Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 330241804/29/2003 TUE 14:35 FA% 970 221 6586 CITY OF FT COLLINS CLRS [a 001/003 EXHIBIT A DRAFT SCOPE OF WORK SOFT GOLD PARK DRAINAGE AND EROSION CONTROL PLAN FORT COLLINS, COLORADO This Scope of Work has been prepared assuming that all site facilities and grading associated with the proposed Soft Gold Park will be designed by the City of Fort Collins Park Planning and Development Department and provided as basis for Anderson Consulting Engineers' (ACE) analyses. This excludes any site grading associated with drainage improvements required for the site. Additional work effort due to any changes to the final site and/or grading plans after ACE has commenced work is specifically excluded from this Scope. ACE proposes to complete all work items associated with Tasks I through 4 by May 23`d, 2003 or within 4 weeks after receiving the final grading and site plan, whichever is later. Scheduling the work effort associated with Task 5 will be determined once final review comments are provided by the City. Task 1. Data Collection and Review information pertinent to the completion of a drainage and erosion control plan for the proposed Soft Gold Park will be gathered and reviewed. Discussions will be held with the City of Fort Collins Staff to define project requirements and details associated with the available information. This task will also include field reconnaissance efforts, as required, to familiarize project staff with the study area. Task 2. Hydrologic Analysis/Drainage Plan Two hydrologic models (pre- and post -project) will be prepared for the area encompassed by the proposed project, and any area tributary to the project site. The hydrologic modeling effort will be conducted using MODSWMM. The pre - project hydrologic analysis will be conducted to determine not only the off -site flows which need to be passed through the proposed park, but the 2-year historic release from the project site which will be used in the determination of on -site detention requirements. The post -project hydrologic analysis will be conducted to verify that the proposed improvements fulfill the drainage requirements set forth by the City of Fort Collins assuming the project has been completed. In addition to the on -site detention requirements provided to reduce the peak 100- year on -site discharge to a 2-year historic level; a storm water quality component will be sized and implemented as part of this task. A a..,;«.ono .,+;rt,, �hPPt , ill he nrennred documenting the drainage improvements his sheet will include any design details 04/29/2003 TUE 14:35 FAX 970 221 6586 CITY OF FT COLLINS CLRS 14002/003 for the drainage improvements and will be provided to the City of Fort Collins Park Planning and Development Department for use in their final design plans. Task 3. Erosion Control Plan An erosion control plan sheet will be prepared documenting all necessary erosion control features required by the project during construction. This sheet will include any design details for the erosion control measures and will be provided to the City of Fort Collins Park Planning and Development Department for use in their final design plans. Task 4. Drainage and Erosion Control Report A drainage and erosion control report, meeting City of Fort Collins requirements, will be prepared documenting the hydrologic analyses and the erosion control plan. The report will include all requisite backup and modeling documentation. Task 5. Addressing and Responding to City Review Comments All comments generated by the City of Fort Collins will be investigated and addressed either as changes to the drainage and erosion control report and/or sheets or via communication/clarification with City Staff. Up to two rounds of review comments are included as part of this task. Additional review comments generated by the City after two rounds have been completed are specifically excluded from this Scope of Work. 04/29/2003 TITE 14:35 FAX 970 221 6586 CITY OF FT COLLINS CLRS R 003/003 c� U M, N 7 1� W• r.,p! x oc5 g , M. e_ w = Ni 69 SR Au a` w ,i•��L r, a _ .., L5 R W 0 E ' gqo � E tl m Y cIn w. 4•.� W a 4= 4 � U ca lee Q La o U. U Jim U Q 9 a O w W[ g W 0 4 v i a o ri ri d vi 0