110"
4
SEND
( M)
OK
099
01:39
PM
95687635
1'13"
4
SEND
( M)
OK
099
01:41
PM
94934943
1'27"
4
SEND
( M)
OK
099
01:43
PM
917195458190
1108"
4
SEND
( M)
OK
099
TOTAL
1011 57S
PAGES:
36
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
BID NO. 5783
SHELDON LAKE LANDSCAPE IMPROVEMENTS
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5783 Sheldon Lake Landscape Improvements
OPENING DATE: April 17, 2003, 3:00 P.M. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
GENERAL CLARIFICATIONS —
1) Grimm is the General Contractor for Sheldon Lake Stormwater Improvements. Construction
schedules will need to be coordinated with other contractors on the job site. Sidewalk
construction that is part of the Stormwater Improvements project must be completed before
irrigation and landscape work may begin. The tentative schedule is as follows:
a) South shore sidewalk — mid Apnl
b% East pool driveway — end of April
c) West shore driveway -- mid May
2) Irrigation sleeves will be installed du-ing sidewalk construction.
3) All irrigation pipc- to be class 200 including mainline.
4) Amefek valve boxes are allowed for irrigation system.
5) Mainline connection and 2" nonrising gate valve will be in place before start or t .is project.
Fit Citv of Fort Collins Parks wilt purchase. install and connect irrigation controller_
P,01
TRANSACTION REPORT
APR-16-03
WED 12:34 PM
X
SEND(M)
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M#
DP
APR-16 12:33 PM 913038334447
11091r 4 SEND
( M) OK
116
TOTAL
1M 9S PAGES:
4
City of Tort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
BID NO. 5783
SHELDON LAKE LANDSCAPE IMPROVEMENTS
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5783 Sheldon Lake Lanascape Improvements
OPENING DATE: April 17, 2003, 3:00 P.M. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
GENERAL CLARIFICATIONS —
1) Grimm is the General Contractor for Sheldon Lake Stormwater Improvements. Construction
schedules will need to be coordinated with other contractors on the job site. Sidewalk
construction that is part of the Stormwater Improvements project must be completed before
irrigation and landscape work may begin. The tentative schedule is as follows:
a) South shore sidewalk — mid April
b) East pool driveway — end of April
c) West shore driveway — mid May
2) Irrigation sleeves will be installed during sidewalk construction.
3) All irrigation pipe to be class 200 includinq mainline.
4) Ametek valve boxes are allowed for irrigation system.
5) Mainline connection and 2" nonrising gate valve will be in place before start of th.:s project.
fit City of Fart Collins Pnrks will nurnhA�,A inst;4 Purl nonnAct irrinatinn rnntrnllar
P. 01
TRANSACTION
REPORT
X
APR-16-03
WED 01:13 PM
BROADCAST
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
M# DP
APR-16 01:05 PM
BUILDERS EXCHANGE
1'07"
4
SEND
( M)
OK
116
01:13 PM
CMD
0
SEND
( M)
BUSY
116
01:10 PM
DAILY JOURNAL
38"
0
SEND
( M)
CANCEL
116
01:08 PM
PLAN ROOM
1110"
4
SEND
( M)
OK
116
TOTAL
2M 55S
PAGES:
8
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
BID NO. 5783
SHELDON LAKE LANDSCAPE IMPROVEMENTS
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5783 Sheldon Lake Landscape Improvements
OPENING DATE:. April 17, 2003, 3:00 P.M. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes ere hereby made.
GENERAL CLARIFICATIONS -
1) Grimm is the General Contractor for Sheldon Lake Stormwater Improvements. Construction
schedules will need to be coordinated with other contractors on the job site. Sidewalk
construction that is part of the Stormwater Improvements project must be completed before
irrigation and landscape work may begin. The tentative schedule is as follows:
a) South shore sidewalk - mid April
b) East pool driveway - end of April
c) West shore driveway - mid May
2) Irrigation sleeves will be installed during sidewalk construction.
3) All irrigation pipe to be class 200 including mainline.
4) Ametek valve boxes are allowed for irrigation system.
5) Mainline connection and 2" nonrising gate valve will be in place before start of tl-;is project-
6) Citv of Fort Collins Parks will purchase, install and connect irrigation controller.
P,Oi
TRANSACTION REPORT
APR-16-03
WED 01:16 PM
BROADCAST
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M#
DP
APR-16 01:15 PM DAILY JOURNAL
1111" 4 SEND
( M) OK
116
TOTAL
1M 11S PAGES.
4
P,O1
TRANSACTION REPORT
APR-16-03
WED 01:21 PM
SEND(M)
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP
APR-16 01:18 PM 917194719500
2'08" 2 SEND
( M) COM E-11
117
01:20 PM
1'02" 3 SEND
( M) OK
117
TOTAL
3M 10S PAGES:
5
AdIntinistrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
BID NO. 5783
SHELDON LAKE LANDSCAPE.IMPROVEMENTS
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5783 Sheldon Lake Landscape Improvements
OPENING DATE: April 17, 2003, 3:00 P.M. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
GENERAL CLARIFICATIONS —
1) Grimm is the General Contractor for Sheldon Lake Storrnwater Improvements. Construction
schedules will need to be coordinated with other contractors on the job site. Sidewalk
construction that is part of the Stormwater Improvements project must be completed before
irrigation and landscape work may begin. The tentative schedule is as follows.
a) South shore sidewalk — mid April
b) East pool driveway — end of April
c) West shore, driveway — mid May
2) Irrigation sleeves will be installed during sidev, ilk construction.
3j All irrigatiol I pipe to be class 200 including +hairline.
4) Arnetek valve boxes are allowed for Irrigation system.
51 Mainline conneciicn and 2" nonrising gate valve will be in place before star of .,-,is projeci.
61 Cifv of ✓-nr} i nllin¢ P7 rlec ,vill ry ernh n. - ___.._._ __.__ •,