Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - CHANGE ORDER05/07/03 WED 14:06 FAX 970 482 4537 SINNETT BUILDERS INC Q 002 mMay. 1. 20031.11:IZAMne2,,ALLER LINGLE AR1H FACILITIES No,0573 P, 2/2 es CHANGE ORDER NO, 3 PROJECT TITLE: Cable 27 Studio — Phase 2! CONTRACTOR: Sinnett Builders, Inc PROJECT NUMBER: Old "7135 DESCRIPTION: InteriorAllmations and Mechanical 8y:bmm for Cable 27 Studio In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: Addi-tions :and deletions to original scope of waft per Customer requests. 2. DescrilWon of change: Verk*A rnllecrllamous smao changes as docuamnted with attached backup Information. 3. Change In contract cost: Yes 4. Change in contracture: No WiL7T-At : - ,-,.j ORIGINAL CONTRACT COST S 188.903.00 TOTAL APPROVED CHANGE ORDERS 11.241.00 TOTAL PENDING CHANGE ORDERS 00 TOTAL THIS CHANGE ORDER $ 2,258.00 ADJUSTED CONTRACT COST $ 182,402-00 ACCEPTED BY: REVIEWED APPROVED BY: L-w-- roFKA101analiew, Sinned Sldrs p, Aber-Ungln Architects, P.C. old�A Facilities Project Managcsr cc: City Clerk Project Fib Contractor Purchasing Engineer S-7-P? Date L�03 Data To: Shaun, Aller * Lingle Architects From: Brian, Sinnett Builders, Inc. Date: March 4, 2003 Fax: 1 Page Subject: Cable 27 Studio - Add for core drilling The following pricing is for the additional core drilling needed for the city. If you have any questions give me a call Core Drilling $124.00 Bond & Builders Risk $ 2.00 SBI 7% Fee $ 9.00 Total $135.00 C.C. Steve, City of Ft. Collins CONSTRUCTION CHANGE DIRECTIVE AIA DOCUMENT G7i4 -ELECTRONIC FORMAT (This document replaces AIA Document C,773 Construction Change Authorization) OWNER El ARCHITECT 51 CONTRACTOR ❑ FIELD ❑ OTHER COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT Deoi. PROJECT: Cable 27 Studio Phase 2 300 Laporte Ave. Ft. Collins. CO 86522 (Name, address) TO CONTRACTOR: Sinnett Builders, Inc. 2926 E. Mulberry Ft. Collins. CO 80524 (Name, address) DIRECTIVE NO.: THREE DATE: March 23, 2003 ARCHITECT'S PROJECT NO: Bid No. 5753 CONTRACT DATED: January 8. 2003 CONTRACT FOR: General Construction You are hereby directed to make the following change(s) in this Contract: The following change order is based on the attached memos provided by Sinnett Builders Inc dated April 23 2003 March 31, 2003, March 26. 2003, March 25 2003 March 12 2003 March 4 2003 March 4 2003 and March 4 2003 PROPOSED ADJUSTMENTS The proposed basis of adjustment to the Contract Sum or (4-ara.,to@d *,r..,,;...um n^cia [ x ] Lump Sum (increase) (decrease) of s 2.258.00 [ ] Unit Price of s per [ ] as provided in Subparagraph 7.3.6 of AIA Document A201, 1987 edition. [ ] as follows: 2. The Contract Time is proposed to (b�c c adjusted) (remain unchanged). The proposed adjustment, if any, is (an of days) (a doerease 9f days). When signed by the Owner and Architect and received by the Contractor, this document becomes effective IMMEDIATELY as a Construction Change Directive (CCD), and the Contractor shall proceed with the change(s) described above. ARCHITECT Aller' Lingle Architects Address712 Whalers Way Ft. Collins CO 80525 BY DATE: j a OWNER City of Ft. Collins Address117 N. Mason Street t. Collins CO80522 BY:/I, DATE: Signature by the Contractor indicates the Contractor's agreement with the proposed adjustments in Contract Sum and Contract Time set forth in this Construction Change Directive. CONTRACTOR Sinnett Builders. Inc. Address2926 E. Mulberry Ft. Colli 60524 :TOEO.: 1987 THE AMERICAN 10TITUTEOF ARCHITECTS, ORK AVENUE, N.W., WA ID.C. -5 . AIA U CONSTRUCTION CHANGE DIRECTIVE - 1987 EDITION - AIA® - WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. User Document: g714•cable 27.aia -- 4/23/2003. AIA License Number 1000327, which expires on 2/15/2004. Electronic Format G714 - 1987 To: Shaun, Aller * Lingle Architects From: Brian, Sinnett Builders, Inc. Date: April 23, 2003 Fax: 223-1833 Subject: Cable 27 Studio - Automatic Door Bottoms Below is the cost for the surface mounted door bottoms. We have to mount these on the inside of the door to make them work so when both doors are opened you will see both bottoms at the same time. Do you want to make them the same color and which color. Collins Door $ 96.00 Builders Risk $ 2.00 SBI Labor $ 75.00 SBI 7% Fee $ 12.00 Total $185.00 Please give me a call if you have any questions. Thank you. C.C. Steve, City of Ft. Collins To: Shaun, Aller' Lingle Architects From: Brian, Sinnett Builders, Inc. Date: March 31, 2003 Fax: 2 Pages Subject: Cable 27 Studio - Electrical for new Console The following add is for the electrical associated with the new console. To furnish and install one additional circuit BB10 and one weatherproof double duplex mounted on the floor below the access flooring. If you have any questions or would like us to proceed with this work, give me a call. H & H Electric $640.00 Builders Risk $ 11.00 SBI 7% Fee $ 46.00 Total $697.00 Thank you C.C. Steve, City of Ft. Collins To: Shaun, Aller' Lingle Architects From: Brian, Sinnett Builders, Inc. Date: March 26, 2003 Fax: 223-1833 Subject: Cable 27 Studio - Access Floor Cutouts The credit for deleting the cutouts in the access floor is listed below. AC Systems will provide the owner with 4"x6" trim pieces (grommets) to use in the future. We do have one on site to look at for tomorrow's meeting. AC Systems ($100.00) Thank you. C.C. Steve, City of Ft. Collins To: Shaun, Aller*Lingle Architects From: Brian, Sinnett Builders, Inc. Date: March 25, 2003 Fax: 1 Page Subject: Cable 27 Studio - Painting Below is the cost for the approved blown in insulation in the walls of the editing rooms. If you have any questions give me a call. Thermal Concepts $250.00 Builders Risk $ 4.00 SBI 7% Fee $ 18.00 Total $272.00 Thank you. To: Shaun, Aller ` Lingle Architects From: Brian, Sinnett Builders, Inc. Date: March 12, 2003 Fax: 1 Page Subject: Cable 27 Studio - Additional Drywall work At Steve's request, we have installed drywall on the backside of the wall that has the remaining casework (see attached). If you have any questions give me a call. Applied Drywall $200.00 Builders Risk & Bond $ 3.00 SBI 7% Fee $ 14.00 Total $217.00 C.C. Steve, City of Ft. Collins To: Shaun, Aller * Lingle Architects From: Brian, Sinnett Builders, Inc. Date: March 4, 2003 Fax: 1 Page Subject: Cable 27 Studio - Install Owners Casework The deductive price to not install the owner provided. control console is listed below. If you have any questions give me a call. Installation Thank you. C.C. Steve, City of Ft. Collins ($350.00) To: Shaun, Aller' Lingle Architects From: Brian, Sinnett Builders, Inc. Date: March 4, 2003 Fax: 1 Page Subject: Cable 27 Studio - change for hardware to door # 7 The following pricing is for the change to the hardware for door # 7 and electrical needed to operate. If you have any questions give me a call. Hardware $ 900.00 Install $ 55.00 Electrical $ 150.00 Builders Risk & Bond $ 18.00 SBI 7% Fee $ 79.00 Total $1,202.00 C.C. Steve, City of Ft. Collins