HomeMy WebLinkAboutRESPONSE - BID - 5783 SHELDON LAKE LANDSCAPE IMPROVEMENTSSECTION 00300
BID FORM
PROJECT: SHELDON LAKE LANDSCAPE IMPROVEMENTS; BID (NCO. 5783
Place "�'04 Coll,, Ks
Date y -1-1 03
1. In compliance with your Invitation to Bid dated 3- ol{O 03
and subject to all conditions thereof, the undersigned
MiSGS, a **(Corporation,
** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a cert.fied o�j cashier's check or standard Bid
bond in the sum of 5 ��p 0 � -6 ($
) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to urnish the specified performance and payment bonds is as
follows: FIKiYv16*1h4ZXKS Rd'4A44A.Co.
Stec E.uh2h.11'e. nemoCA1 Go1a IR013*
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
QMV,through O ht- .
7/96 Section 00300 Page 1
CONTRACTOR'S QUALIFICATION STATEMENT
L & M Enterprises, Inc.
735 East Colorado Hwy 56
P.O. Box W
Berthoud, CO 80513
303-442-7401 or 970-532-3706
Fax: (303) 442-2231
ORGANIZATION
L & M Enterprise, Inc. is a Colorado corporation doing business since October of 1975.
PRESIDENT:
VICE PRESIDENT:
TREASURER/SECRETARY:
CORPORATE OFFICERS
Scott Riddell
Scott Rich
Janet M. DeMott
BANK REFERENCES
Bank One Community First National Bank
200 East 7th Street 415 Mountain Ave
Loveland, CO 80537 Berthoud, Colorado 80513
Contact: Ron Schneider (970) 622-7520 Contact: Tim Merkel (970) 532-1000
BONDING
SURETY: St. Paul Fire & Marine Insurance Company -have been bonded up to
AGENT: Lockton Companies six million dollars for a
8100 E. Union Ave. #700 single job-$20,000,000.00
Denver, Colorado 80237 aggregate
Contact: Celeste Helmes (303) 414-6060
INSURANCE
AGENT: Lockton Companies
8100 E. Union Ave. #700
Denver, Colorado 80237
Contact: Celeste Helmes (303) 414-6060
MISCELLANEOUS
Dun & Bradstreet #040716359
FIRM PREPARING FINANCIAL STATEMENT
Bauerle and Company
Contact: Bruce Gregory (303) 759-0089
LICENSING/PRE-QUALIFICATION
• City & County of Denver
Pre -qualification CE-1,3,4, and 7: Expires February 28, 2004
• City of Longmont
License Classification D-16, No. D16000034: Expires June 30, 2003
• City & County of Denver
RW-EXCVTR License: Expires February 28, 2004
• City of Thornton
Landscaping License Number: 2163: Expires June 5, 2003
• City of Lakewood
License No. 28588 Expires December 31, 2003
• City of Broomfield
General Class A No. A2002-1041: Expires December 31, 2003
• Department of Agriculture
Pesticide Applicator, License Categories 109, 206, 207: Expires December 31, 2003
• City of Commerce City
Subcontractor Right -of -Way: License number 100916: Expires December 31, 2003
• City of Louisville
Contractor Pre -qualification: Expires April 1, 2004
CLIENT REFERENCES
Urban Drainage & Flood Control District (303) 455-6277
2480 West 26`h Avenue, Suite 156B
Denver, Colorado 80211
Contacts: Dave Lloyd, Mark Hunter, Paul Hindman, Dave Bennetts
Icon Engineering, Inc. (303) 221-0802
7108-B South Alton Way
Englewood, Colorado 80112
Contacts: Penn Gildersleeve, Doug Williams, Matt Ursetta
Sellards & Grigg, Inc. (303) 986-1444
143 Union Boulevard, Suite 280
Lakewood, Colorado 80228
Contact: Chuck McKnight
McLaughlin Water Engineers, Ltd. (303) 458-5550
2420 Alcott Street
Denver, Colorado 80211
Contact: Mike Galuzzi, John Pflaum
The Foothills Parks & Recreational District (303) 409-2311
3624 S. Kipling Pkwy
Denver, Colorado 80235
Contact: Bill Kieck
MDG, Inc. (303) 571-5787
820 Santa Fe Drive
Denver, Colorado 80204
Contacts: Dean Pearson, Mark Taylor, Shawn Gordon
EXPERIENCE
Current list of work categories which L & M Enterprises, Inc. normally performs with it's own forces:
EARTHWORK / SITE PREPARATION
Excavation/embankment, backfill, compaction, rock excavation, clearing/grubbing, demolition.
WATER RESOURCES
Soil cement, earthen/rip-rap dams and drop structures, erosion control, dewatering, rip -rap slope
protection, wetland mitigation.
STRUCTURES
Pipeline (concrete/metal), culverts, gabion walls, manholes, storm drainage, box culverts, etc.
LANDSCAPE /REVEGETATION
Soil preparation, planting (trees, shrubs, ground cover), seeding (native and bluegrass) and sod installation.
IRRIGATION
Pump stations, drip systems, temporary and permanent (commercial).
MAINTENANCE
Native/Turf mowing and trimming, aeration, weed/insect control, tree/shrub pruning, snow removal and parking
lot sweeping and striping.
WORK FORCES
Construction:
1 Chief Estimator
2 Estimators
1 Superintendents
3 Foremen
15 Laborers/Operators
Landscape, Irrigation & Maintenance:
5 Supervisors
8 Crew Leader
40 Laborers
Administrative:
1 Office Manager
3 Administrative Assistants
PROJECTS IN PROGRESS
PROJECT: 16`h STREET GRADE CONTROL STURCTURE ON SOUTH PLATTE RIVER:
Water control, install 3' boulders, grout, excavation, native seeding, hydro mulching.
OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT STEVE MATERKOWSKI
(303)455-6277
ENGINEER: McLAUGHLIN WATER EINGINEERS BRIAN KOHLENBERG
(303) 458-5550
CONTRACT AMOUNT: $125,000.00 START DATE: MARCH 10, 2003
ESTIMATED COMPLETION DATE: MAY 23, 2003
PROJECT: PINEY CREEK:
Water control, erosion control, sheet pile, install riprap, grout, excavation, landscape plantings, seeding,
hydro mulching, import clay fill.
OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT PAUL HINDMAN
(303) 455-6277
ENGINEER: ICON DOUG WILLIAMS
(303)221-0802
CONTRACT AMOUNT: $187,000.00 START DATE: FEBRUARY, 20, 2003
ESTIMATED COMPLETION DATE: JUNE 30, 2003
PROJECT: HUSTON LAKE RESTORATON: Muck excavation, shore line restoration, boulder
edging, fine grading, seeding, sodding.
OWNER: CITY & COUNTY OF DENVER JIM GEIST (720) 913-4504
ENGINEER: WENK & ASSOCIATES
NICOLE HORST
CONTRACT AMOUNT: $489,826.00 START DATE: OCTOBER 16, 2002
ESTIMATED COMPLETION DATE: APRIL 30, 2003
PROJECT: PLASTER RESERVOIR DAM IMPROVEMENTS: Clearing & grubbing riprap,
construction of trail, storm sewer system, seeding & planting.
OWNER: CITY & COUNTY OF BROOMFIELD
ENGINEER: LOVE & ASSOCIATES
CONTRACT AMOUNT: $408,00.00
ESTIMATED COMPLETION DATE: MARCH 30, 2003
KATIE ALLE (303) 438-6250
NANCY LOVE (303) 673-9795
START DATE: NOVEMBER 20, 2002
PROJECT: CHERRY CREEK TRAIL-SOUTHCREEK PORTION, PHASE 1A & 113: Clearing,
grubbing, grading, construction of pedestrian trail, box culvert, riprap, seeding and re -vegetation.
OWNER: STATE OF COLORADO-ARAPAHOE COUNTY
LANAE J. RAYMOND (720) 874-6504
ENGINEER: MDG, INC. SHAUN GORDON (303) 571-5787
CONTRACT AMOUNT: $233,486.00 START DATE: SEPTEMBER 15, 2002
ESTIMATED COMPLETION DATE: MARCH 30, 2003
PROJECT: COTTONWOOD CREEK: Grouted boulders, mulching, seeding, earthwork, riprap
OWNER: RAMPART RANGE METROPOLITAN DISTRICT NO.1
RICH SHANNON (303) 779-4525
ENGINEER: CARROLL & LANGE, INC KENNITH L. LINHARDT (303) 980-0200
CONTRACT AMOUNT: $258,259.00 START DATE: AUGUST 10, 2002
ESTIMATED COMPLETION DATE: APRIL 15, 2003
RECENTLY COMPLETED PROJECTS
PROJECT: HARVARD GULCH MINI, GARLAND & SARATOGA, AND WESTWOOD
PLAYGROUND: Grading, concrete flatwork, irrigation and landscaping for 3 playgrounds.
OWNER: CITY AND COUNTY OF DENVER
RICHARD NYSTROM (720) 913-1700
ENGINEER: CITY AND COUNTY OF DENVER CITY ENGINEER
LESLEY B. THOMAS (720) 913-1700
CONTRACT AMOUNT: $92,553.00 START DATE: MAY 1, 2002
COMPLETED: NOVEMBER 1, 2002
PROJECT: BROADWAY MEDIAN LANDSCAPING: Clearing, grubbing, Irrigation installation, tree
planting.
OWNER: CITY OF LITTLETON
ENGINEER: CITY OF LITTLETON
CONTRACT AMOUNT: $29,500.00
COMPLETED: SEPTEMBER 1, 2002
DAVID FLAIG (303) 795-3766
DAVID FLAIG (303) 795-3865
START DATE: JULY 1, 2002
PROJECT: REUNION METROPOLITAN DISTRICT-112TH AVE RETENTION: Seeding, rip -rap,
boulders, concrete, excavation, handrail.
OWNER: REUNION METROPOLITAN DIST
ENGINEER: JR ENGINEERING
CONTRACT AMOUNT: $435,645.00
COMPLETED: JULY 31, 2002
DAVID SOUTHARD (303) 791-8180
AARON CLUTTER (303) 740-9393
START DATE: MAY 13, 2002
PROJECT: LILLEY GULCH: Erosion and Sediment Control, riprap, grouting, concrete cut off wall at
the drop structure, install concrete path, re -vegetation.
OWNER: URBAN DRAINAGE AND FLOOD CONTROL
DAVE BENNETTS (303) 455-6277
ENGINEER: ICON ENGINEERING, INC. DOUG WILLIAMS (303) 221-0802
CONTRACT AMOUNT: $268,762.36
COMPLETED: MAY 1, 2002
START DATE: JANUARY 1, 2002
PROJECT: LAKEWOOD GULCH/SAND CREEK: Water Control and dewatering, rip -rap and
stepped grouted boulders with cut-off wall, Erosion & Sediment Control
OWNER: METRO WASTEWATER RECLAMATION DISTRICT
BILL BRENNAN (303) 286-3000
ENGINEER: ICON ENGINEERING, INC. DOUG WILLIAMS (303) 221-0802
CONTRACT AMOUNT: $82,891.00
COMPLETED: AUGUST 1, 2001
START DATE: JUNE 5, 2001
PROJECT: HARVARD GULCH: Removal of concrete channel lining, modification of existing concrete
drop structure, excavation, grouted boulder channel edge, riprap, sodding, restoration of irrigation system
OWNER: URBAN DRAINAGE AND FLOOD CONTROL
MARK HUNTER (303) 455-6277
ENGINEER: KIRKHAM MICHAEL CONSULTING ENGINEERS
BILLY A. HARRIS (303) 694-2300
CONTRACT AMOUNT: $268,389.00
COMPLETED: JULY 22, 2001
START DATE: APRIL 23, 2001
PROJECT: PONDS 20 AND 21 DROP STRUCTURES: Furnished and installed grouted boulders,
concrete cut off wall, dewatering, two pond drop structures, revegetation, and silt fence.
OWNER: HIGHLANDS RANCH METROPOLITAN DISTRICT NO. 4
FORREST DYKSTRA (303) 791-0430
ENGINEER: NOLTE AND ASSOCIATES/CMIS DAVE LANG (303) 257-5816
CONTRACT AMOUNT: 230,154.72 START DATE: MARCH 15, 2001
COMPLETED: JUNE 20, 2001
PROJECT: LBO PONDS 1&3 REHABILITATION CONTRUCTION: Install trickle channel, grouted
boulders, sod installation, irrigation repair.
OWNER: URBAN DRAINAGE AND FLOOD CONTROL JEFF FISHER (303) 455-6277
ENGINEER: MULLER ENGINEERING COMPANY, INC.
CHRISTOPHER KROEGER (303) 988-4939
CONTRACT AMOUNT: $102,446.91
COMPLETED: MAY 10, 2001
START DATE: DECEMBER 15, 2000
PROJECT: LOCUST STREET OUTFALL: Pond Spillway, Rock Berm, Seeding and Mulching.
OWNER: GRIMM CONSTRUCTION COMPANY, INC.
PETER V. GRIMM (303) 791-3600
ENGINEER: SEAR -BROWN, INC.
CONTRACT AMOUNT: 193,825.00
COMPLETED: APRIL 6, 2001
DON SILAR (970) 482-5922
START DATE: MARCH 16, 2001
M
M
ADDRESS
BID SCHEDULE (Base Bid)
P o. &x Lj
Please use the attached Bid Schedule when submitting your bid.
PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (2,A of the total Agreement Price.
7711'�
FULLY(SUBMITTED:
Signature
Stp4 Q; AL(I Pre_s;dc,,k
Title
License Number (If Applicable)
(Seal Y iW Bid is by corporation)
_L4 - I -Q3
Date
Attest \\ �0.Lt/hW� I l ' .d! d� ►�f� q
Address 1 • 0,i( Lac./
gala �asl3
Telephone
7/96 Section 00300 Page 2
PROJECT: SOUTH PLATTE RIVER
OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT
DAVE LLOYD (303) 455-6277
ENGINEER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT
BRYAN KOHLENBERG (303) 455-6277
CONTRACT AMOUNT: $84,828.00
COMPLETED: JANUARY 24, 2001
START DATE: DECEMBER 5, 2000
PROJECT: SANDCREEK GREENWAY TRAIL
ENGINEER: CITY OF AURORA
CONTRACT AMOUNT: $1,328,734.00
COMPLETED: DECEMBR 22, 2000
TRACY YOUNG (303) 739-7160
START DATE: MAY 11, 2000
PROJECT: SAND CREEK GREENWAY TRAIL: Soil cement retaining wall, crushed recycled concrete
trail, lighting and electrical service, fencing, seeding, tree planting, concrete ramps thickened edge and
concrete curb wall, sprinkler system installation.
OWNER: CITY OF AURORA
ENGINEER: CITY OF AURORA
CONTRACT AMOUNT: $1,357,252.00
COMPLETED: DECEMBER 1, 2000
GREG PAULINI (303) 739-7636
TRACY YOUNG (303) 739-7166
START DATE: JUNE 1, 2000
PROJECT: VALE VIEW IN THE MEADOW TRAIL CONSTRUCTION ENTRY
LANDSCAPE AND IRRIGATION
OWNER: VALE VIEW
ENGINEER: ARCHITERRA GROUP
CONTRACT AMOUNT: $180,707.00
COMPLETED: DECEMBER 30, 2000
DEAN PIERSON (303) 948-0766
START DATE: SEPTEMBER 1, 2000
PROJECT: CHERRY CREEK DROPS #5: Clear & grub, wetlands plantings, buried soil riprap, grouted
boulders, erosion control, sediment and water control.
OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT
DAVE LLOYD (303) 455-6277
ENGINEER: BOYLE
CONTRACT AMOUNT: $217,994.51
COMPLETED: NOVEMBER 1, 2000
DOUGLAS STEWART (303) 987-3443
START DATE: MARCH 6, 2000
PROJECT: DAD CLARK DROP STRUCTURES: Erosion and sediment control, native seeding, steel
sheet piling, grouted boulder, install box culvert, 48" RCP, concrete wing walls and cut off walls, concrete
bike trail, steel railing, encasement of 8" PVC sanitary sewer.
OWNER: HIGHLANDS RANCH METROPOLITAN DISTRICT NO. 3
CHRIS SEELEY (303) 791-0430
ENGINEER: CH2M HILL KYLE HAMILTON (303) 771-0900
CONTRACT AMOUNT: $568,529.80
COMPLETED: SEPTEMBER 1, 2000
START DATE: MAY 15, 2000
PROJECT: 1999 URBAN DRAINAGE RESTORATION ANNUAL MAINTENANCE & S. PLATTE
RIVER PROGRAM: Rip rap erosion protection @ channel or outlets, silt removal from culverts and drainage -
ways, construction and/or repair of concrete structures, rehabilitation of detention ponds and tree thinning in
over -grown drainage -ways.
OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT
DAVE BENNETTS (303) 445-6277
CONTRACT AMOUNT: $ 50,000 - $ 2005000 START DATE: JULY 1, 1999
COMPLETED: JUKE 30, 2000
PROJECT: MONACO WAY CULVERT CROSSING: 50' double 8'x6' RCB, new asphalt
roadway, curb/gutter/sidewalk, grouted boulder drop structure, rip rap and boulder edging,
erosion/sediment/water control
OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT/ARAPAHOE COUNTY
PAUL HINDMAN (303) 455-6277
ARAPAHOE COUNTY
ENGINEER: ICON ENGINEERING
CONTRACT AMOUNT: $ 325,643.00
COMPLETED: FEBRUARY 22, 2000
JUSTIN BOZICH (303) 791-4640
MATT URSETTA (303) 221-0802
START DATE: OCTOBER 25, 1999
PROJECT: JAMISON TRIBUTARY CHANNEL IMPROVEMENTS: 50' type R inlets, 315'
24"/42"/48" RCP, three vertical rip rap drop structures w/ concrete cut-off walls, site restoration including:
seeding, sodding and irrigation, erosion/sediment/water control
OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT/ARAPAHOE COUNTY
CINDY THRUSH (303) 455-6277
ARAPAHOE COUNTY JUSTIN BOZICH (303) 791-4640
ENGINEER: ICON ENGINEERING
CONTRACT AMOUNT: $ 363,385.00
COMPLETED: JANUARY 9, 2000
MATT URSETTA (303) 221-0802
START DATE: OCTOBER 11, 1999
PROJECT: WEST DAD CLARK STORM DRAINAGE: Four grouted and sloping 18" boulder drop
structure one concrete vertical drop structure, site grading, seeding, erosion/sediment/water control
OWNER: HIGHLAND RANCH METROPOLITAN DIST. NO. 2
FORREST DYKSTRA (303) 791-0430
ENGINEER: NOLTE & ASSOCIATES GREG MURPHY (303) 220-9001
CONTRACT AMOUNT: $ 202,260.00
COMPLETED: NOVEM 3ER 12, 1999
START DATE: SEPTEMBER 27, 1999
PROJECT: EAST FRONTAGE ROAD @ ST. VRAIN RIVER: Grouted 4' boulder drop structure
(approx. 4500 tons), rip rap slope protection (approx.12,500 tons) and major river diversion
OWNER: CDOT GERRY PADILLA (303) 442-5640
GENERAL CONTRACTOR: REIMAN CORP
ENGINEER: ICON ENGINEERING
CONTRACT AMOUNT: $ 952,751.01
COMPLETED: NOVEMBER 12, 1999
RICH BOLKOVATZ (307) 632-8971
DOUG WILLIAMS (303) 221-0802
START DATE: JULY 511999
PROJECT: SAND CREEK INTERCEPTOR: Sheet pile with concrete, cap, grouted rip -rap &
associated site work for protection of a utility crossing
OWNER/ENGINEER: METRO WASTEWATER RECLAMATION DISTRICT
BILL BRENAN (303) 286-3000
CONTRACT AMOUNT: $ 164,664.00 START DATE: AUGUST 2, 1999
COMPLETED: OCTOBER 30, 1999
PROJECT: MASSEY DRAW @ CARR STREET: 2161f of double 10'x4'.6" RCB w/ headwall
and wing walls, utility relocations, grouted 3' boulder drop structure, 552' grouted stacked boulder
channel edge, erosion/sediment/water control
OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICTUEFFERSON COUNTY
PAUL HINDMAN (303) 455-6277
JEFFERSON COUNTY PAULA LUNDQUIST (303) 271-8480
ENGINEER: ICON ENGINEERING
CONTRACT AMOUNT: $ 598,101
COMPLETED: OCTOBER 30, 1999
DOUG WILLIAMS (303) 221-0802
START DATE: DUNE 21, 1999
PROJECT: GRANGE HALL CREEK: Irrigation system installation, tree planting, soil prep, erosion
control fabric install
OWNER: CITY OF NORTHGLENN
GENENAL CONTRACTOR: HUDICK EXCAVATING
NESTOR FEDAK (303) 450-8708 BRAD KREINBRING (303) 688-5254
CONTRACT AMOUNT: $ 73,419.10
COMPLETED: SEPTEMBER 29, 1999
START DATE: AUGUST 16, 1999
PROJECT: NIWOT HIGH SCHOOL: Remove/Replace irrigation system, tree/shrub planting, soil prep
OWNER: ST. VRAIN SCHOOL DISTRICT
GENERAL CONTRACTOR: DEFALCO POARCH
RON SMITH (303) 682-7268 FRANK LEE (303) 655-2180
CONTRACT AMOUNT: $ 88,185.77 START DATE: JULY 14, 1999
COMPLETED: SEPTEMBER 7, 1999
PROJECT: CHERRY CREEK RESTORATION: grouted boulder edge, bank stabilization, seeding/mulch,
boulder edge
OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT JEFF FISHER (303) 455-6277
ENGINEER: URBAN DRAINAGE
CONTRACT AMOUNT: $ 103,933.75 START DATE: JUNE 5, 1999
COMPLETED: JULY 16, 1999
PROJECT: GOLDSMITH GULCH @ COOK PARK: grouted boulder/rip rap drop structures, sheet
pile cut-off walls, remove/replace pedestrian bridges, boulder edge tree/shrub planting, sod, bank
restoration
OWNER: URBAN DRAINAGE & FLOOD CONTROL DIST MARK HUNTER (303) 455-6277
ENGINEER: ICON ENGINEERING CURT NEUFELD (303) 221-4019
CONTRACT AMOUNT: $ 458,645.64
COMPLETED: 7/15/99
START DATE: FEBRUARY 2, 1999
PROJECT: LAKEWOOD GULCH D/S HARLAN STREET: 24" RCP install, bank stabilization, concrete
cut-off walls, irrigation system repair, sod, 24" drilled concrete piers, install 16" steel pipe
OWNER: URBAN DRAINAGE & FLOOD CONTROL DIST
MIKE SARMENTO (303) 455-6277
ENGINEER: URBAN DRAINAGE
CONTRACT AMOUNT: $ 174,387.13
COMPLETED: JULY 11 1999
PROJECT: TUSCANY SOUTH
OWNER: RICHMOND HOMES
ENGINEER: JR ENGINEERING
CONTRACT AMOUNT: $ 54,904.89
COMPLETED: JUNE 26, 1999
START DATE: MAY 6, 1999
TIM JOHNSTON (303) 220-4404
(303)740-9393
START DATE: MAY 7, 1999
PROJECT: BEAR CREEK REHABILITATION: grouted boulder drop structure, boat chute including
sheet pile cut-off, bank restoration/stabilization, boulder edge, soil prep, re -vegetation (wetland)
OWNER: URBAN DRAINAGE & FLOOD CONTROL DISTRICT
MARK HUNTER 455-6277
ENGINEER: MK CENTENNIAL CAROLYN TRAYLER (303) 948-4001
CONTRACT AMOUNT: $ 521,638.40
COMPLETED: MAY 31, 1999
START DATE: JANUARY 1, 1998
PROJECT: PUNT THE CREEK: boulder edge, remove/replace concrete trail, bank stabilization, cut-
off walls, colored concrete work, shrub planting
OWNER: THE GREENWAY FOUNDATION/CITY AND COUNTY OF DENVER
JEFF SHOEMAKER (303) 455-7109
ENGINEER: MDG, INC. MARK TAYLOR (303) 571-5787
CONTRACT AMOUNT: $ 739,155.48
COMPLETED: MAY 24, 1999
START DATE: DECEMBER 3, 1998
PROJECT: SOUTH GATE DETENTION: install 18"/24" RCP, concrete trickle channel, manhole, grouted
boulders, pipe under drain system, tree planting
OWNER: SOUTH GATE CORPORATION
ENGINEER: TURNER, COLLIE & BRADEN RICK MOSER (303) 298-7117
CONTRACT AMOUNT: 63,696.00 START DATE: FEBRUARY 1, 1998
COMPLETED: MARCH 25, 1999
PROJECT: BIG DRY CREEK @ PROGRESS PARK: concrete trail, bank stabilization, drop structures,
seeding/mulch
OWNER: URBAN DRAINAGE & FLOOD CONTROL DIST JEFF FISHER (303) 455-6277
ENGINEER: URBAN DRAINAGE
CONTRACT AMOUNT: 95,206.00 START DATE: FEBRUARY 9, 1999
COMPLETED: MARCH 26, 1999
PROJECT: 17"' STREET HILLSIDE PROJECT: storm drainage pipe install, manhole, curb/pavement
replacement, revegetation
OWNER: UNIVERSITY OF COLORADO
ENGINEER: LOVE & ASSOCIATES
CONTRACT AMOUNT: 83,498.00
COMPLETED: JANUARY 31, 1999
MIKE BARDEN (303) 492-5511
NANCY LOVE (303) 673-9795
START DATE: NOVEMBER 7, 1998
AU 01
Auger_
CO 01
1997
Sheepsfoot Compactor
DZ 14
Komatsu D65E
EX 01
2002
Komatsu PC200LC-7L
EX 02
2002
Komatsu PC2001-C-71-
LD 57
1999
Komatsu WA320
LID 58
1988
Komatsu WA350
LID 64 j
19921
Komatsu WA380
LID 75
1997
Komatsu WA320
LD 76
1998
Komatsu WA250
LID 77
2000
Cat Skidsteer 246
LID 78
2000
Cat Skidsteer 246
LE 01
36" Toro (2 each)
LE 02
36" Ransom (2 each)
LE 03
48" Ransom (3 each)
LE 04
21" Toro (7 each)
LE 05
Backpack Blower (6 each)
LE 06
Ryan Aerator
LE 07
Ryan Aerator
LE 08
Tanaka Edger (2 each)
LE 09
Spreader
LE 10
Walker (9 each)
MC 07
Case D100 Backhoe Attach.
MC 32
1982
IHC LOWBOY
FL 01
1998
Komatsu Forklift
FL 02
1998
Komatsu Forklift
GC 01
Golf Cart
GC 02
Golf Cart
GC 03
1998
John Deere Gator
TR 01
1998
John Deere Tractor 4600
TR 02
2000
John Deere Tractor 4600
TR 03
International Tractor
TC 01
1996
Ditch Witch Trencher
TC 02
1998
Ditch Witch Trencher
UL 01
1996
Case 1845C Uniloader
UL 02
1991
Case 1845C Uniloader
UL 03
1999
Case 1845C Uniloader
UL 04
20001
Case 1845C Uniloader
UL 05
19981
Case 85XT Uniloader
UL 06
20021
Case 70XT Uniloader
Scott J. Rich
Professional Experience
January 2002 to
L& M Enterprises, Inc.
Present
Berthoud, Colorado
Vice President: Responsible for all field operations. Supervision and
coordination of employees, subcontractors, suppliers, and equipment. Contract
negotiations with Owners, General Contractor, and Architect \ Engineers.
June 1995 to
Richdell Construction, Inc.
January 2002
Commerce City, Colorado
Secretary\Treasurer -General Superintendent: Responsible for all field
operations. Supervision and coordination of employees, subcontractors,
suppliers, and equipment. Contract negotiations with Owners, General
Contractor, and Architect \ Engineers.
August 1988 to
Consolidated Landscape Construction, Inc.
September 1995
Englewood, Colorado
Project Superintendent: Supervisor for construction of large Public and
Private project. Specializing in streetscape projects, production planting
projects and interlocking pavers. Responsible for scheduling labor, equipment,
subcontractors and materials. Involved with contract negotiations and
major equipment acquisitions.
June 1983 to
Sabell's Inc.
August 1988
Englewood, Colorado
Project Foreman: Construction of Public and Private projects. Coordinated
and oversaw subcontractors and operate heavy equipment. Specialized in
construction of concrete, brick.. woodwork and retaining walls.
June 1982 to
Cedar Landscaping
Mav 1983
Cedar Rapids, Iowa
General Superintendent: Scheduling of crews, equipment, subcontractors, and
materials. Involved in estimating, contracting, and negotiations.
January 1979 to
Jade Structures
February 1982
Washington, Iowa
Construction Foreman: Supervised crew for construction of buildings,
concrete work, ventilation, heating systems, minor plumbing, and electrical
work.
Education
Kirkwood Community College,
Cedar Rapids, Iowa
AAS Degree
Major: Landscape & Nursery Trade
RONALD S. PROPP
2754 Highway 402
Loveland, Colorado 80537
AREAS OF PROFICIENCY: Contact Management
Field Management
Estimating
Scheduling
Conflict Resolution
EDUCATION: Graduated Thompson Valley High School
Contact Management 2 Yrs Mesa College
OSHA Training
Drain Layers Certification
EXPERIENCE: Twenty years in project management. Supervised
and managed projects up to $3,000,000.00.
Managed and supervised projects for owners
including State of Colorado, Denver Water
Department, United States Army Corps of
Engineers, Denver Waste Water, CDOT, Metro
Waste Water and Urban Drainage & Flood Control
District.
APR-11-03 FRI 01:46 PM CITY/FT COLLINS,
PURCHAS FAX
NO, 970 2216707
SHELDON LAKE LANDSCAPE IMPROVEMENTS
ADDENDUM #1 BID SCHEDULE (BASE BID)
Bid items are described in Specification Section 01800
BID
ESTIMATED
UNIT
ITEM # DESCRIPTION
QUANTITY
UNIT
PRICE
1 Mobilization
1
LS
$ .00
2 Irrigation System
1
LS
ali�?L5.Do
3 Soil Preparation and Fine Grading
30,000
SF
$ .Val j>
4 Seed Mixes
A Dryland grass
18,800
SF
$
B Dryland grass w/ wild flowers
92000
SF
$
C Dryland grass w/ wild flowers
2,360
SF
.13
$
5 Tree Plantings
1
LS
$ • Dt�
6 Shrub Plantings
321
EA
$S,Qp
7 Fence
940
LF
$
8 Top Soil
180
Cy
-
TOTAL OF BASE BID
,AI TERMATF BID ITEM 1
1 Shrub Plantings with #1 containers
321
FA
P. 03/04
ITEM
TOTAL
$ qQ .'ate
S TZ.,=
$a Db8.00
$ Id l40.00
$ y?0 00
$3, p.00
$ S,oas.ce
$ I- 81b.640
%In.QQ $3,alp.W
Figure
Scott S. Riddell
Professional Experience
January 2002 to
L & M Enterprises, Inc.
Present
Berthoud, Colorado
President -Controller: Responsible for procurement of work, estimating.
andjob costing. Marketing and negotiation.
June 1995 to
Richdell Construction, Inc.
January 2002
Commerce City, Colorado
President -Controller: Responsible for procurement of work, estimating.
and job costing. Marketing and negotiation.
June 1989 to
Consolidated Landscape Construction, Inc.
September 1995
Englewood, Colorado
Production Coordinator/Superintendent. Schedule production crews,
equipment, subcontractors, and materials. Monitor construction activities and
job costs for all projects. Communicate with estimator to update and/or establish
production costs. Coordination with Owners and Architects on all projects.
Prepare and review cash flow, equipment budgets, and project profitability
reports.
January 1987 to
L & M Enterprises, Inc.
June 1989
Berthoud, Colorado
Assistant Project Manager: Coordination of submittals, force account work,
subcontractors, and suppliers for a six million dollar US Army Corp. of
Engineers flood control project.
March 1986 to
Sabell's Inc.
January 1987
Englewood, Colorado
Project Foreman: Construction of commercial landscape projects under
S300,000 in size.
October 1984 to
Loveland Landscape
March 1986
Loveland, Colorado
General Superintendent: Schedule crews, equipment, subcontractors, and
materials. Involved in estimating, contracting, and negotiations.
May 1975 to
L & M Enterprises, Inc.
October 1984
Berthoud, Colorado
Vice President: Oversee contract negotiations, equipment procurement,
subcontractors, scheduling, and estimating.
Education
Ottawa University 1979 - 1981
Computer Science
Metropolitan State College 1988 -1991
Construction ManagemenUComputer Science
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
L&M Enterprises, Inc.as Principal, and St. Paul Fire and Marine Insurance Company as
Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado,
as OWNER, in the sum of X 5% of the bid amountfor the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, .successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction of
Fo::t Collins Project, SHELDON LAKE LANDSCAPE IMPROVEMENTS; BID NO, 5783.
NOW THEREFORE,
(af If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a. BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted .by the OWNER.
7/96 Section 00410 Page 2
IN WITNESS WHEREOF, the Principal and the Surety have hereunto .set their hands
and seals this 17th day of April , 2003, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
abcve.
PRINCIPAL
SURETY
Name: L&M Enterprises, Inc.
St.
Paul Fire and Marine Insurance Company
Adc.ress:
P.O. Xxy
385
Washington Street
Berthoud,
13
St.
Pa , MN 55102-
Hy:
✓
By:
jM
Tit.le:-4�Cd4�;t
'I iorfsIkv��
Title:
Amy WiAett. Attorney -in -Fact
'EST:
7/96
(SE
Section 00410 Page 3
DeStftl
POWER OF ATTORNEY
Power of Attorney No.
Seaboard Surety Company
St. Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
St. Paul Mercury Insurance Company
United States Fidelity and Guaranty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
Certificate No. 1434209
KNOW ALI, MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York, and that
St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under
the laws of the State of Minnesota, and that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, and
that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of tile State oflowa, and that Fidelity and Guaranty Insurance Underwriters,
Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies'), and that the Companies do hereby make,
constitute and appoint
23457
William M. O'Connell Jr., Debbie Poppe, Shelley Czajkowski, Celeste T. Helms, Amy Wickert, Karen A. Feggestad, and
Garry L. Wesselink
Denver
Colorado
of the City of , State , their true and lawful Attorney(s)-in-Fact,
each in their separate capacity if more than one is named above, to sign its name as surety to, and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the
performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WI- EOF, the Companies have caused this instrument to be signed and sealed this m day of August 2002
t t` Seaboard Surety Company United States Fidelity and Guaranty Company
St. Paul Fire and Marine Insurance Company Fidelity and Guarantv Insurance Company
St, Paul Guardian Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc.
$h Paul Mercury Insurance Company
r tt SIM'fIY F�wr _6 Ci�'r PETER W. CARMAN, Vice President
58AL �"
State of Maryland���
City of Baltimore TIIOMAS E. BUIBREGTSE, Assistant Secretary
7`s August 2002
On this day of ,before me, the undersigned officer, personally appeared Peter W. Carman and
Thomas E. Fluibregise, who acknowledged themselves to be the Vice President and Assistant Secretary, respectively, of Seaboard Surety Company, St. Paul Fire and
Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, United States Fidelity and Guaranty Company, Fidelity and
Guaranty Insurance Company, and Fidelity and Guaranty Insurance Underwriters, Inc.; and that the seals affixed to the foregoing instrument are the corporate seals of
said Companies; and that they, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing the names of the
corporations by themselves as duly authorized officers.
�O�G`p EAS[er�U
In Witness Whereof, I hereunto set my hand and official seal. UB<tpy
My Commission expires the 1st day of July, 2006.
�t,'f CiTV
*kt'WA - r A&
REBECCA EASLEY-ONOKALA, Notary Public
86203 Rev. 7-2002 Printed in U.S.A.
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410Bid Bond
00420Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: LAMlsesl `T��{C, 1 /►
2. Permanent main office address: P.o. ,xw 'V ti"40(o. QQ$L3
3. When organized: 1116
4. If a corporation, where incorporated: [-4)14D,
5. How many years have you been en aged in the contracting business under your
present firm or trade name? of
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
gC
7. Genera character of Work performed by your company:
SGt �►+��.w...d
8. Have you ever failed to complete any Work awarded to you? D_
If so, where and why?
9. Have your ever defaulted on a contract? NO
If so, where and why?
10. Are you debarred by any government agency? hQ
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
12. List your major equipment available for this contract.
13. Experience in construction Work similar in importance to this
project:
14. Background and experience of the principal members of your organization,
including officers:
GG
15. Credit available: $
16. Bank reference:ZkOKG- KOh S4.%V-CZd1C4-
17. Will you, upon request, fill out a detailed financial statement and furnish
an other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? yG5
If yes, in what city, county and state? CG What
class, license and numbers?
19. Do you anticipate subcontracting Work under this Contract?
If yes, what percent of total contract?
and to whom?
20. Are any lawsuits pending against you or your firm at this time? n0
If
yes,
DETAIL
7/96 Section 00420 Page 2
21. What ar
What company?
limits of your public liability? DETAIL
22. What are your company's bonding limitations? � CC 4-4
23. The undersigned
corporation to
verification of
Qualifications.
hereby authorizes and requests any person, firm or
furnish any information requested by the OWNER in
the recital comprising this Statement of Bidder's
Dated at "*to 1D10
Name of deb
By: c/ p
Title: S �`p.}+ Rini
State of
this I Tt—l' day of Apo1 , 2003.
County` of/Q11-��11G�
15C�4 I�16�Gt� being duly sworn deposes and says that he is
CSi C."l' of (,.�� �l►.�U�hiS�, Y1,c and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
ubscribed and sworn to before me this I day of
N ary Public
My commission expires W COMMISSION EXPIRES
OQ/25J06
7/96 Section 00420 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 150 of the contract.
ITEM
SUBCONTRACTOR
7/96 Section 00430 Page 1
L&M
ENTERPRISES
April 17, 2003
City of Fort Collins
RE: Sheldon Lake Landscape Improvements
To Whom It May Conceren:
L&M Enterprises, Inc., acknowledges receipt of addendum #1 dated April I I, 2003.