HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - CHANGE ORDER05/07/03 WED 14:06 FAX 970 482 4537 SINNETT BUILDERS INC Q 002
mMay. 1. 20031.11:IZAMne2,,ALLER LINGLE AR1H FACILITIES No,0573 P, 2/2 es
CHANGE ORDER NO, 3
PROJECT TITLE: Cable 27 Studio — Phase 2!
CONTRACTOR: Sinnett Builders, Inc
PROJECT NUMBER: Old "7135
DESCRIPTION: InteriorAllmations and Mechanical 8y:bmm for Cable 27 Studio
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Addi-tions :and deletions to original scope of waft per Customer
requests.
2. DescrilWon of change: Verk*A rnllecrllamous smao changes as docuamnted with
attached backup Information.
3. Change In contract cost: Yes
4. Change in contracture: No
WiL7T-At : - ,-,.j
ORIGINAL CONTRACT COST S 188.903.00
TOTAL APPROVED CHANGE ORDERS 11.241.00
TOTAL PENDING CHANGE ORDERS 00
TOTAL THIS CHANGE ORDER $ 2,258.00
ADJUSTED CONTRACT COST $ 182,402-00
ACCEPTED BY:
REVIEWED
APPROVED BY:
L-w--
roFKA101analiew, Sinned Sldrs
p, Aber-Ungln Architects, P.C.
old�A Facilities Project Managcsr
cc: City Clerk Project Fib
Contractor Purchasing
Engineer
S-7-P?
Date
L�03
Data
To: Shaun, Aller * Lingle Architects
From: Brian, Sinnett Builders, Inc.
Date: March 4, 2003
Fax: 1 Page
Subject: Cable 27 Studio - Add for core drilling
The following pricing is for the additional core drilling needed for the city. If you have
any questions give me a call
Core Drilling $124.00
Bond & Builders Risk $ 2.00
SBI 7% Fee $ 9.00
Total $135.00
C.C. Steve, City of Ft. Collins
CONSTRUCTION
CHANGE
DIRECTIVE
AIA DOCUMENT G7i4 -ELECTRONIC FORMAT
(This document replaces AIA Document C,773 Construction Change Authorization)
OWNER
El
ARCHITECT
51
CONTRACTOR
❑
FIELD
❑
OTHER
COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA
DOCUMENT Deoi.
PROJECT: Cable 27 Studio Phase 2
300 Laporte Ave.
Ft. Collins. CO 86522
(Name, address)
TO CONTRACTOR: Sinnett Builders, Inc.
2926 E. Mulberry
Ft. Collins. CO 80524
(Name, address)
DIRECTIVE NO.: THREE
DATE: March 23, 2003
ARCHITECT'S PROJECT NO: Bid No. 5753
CONTRACT DATED: January 8. 2003
CONTRACT FOR: General Construction
You are hereby directed to make the following change(s) in this Contract:
The following change order is based on the attached memos provided by Sinnett Builders Inc dated April 23 2003 March
31, 2003, March 26. 2003, March 25 2003 March 12 2003 March 4 2003 March 4 2003 and March 4 2003
PROPOSED ADJUSTMENTS
The proposed basis of adjustment to the Contract Sum or (4-ara.,to@d *,r..,,;...um n^cia
[ x ] Lump Sum (increase) (decrease) of s 2.258.00
[ ] Unit Price of s per
[ ] as provided in Subparagraph 7.3.6 of AIA Document A201, 1987 edition.
[ ] as follows:
2. The Contract Time is proposed to (b�c c adjusted) (remain unchanged). The proposed adjustment, if any, is (an of
days) (a doerease 9f days).
When signed by the Owner and Architect and received by the Contractor, this document
becomes effective IMMEDIATELY as a Construction Change Directive (CCD), and the
Contractor shall proceed with the change(s) described above.
ARCHITECT
Aller' Lingle Architects
Address712 Whalers Way
Ft. Collins CO 80525
BY
DATE: j a
OWNER
City of Ft. Collins
Address117 N. Mason Street
t. Collins CO80522
BY:/I,
DATE:
Signature by the Contractor indicates
the Contractor's agreement with the
proposed adjustments in Contract Sum
and Contract Time set forth in this
Construction Change Directive.
CONTRACTOR
Sinnett Builders. Inc.
Address2926 E. Mulberry
Ft. Colli 60524
:TOEO.:
1987 THE AMERICAN 10TITUTEOF ARCHITECTS, ORK AVENUE, N.W., WA ID.C. -5 . AIA U
CONSTRUCTION CHANGE DIRECTIVE - 1987 EDITION - AIA® - WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the
violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with
your license without violation until the date of expiration as noted below. expiration as noted below. User Document: g714•cable 27.aia --
4/23/2003. AIA License Number 1000327, which expires on 2/15/2004.
Electronic Format G714 - 1987
To: Shaun, Aller * Lingle Architects
From: Brian, Sinnett Builders, Inc.
Date: April 23, 2003
Fax: 223-1833
Subject: Cable 27 Studio - Automatic Door Bottoms
Below is the cost for the surface mounted door bottoms. We have to mount these on
the inside of the door to make them work so when both doors are opened you will see
both bottoms at the same time. Do you want to make them the same color and which
color.
Collins Door $ 96.00
Builders Risk $ 2.00
SBI Labor $ 75.00
SBI 7% Fee $ 12.00
Total $185.00
Please give me a call if you have any questions.
Thank you.
C.C. Steve, City of Ft. Collins
To: Shaun, Aller' Lingle Architects
From: Brian, Sinnett Builders, Inc.
Date: March 31, 2003
Fax: 2 Pages
Subject: Cable 27 Studio - Electrical for new Console
The following add is for the electrical associated with the new console. To furnish and
install one additional circuit BB10 and one weatherproof double duplex mounted on the
floor below the access flooring. If you have any questions or would like us to proceed
with this work, give me a call.
H & H Electric $640.00
Builders Risk $ 11.00
SBI 7% Fee $ 46.00
Total $697.00
Thank you
C.C. Steve, City of Ft. Collins
To: Shaun, Aller' Lingle Architects
From: Brian, Sinnett Builders, Inc.
Date: March 26, 2003
Fax: 223-1833
Subject: Cable 27 Studio - Access Floor Cutouts
The credit for deleting the cutouts in the access floor is listed below. AC Systems will
provide the owner with 4"x6" trim pieces (grommets) to use in the future. We do have
one on site to look at for tomorrow's meeting.
AC Systems ($100.00)
Thank you.
C.C. Steve, City of Ft. Collins
To: Shaun, Aller*Lingle Architects
From: Brian, Sinnett Builders, Inc.
Date: March 25, 2003
Fax: 1 Page
Subject: Cable 27 Studio - Painting
Below is the cost for the approved blown in insulation in the walls of the editing rooms.
If you have any questions give me a call.
Thermal Concepts $250.00
Builders Risk $ 4.00
SBI 7% Fee $ 18.00
Total $272.00
Thank you.
To: Shaun, Aller ` Lingle Architects
From: Brian, Sinnett Builders, Inc.
Date: March 12, 2003
Fax: 1 Page
Subject: Cable 27 Studio - Additional Drywall work
At Steve's request, we have installed drywall on the backside of the wall that has the
remaining casework (see attached). If you have any questions give me a call.
Applied Drywall $200.00
Builders Risk & Bond $ 3.00
SBI 7% Fee $ 14.00
Total $217.00
C.C. Steve, City of Ft. Collins
To: Shaun, Aller * Lingle Architects
From: Brian, Sinnett Builders, Inc.
Date: March 4, 2003
Fax: 1 Page
Subject: Cable 27 Studio - Install Owners Casework
The deductive price to not install the owner provided. control console is listed below. If
you have any questions give me a call.
Installation
Thank you.
C.C. Steve, City of Ft. Collins
($350.00)
To: Shaun, Aller' Lingle Architects
From: Brian, Sinnett Builders, Inc.
Date: March 4, 2003
Fax: 1 Page
Subject: Cable 27 Studio - change for hardware to door # 7
The following pricing is for the change to the hardware for door # 7 and electrical
needed to operate. If you have any questions give me a call.
Hardware
$
900.00
Install
$
55.00
Electrical
$
150.00
Builders Risk & Bond
$
18.00
SBI 7% Fee
$
79.00
Total
$1,202.00
C.C. Steve, City of Ft. Collins