Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - CURED IN PLACE PIPEEXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND INSITUFORM TECHNOLOGIES, INC. DATED: July 21, 2000 Work Order Number: Purchase Order Number: Project Title: 2002 Insituform Projects ;CM�Jommencement Date: �p Completion Date: /9 N 01 Maximum Fee: °(arse and reimbursable direct costs): Project Description: City of Fort Collins Wastewater Utilities 2002 Cured In Place Pipe Scope of Services: Address: 3400 Blk. McConnell Dr., 3700 Blk. Post Rd., 3600 Blk. Anvil Ln., 2924 Lambert Ln., 2900 Blk. Welch Dr., 3300 Blk. Orchard Dr., 1500 & 1600 Blk. Redwood St., 1200 Blk. Riverside, 2100 Blk. Springfield Dr., 2600 Blk. Kildeer, 1700 Blk. Lakeshore Dr., 3200 Blk. Camelot Dr. Pipe Diameter: 8", 10" & 12" Vetrified Clay Pipe Length: 12" — 213 lineal feet 10" — 994 lineal feet 8" — 4,889 lineal feet Service Connections: 75 Protruding Taps: 0 Insitutube: 0.20 nominal wall thickness, based on 400,000 PSI Modulus ➢ Certificate of Insurance as indicated in Contract ➢ Mobilization and demobilization ➢ Pipeline cleaning prior to and after installation ➢ Preliminary Video and Service Connection Identification ➢ Mainline Bypass pumping during installation ➢ Insitutube pipe installed complete including curing and finishing ➢ As -built Video inspection logs and Video tape ➢ Proper Traffic Control for the work site as approved by City of Fort Collins Traffic Operations Superintendent. ➢ Coordination and notification with project manager, residents, homeowners association, water districts, including letters and flyers prior to installation ➢ Coordination with appropriate water district to operate fire hydrants during installation ➢ Daily fax notification to Utility Supervisor of project work being completed on that day ➢ Project pre -construct meeting with Utility Supervisor ➢ Two Year Contractor's Warranty