April 7, 2002
Vogel Concrete Inc.
1313 Blue Spruce Dr.
Ft. Collins, CO 80524
Re: Bid #5473 Miscellaneous Concrete Program
The City of Fort Collins has elected to renew Bid #5473 Miscellaneous Concrete Program for the
City of Fort Collins with your firm. The terms and conditions of this renewal will be the same as
stated in the original bid documents with 3.4% price increase as listed in the attachment.
If the renewal is acceptable to your firm, please sign this letter in the space provided and return
along with a current copy of your insurance to the City of Fort Collins, Purchasing Division, P.O.
Box 580, Fort Collins, CO 80522, before April 22, 2002.
If this renewal is not acceptable with your firm, please send us a written notice stating that you
do not wish to renew the bid. If you have any questions regarding this renewal, please contact
John Stephen, CPPB, Buyer, at 970-221-6777.
Sincerely,
Q�� Onz, Z—,
am B. O'Neill II, CPPO, FNIGP
Dir for of Purchasing and Risk Management
SignatureR Date
(Please indicate your desire to renew Bid #5473 by signing this letter and returning it with a
current copy of insurance forms to Purchasing Division on or before April 22, 2002.)
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
2002 Miscellaneous Concrete Program
Bid # 5473 - Contract Renewal Prices
202.01
,
"AINIAWIN
Remove Concrete/Asphalt
.
$ 2.33
$
2.41
202.02
Remove and Haul Fillets
$
25.88
$
26.75
202.03
Sawcut Concrete/Asphalt 0-4"
$
2.07
$
2.14
202.04
Sawcut Concrete/Asphalt 4-6"
$
2.48
$
2.57
202.05
Sawcut Concrete/Asphalt 6-8"
$
3.52
$
3.64
202.06
Sawcut Concrete/Asphalt 8-10"
$
4.14
$
4.28
203.01
Excavation
$
62.10
$
64.21
203.02
Excavation - Walls Only
$
10.35
$
10.70
203.03
Embankment Borrow CL-5 or CL-6, Complete In Place
$
28.98
$
29.97
210.00
Reset Flagstone
$
5.18
$
5.35
212.10
Sod
$
2.07
$
2.14
403.01
Temporary Patching
$
82.80
$
85.62
403.02
Asphalt Patching - 6" depth
$
62.10
$
64.21
403.03
Asphalt Patchin - 10" depth
$
77.63
$
80.26
604.01
Reconstruct Inlet Deck
$
957.38
$
989.93
604.02
Inlet Deck - Additional Foot Opening
$
155.25
$
160.53
604.03
Curb Inlet - 4'Opening
$
1,552.50
$
1,605.29
604.04
Area Inlet
$
972.90
$
1,005.98
604.05
Type R Inlet - 5'Opening
$
1,656.00
$
1,712.30
604.06
Type R Inlet - Additional Foot Opening
$
215.28
$
222.60
604.07
Curb Inlet w/ Frame and Grate w/ Adjustable Curb Box
$
1,395.18
$
1,442.62
604.08
Concrete Sidewalk Culvert
$
310.50
$
321.06
604.09
Metal Sidewalk Culvert - 2' Opening, 5/8" Plate
$
1,138.50
$
1,177.21
604.10
Metal Sidewalk Culvert - 2' Opening, 1/2" Plate
$
1,100.21
$
1,137.61
604.11
Additional Square Foot, 5/8" Plate
$
103.50
$
107.02
604.12
Additional Square Foot, 1/2" Plate
$
82.80
$
85.62
608.01
Aron
$
4.66
$
4.82
608.02
Cross an
$
4.14
$
4.28
608.03
Driveover Curb, Gutter, & 4" Sidewalk
$
18.11
$
18.73
608.04
Driveover Curb, Gutter, & 6" Sidewalk
$
19.15
$
19.80
608.05
Driveover Curb, Gutter - No Sidewalk
$
13.46
$
13.91
608.06
Driveover Curb, Gutter, & Drive Approach
$
20.70
$
21.40
608.07
Driveover Curb and Gutter Drive Approach - No Sidewalk
$
13.46
$
13.91
608.08
Vertical Curb, Gutter, & 4" Sidewalk
$
19.67
$
20.33
608.09
Vertical Curb, Gutter, & 6" Sidewalk
$
21.74
$
22.47
608.10
Vertical Curb & Gutter - No Sidewalk
$
15.53
$
16.05
608.11
Vertical Curb, Gutter, & Drive Approach
$
21.74
$
22.47
608.12
Vertical Curb, Gutter, & Drive Approach - No Sidewalk
$
15.53
$
16.05
608.13
12" Reinforced Vertical Curb
$
15.01
$
15.52
608.14
Hollywood Curb, Gutter, & 4" Sidewalk
$
13.46
$
13.91
608.15
Hollywood Curb, Gutter, & 6" Sidewalk
$
14.49
$
14.98
608.16
Hollywood Curb, Gutter, & No Sidewalk
$
13.46
$
13.91
608.17
Hollywood Curb, Gutter, & Drive Approach
$
15.53
$
16.05
608.18
Hollywood Curb, Gutter, & Drive Approach - No Sidewalk
$
13.46
$
13.91
608.19
Hi hback Curb & Gutter
$
20.701
$
21.40
608.20
Pedestrian Access Ramp, Driveover Curb
$
26.91
$
27.82
608.21
Pedestrian Access Ramp, Vertical Curb
$
25.88
$
26.75
608.22
Pedestrian Access Ramp, Hollywood Curb
$
20.70
$
21.40
608.23
Pedestrian Access Ramp, Hi hback Curb
$
4.66
$
4.82
608.24
4" Flatwork
$
2.59
$
2.68
608.25
6" Flatwork
$
3.11
$
3.21
608.26
Replace Flatwork 1" Additional Depth
$
0.50
$
0.51
608.27
8" Concrete Pavement
$
4.14
$
4.28
608.28
Concrete Staining/SealingStaining/Sealing
$
3.62
$
3.75
608.29
Valle Pan - 6" Depth
$
5.69
$
5.89
608.30
5" Trail w! Fibermesh
$
2.59
$
2.68
608.31
5" Trail w! Fibermesh - Colored Yosemite Brown
$
3.52
$
3.64
608.32
12" Mow Strip - 4" Depth
$
6.73
$
6.96
2002 Miscellaneous Concrete Program
Bid # 5473 - Contract Renewal Prices
608.33
aA�,�R8
ITSIashblock - 4" Depth
1120 I
$ 8.28
Is
�'w a
to
$
8.56
608.34
8" Non -Reinforced Concrete Wall
$
9.32
$
9.63
608.35
16" Non -Reinforced Footer - 8" Depth
$
13.46
$
13.91
614.01
"NO PARKING' Sign w/ Stand
$
1.45
$
1.50
614.02
lVertical Panel w/o Light
$
0.83
$
0.86
614.03
Type I Barricade w/o Light
$
0.83
$
0.86
614.04
Type II Barricade w/o Light
$
0.83
$
0.86
614.05
Type I I I Barricade w/o Light
$
4.14
$
4.28
614.06
Size A Sign w/ Stand
$
1.55
$
1.61
614.07
Size B Sign w/ Stand
$
1.55
$
1.61
614.08
Size A Specialty Sign - Cost of Manufacturing
$
77.63
$
80.26
614.09
Size B Specialty Sign - Cost of Manufacturing
$
77.63
$
80.26
614.10
Cone w/ Reflective Strip
$
0.67
$
0.70
614.11
Safety Fence
$
5.18
$
5.35
614.12
Light - Steady Burn
$
0.52
$
0.54
614.13
Light - Flashing
$
0.52
$
0.54
614.14
Advance Warning Flashing or Sequencing Arrow Panel
$
77.63
$
80.26
Traffic Control Su ervisor
$
232.88
$
240.79
r
Traffic Control Supervisor
$
27.95
$
28.90
Fla in
$
17.60
$
18.19
Backer Rod/Sealant
$
2.07
$
2.14
Vogel Concrete
1313 Blue Spruce Dr. Suite B
Ft. Collins Co 80524
Ph 484-3880 Fax 407-9484
February 12, 2002
James B. O'Neill 11
City of Fort Collins Purchasing
256 W. Mountain Ave.
Fort Collins, CO 80521
Dear Mr. O'Neill:
This letter is a request for a cost of living increase concerning the renewal of Bid#5473,
Micellaneous Concrete Program. Vogel Concrete is requesting an increase of 3.4% on all
of
the line items.
Although we have had a significant decrease in diesel fuel, (25%), our health insurance,
concrete cost and labor cost have increased. Our group health insurance, of which Vogel
Concrete pays 50%, is up 22%. High early concrete is up 4.4%, and labor approximately
2%.
The City of Fort Collins is our most valued customer, so please call if you have any
questions regarding this matter.
Thank you,
Dan Vogel