HomeMy WebLinkAboutRESPONSE - RFP - P884 CIVIL ENGINEERING ANNUAL (2)North Star �Awo, design, inc. March 18, 2003 Mr. John Lang, PE Mr. John Stephen, CPPB City of Fort Collins 215 North Mason Street Fort Collins, Colorado 80521 RE: Civil Engineering Design, Drafting, and Surveying Services — RFP P-884 Dear Mr. Lang and Mr. Stephen: North Star Design, Inc. is please to provide this proposal for the City of Fort Collins - Civil Engineering Design, Drafting and Surveying Services contract. Over the past five years, North Star Design has grown and established itself as one of the premier civil engineering consulting firms in Larimer and Weld Counties. We are a small company, but extremely efficient. We strive to satisfy our clients by providing sound, economical engineering designs meeting project schedules and design budgets. King Surveyors, Inc. will act as a sub -consultant to North Star Design for any surveying services required for this contract. King Surveyors has served northern Colorado for over 18 years and has an excellent reputation. They are consistently the preferred survey company for North Star Design. The working relationship between the two companies is excellent and the dedication to a superior product for the cost is mutual. Mike Oberlander will serve as the Project Manager for this contract. While at JR Engineering, Mike served as the lead engineer to the City of Fort Collins on the following projects: • Linden Street and Lincoln Avenue Railroad Crossings • Harmony Road Bike Lanes (Phase 3) • Timberline Bike Lanes (Willow Springs to Trilby) • Lemay Avenue and Vine Drive Alignment Study • Lemay Avenue at Fossil Creek Park Alignment Study • Harmony Road and Shield Street Preliminary Intersection and Roadway Designs • Rolland Moore Drive design adjacent to the proposed Horticulture Center • AutoCAD Training of City Engineering Staff As you will see in the proposal, the majority of the roadway and street design that is presently done at North Star Design is associated with land development. We design the 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone • 970-686-1188 Fax Troy D. Spraker, EIT Project Engineer Registration: 1998 / Engineer in Training Education: BS / Civil Engineering / Colorado Sate University / 1999 Years of Experience: 2 years at North Star Design, Inc., 4 years total Expertise: Mr. Spraker has four years of experience in the civil engineering field and has been responsible for the design and drafting of hydraulic systems on major transportation projects, as well as other transportation, civil, structural, and architectural assignments. Mr. Spraker has been responsible for engineering design including: roadway plans, profiles, cross sections and striping plans, hydraulic modeling, pipe/channel flow capacities, overland runoff, stream/channel routing, project quantities, grading, and plan set review for internal quality control. Mr. Spraker also serves as the lead engineer on construction observation and inspection projects for North Star Design. Key Projects: North Star Design, Inc., Windsor, Colorado Project Engineer providing street, utility, drainage and grading design for a variety of roadway and land development projects. These projects include: • Vista Grande single-family residential subdivision and County Road 5 Widening, Larimer County • County Road 10 Improvements, Latimer County • Douglas Road Widening, Fort Collins • Summit View Subdivision and Weld County Road 21 and 74 Improvements, Severance • Windsor Commons commercial development and Automation Drive Improvements, Windsor • Poudre River Ranch residential / commercial development and 83'd Avenue Improvements, Greeley • Streamside single-family residential subdivision and Vine Drive Widening, Latimer County Carter & Burgess Transportation Consulting Firm, Denver, Colorado Design Engineer providing support in the areas of hydraulic and hydrologic design support for a variety of transportation projects on the Front Range. Projects included: • Highway Re -alignment and Light Rail Addition, SE Corridor I-25 and I-225, Denver • Woodman & I-25 Interchange, Colorado Springs • Roadway Widening, Table Mesa, Boulder • Pine Creek Improvements / Encroachments, Colorado Springs North Star Design, Inc. Lawrence S. Pepek, PLS Project Manager Registration: 1999 / Professional Land Surveyor, Colorado, No. 33642 Education: BS / University of Northern Colorado Diploma in Surveying and Mapping / Denver Institute of Technology Years of Experience: 9 years at King Surveyors, Inc., 12 years total Expertise: Mr. Pepek is responsible for the day-to-day operations of King Surveyors, Inc. His position includes the majority of client contact, preparation of proposals and estimates, and staff scheduling. Mr. Pepek assigns new projects to a project manager and ultimately ensures that projects are completed in accordance with the client's specifications and schedule. Mr. Pepek has been a fundamental asset to King Surveyors, Inc. since January 1994 and has recently become a joint owner of the company. Key Projects: Elm Street & Locust Street Improvements, Windsor, Colorado Project Manager responsible for providing the Town of Windsor with topographic survey of ten city blocks for roadway reconstruction design. Right -of -Way was established throughout the project corridor. King Surveying, Inc. provided construction staking for the reconstruction. Main Street Improvements, Windsor, Colorado Project Manager responsible for providing the Town of Windsor with topographic survey of downtown Windsor for street and sidewalk renovation. King Surveying, Inc. established Right -of -Way throughout the project and provided construction staking. King Surveyors, Inc. Charles B. Jones, PLS Project Manager Registration: 1983 / Professional Land Surveyor, Colorado, No. 22098 1987 / Registered Land Surveyor, Nebraska, No. 457 Education: Aims Community College Years of Experience: 9 years at King Surveyors, Inc., 26 years total Memberships: Professional Surveyors Association of Nebraska Awards: "In Recognition of Sustained Distinguished Professional Performance — 1988" from the Professional Land Surveyors of Colorado Expertise: Mr. Jones is involved in various aspects of project management and development at King Surveyors, Inc. He is responsible for overseeing GPS control surveys and any GPS static calculations. He is also involved in Right -of -Way mapping, as well as preparing legal descriptions and the assigning of field crews. Mr. Jones has been a valuable and dedicated employee since January 1994 and has recently become a partial owner of King Surveyors, Inc. He is a licensed surveyor in both Colorado and Nebraska and has attended numerous seminars for GPS control surveys such as Advanced Geomatics and Bluebooking. Key Projects: Weld County Roads 17 & 62, Weld County, Colorado Project manager responsible for providing the Weld County Engineering Department with topographic survey for the design of roadway improvements. Existing right of way for the project was determined and mapped and legal descriptions and exhibits for additional right of way dedications were prepared. North Weld Water District Projects, Weld County, Colorado Project manager responsible for providing the North Weld Water District with various topographic surveys for pipeline design as well as preparing easement and right of way descriptions for pipelines. King Surveyors, Inc. Proiect Experience Douglas Road Improvements, Fort Collins, Colorado North Star Design, Inc. provided roadway widening plans for approximately 4,600 linear feet of Douglas Road (immediately west of LCR 11). The plans provided for bike lanes and auxiliary turn lanes that were required for a proposed development in the area. This project included improvements to existing ditches and culverts. Plan and profiles of the road, as well as cross section and signing and striping plans were provided. These plans have been approved; a construction date has not yet been set. Client: Project Manager: Project Engineer: Tom Kennedy Patricia Kroetch, PE Troy Spraker, EI Caribou Apartments — Timberline Road Improvements, Fort Collins, Colorado North Star Design, Inc. provided grading, drainage, utility and private street design for a six building, 196-unit apartment complex. Close coordination with the architect, site planner, and City was required to meet density requirements for the Owner as well as meeting the City's requirements for parking, water quality and detention facilities, and handicap access to the buildings. This project requires the design of approximately 1800 feet of Timberline Road (from Caribou Road to the existing Harmony Road intersection improvements). Final design of a 4-lane configuration and preliminary design of a 6-lane configuration is required as a part of this project. Plans include street plan and profiles, cross sections, grading plans, and drainage plans. This project is expected to start construction in the spring of 2003. King Surveyors, Inc. provided topographic survey, boundary survey, right of way delineation and platting services on this project. Clients: Martin Design, Inc. & Hendricks Communities, LLC Project Manager: Michael Oberlander, PE, LSI Summit View Subdivision — Weld County Roads 21 & 74Improvements, Severance, Colorado North Star Design, Inc. provided the final grading, drainage, street and utility design of a 72- acre single-family residential subdivision. This project had strict stormwater detention requirements, and required the design of approximately one-half mile of off -site sewer. Several design iterations were required to provide an earthwork balance for the site while maintaining sewer service for all of the lots and required drainage paths. This project included approximately 12,400 linear feet of new local and collector street design and well as improvements to approximately 4,000 linear feet of existing county North Star Design, Inc. Project Experience roads (WCR 74 and WCR 21). The county roads were designed to be widened and or completely reconstructed to provide curb and gutter, sidewalks, bike lanes and auxiliary turn lanes. Portions of the improvements are presently built; the remaining portion of the project will be constructed in the next year. King Surveyors, Inc. provided topographic survey, boundary survey, right of way delineation and platting services on this project. Client: Grand Valley Development, LLC Project Manager: Patricia Kroetch, PE Project Engineer: Troy Spraker, EI Larimer County Road 10 improvements, Larimer County, Colorado North Star Design, Inc. provided roadway improvement plans for one mile of Larimer County Road 10 (between LCR 21 and LCR 23). The existing roadway is a narrow gravel road and the improvements proposed will pave and widen the road, provide shoulders and bring the road into compliance with the Larimer County Urban Area Street Standards. Improvements to existing roadside ditches, drive accesses, and drainage culverts are included in these plans. Construction of these improvements is expected later this year. Client: Project Manager: Project Engineer: Orcas Development Patricia Kroetch, PE Troy Spraker, EI Thunder Mountain Harley Davidson — Crossroads Blvd. & Byrd Drive Improvements, Loveland North Star Design, Inc. is in the process of preparing design plans for a future Harley Davidson dealership with surrounding commercial pad sites at the northwest corner of Crossroads Boulevard and Interstate 25. These plans include the drainage design for the entire development, grading design and utility design for the proposed facility. Adjacent roadway improvements that are being designed with this project include: • Interim improvements adding auxiliary turn lanes to Crossroads Boulevard. • A new Major Collector street (Byrd Drive) that will ultimately replace the existing Interstate Frontage Road and will connect to the airport. • An ultimate layout that shows a conceptual design of a new interchange at Interstate 25, a four lane configuration of Crossroads Boulevard, and the connection of Byrd Drive to the south. This design is presently under review at the City of Loveland. King Surveyors, Inc. is providing all surveying services on the project. Client: Thorp Associates, PC Project Manager: Michael Oberlander, PE, LSI North Star Design, Inc. Proiect Experience Mulberry/Riverside Storm Sewer Improvements, Fort Collins, Colorado Provided intersection topographic survey for reconstruction and drainage improvement design. Client: Anderson Consulting Engineers Project Manager: Lawrence Pepek, King Surveyors, Inc. State HiQhway 287 and Highway 1, Fort Collins, Colorado Provided construction surveying services for the reconstruction of the State Highway 287 and State Highway 1 intersection. Services included staking and grading of utilities, curb and gutter, storm sewers, and bluetopping pavement. Client: Mountain Constructors Project Manager: Robert Wesnitzer, King Surveyors, Inc. Drake and Shields Roadway Improvements, Fort Collins, Colorado Provided construction surveying services for the reconstruction of Drake Road and Shields Street in Fort Collins. Services included staking and grading of utilities, curb and gutter, storm sewers, and bluetopping pavement. Client: LaFarge Project Manager: Chris Brown, King Surveyors, Inc. Dry Creek Flood Plain Basin, Larimer County, Colorado Provided surveying services for the Dry Creek Drainage Basin including: location of inlets, drainage structures and horizontal and vertical control for aerial mapping. Client: URS Corporation Project Managers: Paul Groves and Kevin King, King Surveyors, Inc. King Surveyors, Inc. Proiect Team References Stuart MacMillan, Partner Everitt Commercial Partners, LLC 3030 South College Avenue Fort Collins, Colorado 80525 (970)226-1500 Roger Thorp, AIA, NCARB, President Thorp Associates, PC PO Box 129 131 Stanley Avenue Estes Park, Colorado, 80517 (970) 586-9528 Doug Dohn, President Connie Dohn, Chief Financial Officer Dohn Construction, Inc. 2642 Midpoint Drive, Unit A Fort Collins, Colorado, 80525 (970) 490-1855 Don Shedd, Director of Parks Town of Windsor 301 Walnut Street Windsor, Colorado 80550 (970)686-7476 North Star Design, Inc. � North Star '401 AmrAw design, inc. PROJECT TEAM SCHEDULE OF RATES City of Fort Collins RFP P-884 2003 Civil Engineering Design, Drafting and Surveying Services ENGINEERING HOURLY RATE Project Manager $85 Project Engineer / Project Designer $67 Design Engineer / Technician $55 Clerical $37 SURVEYING HOURLY RATE Registered Land Surveyor $64 Surveying Technician I $52 Surveying Technician II $42 Surveying Technician III $37 Crew Rate (3 person) $130 Crew Rate (2 person) $105 GPS Receivers (each) $40 Draftsman (CAD Technician I) $52 Draftsman (CAD Technician II) $42 Draftsman (CAD Technician III) $37 DIRECT EXPENSES Mileage: Standard Vehicle $0.35 / Mile 4-Wheel Drive $0.48 / Mile Prints: 18"x24" $1.50 / Sheet 24"x36" $2.00 / Sheet Mylar Sepia 24" X 36" $10.00/Sheet Copies: 8 '/z x 11" $0.15/copy 8 %2 x 14" $0.20/copy 11 x 17" $0.25/copy 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone • 970-686-1188 Fax new interior Local and Collector streets within developments and provide reconstructive street designs for the Arterial streets on the perimeters of the developments. Therefore, we consider ourselves a transportation firm, as we do a large volume of street and roadway design over the course of our projects. Our recent projects have required that we follow the Larimer County Urban Area Street Standards; as a group, we are quite familiar with the requirements, processes and procedures set forth in the Standards. Through the course of this contract, if a set of plans needs to be prepared for CDOT's review, both Mike and I are familiar with CDOT's requirements and capable of producing plans in this format if necessary. Our computer hardware and software are completely compatible with the City of Fort Collins Engineering Department. Our offices presently utilize IBM compatible PC's running AutoCAD 2000 and 2002 with Land Development Desktop 3.0 (LDD). We also have the LDD Civil package, which is utilized in roadway design as well as various other programs for hydraulic, hydrologic, utility and grading design. Our Project Manager, Mike Oberlander, and staff, including surveying support, will be able to commit to the City adequate time to meet the contract's requirements for the next 4 to 6 months. Each assignment throughout the life of this contract will require the identification of project scope and schedule. In general, our project approach and methodology will consist of preparing conceptual design documents using field survey or City GIS data for background. These documents will be suitable for staff review, preliminary cost estimating, and public input (if required). After this phase of the project is completed, final survey and design documents can be prepared. We have found that this approach is the most cost effective and time efficient manner of preparing plans. Several iterations of conceptual documents can be prepared at relatively little cost to the City. With the clear direction that the conceptual phase provides, the preparation of final plans is simplified. Internal checks for quality control are provided throughout all phases of design. Again, we thank you for the opportunity to propose on this contract and look forward to discussing the contract further in an interview. Please do not hesitate to call if you have any questions or need clarification on any portion of this proposal. Sincerely, 6ik4 I Patricia Kroetch, PE President, North Star Design, Inc. Table of Contents Cover Letter Table of Contents Section 1— Project Team • Company Profiles • Key Personnel Section 2 — Qualifications • Project Experience • References Section 3 — Rate Schedules North Star Design, Inc. North Star design North Star Design, Inc. employs a staff of professional engineers, designers, technical assistants, and support staff in one office located in Windsor, Colorado. The company has a consistent record of controlled growth and of providing top quality service to its clients. We believe that the continued success of the company depends upon these efforts and adherence to the professional standards and ideals upon which the company was formed. SERVICES AND ORGANIZATION North Star Design, Inc. is a civil engineering design firm. Staff is experienced in project management and design in the areas of Land Development, Transportation, and Storm Water Hydrology and Hydraulics. North Star Design, Inc. stresses "personal' service working closely with clients to jointly establish goals and specific ways to meet them. The company is committed to satisfying client needs on a long-term basis thereby improving the public good and enhancing the engineering profession. In support of this mission North Star Design, Inc. pledges to: • Maintain a high standard of business ethics • Provide an environment where employees can achieve personal excellence and growth • Provide personalized services • Encourage technical growth • Treat associates and contractors with fairness and respect PHILOSOPHY AND GENERAL POLICIES North Star Design, Inc. strives to achieve and maintain total client satisfaction. In addition, the company maintains an undisputed leadership as the desired engineering firm of their clients by serving to the highest professional standard. KIN S R OR IN 9299 Eastman Park Drive Windsor, CO 80550 Mission: To provide superior quality surveying services emphasizing quality control through all phases of land development and construction with a high degree of personal commitment to our diverse group of clientele. Company History: In January 1985, Kevin King established a company known as King & Associates. Kevin began the practice to provide thorough, experienced and complete surveying services. On January 1, 1994 the firm was renamed King Surveyors, Inc. On January 3, 2003 long-term employees Lawrence Pepek, Charles Jones, and Robert Wesnitzer acquired King Surveyors, Inc. from Kevin and are presently managing the Company. Company Location: The firm is located in Windsor, Colorado. Its central location provides excellent access to Northern Colorado. Company Services: King Surveyors, Inc. is a diverse and professional consulting firm. The company is multifaceted and concentrates on providing our clientele with construction, topographical and land surveying services. Our firm is comprised of registered land surveyors and associated support groups organized to offer assistance in the following areas: Land Surveying Services: Boundary Surveys Site Plans Easement Preparation Improvement Surveys Subdivisions Right of Way Surveys Topographical Services: Route Surveys Topographic Surveys Photogrammetric Surveys Architectural Surveys GPS Control Surveys Construction Services: Street Construction Staking Utility Staking Building Layout Quality Assurance: King Surveyors, Inc. follows very strict guidelines for quality control in the field and in the office. Office personnel thoroughly examine all data that comes from the field and vice versa. The office currently utilizes the PLSC checklist for all survey plats. Independent geometry checks are also completed prior to finalizing any drawing. Patricia Kroetch, PE President / Owner Registration: 1996 / Professional Engineer / Colorado, No. 31306 Education: MS / Civil Engineering / South Dakota School of Mines & Technology / 1992 BS / Civil Engineering / South Dakota School of Mines & Technology / 1989 Years of Experience: 14 Years, including 5 years as owner and president of North Star Design, Inc. Memberships: American Consulting Engineers Council Windsor Business Women's Network Windsor Chamber of Commence Board of Directors Expertise: Ms. Kroetch has over 14 years of experience in a wide variety of civil engineering projects for federal, state, county, municipal, and private clients. Her various projects have included roadway, parking lot, intersection, drainage, water, storm sewer, sanitary sewer, and utility design, as well as assisting with land development, grading, construction and design cost estimating, legal descriptions, survey coordination, and construction engineering and administration services. Ms. Kroetch is familiar with the land development approval processes in Fort Collins, Greeley, Longmont, Loveland, Windsor, and Larimer and Weld Counties. She is proficient with Land Development Desktop, AutoCAD, Word, Excel, and various Urban Drainage programs. Key Projects: Vista Grande, Larimer County, Colorado Project Manager responsible of the design of the public improvements for a 40-acre single-family residential development. This project required that the design of all public streets be in accordance with the Larimer County Urban Area Street Standards. Coordination with adjacent development and street connections was critical in this design. Approximately 1,400 linear feet of County Road 5 will be upgraded to a Minor Arterial road with the construction of this project. Douglas Road Improvements, Fort Collins, Colorado Project Manager responsible for the design plans for the widening of 4,600 linear feet of Douglas Road in north Fort Collins. These plans provide for roadway widening sufficient for bike lanes and new auxiliary lanes needed by an adjacent development. Diamond Valley Road, Windsor, Colorado Project Manager responsible for the design of one-half mile of collector roadway through a proposed industrial park in Windsor. Utility and drainage design for the adjacent properties was required with the street design. Two City of Greeley water transmission lines crossed the alignment of this roadway and coordination and approval by the City of Greeley was required prior to construction. Oakridge Block 4, Fort Collins, Colorado Project Manager responsible for the design of a commercial development which included five office buildings, a hotel expansion and a new public street. Coordination with other consultants and the Owner was critical on this project to optimize land uses. North Star Design, Inc. Patricia Kroetch, PE, Page 2 Diamond Valley Tech Center, Lot 2, Block 1, Windsor, Colorado Project Manager responsible for the design of a multi -building commercial park in southeast Windsor. This project included intensive drainage design because of off - site flows entering the property. The design of the widening of Eastman Park Drive was included in the improvement plans for this site. Coordination of the roadway plans with the neighboring property's improvements was a critical part of this design. Windsor Tech Business Center, Filing No. 2, Windsor, Colorado Engineer responsible of the design of a 40-acre industrial development in Windsor. This project required the coordination of large sewer and storm system extensions with the Town of Windsor. Eastman Park, Diamond Park and Chimney Park, Windsor, Colorado Engineer responsible for provided design -engineering services for the Town of Windsor for three parks ranging in size from 1 to 90 acres. Services included parking lot design, grading of soccer and baseball fields, stormwater and utility system design and coordination with Town staff and other consultants. Eastman Park design plans include roadway widening plans for adjacent portions of Eastman Park Drive. Timber Ridge Subdivision, Severance, Colorado Project Manger responsible for the preliminary design of this 174-acre residential development. Final design plans for the subdivision have been completed for the first two phases of construction. North Star Design is responsible for providing construction inspection of utility installation on these projects. Windsor Charter School, Windsor, Colorado Engineer responsible for the site design for a new school building for the Windsor Charter Academy included design of the adjacent street, storm facilities and water and sewer mains. Poudre River Ranch, Phase 3, Greeley, Colorado Project Manager on this 115-acre development that includes single-family homes, condominiums, patio homes and commercial property. This development is adjacent to the Poudre River and issues related to the proposed regional trail, floodplain, stormwater quality, and existing buffers and easements were coordinated throughout the design. Approximately 3 miles of Arterial, Collector and Local street design was included with this project. North Star Design, Inc. Michael P. Oberlander, PE, LSI Registration: 2000 / Professional Engineer / Colorado, No. 34288 2002 / Professional Engineer / Wyoming, No. 9751 1996 / Land Surveyor Intern / Iowa, No. 13211 Project Manager Education: BS / Civil Engineering / South Dakota School of Mines & Technology / 1995 Years of Experience: 1-'/2 years at North Star Design, Inc., 8 years total Memberships: American Council of Engineering Companies Expertise: Mr. Oberlander has 8 years of experience in a variety of civil engineering areas for both public and private sector projects including site and subdivision design, street and highway improvement, water and wastewater projects, and surveying. He has extensive experience in commercial site and subdivision design where he has been responsible for site layout, utility design, grading, erosion control, and stormwater management. Mr. Oberlander's roadway improvement experience includes municipal street reconstruction design involving curb and gutter replacement with asphalt overlay, and full depth pavement replacement design. He has been responsible for highway design including horizontal and vertical alignments, super elevation, cross sections, grading and construction staging. His survey experience has included drafting subdivision and easement plats, boundary, topographic, and construction field survey, and extensive work with office setup for construction staking. Key Projects: Caribou Apartments, Fort Collins, Colorado Project Manager responsible for the grading, drainage, utility and street design for a proposed apartment complex. Approximately 1800 feet of Timberline Road is presently being designed for a 4-lane configuration and a 6-lane configuration as a part of this project. Thunder Mountain Harley Davidson, Loveland, Colorado Project Manager responsible for the grading, drainage and utility design of a 14-acre commercial development at I-25 and Crossroads Boulevard. The motorcycle dealership and service facility will be constructed with this project. Three additional commercial pad sites are also being planned. Roadway design on this project includes the design of auxiliary lanes on existing Crossroads Boulevard, the design of a new Major Collector street which will ultimately replace the interstate frontage road, as well as a conceptual layout of the ultimate ramp and roadway configuration. Eagle Cliffs Subdivision, Fort Collins, Colorado Project Manager responsible for grading, drainage, public street and utility design of a 10-acre residential subdivision (single family detached and attached). Fort Collins Railroad Crossings, Fort Collins, Colorado Project Engineer responsible for providing the City of Fort Collins Engineering Department with preliminary horizontal design for five railroad crossings throughout Fort Collins. Interim and ultimate roadway configurations were considered at several sites. This information was then available for PUC permitting North Star Design, Inc. Michael P. Oberlander, PE, LSI, Page 2 and project budgeting. Assisted in the preparation of final construction drawings for two of the crossings. Harmony Road (SH 68) Corridor Projects, Fort Collins, Colorado Project Engineer responsible for the design of the widening and median improvements for several projects on Harmony Road. Two of these projects are improvements related to adjacent commercial developments which include interim and ultimate plans for widening and median design as well as coordination with CDOT for Access Permits and Access Line revisions. Additionally, Project Engineer responsible for design of bike lane improvements for the City of Fort Collins for approximately 2.5 miles of Harmony Road which had no bicycle facilities. Other responsibilities along the Harmony Road Corridor include the construction staking setup for the Harmony Road and I-25 Interchange Project. Timberline Bike Lanes, Fort Collins, Colorado Project Engineer responsible for providing the City of Fort Collins with preliminary and final design plans for the widening of Timberline Road for bicycle facilities between Willow Springs and Trilby Road. City of Fort Collins AutoCAD Training Providing AutoCAD and related computer training to the City of Fort Collins Engineering Department. Training included basic drafting for design and survey, survey reduction, and roadway and utility design. In 2003, similar training was provided to the Park Planning and Development Department. North Boise Avenue Extension, Loveland, Colorado Project Engineer responsible for providing alignment alternatives to the City of Loveland for the extension of North Boise Avenue to County Road 11 C as well as its intersection with East 371h Street. Preliminary horizontal and vertical design was provided because of sensitive environmental areas adjacent to the proposed road. Consideration was also provided for the adjacent property that will be developed as a residential subdivision. Eisenhower Blvd. (SH 34) Horizontal Layout, Loveland, Colorado Project Engineer responsible for alignment and roadway configuration alternatives for approximately 2 miles of Eisenhower Boulevard. Services were provided to the City of Loveland for ultimate roadway planning purposes. Walnut Street Reconstruction, Boulder, Colorado Project Engineer responsible for roadway design plans for approximately 1000 feet of unimproved collector street. Services were provided for the City of Boulder and included preliminary layout, public meeting participation, final plan, profile and cross section design, bike lane connections, and the resolution of drainage issues. I-70 at Hidden Valley, East of Idaho Springs, Colorado Project Engineer directly involved with the geometric design (horizontal and vertical) of an interstate highway interchange. This project also included the design of ramps, acceleration and deceleration lanes; grading; cross sections; construction staging plans; and final signing, striping and barrier plans. North Star Design, Inc.