Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5748 GARDENS ON SPRING CREEK (15)SECTION 00300 BID FORM PROJECT: GARDENS ON SPRING CREEK; Bid No. 5748 Place C'; r-r ar- j,*�pT C'• t Lrali `f �rYyvy- Date 1. In compliance with your Invitation to Bid dated IL!©✓ram rx f�2avZ , and subject to all conditions thereof, the undersigned W24. 'ae--,E Co" 5'TRcut'r/a.✓ a ** Corporation Limited Liability Company, Partnership, Joint Venture, or Sole Proprie or)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5! e,r— ai-r> ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned through I_ 7/96 Bidder hereby acknowledges receipt of Addenda No. Section 00300 Page 1 1 "ATTACHMENT #2" Sheetl 5;rn,(10, NEW BLDG. PROJECTS 12/3/2002 B ROWN CONS T R U C T 1 0 N CONTRACT REFERENCE MANAGERISUPER PROJECT NAME & TYPE ARCHITECT AMOUNT LOCATION IOWNER IS INTENDENT John Miller 210-669- Carol Coover 4929 Clark Mary Anderson/PM 1995 Advantage Rent-A-Car Coover Clark $ 500,000.00 DIA Advantage Rent-A-Car 783-0040 John Ciancio/Supt. Rich McRae Mary Anderson/PM 1995 Buckley Office of Special Investigations Merrick & Co. $ 1,900,000.00 Buckley ANG Corp. of Engineers 286-1910 Jerry Downs/Supt. Mary Anderson & City & County of Wayne Brown/PM 1986 District#4 Police Roth Shepard $ 1,203,130.00 Denver, CO Denver Mike Brown/Supt. Michael Brown/PM Bob Maestas/Supt. Howard 1997 Hoover Village Hoffman Partnership $ 1,048,000.00 Longmont, CO Rocky Mtn. Methodist Essen/Asst. Supt. Michael Brown/PM Howard 1997 1997 1997 Hoover Village Personal Care Facility Avis -Rent -Car (Concrete Package) Value Rent-A-Car (Concrete Package) Hoffman Partnership InterPlan InterPlan $ 1,098,000.00 $ 244,659.00 $ 143,428.00 Longmont, CO DIA DIA Rocky Mtn. Methodist Avis Value Essen/Asst. Supt. Michael Brown/PM Michael Brown/PM Peter's Construction- 1997 Joslins Southglenn Mall (Concrete Package) THP Limited $ 1,192,847.00 Joslins Steven Bosley 1-926-4520 Robert Michael Brown/PM Michael Brown/PM Bear Valley Herndon Howard 1997 Colorado National Bank Bear Valley Herndon Associates $ 450,000.00 Shopping Center Chandell & Associates 393-1419 Essen/Supt. 1997 Airport Mail Center $ 171,847.00 DIA Robert 1997 1997E Colorado National Bank Montbello 470 Herndon Associates DPR Construction $ 508,000.00 $ 341,165.00 4590 Peoria Denver, CO Charles P. Woods DPR Construction Herndon 393-1419 Michael Brown/PM Dan Harrington/PM Craig Anderson- PM/Jerry Downs- 2001 Huron Animal Hospital Zeiler Pennock $ 1,131,422.00 Thornton Huron Animal Hospital Dr. Heller Supt. Dan Harrington - Mark PM /Howard Essen- 2001 Zimmerman Metals Machine Shop Zeiler Pennock $ 368,539.00 Denver, CO Zimmerman Metals Zimmerman Sul Page 2 "ATTACHMENT #2" Sheet1 12/3/2002 NEW BLDG. PROJECTS BROWN CONSTRUCTION ARCHITECT CONTRACT AMOUNT LOCATION OWNER REFERENCE S MANAGER/SUPER INTENDENT PROJECT NAME & TYPE 2002 Goldco Retaining Wall TST Inc. of Denver $ 443,814.00 Golden City of Golden Dan Harrington- PM/Jim Robinson- Supt. 2002 Hertz Site Package $ 112,026.00 Page 3 "ATTACHMENT #2" Sheet1 12/3/2002 TENANT FINISH REMODEL ADDITION BRC)WN C 0 1 S 1 8 U C I 1 0 N COMPLETION PROJECT NAME & TYPE AMOUNT LOCATION ARCHITECT Owner REFERENCES MANAGERISUPT Feb-87 Denver General Hospital $ 1,062,119.00 Denver, CO Hoffman Partnership City & County of Denver Dennis Sobolik 436-5840 Craig Anderson/PM Howard Essen/Supt. Mar-87 BOR Computer Facility Denver Federal Center Bldg. (53) Renovations $ 3,482,000.00 Lakewood, CO EMS GSA Feb-88 St. Charles Recreation Center $ 276,212.00 Denver, CO Tom Morris City & County of Denver Mar-88 Lantrin Bldg. (376) Lowry AFB $ 140,000.00 Denver, CO Civil Engineering Lowry AFB US Air Force May-88 Aug-88 Denver Federal Center Bldg. 20 & 25 Initial Space Alterations City Permit Center Concrete Package Exterior Finish $ 409,000.00 $ 466,412.00 Lakewood, CO 200 W. 14th Denver, CO Slater & Paul Associates C.W. Fentress GSA City & County of Denver Roger Booker 640-3554 Owner Apr-89 Denver Federal Center Bldg. 21 New Mechanical Penthouse $ 500,000.00 Slater & Paul Associates GSA Jun-89 FAA Office Relocation $ 1,069,977.00 5440 Roslyn Denver, CO Roybal & Associates City & County of Denver Jan-90 Mile High Stadium Restroom Remodel $ 222,000.00 Denver, CO WC Muchow City & County of Denver Jun-91 Congress Park Swimming Pool $ 965,735.00 Denver, CO Herndon & Associates City & County of Denver May-92 US Customs House Denver Federal Center $ 539,748.00 Lakewood, CO GSA GSA Beth Smith 236-7144 Owner Sep-92 Apr-94 Mile High Stadium Improvements 20th Street Recreation I Center $ 221,011.00 $ 1,205,137.00 Denver, CO Martin & Martin OzArchitects City & County of Denver City & County of Denver Jim Gilbert 640-3500 Owner Page 1 "ATTACHMENT #2" 5 mr (C I rt� Sheetl TENANT FINISH REMODEL ADDITION 12/3/2002 BRC>WN C D N S 1 8 U C I 1 0 N -- COMPLETION PROJECT NAME & TYPE CONTRACT- AMOUNT LOCATION ARCHITECT Owner PROJECT-- REFERENCES PROJECT MANAGER/SUPT Sep-94 Thornton High School Remodel $ 968,750.00 90th & Washington Dulaney Architect Adams Twelve Five Star Schools Pat Dulaney 615 9123 Architect Wayne Brown/PM Jerry Downs/Supt. Jan-95 DGH General Electric AFM Angio/CT Labs $ 366,860.00 8th & Bannock Anderson Mason Dale General Electric Dennis Sobolik 436-5840 Owner Craig Anderson/PM Howard Essen/Supt. Jan-95 Littleton Plaza Renovations $ 2,923,000.00 1690 Littlleton Blvd. Lewis Associates Bob Patterson 795-4515 Arapahoe County Gordon Lewis 738-9988 Architect Wayne Brown/PM Jerry Downs/Supt. Mar-95 Vehicle Emissions Lab $ 200,000.00 Denver, CO General Motors General Motors Jerry Lohmeyer 375-5050 Owner Jul-95 5 Recreation Centers $ 2,000,000.00 Denver, CO Wong Strauch Denver Parks & Rec. Roger Booker 640-3554 Owner Mary Anderson/PM Jerry Downs/Supt. Aug-95 Denver Public Schools Goldrick, Force & Doull $ 893,600.00 Denver, CO Allred Architects DPS Jose 292-1875 Architect Mike Brown/PM Sep-95 DGH Davis Pavilion Clinics $ 1,273,600.00 700 Delware RNL Design City & County of Denver Dennis Sobolik Owner Craig Anderson/PM Howard Essen/Supt. Sep-95 Mile High Stadium 1994 Improvements $ 700,075.00 Denver, CO Lonco City of Denver Park & Rec. Alex Abel 620- 0098 Architect Wayne Brown/PM Aug-96 Lincoln Elementary School $ 875,000.00 Denver, CO Roybal Architects Denver Public Schools Greg McMenamir Architect Mary Anderson/PM Jun-97 Fitzsimons Elevator Repairs $ 1,653,408.00 Aurora, CO Moyes Assoc. FAMC Pat Harville 361- 3001 Craig Anderson/PM Jim Robinson/Supt. Dec-97 I New York Bldg. $ 1,874,000.00 Lakewood, CO Durrant Architects Jefferson County Eric Hjelle 271-5009 Owner Craig Anderson/PM Chuck Mangus/Supt. Page 2 "ATTACHMENT #2" Sheet1 TENANT FINISH REMODEL ADDITION 12/3/2002 BRAWN C 0 N S I U U C I 1 0 N COMPLETION PROJECT NAME & TYPE AMOUNT LOCATION ARCHITECT Owner REFERENCES R/SUPT 5/96 - 9/96 12/96-11/97 Colorado State Penitentiary Bid Package #1 Colorado State Penitentiary Bid Package #4 $ 1,247,506.00 $ 1,040,000.00 Canon City, CO Canon City, CO DMJM DMJM State of Colorado State of Colorado Ed Starr 719-269 5779 Ed Starr 719-269 5779 Architect Architect WayneMANABrown/PM WayneLutz/Supt. Gene Lutz/Supt. Wayne Brown/PM Gene Lutz/Supt. Craig Anderson/PM 99/98-5/98 Cook Park Recreation Center $ 1,699,150.00 Denver, CO Slater & Paul Associates City & County of Denver Roger Booker- 640-3554 Owner Howard Essen/Supt. Mark Schlindwein/PM Ford Emmission Lab $ 137,723.00 Denver, CO Harley Ellington Design Ford Motor Co. Jim Robinson/Supt. Craig Anderson/PM Chuck 1997 Mile High Stadium $ 2,442,772.00 Denver, CO Denver Owner Mangus/Supt. 1/00-12/00 Boulder Valley Schools Bid Package #13 $ 3,263,000.00 Boulder, CO Hagen Cameron Boulder Valley Schools John Bollinger 303-447-5113 Owner Dan Harrington- PM Jerry Downs- Supt. Dan Harrington- PM 11/99-4/00 Boulder Valley Schools Bid Package #7 $ 1,608,000.00 Boulder, CO Larson Architects Boulder Valley Schools Lou Novak Owner Jim Robinson- Supt. Dan Denver Public Eddie McGrady Harrington/Katie Lincoln Elementary School $ 730,002.00 Denver Hans Kahn Schools Denver Public 303-575-4171 Trena Jones 303 Owner Hoff-Supt. Mike Brown -PM/ North High School $ 919,000.00 Denver TSP Five Inc. Schools 575-4146 Owner Jim Robinson/Supt. Craig Anderson -PM UCAR Main Drive & Front Entrance Replacment $ 1,294,555.00 Boulder, CO Merrick & Co. UCAR Roseann Suer 303-497-8867 Owner /Howard Essen - Supt. Page 3 City of Lakewood City of Westminster City of Westminster City of Westminster City of Denver City of Aurora ATTACHMENT A LICENSES Structural LIM Commercial 6436 Gen. Bus/Sales & Use 44603 17 Class D Public Way 63176 10 Class A Contractor Req. 62659 Building A 11075 General Business/Retail Sellers 44447 RESUME MARY R. ANDERSON 5845 W. 33rd Ave. Denver, CO 80212 CURRENT Chairman of Board of Directors, President and Principle Owner of W. M. Brown Construction Corp. WORK EXPERIENCE: Operation Manager Coordinate work procurements, estimating, pricing, development of business plan and continuity schedule, including man loading and cash flow of projects. Estimator Including price development and final estimates $200,000.00 to 10 Million Project Manager For projects ranging from $200,000.00 to 6 Million. These projects included commercial projects consisting of Hotels, Banks, Office Space, Schools, Tenant Finish, Remodel and Additions, Civil projects consisting of bridges, bridge and road repairs, concrete drainage features, utilities, parking lots, box culverts. Superintendent For projects ranging from $500,000.00 to $3,000,000.00. This work includes: The interior remodel of first floor clinic spaces at Denver General Hospital. Foundations, elevator shafts, and exterior finish system at City & County of Denver Permit Center. PROJECTS/ Current 2002 EXPERIENCE Operations Manager/President Boulder Valley School Dist. Bid Package #7 & #13 5 million of school renovation projects being completed during school year and summer of 2000 Dillion Comfort Suites Westminster Comfort Suites OTHER KEY 98 Unit Comfort Inn at DIA Denver Public Schools- Lincoln Elementary School Addition & Remodel 1995 My Responsiblities on this project as operations manager I oversaw the project manager and superintendent. Denver General Hospital Interior Remodel of First Floor Clinic Spaces, PROJECTS Project size was $1,062,000. July 1986- February 1987. My Responsibilities on this project included quantity take off, on site Superintendent /Project Manager. FAA Office Relocation , Project Size was $1,069,000. March 1989- July 1989. This project was a fast track interior remodel with a 60 day duration this was accomplished despite 70 Change Orders. The project involved demolition and remodel of 3 story building with 1 story Garage Warehouse. My Responsibilities on this project included Estimating, Project Management. Cherry Creek Park, Project size was $1,053,123. February 1990. This project involved relocating utilities and building park with fountaining and monuments over old dump area next to Platte River and Cherry Creek Mall. My Responsibilities included Project Manager F-111A Apron Grading & Drainage at Denver International Airport, project size $2,700,000, October 1991- March 1992. This project involved a combination of cast in place, precast offsite and onsite over 500 Inlets and manholes which were under the aprons and handled sewer. Water and De icing the average manhole was 8' x 10' x 15'. My Responsibilities included Estimating, Project Manager and over seeing Quality Control of off site suppliers. TRADE ASSOCIATIONS Women's Construction Owners & Executives Past Colorado Chapter President 1993-1995 Past National Board Member Reference: Past National President- Rosemary Breiner-Breiner Construction Current Executive Vice President- Cheryl Brooks- J.C. Brooks- 428-1604 Associated General Contractors Previous Chapter Board Member Executive Director- Dick O'Brecht- 388-2422 Colorado Building Industry Coalition Past Board Member AWARDS RECOGNITION 1996- Women's Construction Owners & Executives Outstanding Service for Changing the Image of Construction Industry 1996 Colorado Leadership Coalition Award of Excellence (See Attached Letter) 1992-1997 Listed as a Top 100 Women Business in Colorado 1996-1997 Listed as a Top 250 Private Held Business in Colorado EDUCATION: Metro State College Denver, CO Civil Engineering Westminster High School Westminster, CO REFERENCES: Jam Wong- Wong Strauch Architects- 303-293-9206 Barry Smith -City of Denver- 720-913-8833 Dale G. Harrington 160 S. Holland Lakewood, CO 80226 303-232-7123 WORK EXPERIENCE: 2000 to Present W.M. BROWN CONSTRUCTION CORPORATION Westminster, Colorado Operations & Marketing Manager 1992 to 2000 WARD CONSTRUCTION Englewood, Colorado Superintendent/Estimator 1991 to 1994 CONSULTANT & ON CALL FOR SPECIAL PROJECTS American Eagle Industries Cheyenne, Wyoming B.E.I. Engineers/Constructors Inc. Lakewood, Colorado Grain Processors Inc. Denver, Colorado Western States Construction Loveland, Colorado 1987-1991 GRACON CORPORATION Loveland, Colorado Superintendent/Project Manager/Estimator 1981-1986 WRG CONSTRUCTION COMPANY Denver, Colorado President 1973-1980 CENTRIC CORPORATION Denver, Colorado Executive Vice President Manager, Building Division Director of Personnel Responsible for hiring project management personnel and coordinating assignment of all jobsite personnel. 1967-1973 PENNER CONSTRUCTION (now Centric Corporation) Denver, Colorado Project Manager/Estimator Estimated and managed projects throughout the Rocky Mountain area ranging from 500 thousand to 15 million dollars 1958-1967 MARTIN K. EBY CONSTRUCTION Wichita, Kansas Superintendent/Estimator Obtained field experience in all phases of construction on contracts from 300 thousand to 40 million dollars. These jobs required living in 11 places and ranged from buildings to a nuclear reactor. FORMAL EDUCATION: B.S., Friends University, Wichita Kansas, 1958 Dale Carnegie Institute, Denver, CO, 1972 Fails Management Seminars American Management Training PAST PROFESSIONAL AFFILIATION EXPERIENCE: Associated General Contractors of America, National Director A.G.C. of Colorado, President A.G.C. Of Colorado, Chairman of Labor Negotiations Committee Western Force Director Colorado Transportation Association Director CIMC/CBCTC Co -Chairman - - x______-__-- ADDRESS: iF�� tj 8. BID SCHEDULE (Base Bid) GARDENS OF SPRING CREEK PHASE 1 / a TOTAL BASE BID �J� g I/i % r'J �. X �- h S LiY� '�1� ��C Y DOLLARS ADD ALTERNATES Item Description Price LANDSCAPE 1. Planter Area C & D $ (� 2. Planter Area A & B $ ARCHITECTURE 3. Entry Vestibule $s 4. Restroom Building $ 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price. 7/96 Section 00300 Page 2 Dan A. Harrington 6307 N. St. Louis Ave. Loveland, CO 80538 WORK EXPERIENCE: 1996 to Present W.M. BROWN CONSTRUCTION CORPORATION Westminster, CO Project Manager Bridge Projects: City and County of Denver Projects - 6TH Ave. Viaduct Rehabilitation, 161h Street Pedestrian Bridge, and 48th Ave. Viaduct Repairs Schools: Boulder Valley Public Schools — Fairview HS and Southern Hills MS (Bid Package #13), Base Line MS, University Hill Elementary, Community Montessori, and Flat Irons Elementary Schools (Bid Package #7) Automobile Dealerships: All structural concrete for Christopher's Dodge World — Golden, CO., Formby Ford — Dacono, Colorado (design -build tilt -up concrete / structural steel), Shortline Suzuki -Hyundai — Aurora, CO (structural concrete work). 1989 to 1996 GRACON CORPORATION Loveland, Colorado On -Site Project Manager Upgrade Drainage Facilities, Offutt AFB, Nebraska, involved installation of underground fuel spill containment tanks, fuel dispensers, above ground de-icing tank, and modifications to the storm and sewer piping at eighteen separate work sites. Rocky Mountain Project, Rome, Georgia. A 10 million dollar mechanical subcontract for a 150 million dollar 760 MW hydro- electric power plant project. Satellite Boilers, Denver Federal Center, a 5 million dollar project involving installation of 32 new boilers to replace the central steam system. 1985 to 1989 ROBERT E. MCKEE, INC. Denver, Colorado Project Engineer EDUCATION: Tarrant County Jail Facility, Fort Worth Texas. A 40 million dollar maximum security prison project. North Secondary Clarifier Chlorination / Dechlorination Facility Improvements, Metro Denver Waste Water Treatment Plant, Commerce City, Colorado. (5 million dollar project) Quality Control Administrator Primary Plant Expansion, Metro Denver Waste Water Treatment Plant, Commerce City, Colorado. (12 million dollar project) Colorado State University, B.S. in Industrial Construction Management Graduation December of 1984. Courses of study: Estimating, Scheduling, Drafting, Surveying, Engineering Structures / Design, Safety, Management, Business Law, and Construction Contracts. Michael W. Brown 6655 % Yale Lakewood, CO 80227 303-989-4596 SUMMARY I have comprehensive understanding of the Construction Industry. My exposure and involvement have been nearly continuos since I was fourteen. I am knowledgeable of IBM PC's both hardware and software aspects. I understand DOS, Windows and network environments. I have supervised a small (11 node) Novel Network that involved installing programs and training on software or applications that I developed for use. I am comfortable with use of Word Perfect, Word for Windows, Exel, Lotus, Primevera, Project 3.0 for Windows and Access Data Base. I have worked as an estimator, project manager, safety officer and computer consultant. Frequently I have had to perform many of these duties simultaneously. PROJECT ASSIGNMENTS/WORK EXPERIENCE 8/85 to Present W. M. Brown Construction Corp. 3440 W. 7151 Pl. Westminster, CO 80030 430-8935 Working for a small family owned business I have had to perform numerous duties and responsibilities simultaneously. The major project responsibilities are listed below. 1994 Denver Public Schools Goldrick, Force & Doull Elementary Schools Additiona & Remodel 1/92 to 2/94 Project Manager Denver International Airport Various Projects (total 15 projects) 3/90 to 12/92 Project Manager City & County of Denver 1990 Bridge & Viaduct Repairs 3/91 to 12/91 Project Manager Hoover Village Personal Care Facility II A 15,000 SF addition to an elderly care facility in Longmont. Negotiated, estimated and managed this project. 6/90 to 4/91 Project Manager RTD Wadsworth Corridor Bus Shelters Performing concrete work and installing glass bus shelters on 30 sites along Wadsworth in Denver. 6/90 to 8/90 Project Manager Stapleton International Airport Upper Level Roadways Repairs Removal & replacement of expansion joint, asphalt & waterproofing deck while maintaining vehicle and pedestrian traffic during peck hours. 10/89 to 6/90 Project Manager Hoover Village Personal Care Facility I A 18,000 SF addition to an elderly care facility in Longmont. Negotiated, estimated and managed this project. 11/88 to 2/89 Project Manager/Superintendent FAA Office Relocation To Roslyn St. A 50,000 SF renovation of office space within a 60 day schedule. Numerous changes were added at the end of the contract. 2/88 to 9/88 Project Manager/Superintendent City & County of Denver Permit Center Concrete & Exterior Finishes 6/87 to 10/87 Project Manager/Superintendent St. Charles Recreation Center 4/86 to 4/87 Project Manager/Superintendent City & County of Denver District #4 Police Station 9/85 to 2/86 Superintendent Office Remodel #1 & #2 for the Colorado Division of Wildlife This was W. M. Brown first 2 projects that were used to launch the company. 1974 to 9/85 Centric Corp. 5490 West 13th Ave. P.O. Box 14026 Denver, CO 80214 303/233-8440 I worked for Centric starting as a labor when I was fourteen. I worked my vacations through school and worked my way through the ranks to Superintendent/Assistant Project Manager. 3/85 to 8/85 Superintendent Mervyn's Department Store (Boulder) Estimated and engineered drawings to local code. 10/83 to 11/84 Superintendent/Assistant Project Manager Holiday Inn @ Hampden & Wadsworth Estimated, negotiated and managed this fine hotel. 9/82 to 8/83 Superintendent/Assistant Project Manager Denver West Marriott (Site work & concrete) 12/80 to 7/82 Superintendent/Assistant Project Manager 17th Street Plaza Concrete Package for 34 Story Prepared of 40 pages of size C shop drawings prior to start 6/80 to 12/80 Project Engineer/Assistant Project Manager Beaver Creek Ski Area Service Center Reception Center and Water Pump Station Facility 1980 Wheatland Power Plant Wheatland, WY Foundations & Structures for Power Plan & Cooling Tower Water Discharge Mains to river. 1978 to 1979 Project Engineer/Assistant Project Manager 1-70 Vail Pass Segmental Bridges over Gore Creek and Hillside Bridges 1976 to 1977 Project Engineer Mountain Bell Service Center 17th & Curtis 1974 Ironworker Apprentice McNichols Sports Arena Between field assignments I worked in the home office as an estimator and as an assistant project manager. EDUCATION High School- Regis High School 1971-1974 Graduated College- Trinidad Jr. College 1974-1975 1 year C.S.U. Ft. Collins, Colo. 1975-1976 1 year University of Wyoming 1976-1979 2 years At Trinidad and University of Wyoming my major was civil engineering. At C.S.U. my major was Industrial Construction Management. References: Upon Request ACORDT. CERTIFICATE OF LIABILITY INSURANCE 0DATE9/309/30MI/200002 PROIDUCER (303)824-6600 FAX (303) 370-0118 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Moody Insurance Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 3T73 Cherry Creek North Drive HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR Y ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Suite 800 Denver, CO 80209-3804 INSURERS AFFORDING COVERAGE INSURED W M Brown Construction Corp INSURER A: Transcontinental Ins Co (CNA) (A p Rating) 3440 West 71st Place, LLLP INSURER8: Transportations Ins Co (CNA) P 0 Box 1048 INSURERC: United Natl Ins Co (SUI) Westminster, CO 90030 INSURERD: Valley Forge Ins Co. (CNA) INSURER E: THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DATE M DD POLICY EXPIRATION DATE (MWDDffYI LIMITS GENERAL LIABILITY 13 5981849 09/01/2002 09/01/2003 EACH OCCURRENCE $ 11000,000 X COMMERCIAL GENERAL LIABILITY FIRE DAMAGE (Any one fire) $ 100,00 CLAIMS MADE FX ] OCCUR MED EXP (Any one person) $ 5100 A X PerProjAgg(CG2503) PERSONAL & ADV INJURY $ 1,000,00 X Bl nkt Addl Insrd GENERAL AGGREGATE $ 2,000,00 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,00 POLICY X JECOT- X LOC AUTOMOBILE LIABILITY 135981852 09/01/2002 09/01/2003 X COMBINED SINGLE LIMIT $ ANY AUTO (Ea accident) 1,000,001 ALL OWNED AUTOS BODILY INJURY $ B SCHEDULED AUTOS (Per person) X HIRED AUTOS X NON -OWNED AUTOS BODILY INJURY (Per accident) $ PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS LIABILITY MBU0001834 09/01/2002 09/01/2003 EACH OCCURRENCE $ 2,000,000 is OCCUR FICLAIMS MADE AGGREGATE $ 2,000,000 $ XIDEDUCTIBLE RETENTION $ $ WORKERS COMPENSATION AND 176667950 10/01/2002 10/01/2003 X OWC RY LIMITS ER EMPLOYERS' LIABILITY E.L. EACH ACCIDENT $ 500,00 D E.L. DISEASE - EA EMPLOYEE $ 500,00 E.L. DISEASE - POLICY LIMIT 1 $ 500,00 OTHER DESCRIPTION OF OPERATIONS/LOCATIONEHICLES/EXC�USIONS ApDED BY ENDORSEMENT/SPECIAL PROM IONS S/Ve: Big Dry Creek Trail Pedestrian Platte Bridge across the South River - W.M. Brown Job #20218 ertificate holder, McLaughlin Water Egineers and subconsiltants, the City of Englewood and the olorado Water Conservation Board are named as Additional Insureds under the General Liability as espects work performed by Named Insured. P. CPITl-A- - - I I South Suburban Park & Recreation District 6631 S. University Blvd. Centennial, CO 80121 ACCIRD 25-S SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT. BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE Sandra Thomas. CISR. CIC/SK SECTION C0410 BID BOND KNOW ALL McN SY THESE PR-SENTS: that we, the undersigned W.M. BROWN CONSTRUCTION CORP., as Principle and R_LI INSURANCE COMPANY as Surety, are hereby held and firmly bound unto the City -of Fart Collins, Colorado, as OWNER, in the sum of :$5% OF BID for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and' hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, GARDENS ON SPRING CREEK; BID No. 5748. NOW T.iEREFORE, (a)- If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement --reared by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall .remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 2 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set t-heir hands and seals this 25TH. day of NOVEMBER 20 OZ and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed'by their proper officers, the day and year first set forth above. PRINCIPAL Name: W.M. BROWN CONSTRUCTION CORP. Address: P.O. BOX 1048 WESTMINISTER, CO 80030 By: 4 Title : ATTEST:: / By: �Jitl {�4"QxtnJC,su...-S^�cR��Aa.t� (SEAL) 7/96 SURETY RLI INSURANCE COMPANY P.O. BOX 30669 CLEVEL4iND, OH 44130 By: C / MARk H. SWEIGART Title:ATTORNEY IN -FACT (SEAL) Section 00410 Page 3 °:�G�TY A Division of RLI Insurance Company P.O. Box 3967 Peoria, IL 61612-3967 Know All Men by These Presents: POWER OF ATTORNEY RLI Insurance Company That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the approving officer if desired. That RLI Insurance Company, an Illinois corporation, does hereby make, constitute and appoint: DARRELL C. R. OLSON DARRELL C. R. OLSON II MARK H. SWEIGART CHERYL HUSTED JOINTLY OR SEVERALLY in the City of ENGLEWOOD . State of COLORADO its true and lawful Agent and Attorney -in -Fact, with full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, the following described bond. Any and all bonds, undertakings, and recognizances in an amount not to exceed Ten Million Dollars ($10,000,000) for any single obligation. The acknowledgment and execution of such bond by the said Attorney -in -Fact shall be as binding upon this Company as if such bond had been executed and acknowledged by the regularly elected officers of this Company. The RLI Insurance Company further certifies that the following is a true and exact copy of the Resolution adopted by the Board of Directors of RLI Insurance Company, and now in force to -wit: "All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the company by the President, Secretary, any Assistant Secretary, Treasurer, Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, and Assistant Secretary, or the Treasurer, may appoint Attorneys -in -Fact or Agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile." IN WITNESS WHEREOF, the RLI Insurance Company has caused these presents to be executed by its President with its corporate seal affixed this 29th day of April 1 2002 . �� C,•OAPORgT _•_ �. is SEAL State of Illinois ��'••.....••5• SS 4 IN 0 County of Peoria On this 29th day of April 2002 ' before me, a Notary Public, personally appeared Jonathan E. Michael I who being by me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of the RLI Insurance Company and acknowledged said instrument to be the voluntary act and deed of said corporation. By: CJLIn (A. d-#7 Notary PuKlic "OFFICIAL SEAL" r�rro HERIE L. MOWGOMERY CO�MnisS�ON ExMREf OZ/Oy01 RLI Insurance Company By: Q' President CERTIFICATE I, the undersigned officer of RLI Insurance Company, a stock corporation of the State of Illinois, do hereby certify that the attached Power of Attorney is in full force and effect and is irrevocable; and furthermore, that the Resolution of the Company as set forth in the Power of Attorney, is now in force. In testimony whereof, I have hereunto set my hand and the seal of RLI Insurance Company this 25TH . day of NOV. 2ft Z RLI Insurance Company 0513713020204 d MCOOnI A Division of RLI Insurance Company P.O. Box 3967 Peoria, IL 61612-3967 Know All Men by These Presents: POWER OF ATTORNEY RLI Insurance Company That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the approving officer if desired. That RLI Insurance Company, an Illinois corporation, does hereby make, constitute and appoint: DARRELL C. R. OLSON DARRELL C. R. OLSON II MARK H. SWEIGART CHERYL HUSTED JOINTLY OR SEVERALLY in the City of ENGLEWOOD . State of COLORADO its true and lawful Agent and Attorney -in -Fact, with full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, the following described bond. Any and all bonds, undertakings, and recognizances in an amount not to exceed Ten Million Dollars ($10,000,000) for any single obligation. The acknowledgment and execution of such bond by the said Attorney -in -Fact shall be as binding upon this Company as if such bond had been executed and acknowledged by the regularly elected officers of this Company. The RLI Insurance Company further certifies that the following is a true and exact copy of the Resolution adopted by the Board of Directors of RLI Insurance Company, and now in force to -wit: "All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the company by the President, Secretary, any Assistant Secretary, Treasurer, Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, and Assistant Secretary, or the Treasurer, may appoint Attorneys -in -Fact or Agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile." IN WITNESS WHEREOF, the RLI Insurance Company has caused these presents to be executed by its President with its corporate seal affixed this 29th day of April 1 2002 . �� C,•OAPORgT _•_ �. is SEAL State of Illinois ��'••.....••5• SS 4 IN 0 County of Peoria On this 29th day of April 2002 ' before me, a Notary Public, personally appeared Jonathan E. Michael I who being by me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of the RLI Insurance Company and acknowledged said instrument to be the voluntary act and deed of said corporation. By: CJLIn (A. d-#7 Notary PuKlic "OFFICIAL SEAL" r�rro HERIE L. MOWGOMERY CO�MnisS�ON ExMREf OZ/Oy01 RLI Insurance Company By: Q' President CERTIFICATE I, the undersigned officer of RLI Insurance Company, a stock corporation of the State of Illinois, do hereby certify that the attached Power of Attorney is in full force and effect and is irrevocable; and furthermore, that the Resolution of the Company as set forth in the Power of Attorney, is now in force. In testimony whereof, I have hereunto set my hand and the seal of RLI Insurance Company this 25TH . day of NOV. 2ft Z RLI Insurance Company 0513713020204 d MCOOnI RES PECT FULJ,,Y _ SUBMZTT&O : Signature Date Title License Number (If Applicable) (Seal - if Bid is by corporation) AtteC�_- AddressL��_1 i�Ci' E STt�tt rt ST�� _ G'u yj[�,3p Telephone 0a 7/96 Section 00300 Page 3 0 I I I I I r 7 r SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: W. M. Brown Construction Corp. 2. Permanent main office address: 3440 W. 71st Place 3. When organized: May17,1985 4. If a corporation, where incorporated: Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name?_17years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) See attachment #1 7. General character of Work performed by your company: Minor excavation, structural, architectura concrete, misc. metals, rough & finish carpentry. 8. Have you ever failed to complete any Work awarded to you? No If so, where and why? 9. Have your ever defaulted on a contract? No If so, where and why? 10. Are you debarred by any government agency? NO If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. See attachment #2 12. List your major equipment available for this contract. Bobcat, fQLklift,.vasiq,us_ hand _& smalLtoolsiacluding generators. c=pactorG,�yibratnrs Fqtjopment leased or rented on a p_ro ect_by project as needed basis. This allows us to obtain the proper eequipr for each each-project._—_-- 13. Experience in construction Work similar in importance to this project: See attachment #2 14. Background and experience of the principal members including officers: _ See Resumes___... 15. Credit available: $ 225,000 LOC 16. Bank reference: Bank of Denver- Warren Culpepper of your organization, 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General CONTRACTOR? See attachmeni#A If yes, in what city, county and state? What class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? 60% and to whom? Mechanical, electrical, greenhouse & finishes. 20. Are any lawsuits. pending against you or your firm at this time? No If yes, DETAIL 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL See attached certificate _ What company? C A 22. What are your company's bonding limitations? 3-4 Million Single Project 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at 10:00 AM this 3rd day of _ December 2002• W. M. Brown Construction orp_ Name of Bidder BY Title: President State of -Colorado County of Adams rMary Anderson being duly sworn deposes and says that he is President of W. M. Brown Construction Corp. and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. I 1 1 N �bscribed and sworn to before me this day of 20C%. o ary Public My commission expires DANUM O. v,REN f CO Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 20% of the contract. ITEM SUBCONTRACTOR 7/96 Section 00430 Page 1 "ATTACHMENT 1" CURRENT WORK UNDER CONTRACT 12/3/2002 C0 N S I H H C I 1 0 N CONTRACT DATE BEGIN & END % COMPLETE PROJECT NAME & TYPE CONTRACT AMOUNT LOCATION ARCHITECT OWNER PROJECT MANAGER/ SUPERINTENDENT January-03 60% Owens Brothers Batch Plant_ $ 1,450,000.00 Aurora Bruce Cousins Owens Brothers Dan Harrington/Jerry Downs October-02 50% South Suburban Big Dry Creek $ 267,757.00 Denver South Suburban Recreation District Dan Harrington/Bob Maestas October-02 90% Crestview Vehicle Maintenance Facility $ 487,000.00 Westminster Durrant Architects Crestview Vehicle Craig Anderson/Dan Kaiser November-02 25% Fitzsimons Pool HVAC Replacement $ 749,000.00 Aurora Colorado Design Scapes City of Aurora Mike Brown/Katie Hoff Ma -03 30% Alamosa Family Recreation Center 1 $ 3,035,000.00 jAlamosa IDLR Group I City of Alamosa Mary Anderson/Dale lHarrington "ATTACHMENT #2" Sheet1 S,rnil+`��,,,,,,,/NEW BLDG. PROJECTS 12/3/2002 B ROWN C 0 N S T R 0 C T 1 0 N - ARCHITECT CONTRACT AMOUNT LOCATION OWNER REFERENCE S MANAGER/SUPER INTENDENT PROJECT NAME & TYPE 2001 Christopher Dodge -Detail Shop Interplan $ 292,525.00 Denver InterPlan Kevin Diedrichs 303- 721-1133 Dan Harrington/Jim Robinson 2001 2001 Formby Ford Dacona- Foundation/Tilt Up Bldg. Shell InterpIan/Co nSteel $ 680,000.00 Dacona Formby Ford/Interplan Kevin Diedrichs 303- 721-1133 Dan Harrington/Howard Essen 2001 Thraemoor Townhomes Zeiler Pennock/Design Build $ 1,400,000.00 Lakewood On the Hill Corp. John Hellgren- Zeiler Pennock 303 455-3322 Mary Anderson/Dan Kaiser 2001 Shortline Suzuki- Foundation Package Interplan $ 208,600.00 Denver Shortline Suzuki Kevin Diedrichs 303- 721-1133 Dan Harrington/Jim Robinson 2000 Christopher Dodge Foundation/Slabs Inter Plan CM $ 794,131.00 Golden Christopher Dodge Kevin Diedrichs 303- 721-1133 Dan Harrignton/Jerry Downs Jr. 2000 Generic Electric Office Design Build $ 520,000.00 Littleton Generic Electric John Hellgren- Zeiler Pennock 303 455-3322 Mary Anderson -PM Jerry Downs Jr.- Supt. 000 Westwood College Class Room Addition Dauer Haswell $ 1,093,680.00 Denver, CO Chandell & Associates Bonnie Supan Wayne Brown -PM Chuck Mangus- Supt. 1999 Comfort Suites/Melody Plaza J.G. Johnson- Kevin Stockton $ 2,300,000.00 Westminster, CO Stondebridge Co. Mark Lionberger 696-7700 Mary Anderson -PM Howard Essen- Supt. 1996 Watkin Front Range Armory Merrick & Co.- Fred Hynek $ 3,600,000.00 Watkins, CO State of Colorado Leon Harrell 397-3275 Mary Anderson -PM Jerry Downs Sr.- Supt. 1997 OEA Phase II Manufacturing Zeiler Pennock $ 3,947,000.00 Watkins, CO OEA Garo 693-1248 Michael Brown/PM Robert Maestas/Supt. 1997 DIA Comfort Inn Leon Lauver $ 2,465,000.00 Apex Capital Mary Anderson/PM Page 1