Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 2201622FACILITIES REQUISITION FORM VENDOR The Neenan Company DATE 4/28/03 REQ BY: Ron Kechter SERVCALL WK ORDER # STANDING CONTRR WO # CHARGE# 30513900.543100.6 TOTAL COST: $29,568.00 - BUYER: Jim ONeill OTY DESCRIPTION l Amend P.O. # 2201622 to add ADDITIONAL INFO COMPUTER INPUT INFORMATION: VENDOR# Order #12 for the Second Sheet of Ice at EPIC. REQUISITION # 0 DATE ENTERED: COST $29,568.00 SECTION 00950 CHANGE ORDER NO. 12 PROJECT TITLE: Second Sheet of Ice at EPIC CONTRACTOR: The Neenan Company BID NUMBER: P-812 DESCRIPTION: The design and construction of an addition to the Edora Pool Ice Center (EPIC) to house a full size ice arena and associated facilities and equipment. In preparing change orders show in order as separate numbered paragraphs the following: Reason for change: To incorporate miscellaneous changes into the contract. 2. Description of change: Provide all materials, labor and equipment necessary to: add approximately 800 square feet of Tuflex Titan flooring to the existing rink; bead blast and apply ReSeal 4800 to approximately 7682 square feet of new floor surface in the addition; install additional interior signage; and install art lighting in the entry area of the addition. 3. Change in Contract Cost: $29,568.00 4. Change in Contract Time: 23 Days (Attach additional sheets as required) ORIGINAL CONTRACT COST $3,360,896.00 TOTAL APPROVED CHANGE ORDERS 291.036.62 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER 29,568.00 ADJUSTED CONTRACT COST $3,681,500.62 (Assuming all change orders approved) ACCEPTED BY: Contract6es Representative APPROVED BY: ( ckl%"- Facilities Project Man; cc: City Clerk Project File D/B Contractor Purchasing ��z -.? Date 28 Q 3 Date