HomeMy WebLinkAboutWORK ORDER - RFP - P763 CURED IN PLACE PIPE (5)EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
INSITUFORM TECHNOLOGIES, INC.
DATED: February 22, 2001
Work Order Number: 503-1-01
Purchase Order Number:
Project Title: 2001 Insituform Projects
Commencement Date: March 1, 2001
Completion Date: April 16, 2001
Maximum Fee: (time and reimbursable direct costs):
334 ft. of 10" pipe @ $34.00 per ft. _ $11,510.00
401 ft. of 10" pipe @ $34.00 per ft. _ $13,834.00
237 ft. of 8" pipe @ $32.00 per ft. _ $ 8,184.00
228 ft. of 8" pipe @ $32.00 per ft. _ $ 7,756.00
176 ft. of 24" pipe @ $90.00 per ft. _ $15,840.00
502 ft. of 24" pipe @ $90.00 per ft. _ $45,180.00
10 ft. of 24" pipe @ $90.00 per ft. _ $ 900.00
600 ft. of 24" pipe @ $90.00 per ft. _ $54,000.00
185 ft. of 24" pipe @ $90.00 per ft. _ $16,650.00
268 ft. of 8" pipe @ $32.00 per ft. _ $ 8,736.00
296 ft. of 8" pipe @ $32.00 per ft. _ $ 9,752.00
266 ft. of 10" oiiDee 0) $34.00 per ft = $ 9,044.00
3,504 total ft. of pipe $201,386.00
Sewer service tap reinstatements add $40 and protruding taps add $100 per service to the total
cost of each line segment.
Project Description: City of Fort Collins Wastewater Utiliti s 2n 1 Cured In Place Pio
Scope of Services:
Address: 2900 & 3000 Blk. W. Vine Dr., 600 Blk. S. Meldrum St., 800, 900, & 1000 Blk. Riverside
1900 Blk. W. Elizabeth St., 1700 Blk. Springfield Dr., 1200 Blk. Fairview Dr. &
1200 Blk. Lynnwood Dr.
Pipe Diameter: 8", 10" & 24" Vetrified Clay Pipe
Length: 24"— 1,473 lineal feet 10"— 1,002 lineal feet 8"— 1,029 lineal feet
Service Connections: 38
Protruding Taps: 3
Insitutube: 0.20 nominal wall thickness, based on 400,000 PSI Modulus
0 Certificate of Insurance as indicated in Exhibit T"
• Schedule: All work to be completed within 90 days of notice to proceed.
• Preconstruction Conference: After the contract award and prior to
commencing work, the contractor will attend a preconstruction conference.
The contractor will have the following submittal available for City of Fort
Collins approval: Traffic control plans, Fire Hydrant metering, Homeowner
notification letter, summary of equipment to be used, sources of materials,
summary of trenchless lining method to be used, major subcontractors,
proposed method of handling existing sewage while replacing lines.
• Reference Specifications:
A. Where reference is made to one of the standards listed below, the revision
in effect at the time of the bid opening shall apply.
B. American Society for Testing and Materials (ASTM)
1. ASTM D-638: Test Method for Tensile Properties of Plastics
2. ASTM D-790: Test Method for Flexural Properties of Unreinforced and
Reinforced Plastics and Electrical Insulating Materials
3. ASTM F-1216: Standard Practice for Rehabilitation of Existing
Pipelines and Conduits by the Inversion and Curing of a Resin
Impregnated Tube
4. ASTM C-581-87: Resistance to Chemical Reagents
5. ASTM D-3681: Chemical Resistance of Fiberglass Pipe in a Deflected
Condition
• Mobilization and Demobilization
• Traffic Control: The contractor shall follow all City of Fort Collins codes and
regulations, which include the "Manual of Traffic Control Devices" and the
"Colorado Supplement" to this manual. The Contractor will submit a written
Traffic Control Plan in accordance with previously mentioned codes and
manuals. When the contracted project requires more than one traffic control
plan, more than one will be provided.
All traffic control plans will be submitted to the Traffic Operations
Superintendent. The Contractor shall appoint a Traffic Control Supervisor to
this project. The Traffic Control Supervisor shall be certified as a Worksite
Traffic Supervisor by the American Safety Services Association (ATSSA).
Traffic control is to be paid for as part of the unit price for various other work
and shall not be paid for separately.
• Permits: Projects within the State Highways require a permit from the
Colorado Department of Transportation. Contractors can not obtain permits
directly from the state. The contractor shall make application to the City of
Fort Collins by filling out the appropriate forms. Before and after normal
working hours 8 am to 5 pm the City of Fort Collins requires a noise
ordinance variance permit which can be obtained from the Code Compliance
Supervisor at 970—221-6675. If contractor vehicles or equipment are parked
in designated parking areas parking permits will need to be obtained from
parking enforcement at 970- 221-6617
• Materials: The tube requirement shall meet the requirements of ASTM
F1216
• Pumping and Bypassing: When pumping and bypassing is required, the
Contractor shall supply the pumps, conduits, and other equipment to divert
the flow of sewage around the manhole section in which work is to be
performed. The bypass system shall be of sufficient capacity to handle
existing peak flow plus additional flow that may occur during a storm. The
bypassing system shall be watertight and not leak. The contractor will be
responsible for furnishing the necessary labor and supervision to set up and
operate the pumping and bypassing system. At no time will the bypass
operation be unattended. Pumps shall be equipped in a manner to keep hose
noise to a minimum. Standby equipment will be available to allow continuous
operation of bypass pumping despite equipment, pump, or generator failure.
All bypassed sewage flow shall be returned to the sanitary sewer system.
The bypass piping shall not interfere with traffic unless absolutely necessary.
The use of steel plates or other ramp materials is anticipated. With this type
of sewer line rehabilitation, interruptions of the normal flow of sewage from
residences and businesses is expected. The contractor will be responsible
for notifying the affected users and insuring that any interruptions are as brief
as possible.
• Flow Control Precautions: Precautions must be taken to insure that sewer
flow control operations do not cause flooding or damage to public or private
property being served by the sewers involved. Contractor will be liabl for
private property damages caused by sewer blockages resulting from
contractor's activities of lack of action to prevent. Contractor will be liable for
punitive damages should the City of Fort Collins be fined by a regulatory
agency because of the contractor's failure to control sewage flow.
• Cleaning of Sewer Lines: The contractor will remove all internal debris out
of the sewer line that will interfere with the installation of cured in place pipe.
The contractor will be responsible for disposal of all debris removed from the
sewers during cleaning operation.
• Line Obstruction: It will be the responsibility of the contractor to clear the
line of obstructions such as solids, roots, and protruding service connections
that will prevent the insertion of the liner. If inspection reveals an obstruction
such as protruding service connection, dropped joint, or a collapse that will
prevent the cured in place pipe process, and it cannot be removed by
conventional sewer cleaning equipment, then the City of Fort Collins project
manager will make a decision for the appropriate action prior to the
commencement of the work.
• Service Line Location: During the inspection of the sanitary and storm
sewer lines the contractor will be responsible for locating all service
connections to the sanitary and storm sewer mains. The contractor will also
determine if each individual service connection is active or inactive and to
what property they are connected. Inactive service connections may or may
not be reconnected. The project manager will make the final decision on
reconnecting inactive services.
• Inspection of Pipelines: Prior to lining the pipe the contractor will clean and
television inspect the sanitary and storm sewer lines. The contractor will
inspect the sanitary and storm lines with a closed circuit television unit
(CCTV). At the time of this inspection the contractor will produce a hard copy
TV reports and video tapes of the complete project.
• Public Information and Notification: The contractor will be responsible for
contacting each home/apartment or business connected to the sanitary sewer
informing them of the work to be done, and when the system will be off line
and including but not limited to the following:
Written notification to be delivered by mail one week prior to installation to
each home or business describing work, schedule, what impact or how it
affects tenants or owners, and a local telephone number of the contractor
they can call to discuss the project or problems.
Personal contact with homeowners on the day of pre -installation inspection
of the sewer. Each lateral shall be verified by having the owner/tenant run
water down their drain. If the owner/tenant is unavailable, other
arrangements shall be made to drain water through the lateral.
Personal contact with owner/tenant and written notice the day prior to
beginning reconstruction of the section of sewer to which they are
connected.
Personal contact with any home or business which cannot be reconnected
within the time slated in the written notice.
If required by a served business or homeowner, portable toilets for use by
the occupants will be furnished and serviced by the contractor. The cost of
these items are considered to be included in the cost of the cured in place
pipe installation. No additional payment will be made for these items.
Daily notification of job location and schedule to the project manager is
mandatory. This will be accomplished by faxing a report the night before or
on the morning work will begin. This will be done for each location.
The use of water from fire hydrants will be free to the contractor. However a
hydrant meter/backflow preventer with auxiliary valve will be connected to
the approved fire hydrant. Only fire hydrants approved by the City of Fort
Collins will be used. All fire hydrant use will be coordinated through the
Water Utilities dispatcher or appropriate crew chief.
• Installation: Cured in place pipe installation shall be in accordance with
ASTM F1216, section 7. The quantity of resin used for tube impregnation
shall be sufficient to fill the volume or air voids in the tube with additional
allowances for polymerization shrinkage and the loss of resin through cracks
and irregularities in the original pipe wall. A vacuum impregnation process
shall be used. A roller system shall be used to uniformly distribute the resin
throughout the tube.
• Reinstatement of branch connections: Branch connections will be
reopened without excavation, utilizing a remote controlled cutting device,
monitored by a video TV camera. The contractor will certify they have a
minimum of two (2) complete working cutters before reconstruction. No
additional payment will be made for excavations for the purpose of reopening
connections and the contractor will be responsible for all costs and liability
associated with such excavation and restoration work. No service connection
will remain out of service for more than 24 hours without the contractor
providing some means of temporary facilities or hotel accommodations for the
residents. Service lines will be reconnected with 100% of their original
capacity.
• Quality control: The contractor will be responsible for the quality and
protection of work until accepted by the City of Fort Collins.
• Inspection: Cured in place pipe samples will be prepared and tested in
accordance with ASTM F1216, Section 8.1 using method 8.1.1 when space
and size permits. The results will be submitted to the City of Fort Collins.
A television inspection of the completed project will be performed by the
contractor. The City of Fort Collins will have a representative present at the
time of this inspection. At the time of this inspection the contractor will
produce color video tapes of the entire project. These video tapes will be
delivered to the project manager at completion of the project. The contractor
will maintain bypassing operations during this inspection so the entire
circumference of the pipe can be viewed.
Prior to expiration of two (2) years from date of substantial completion, the
City of Fort Collins project manager will make visual inspection of the project
in company with other representatives of the City of Fort Collins to determine
whether corrective work is required. The contractor shall attend this
inspection if requested by the City of Fort Collins.
• Clean up: Upon acceptance of the cured in place pipe installation and
testing, the contractor will reinstate the project area affected by the
operations. Waste material will be disposed of by the contractor at his
expense.
• Measurement and payment: Payment will be made based on unit price of
material actually installed in the sanitary and stormwater systems.
Measurement for cured in place pipe payment will be that footage measured
from center of manhole to center of manhole or actual length of line.
• Warranty. The contractor and the manufacturer shall warranty all materials
and workmanship for a period of two (2) calendar years. The warranty shall
cover, but not limited to the following: Defects discovered in material used in
the project. Failure of liner to remain formed to the previously existing sewer
line. Lateral connections that were active but not reconnected to the line at
the time of construction. Any damages resulting from same.
• References: The contractor will provide to the City of Fort Collins all
references both past and present projects including project name, contact
person, and telephone number.
Service Provider agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Services Agreement
between the parties. In the event of a conflict
between or ambiguity in the terms of the Services
Agreement and this work order (including the
Attached forms) the Services Agreement shall
CArArol.
Service Pvider . I rm Technologies, Inc.
d
1, �tofe-VItale
dent- North America
r,g
f7as FAuary 27, 2001
a�
The attached forms consisting
d'�..(_) pages are hereby
accepted and incorporated
herein by this reference, and
Notice to Proceed is hereby
given.
City gFilinsBy:Title:�c�//r//�U/�
Date: cT'
rkord r over $ 0
irector P rchas—irlg & Risk
anagement