Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5783 SHELDON LAKE LANDSCAPE IMPROVEMENTSSECTION 00300 BID FORM PROJECT: SHELDON LAKE LANDSCAPE IMPROVEMENTS; BID (NCO. 5783 Place "�'04 Coll,, Ks Date y -1-1 03 1. In compliance with your Invitation to Bid dated 3- ol{O 03 and subject to all conditions thereof, the undersigned MiSGS, a **(Corporation, ** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a cert.fied o�j cashier's check or standard Bid bond in the sum of 5 ��p 0 � -6 ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to urnish the specified performance and payment bonds is as follows: FIKiYv16*1h4ZXKS Rd'4A44A.Co. Stec E.uh2h.11'e. nemoCA1 Go1a IR013* 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. QMV,through O ht- . 7/96 Section 00300 Page 1 CONTRACTOR'S QUALIFICATION STATEMENT L & M Enterprises, Inc. 735 East Colorado Hwy 56 P.O. Box W Berthoud, CO 80513 303-442-7401 or 970-532-3706 Fax: (303) 442-2231 ORGANIZATION L & M Enterprise, Inc. is a Colorado corporation doing business since October of 1975. PRESIDENT: VICE PRESIDENT: TREASURER/SECRETARY: CORPORATE OFFICERS Scott Riddell Scott Rich Janet M. DeMott BANK REFERENCES Bank One Community First National Bank 200 East 7th Street 415 Mountain Ave Loveland, CO 80537 Berthoud, Colorado 80513 Contact: Ron Schneider (970) 622-7520 Contact: Tim Merkel (970) 532-1000 BONDING SURETY: St. Paul Fire & Marine Insurance Company -have been bonded up to AGENT: Lockton Companies six million dollars for a 8100 E. Union Ave. #700 single job-$20,000,000.00 Denver, Colorado 80237 aggregate Contact: Celeste Helmes (303) 414-6060 INSURANCE AGENT: Lockton Companies 8100 E. Union Ave. #700 Denver, Colorado 80237 Contact: Celeste Helmes (303) 414-6060 MISCELLANEOUS Dun & Bradstreet #040716359 FIRM PREPARING FINANCIAL STATEMENT Bauerle and Company Contact: Bruce Gregory (303) 759-0089 LICENSING/PRE-QUALIFICATION • City & County of Denver Pre -qualification CE-1,3,4, and 7: Expires February 28, 2004 • City of Longmont License Classification D-16, No. D16000034: Expires June 30, 2003 • City & County of Denver RW-EXCVTR License: Expires February 28, 2004 • City of Thornton Landscaping License Number: 2163: Expires June 5, 2003 • City of Lakewood License No. 28588 Expires December 31, 2003 • City of Broomfield General Class A No. A2002-1041: Expires December 31, 2003 • Department of Agriculture Pesticide Applicator, License Categories 109, 206, 207: Expires December 31, 2003 • City of Commerce City Subcontractor Right -of -Way: License number 100916: Expires December 31, 2003 • City of Louisville Contractor Pre -qualification: Expires April 1, 2004 CLIENT REFERENCES Urban Drainage & Flood Control District (303) 455-6277 2480 West 26`h Avenue, Suite 156B Denver, Colorado 80211 Contacts: Dave Lloyd, Mark Hunter, Paul Hindman, Dave Bennetts Icon Engineering, Inc. (303) 221-0802 7108-B South Alton Way Englewood, Colorado 80112 Contacts: Penn Gildersleeve, Doug Williams, Matt Ursetta Sellards & Grigg, Inc. (303) 986-1444 143 Union Boulevard, Suite 280 Lakewood, Colorado 80228 Contact: Chuck McKnight McLaughlin Water Engineers, Ltd. (303) 458-5550 2420 Alcott Street Denver, Colorado 80211 Contact: Mike Galuzzi, John Pflaum The Foothills Parks & Recreational District (303) 409-2311 3624 S. Kipling Pkwy Denver, Colorado 80235 Contact: Bill Kieck MDG, Inc. (303) 571-5787 820 Santa Fe Drive Denver, Colorado 80204 Contacts: Dean Pearson, Mark Taylor, Shawn Gordon EXPERIENCE Current list of work categories which L & M Enterprises, Inc. normally performs with it's own forces: EARTHWORK / SITE PREPARATION Excavation/embankment, backfill, compaction, rock excavation, clearing/grubbing, demolition. WATER RESOURCES Soil cement, earthen/rip-rap dams and drop structures, erosion control, dewatering, rip -rap slope protection, wetland mitigation. STRUCTURES Pipeline (concrete/metal), culverts, gabion walls, manholes, storm drainage, box culverts, etc. LANDSCAPE /REVEGETATION Soil preparation, planting (trees, shrubs, ground cover), seeding (native and bluegrass) and sod installation. IRRIGATION Pump stations, drip systems, temporary and permanent (commercial). MAINTENANCE Native/Turf mowing and trimming, aeration, weed/insect control, tree/shrub pruning, snow removal and parking lot sweeping and striping. WORK FORCES Construction: 1 Chief Estimator 2 Estimators 1 Superintendents 3 Foremen 15 Laborers/Operators Landscape, Irrigation & Maintenance: 5 Supervisors 8 Crew Leader 40 Laborers Administrative: 1 Office Manager 3 Administrative Assistants PROJECTS IN PROGRESS PROJECT: 16`h STREET GRADE CONTROL STURCTURE ON SOUTH PLATTE RIVER: Water control, install 3' boulders, grout, excavation, native seeding, hydro mulching. OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT STEVE MATERKOWSKI (303)455-6277 ENGINEER: McLAUGHLIN WATER EINGINEERS BRIAN KOHLENBERG (303) 458-5550 CONTRACT AMOUNT: $125,000.00 START DATE: MARCH 10, 2003 ESTIMATED COMPLETION DATE: MAY 23, 2003 PROJECT: PINEY CREEK: Water control, erosion control, sheet pile, install riprap, grout, excavation, landscape plantings, seeding, hydro mulching, import clay fill. OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT PAUL HINDMAN (303) 455-6277 ENGINEER: ICON DOUG WILLIAMS (303)221-0802 CONTRACT AMOUNT: $187,000.00 START DATE: FEBRUARY, 20, 2003 ESTIMATED COMPLETION DATE: JUNE 30, 2003 PROJECT: HUSTON LAKE RESTORATON: Muck excavation, shore line restoration, boulder edging, fine grading, seeding, sodding. OWNER: CITY & COUNTY OF DENVER JIM GEIST (720) 913-4504 ENGINEER: WENK & ASSOCIATES NICOLE HORST CONTRACT AMOUNT: $489,826.00 START DATE: OCTOBER 16, 2002 ESTIMATED COMPLETION DATE: APRIL 30, 2003 PROJECT: PLASTER RESERVOIR DAM IMPROVEMENTS: Clearing & grubbing riprap, construction of trail, storm sewer system, seeding & planting. OWNER: CITY & COUNTY OF BROOMFIELD ENGINEER: LOVE & ASSOCIATES CONTRACT AMOUNT: $408,00.00 ESTIMATED COMPLETION DATE: MARCH 30, 2003 KATIE ALLE (303) 438-6250 NANCY LOVE (303) 673-9795 START DATE: NOVEMBER 20, 2002 PROJECT: CHERRY CREEK TRAIL-SOUTHCREEK PORTION, PHASE 1A & 113: Clearing, grubbing, grading, construction of pedestrian trail, box culvert, riprap, seeding and re -vegetation. OWNER: STATE OF COLORADO-ARAPAHOE COUNTY LANAE J. RAYMOND (720) 874-6504 ENGINEER: MDG, INC. SHAUN GORDON (303) 571-5787 CONTRACT AMOUNT: $233,486.00 START DATE: SEPTEMBER 15, 2002 ESTIMATED COMPLETION DATE: MARCH 30, 2003 PROJECT: COTTONWOOD CREEK: Grouted boulders, mulching, seeding, earthwork, riprap OWNER: RAMPART RANGE METROPOLITAN DISTRICT NO.1 RICH SHANNON (303) 779-4525 ENGINEER: CARROLL & LANGE, INC KENNITH L. LINHARDT (303) 980-0200 CONTRACT AMOUNT: $258,259.00 START DATE: AUGUST 10, 2002 ESTIMATED COMPLETION DATE: APRIL 15, 2003 RECENTLY COMPLETED PROJECTS PROJECT: HARVARD GULCH MINI, GARLAND & SARATOGA, AND WESTWOOD PLAYGROUND: Grading, concrete flatwork, irrigation and landscaping for 3 playgrounds. OWNER: CITY AND COUNTY OF DENVER RICHARD NYSTROM (720) 913-1700 ENGINEER: CITY AND COUNTY OF DENVER CITY ENGINEER LESLEY B. THOMAS (720) 913-1700 CONTRACT AMOUNT: $92,553.00 START DATE: MAY 1, 2002 COMPLETED: NOVEMBER 1, 2002 PROJECT: BROADWAY MEDIAN LANDSCAPING: Clearing, grubbing, Irrigation installation, tree planting. OWNER: CITY OF LITTLETON ENGINEER: CITY OF LITTLETON CONTRACT AMOUNT: $29,500.00 COMPLETED: SEPTEMBER 1, 2002 DAVID FLAIG (303) 795-3766 DAVID FLAIG (303) 795-3865 START DATE: JULY 1, 2002 PROJECT: REUNION METROPOLITAN DISTRICT-112TH AVE RETENTION: Seeding, rip -rap, boulders, concrete, excavation, handrail. OWNER: REUNION METROPOLITAN DIST ENGINEER: JR ENGINEERING CONTRACT AMOUNT: $435,645.00 COMPLETED: JULY 31, 2002 DAVID SOUTHARD (303) 791-8180 AARON CLUTTER (303) 740-9393 START DATE: MAY 13, 2002 PROJECT: LILLEY GULCH: Erosion and Sediment Control, riprap, grouting, concrete cut off wall at the drop structure, install concrete path, re -vegetation. OWNER: URBAN DRAINAGE AND FLOOD CONTROL DAVE BENNETTS (303) 455-6277 ENGINEER: ICON ENGINEERING, INC. DOUG WILLIAMS (303) 221-0802 CONTRACT AMOUNT: $268,762.36 COMPLETED: MAY 1, 2002 START DATE: JANUARY 1, 2002 PROJECT: LAKEWOOD GULCH/SAND CREEK: Water Control and dewatering, rip -rap and stepped grouted boulders with cut-off wall, Erosion & Sediment Control OWNER: METRO WASTEWATER RECLAMATION DISTRICT BILL BRENNAN (303) 286-3000 ENGINEER: ICON ENGINEERING, INC. DOUG WILLIAMS (303) 221-0802 CONTRACT AMOUNT: $82,891.00 COMPLETED: AUGUST 1, 2001 START DATE: JUNE 5, 2001 PROJECT: HARVARD GULCH: Removal of concrete channel lining, modification of existing concrete drop structure, excavation, grouted boulder channel edge, riprap, sodding, restoration of irrigation system OWNER: URBAN DRAINAGE AND FLOOD CONTROL MARK HUNTER (303) 455-6277 ENGINEER: KIRKHAM MICHAEL CONSULTING ENGINEERS BILLY A. HARRIS (303) 694-2300 CONTRACT AMOUNT: $268,389.00 COMPLETED: JULY 22, 2001 START DATE: APRIL 23, 2001 PROJECT: PONDS 20 AND 21 DROP STRUCTURES: Furnished and installed grouted boulders, concrete cut off wall, dewatering, two pond drop structures, revegetation, and silt fence. OWNER: HIGHLANDS RANCH METROPOLITAN DISTRICT NO. 4 FORREST DYKSTRA (303) 791-0430 ENGINEER: NOLTE AND ASSOCIATES/CMIS DAVE LANG (303) 257-5816 CONTRACT AMOUNT: 230,154.72 START DATE: MARCH 15, 2001 COMPLETED: JUNE 20, 2001 PROJECT: LBO PONDS 1&3 REHABILITATION CONTRUCTION: Install trickle channel, grouted boulders, sod installation, irrigation repair. OWNER: URBAN DRAINAGE AND FLOOD CONTROL JEFF FISHER (303) 455-6277 ENGINEER: MULLER ENGINEERING COMPANY, INC. CHRISTOPHER KROEGER (303) 988-4939 CONTRACT AMOUNT: $102,446.91 COMPLETED: MAY 10, 2001 START DATE: DECEMBER 15, 2000 PROJECT: LOCUST STREET OUTFALL: Pond Spillway, Rock Berm, Seeding and Mulching. OWNER: GRIMM CONSTRUCTION COMPANY, INC. PETER V. GRIMM (303) 791-3600 ENGINEER: SEAR -BROWN, INC. CONTRACT AMOUNT: 193,825.00 COMPLETED: APRIL 6, 2001 DON SILAR (970) 482-5922 START DATE: MARCH 16, 2001 M M ADDRESS BID SCHEDULE (Base Bid) P o. &x Lj Please use the attached Bid Schedule when submitting your bid. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (2,A of the total Agreement Price. 7711'� FULLY(SUBMITTED: Signature Stp4 Q; AL(I Pre_s;dc,,k Title License Number (If Applicable) (Seal Y iW Bid is by corporation) _L4 - I -Q3 Date Attest \\ �0.Lt/hW� I l ' .d! d� ►�f� q Address 1 • 0,i( Lac./ gala �asl3 Telephone 7/96 Section 00300 Page 2 PROJECT: SOUTH PLATTE RIVER OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT DAVE LLOYD (303) 455-6277 ENGINEER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT BRYAN KOHLENBERG (303) 455-6277 CONTRACT AMOUNT: $84,828.00 COMPLETED: JANUARY 24, 2001 START DATE: DECEMBER 5, 2000 PROJECT: SANDCREEK GREENWAY TRAIL ENGINEER: CITY OF AURORA CONTRACT AMOUNT: $1,328,734.00 COMPLETED: DECEMBR 22, 2000 TRACY YOUNG (303) 739-7160 START DATE: MAY 11, 2000 PROJECT: SAND CREEK GREENWAY TRAIL: Soil cement retaining wall, crushed recycled concrete trail, lighting and electrical service, fencing, seeding, tree planting, concrete ramps thickened edge and concrete curb wall, sprinkler system installation. OWNER: CITY OF AURORA ENGINEER: CITY OF AURORA CONTRACT AMOUNT: $1,357,252.00 COMPLETED: DECEMBER 1, 2000 GREG PAULINI (303) 739-7636 TRACY YOUNG (303) 739-7166 START DATE: JUNE 1, 2000 PROJECT: VALE VIEW IN THE MEADOW TRAIL CONSTRUCTION ENTRY LANDSCAPE AND IRRIGATION OWNER: VALE VIEW ENGINEER: ARCHITERRA GROUP CONTRACT AMOUNT: $180,707.00 COMPLETED: DECEMBER 30, 2000 DEAN PIERSON (303) 948-0766 START DATE: SEPTEMBER 1, 2000 PROJECT: CHERRY CREEK DROPS #5: Clear & grub, wetlands plantings, buried soil riprap, grouted boulders, erosion control, sediment and water control. OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT DAVE LLOYD (303) 455-6277 ENGINEER: BOYLE CONTRACT AMOUNT: $217,994.51 COMPLETED: NOVEMBER 1, 2000 DOUGLAS STEWART (303) 987-3443 START DATE: MARCH 6, 2000 PROJECT: DAD CLARK DROP STRUCTURES: Erosion and sediment control, native seeding, steel sheet piling, grouted boulder, install box culvert, 48" RCP, concrete wing walls and cut off walls, concrete bike trail, steel railing, encasement of 8" PVC sanitary sewer. OWNER: HIGHLANDS RANCH METROPOLITAN DISTRICT NO. 3 CHRIS SEELEY (303) 791-0430 ENGINEER: CH2M HILL KYLE HAMILTON (303) 771-0900 CONTRACT AMOUNT: $568,529.80 COMPLETED: SEPTEMBER 1, 2000 START DATE: MAY 15, 2000 PROJECT: 1999 URBAN DRAINAGE RESTORATION ANNUAL MAINTENANCE & S. PLATTE RIVER PROGRAM: Rip rap erosion protection @ channel or outlets, silt removal from culverts and drainage - ways, construction and/or repair of concrete structures, rehabilitation of detention ponds and tree thinning in over -grown drainage -ways. OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT DAVE BENNETTS (303) 445-6277 CONTRACT AMOUNT: $ 50,000 - $ 2005000 START DATE: JULY 1, 1999 COMPLETED: JUKE 30, 2000 PROJECT: MONACO WAY CULVERT CROSSING: 50' double 8'x6' RCB, new asphalt roadway, curb/gutter/sidewalk, grouted boulder drop structure, rip rap and boulder edging, erosion/sediment/water control OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT/ARAPAHOE COUNTY PAUL HINDMAN (303) 455-6277 ARAPAHOE COUNTY ENGINEER: ICON ENGINEERING CONTRACT AMOUNT: $ 325,643.00 COMPLETED: FEBRUARY 22, 2000 JUSTIN BOZICH (303) 791-4640 MATT URSETTA (303) 221-0802 START DATE: OCTOBER 25, 1999 PROJECT: JAMISON TRIBUTARY CHANNEL IMPROVEMENTS: 50' type R inlets, 315' 24"/42"/48" RCP, three vertical rip rap drop structures w/ concrete cut-off walls, site restoration including: seeding, sodding and irrigation, erosion/sediment/water control OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT/ARAPAHOE COUNTY CINDY THRUSH (303) 455-6277 ARAPAHOE COUNTY JUSTIN BOZICH (303) 791-4640 ENGINEER: ICON ENGINEERING CONTRACT AMOUNT: $ 363,385.00 COMPLETED: JANUARY 9, 2000 MATT URSETTA (303) 221-0802 START DATE: OCTOBER 11, 1999 PROJECT: WEST DAD CLARK STORM DRAINAGE: Four grouted and sloping 18" boulder drop structure one concrete vertical drop structure, site grading, seeding, erosion/sediment/water control OWNER: HIGHLAND RANCH METROPOLITAN DIST. NO. 2 FORREST DYKSTRA (303) 791-0430 ENGINEER: NOLTE & ASSOCIATES GREG MURPHY (303) 220-9001 CONTRACT AMOUNT: $ 202,260.00 COMPLETED: NOVEM 3ER 12, 1999 START DATE: SEPTEMBER 27, 1999 PROJECT: EAST FRONTAGE ROAD @ ST. VRAIN RIVER: Grouted 4' boulder drop structure (approx. 4500 tons), rip rap slope protection (approx.12,500 tons) and major river diversion OWNER: CDOT GERRY PADILLA (303) 442-5640 GENERAL CONTRACTOR: REIMAN CORP ENGINEER: ICON ENGINEERING CONTRACT AMOUNT: $ 952,751.01 COMPLETED: NOVEMBER 12, 1999 RICH BOLKOVATZ (307) 632-8971 DOUG WILLIAMS (303) 221-0802 START DATE: JULY 511999 PROJECT: SAND CREEK INTERCEPTOR: Sheet pile with concrete, cap, grouted rip -rap & associated site work for protection of a utility crossing OWNER/ENGINEER: METRO WASTEWATER RECLAMATION DISTRICT BILL BRENAN (303) 286-3000 CONTRACT AMOUNT: $ 164,664.00 START DATE: AUGUST 2, 1999 COMPLETED: OCTOBER 30, 1999 PROJECT: MASSEY DRAW @ CARR STREET: 2161f of double 10'x4'.6" RCB w/ headwall and wing walls, utility relocations, grouted 3' boulder drop structure, 552' grouted stacked boulder channel edge, erosion/sediment/water control OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICTUEFFERSON COUNTY PAUL HINDMAN (303) 455-6277 JEFFERSON COUNTY PAULA LUNDQUIST (303) 271-8480 ENGINEER: ICON ENGINEERING CONTRACT AMOUNT: $ 598,101 COMPLETED: OCTOBER 30, 1999 DOUG WILLIAMS (303) 221-0802 START DATE: DUNE 21, 1999 PROJECT: GRANGE HALL CREEK: Irrigation system installation, tree planting, soil prep, erosion control fabric install OWNER: CITY OF NORTHGLENN GENENAL CONTRACTOR: HUDICK EXCAVATING NESTOR FEDAK (303) 450-8708 BRAD KREINBRING (303) 688-5254 CONTRACT AMOUNT: $ 73,419.10 COMPLETED: SEPTEMBER 29, 1999 START DATE: AUGUST 16, 1999 PROJECT: NIWOT HIGH SCHOOL: Remove/Replace irrigation system, tree/shrub planting, soil prep OWNER: ST. VRAIN SCHOOL DISTRICT GENERAL CONTRACTOR: DEFALCO POARCH RON SMITH (303) 682-7268 FRANK LEE (303) 655-2180 CONTRACT AMOUNT: $ 88,185.77 START DATE: JULY 14, 1999 COMPLETED: SEPTEMBER 7, 1999 PROJECT: CHERRY CREEK RESTORATION: grouted boulder edge, bank stabilization, seeding/mulch, boulder edge OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT JEFF FISHER (303) 455-6277 ENGINEER: URBAN DRAINAGE CONTRACT AMOUNT: $ 103,933.75 START DATE: JUNE 5, 1999 COMPLETED: JULY 16, 1999 PROJECT: GOLDSMITH GULCH @ COOK PARK: grouted boulder/rip rap drop structures, sheet pile cut-off walls, remove/replace pedestrian bridges, boulder edge tree/shrub planting, sod, bank restoration OWNER: URBAN DRAINAGE & FLOOD CONTROL DIST MARK HUNTER (303) 455-6277 ENGINEER: ICON ENGINEERING CURT NEUFELD (303) 221-4019 CONTRACT AMOUNT: $ 458,645.64 COMPLETED: 7/15/99 START DATE: FEBRUARY 2, 1999 PROJECT: LAKEWOOD GULCH D/S HARLAN STREET: 24" RCP install, bank stabilization, concrete cut-off walls, irrigation system repair, sod, 24" drilled concrete piers, install 16" steel pipe OWNER: URBAN DRAINAGE & FLOOD CONTROL DIST MIKE SARMENTO (303) 455-6277 ENGINEER: URBAN DRAINAGE CONTRACT AMOUNT: $ 174,387.13 COMPLETED: JULY 11 1999 PROJECT: TUSCANY SOUTH OWNER: RICHMOND HOMES ENGINEER: JR ENGINEERING CONTRACT AMOUNT: $ 54,904.89 COMPLETED: JUNE 26, 1999 START DATE: MAY 6, 1999 TIM JOHNSTON (303) 220-4404 (303)740-9393 START DATE: MAY 7, 1999 PROJECT: BEAR CREEK REHABILITATION: grouted boulder drop structure, boat chute including sheet pile cut-off, bank restoration/stabilization, boulder edge, soil prep, re -vegetation (wetland) OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT MARK HUNTER 455-6277 ENGINEER: MK CENTENNIAL CAROLYN TRAYLER (303) 948-4001 CONTRACT AMOUNT: $ 521,638.40 COMPLETED: MAY 31, 1999 START DATE: JANUARY 1, 1998 PROJECT: PUNT THE CREEK: boulder edge, remove/replace concrete trail, bank stabilization, cut- off walls, colored concrete work, shrub planting OWNER: THE GREENWAY FOUNDATION/CITY AND COUNTY OF DENVER JEFF SHOEMAKER (303) 455-7109 ENGINEER: MDG, INC. MARK TAYLOR (303) 571-5787 CONTRACT AMOUNT: $ 739,155.48 COMPLETED: MAY 24, 1999 START DATE: DECEMBER 3, 1998 PROJECT: SOUTH GATE DETENTION: install 18"/24" RCP, concrete trickle channel, manhole, grouted boulders, pipe under drain system, tree planting OWNER: SOUTH GATE CORPORATION ENGINEER: TURNER, COLLIE & BRADEN RICK MOSER (303) 298-7117 CONTRACT AMOUNT: 63,696.00 START DATE: FEBRUARY 1, 1998 COMPLETED: MARCH 25, 1999 PROJECT: BIG DRY CREEK @ PROGRESS PARK: concrete trail, bank stabilization, drop structures, seeding/mulch OWNER: URBAN DRAINAGE & FLOOD CONTROL DIST JEFF FISHER (303) 455-6277 ENGINEER: URBAN DRAINAGE CONTRACT AMOUNT: 95,206.00 START DATE: FEBRUARY 9, 1999 COMPLETED: MARCH 26, 1999 PROJECT: 17"' STREET HILLSIDE PROJECT: storm drainage pipe install, manhole, curb/pavement replacement, revegetation OWNER: UNIVERSITY OF COLORADO ENGINEER: LOVE & ASSOCIATES CONTRACT AMOUNT: 83,498.00 COMPLETED: JANUARY 31, 1999 MIKE BARDEN (303) 492-5511 NANCY LOVE (303) 673-9795 START DATE: NOVEMBER 7, 1998 AU 01 Auger_ CO 01 1997 Sheepsfoot Compactor DZ 14 Komatsu D65E EX 01 2002 Komatsu PC200LC-7L EX 02 2002 Komatsu PC2001-C-71- LD 57 1999 Komatsu WA320 LID 58 1988 Komatsu WA350 LID 64 j 19921 Komatsu WA380 LID 75 1997 Komatsu WA320 LD 76 1998 Komatsu WA250 LID 77 2000 Cat Skidsteer 246 LID 78 2000 Cat Skidsteer 246 LE 01 36" Toro (2 each) LE 02 36" Ransom (2 each) LE 03 48" Ransom (3 each) LE 04 21" Toro (7 each) LE 05 Backpack Blower (6 each) LE 06 Ryan Aerator LE 07 Ryan Aerator LE 08 Tanaka Edger (2 each) LE 09 Spreader LE 10 Walker (9 each) MC 07 Case D100 Backhoe Attach. MC 32 1982 IHC LOWBOY FL 01 1998 Komatsu Forklift FL 02 1998 Komatsu Forklift GC 01 Golf Cart GC 02 Golf Cart GC 03 1998 John Deere Gator TR 01 1998 John Deere Tractor 4600 TR 02 2000 John Deere Tractor 4600 TR 03 International Tractor TC 01 1996 Ditch Witch Trencher TC 02 1998 Ditch Witch Trencher UL 01 1996 Case 1845C Uniloader UL 02 1991 Case 1845C Uniloader UL 03 1999 Case 1845C Uniloader UL 04 20001 Case 1845C Uniloader UL 05 19981 Case 85XT Uniloader UL 06 20021 Case 70XT Uniloader Scott J. Rich Professional Experience January 2002 to L& M Enterprises, Inc. Present Berthoud, Colorado Vice President: Responsible for all field operations. Supervision and coordination of employees, subcontractors, suppliers, and equipment. Contract negotiations with Owners, General Contractor, and Architect \ Engineers. June 1995 to Richdell Construction, Inc. January 2002 Commerce City, Colorado Secretary\Treasurer -General Superintendent: Responsible for all field operations. Supervision and coordination of employees, subcontractors, suppliers, and equipment. Contract negotiations with Owners, General Contractor, and Architect \ Engineers. August 1988 to Consolidated Landscape Construction, Inc. September 1995 Englewood, Colorado Project Superintendent: Supervisor for construction of large Public and Private project. Specializing in streetscape projects, production planting projects and interlocking pavers. Responsible for scheduling labor, equipment, subcontractors and materials. Involved with contract negotiations and major equipment acquisitions. June 1983 to Sabell's Inc. August 1988 Englewood, Colorado Project Foreman: Construction of Public and Private projects. Coordinated and oversaw subcontractors and operate heavy equipment. Specialized in construction of concrete, brick.. woodwork and retaining walls. June 1982 to Cedar Landscaping Mav 1983 Cedar Rapids, Iowa General Superintendent: Scheduling of crews, equipment, subcontractors, and materials. Involved in estimating, contracting, and negotiations. January 1979 to Jade Structures February 1982 Washington, Iowa Construction Foreman: Supervised crew for construction of buildings, concrete work, ventilation, heating systems, minor plumbing, and electrical work. Education Kirkwood Community College, Cedar Rapids, Iowa AAS Degree Major: Landscape & Nursery Trade RONALD S. PROPP 2754 Highway 402 Loveland, Colorado 80537 AREAS OF PROFICIENCY: Contact Management Field Management Estimating Scheduling Conflict Resolution EDUCATION: Graduated Thompson Valley High School Contact Management 2 Yrs Mesa College OSHA Training Drain Layers Certification EXPERIENCE: Twenty years in project management. Supervised and managed projects up to $3,000,000.00. Managed and supervised projects for owners including State of Colorado, Denver Water Department, United States Army Corps of Engineers, Denver Waste Water, CDOT, Metro Waste Water and Urban Drainage & Flood Control District. APR-11-03 FRI 01:46 PM CITY/FT COLLINS, PURCHAS FAX NO, 970 2216707 SHELDON LAKE LANDSCAPE IMPROVEMENTS ADDENDUM #1 BID SCHEDULE (BASE BID) Bid items are described in Specification Section 01800 BID ESTIMATED UNIT ITEM # DESCRIPTION QUANTITY UNIT PRICE 1 Mobilization 1 LS $ .00 2 Irrigation System 1 LS ali�?L5.Do 3 Soil Preparation and Fine Grading 30,000 SF $ .Val j> 4 Seed Mixes A Dryland grass 18,800 SF $ B Dryland grass w/ wild flowers 92000 SF $ C Dryland grass w/ wild flowers 2,360 SF .13 $ 5 Tree Plantings 1 LS $ • Dt� 6 Shrub Plantings 321 EA $S,Qp 7 Fence 940 LF $ 8 Top Soil 180 Cy - TOTAL OF BASE BID ,AI TERMATF BID ITEM 1 1 Shrub Plantings with #1 containers 321 FA P. 03/04 ITEM TOTAL $ qQ .'ate S TZ.,= $a Db8.00 $ Id l40.00 $ y?0 00 $3, p.00 $ S,oas.ce $ I- 81b.640 %In.QQ $3,alp.W Figure Scott S. Riddell Professional Experience January 2002 to L & M Enterprises, Inc. Present Berthoud, Colorado President -Controller: Responsible for procurement of work, estimating. andjob costing. Marketing and negotiation. June 1995 to Richdell Construction, Inc. January 2002 Commerce City, Colorado President -Controller: Responsible for procurement of work, estimating. and job costing. Marketing and negotiation. June 1989 to Consolidated Landscape Construction, Inc. September 1995 Englewood, Colorado Production Coordinator/Superintendent. Schedule production crews, equipment, subcontractors, and materials. Monitor construction activities and job costs for all projects. Communicate with estimator to update and/or establish production costs. Coordination with Owners and Architects on all projects. Prepare and review cash flow, equipment budgets, and project profitability reports. January 1987 to L & M Enterprises, Inc. June 1989 Berthoud, Colorado Assistant Project Manager: Coordination of submittals, force account work, subcontractors, and suppliers for a six million dollar US Army Corp. of Engineers flood control project. March 1986 to Sabell's Inc. January 1987 Englewood, Colorado Project Foreman: Construction of commercial landscape projects under S300,000 in size. October 1984 to Loveland Landscape March 1986 Loveland, Colorado General Superintendent: Schedule crews, equipment, subcontractors, and materials. Involved in estimating, contracting, and negotiations. May 1975 to L & M Enterprises, Inc. October 1984 Berthoud, Colorado Vice President: Oversee contract negotiations, equipment procurement, subcontractors, scheduling, and estimating. Education Ottawa University 1979 - 1981 Computer Science Metropolitan State College 1988 -1991 Construction ManagemenUComputer Science SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned L&M Enterprises, Inc.as Principal, and St. Paul Fire and Marine Insurance Company as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of X 5% of the bid amountfor the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, .successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fo::t Collins Project, SHELDON LAKE LANDSCAPE IMPROVEMENTS; BID NO, 5783. NOW THEREFORE, (af If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a. BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted .by the OWNER. 7/96 Section 00410 Page 2 IN WITNESS WHEREOF, the Principal and the Surety have hereunto .set their hands and seals this 17th day of April , 2003, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth abcve. PRINCIPAL SURETY Name: L&M Enterprises, Inc. St. Paul Fire and Marine Insurance Company Adc.ress: P.O. Xxy 385 Washington Street Berthoud, 13 St. Pa , MN 55102- Hy: ✓ By: jM Tit.le:-4�Cd4�;t 'I iorfsIkv�� Title: Amy WiAett. Attorney -in -Fact 'EST: 7/96 (SE Section 00410 Page 3 DeStftl POWER OF ATTORNEY Power of Attorney No. Seaboard Surety Company St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company St. Paul Mercury Insurance Company United States Fidelity and Guaranty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Certificate No. 1434209 KNOW ALI, MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York, and that St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, and that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, and that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of tile State oflowa, and that Fidelity and Guaranty Insurance Underwriters, Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies'), and that the Companies do hereby make, constitute and appoint 23457 William M. O'Connell Jr., Debbie Poppe, Shelley Czajkowski, Celeste T. Helms, Amy Wickert, Karen A. Feggestad, and Garry L. Wesselink Denver Colorado of the City of , State , their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety to, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WI- EOF, the Companies have caused this instrument to be signed and sealed this m day of August 2002 t t` Seaboard Surety Company United States Fidelity and Guaranty Company St. Paul Fire and Marine Insurance Company Fidelity and Guarantv Insurance Company St, Paul Guardian Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. $h Paul Mercury Insurance Company r tt SIM'fIY F�wr _6 Ci�'r PETER W. CARMAN, Vice President 58AL �" State of Maryland��� City of Baltimore TIIOMAS E. BUIBREGTSE, Assistant Secretary 7`s August 2002 On this day of ,before me, the undersigned officer, personally appeared Peter W. Carman and Thomas E. Fluibregise, who acknowledged themselves to be the Vice President and Assistant Secretary, respectively, of Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, United States Fidelity and Guaranty Company, Fidelity and Guaranty Insurance Company, and Fidelity and Guaranty Insurance Underwriters, Inc.; and that the seals affixed to the foregoing instrument are the corporate seals of said Companies; and that they, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing the names of the corporations by themselves as duly authorized officers. �O�G`p EAS[er�U In Witness Whereof, I hereunto set my hand and official seal. UB<tpy My Commission expires the 1st day of July, 2006. �t,'f CiTV *kt'WA - r A& REBECCA EASLEY-ONOKALA, Notary Public 86203 Rev. 7-2002 Printed in U.S.A. SECTION 00400 SUPPLEMENTS TO BID FORMS 00410Bid Bond 00420Statement of Bidder's Qualifications 00430 Schedule of Subcontractors 7/96 Section 00410 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: LAMlsesl `T��{C, 1 /► 2. Permanent main office address: P.o. ,xw 'V ti"40(o. QQ$L3 3. When organized: 1116 4. If a corporation, where incorporated: [-4)14D, 5. How many years have you been en aged in the contracting business under your present firm or trade name? of 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) gC 7. Genera character of Work performed by your company: SGt �►+��.w...d 8. Have you ever failed to complete any Work awarded to you? D_ If so, where and why? 9. Have your ever defaulted on a contract? NO If so, where and why? 10. Are you debarred by any government agency? hQ If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 12. List your major equipment available for this contract. 13. Experience in construction Work similar in importance to this project: 14. Background and experience of the principal members of your organization, including officers: GG 15. Credit available: $ 16. Bank reference:ZkOKG- KOh S4.%V-CZd1C4- 17. Will you, upon request, fill out a detailed financial statement and furnish an other information that may be required by the OWNER? 18. Are you licensed as a General CONTRACTOR? yG5 If yes, in what city, county and state? CG What class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract? If yes, what percent of total contract? and to whom? 20. Are any lawsuits pending against you or your firm at this time? n0 If yes, DETAIL 7/96 Section 00420 Page 2 21. What ar What company? limits of your public liability? DETAIL 22. What are your company's bonding limitations? � CC 4-4 23. The undersigned corporation to verification of Qualifications. hereby authorizes and requests any person, firm or furnish any information requested by the OWNER in the recital comprising this Statement of Bidder's Dated at "*to 1D10 Name of deb By: c/ p Title: S �`p.}+ Rini State of this I Tt—l' day of Apo1 , 2003. County` of/Q11-��11G� 15C�4 I�16�Gt� being duly sworn deposes and says that he is CSi C."l' of (,.�� �l►.�U�hiS�, Y1,c and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. ubscribed and sworn to before me this I day of N ary Public My commission expires W COMMISSION EXPIRES OQ/25J06 7/96 Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 150 of the contract. ITEM SUBCONTRACTOR 7/96 Section 00430 Page 1 L&M ENTERPRISES April 17, 2003 City of Fort Collins RE: Sheldon Lake Landscape Improvements To Whom It May Conceren: L&M Enterprises, Inc., acknowledges receipt of addendum #1 dated April I I, 2003.