HomeMy WebLinkAboutCORRESPONDENCE - BID - 5473 MISCELLANEOUS CONCRETE PROGRAM ANNUAL (3)Admini—eative Services Purchasing Division City of Fort Collins April 7, 2002 Vogel Concrete Inc. 1313 Blue Spruce Dr. Ft. Collins, CO 80524 Re: Bid #5473 Miscellaneous Concrete Program The City of Fort Collins has elected to renew Bid #5473 Miscellaneous Concrete Program for the City of Fort Collins with your firm. The terms and conditions of this renewal will be the same as stated in the original bid documents with 3.4% price increase as listed in the attachment. If the renewal is acceptable to your firm, please sign this letter in the space provided and return along with a current copy of your insurance to the City of Fort Collins, Purchasing Division, P.O. Box 580, Fort Collins, CO 80522, before April 22, 2002. If this renewal is not acceptable with your firm, please send us a written notice stating that you do not wish to renew the bid. If you have any questions regarding this renewal, please contact John Stephen, CPPB, Buyer, at 970-221-6777. Sincerely, Q�� Onz, Z—, am B. O'Neill II, CPPO, FNIGP Dir for of Purchasing and Risk Management SignatureR Date (Please indicate your desire to renew Bid #5473 by signing this letter and returning it with a current copy of insurance forms to Purchasing Division on or before April 22, 2002.) 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 2002 Miscellaneous Concrete Program Bid # 5473 - Contract Renewal Prices 202.01 , "AINIAWIN Remove Concrete/Asphalt . $ 2.33 $ 2.41 202.02 Remove and Haul Fillets $ 25.88 $ 26.75 202.03 Sawcut Concrete/Asphalt 0-4" $ 2.07 $ 2.14 202.04 Sawcut Concrete/Asphalt 4-6" $ 2.48 $ 2.57 202.05 Sawcut Concrete/Asphalt 6-8" $ 3.52 $ 3.64 202.06 Sawcut Concrete/Asphalt 8-10" $ 4.14 $ 4.28 203.01 Excavation $ 62.10 $ 64.21 203.02 Excavation - Walls Only $ 10.35 $ 10.70 203.03 Embankment Borrow CL-5 or CL-6, Complete In Place $ 28.98 $ 29.97 210.00 Reset Flagstone $ 5.18 $ 5.35 212.10 Sod $ 2.07 $ 2.14 403.01 Temporary Patching $ 82.80 $ 85.62 403.02 Asphalt Patching - 6" depth $ 62.10 $ 64.21 403.03 Asphalt Patchin - 10" depth $ 77.63 $ 80.26 604.01 Reconstruct Inlet Deck $ 957.38 $ 989.93 604.02 Inlet Deck - Additional Foot Opening $ 155.25 $ 160.53 604.03 Curb Inlet - 4'Opening $ 1,552.50 $ 1,605.29 604.04 Area Inlet $ 972.90 $ 1,005.98 604.05 Type R Inlet - 5'Opening $ 1,656.00 $ 1,712.30 604.06 Type R Inlet - Additional Foot Opening $ 215.28 $ 222.60 604.07 Curb Inlet w/ Frame and Grate w/ Adjustable Curb Box $ 1,395.18 $ 1,442.62 604.08 Concrete Sidewalk Culvert $ 310.50 $ 321.06 604.09 Metal Sidewalk Culvert - 2' Opening, 5/8" Plate $ 1,138.50 $ 1,177.21 604.10 Metal Sidewalk Culvert - 2' Opening, 1/2" Plate $ 1,100.21 $ 1,137.61 604.11 Additional Square Foot, 5/8" Plate $ 103.50 $ 107.02 604.12 Additional Square Foot, 1/2" Plate $ 82.80 $ 85.62 608.01 Aron $ 4.66 $ 4.82 608.02 Cross an $ 4.14 $ 4.28 608.03 Driveover Curb, Gutter, & 4" Sidewalk $ 18.11 $ 18.73 608.04 Driveover Curb, Gutter, & 6" Sidewalk $ 19.15 $ 19.80 608.05 Driveover Curb, Gutter - No Sidewalk $ 13.46 $ 13.91 608.06 Driveover Curb, Gutter, & Drive Approach $ 20.70 $ 21.40 608.07 Driveover Curb and Gutter Drive Approach - No Sidewalk $ 13.46 $ 13.91 608.08 Vertical Curb, Gutter, & 4" Sidewalk $ 19.67 $ 20.33 608.09 Vertical Curb, Gutter, & 6" Sidewalk $ 21.74 $ 22.47 608.10 Vertical Curb & Gutter - No Sidewalk $ 15.53 $ 16.05 608.11 Vertical Curb, Gutter, & Drive Approach $ 21.74 $ 22.47 608.12 Vertical Curb, Gutter, & Drive Approach - No Sidewalk $ 15.53 $ 16.05 608.13 12" Reinforced Vertical Curb $ 15.01 $ 15.52 608.14 Hollywood Curb, Gutter, & 4" Sidewalk $ 13.46 $ 13.91 608.15 Hollywood Curb, Gutter, & 6" Sidewalk $ 14.49 $ 14.98 608.16 Hollywood Curb, Gutter, & No Sidewalk $ 13.46 $ 13.91 608.17 Hollywood Curb, Gutter, & Drive Approach $ 15.53 $ 16.05 608.18 Hollywood Curb, Gutter, & Drive Approach - No Sidewalk $ 13.46 $ 13.91 608.19 Hi hback Curb & Gutter $ 20.701 $ 21.40 608.20 Pedestrian Access Ramp, Driveover Curb $ 26.91 $ 27.82 608.21 Pedestrian Access Ramp, Vertical Curb $ 25.88 $ 26.75 608.22 Pedestrian Access Ramp, Hollywood Curb $ 20.70 $ 21.40 608.23 Pedestrian Access Ramp, Hi hback Curb $ 4.66 $ 4.82 608.24 4" Flatwork $ 2.59 $ 2.68 608.25 6" Flatwork $ 3.11 $ 3.21 608.26 Replace Flatwork 1" Additional Depth $ 0.50 $ 0.51 608.27 8" Concrete Pavement $ 4.14 $ 4.28 608.28 Concrete Staining/SealingStaining/Sealing $ 3.62 $ 3.75 608.29 Valle Pan - 6" Depth $ 5.69 $ 5.89 608.30 5" Trail w! Fibermesh $ 2.59 $ 2.68 608.31 5" Trail w! Fibermesh - Colored Yosemite Brown $ 3.52 $ 3.64 608.32 12" Mow Strip - 4" Depth $ 6.73 $ 6.96 2002 Miscellaneous Concrete Program Bid # 5473 - Contract Renewal Prices 608.33 aA�,�R8 ITSIashblock - 4" Depth 1120 I $ 8.28 Is �'w a to $ 8.56 608.34 8" Non -Reinforced Concrete Wall $ 9.32 $ 9.63 608.35 16" Non -Reinforced Footer - 8" Depth $ 13.46 $ 13.91 614.01 "NO PARKING' Sign w/ Stand $ 1.45 $ 1.50 614.02 lVertical Panel w/o Light $ 0.83 $ 0.86 614.03 Type I Barricade w/o Light $ 0.83 $ 0.86 614.04 Type II Barricade w/o Light $ 0.83 $ 0.86 614.05 Type I I I Barricade w/o Light $ 4.14 $ 4.28 614.06 Size A Sign w/ Stand $ 1.55 $ 1.61 614.07 Size B Sign w/ Stand $ 1.55 $ 1.61 614.08 Size A Specialty Sign - Cost of Manufacturing $ 77.63 $ 80.26 614.09 Size B Specialty Sign - Cost of Manufacturing $ 77.63 $ 80.26 614.10 Cone w/ Reflective Strip $ 0.67 $ 0.70 614.11 Safety Fence $ 5.18 $ 5.35 614.12 Light - Steady Burn $ 0.52 $ 0.54 614.13 Light - Flashing $ 0.52 $ 0.54 614.14 Advance Warning Flashing or Sequencing Arrow Panel $ 77.63 $ 80.26 Traffic Control Su ervisor $ 232.88 $ 240.79 r Traffic Control Supervisor $ 27.95 $ 28.90 Fla in $ 17.60 $ 18.19 Backer Rod/Sealant $ 2.07 $ 2.14 Vogel Concrete 1313 Blue Spruce Dr. Suite B Ft. Collins Co 80524 Ph 484-3880 Fax 407-9484 February 12, 2002 James B. O'Neill 11 City of Fort Collins Purchasing 256 W. Mountain Ave. Fort Collins, CO 80521 Dear Mr. O'Neill: This letter is a request for a cost of living increase concerning the renewal of Bid#5473, Micellaneous Concrete Program. Vogel Concrete is requesting an increase of 3.4% on all of the line items. Although we have had a significant decrease in diesel fuel, (25%), our health insurance, concrete cost and labor cost have increased. Our group health insurance, of which Vogel Concrete pays 50%, is up 22%. High early concrete is up 4.4%, and labor approximately 2%. The City of Fort Collins is our most valued customer, so please call if you have any questions regarding this matter. Thank you, Dan Vogel