HomeMy WebLinkAboutRESPONSE - BID - 5748 GARDENS ON SPRING CREEK (13)SECTION 00300 BID FORM PROJECT: GARDENS ON SPRING CREEK; Bid No. 5748 Place Loveland, CO Date December 3, 2002 1. In compliance with your Invitation to Bid dated November 1, 2002 and subject to all conditions thereof, the undersigned Environmental Concerns, Inc. a ** Corporation Limited Liability Company, Partnership, Joint Venture, or Sole roprie or)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all c which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% of total bid ($ ) in accordance with the Invitation To Bid and Instructions to Bidders.' 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of .this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Employers Mutual Casualty Company 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR, under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersiqned Bidder hereby acknowledges receipt of Addenda No. One through Four 7/96 Section 00300 Page 1 Environmental Concerns, Inc. Project References EAST WEST GREENWAY OWNER: Park Creek Metropolitan District 3333 Quebec Street, Suite 8100 Denver, CO 80207 M.A. Mortenson Construction Manager George Forristall (303) 321-4122 CONTRACT AMOUNT: $1,186,792.00 ARCHITECT: EDAW 1809 Blake Street, Suite 200 Denver, CO 80202 Gregory Weykamp (303) 595-4522 COMPLETION DATE: 9/03 PROJECT SUPERINTENDENT: Mike Paetzel PROJECT MANAGER: Tina Connett SCOPE: Construction of a shotcrete skate park and 2 tennis courts. Contract also included the installation of playground equipment and surfacing, boulder climbing wall, custom boulders, sand and water play structure, site amenities, dog park fencing, 6 pre -cast pedestrian bridges, and custom park signage. GREENLAND OPEN SPACE TRAIL PROJECT: OWNER: ARCHITECT: Douglas County Government The Architerra Group Div. of Open Space & Natural Resources 8361 Sangre de Cristo Road 100 Third Street Suite 110 Castle Rock, CO 80104 Littleton, CO 80127 Cheryl Matthews (303) 660-7495 CONTRACT AMOUNT: $615,046.00 PROJECT SUPERINTENDENT: Bob Coulter PROJECT MANAGER: Ted Johnson Dean Pearson (303) 948-0766 COMPLETION DATE: 3/03 SCOPE: Construction of an open space crusher fines trails with a trail head consisting of extensive erosion control and a drainage system, concrete sidewalks, road base parking lot, information kiosk, toilet enclosure, fencing with gates, and a wood frame shelter building. SECTION 30 PARK AND BALLFIELDS OWNER: City and County of Broomfield One DesCombes Drive Broomfield, CO 80020 Ronda Jo Ackerman Alford (303) 464-5807 GMP: To Be Determined ARCHITECT: Sports One Development, Inc. 140 E. 191h Avenue, Suite 202 Denver, CO 80203 Jeff Kroeger (303) 861-0186 COMPLETION DATE: 9/03 GENERAL SUPERINTENDENT: Rick Coulter PROJECT SUPERINTENDENT: Chad Oleson PROJECT MANAGER: Ted Johnson PROJECT ADMINISTRATIVE ASSISTANT: Tina Connett SCOPE: CM/GC project for the City and County of Broomfield for the construction of an 80-acre athletic complex along Sheridan Boulevard. Project consists of four multi -field pods connected by concrete and crusher fines trails, picnic shelters, a restroom building and a large multi -use building centrally located in an open concrete plaza adjacent to a playground / park area and amphitheater. The project also includes extensive landscaping and irrigation with special sand based athletic fields and an artificial tun` championship field. CSU TRANSIT CENTER OWNER: City of Fort Collins 117 N. Mason Street Fort Collins, CO 80522 Steve White (970) 221-6273 CONTRACT AMOUNT: $1,745,754 ARCHITECT: Coover-Clark & Associates, P.C. 455 Sherman Street, Suite 205 Denver, CO 80203 Phaedra Lankutis (303) 783-0040 COMPLETION DATE: 8/02 PROJECT SUPERINTENDENT: Chad Oleson PROJECT MANAGER: Ted Johnson SCOPE: Fast track construction of a bus transit center on the CSU campus. The City of Fort Collins and CSU Facilities Management jointly managed the project. Construction included extensive concrete flatwork, concrete retaining walls with flagstone veneer, masonry entry sign, security gates, site furnishings, asphalt paving, landscaping, custom -fabricated bus shelters, information kiosk, custom signage, and site electrical. This project required upfront value engineering in order to meet the City of Fort Collin's budget. ECI was an integral part of this process, providing cost effective alternatives to meet the project budget. 2 DIAMOND VALLEY SPORTS COMPLEX OWNER: Town of Windsor 301 Walnut Street Windsor, CO 80550 Don Shedd (970) 674-2444 ARCHITECT: Jim Sell Design, Inc. 153 W. Mountain Avenue Fort Collins, CO 80524 Matt Blakely (970) 484-1921 CONTRACT AMOUNT: $489,081 COMPLETION DATE: 9/02 PROJECT SUPERINTENDENT: Mike Paetzel PROJECT MANAGER: Tina Connett SCOPE: Second phase construction of a ballfield complex consisting of the installation of a pump station including an associated water meter pit, diversion structure, and dewatering pump. Construction also included backstops, Musco ballfield light pole bases, irrigation and seeding. This project required value engineering between ECI and the Town of Windsor in order to meet the Town's available funds for the project. ECI was integral in preparing a multi -phase schedule for construction order to meet the Town's current funding availability while ensuring that they will be able to utilize a portion of the project after this phase is complete. BLUFFS REGIONAL PARK OWNER: Douglas County Government 100 Third Street Castle Rock, CO 80104 Randy Burkhardt (303) 663-6226 ARCHITECT: The Architerra Group 8361 Sangre De Cristo Rd Suite 110 Littleton, CO 80127 Dean Pearson (303) 948-0766 CONTRACT AMOUNT: $637,424 COMPLETION DATE: 6/02 PROJECT SUPERINTENDENT: Chad Oleson and John Oatsvall PROJECT MANAGER: Tina Connett SCOPE: Construction of approximately 3 miles of soft surface trail, two masonry signs and a trailhead area including a masonry entry sign and a road base parking area with concrete sidewalks and plaza. 3 EASTMEST REGIONAL TRAIL PH. I OWNER: Douglas County Government 100 Third Street Castle Rock, CO 80104 Randy Burkhardt (303) 663-6226 ARCHITECT: The Architerra Group 8361 Sangre De Cristo Rd. Suite 110 Littleton, CO 80127 Dean Pearson (303) 948-0766 CONTRACT AMOUNT: $165,666 COMPLETION DATE: 8/02 PROJECT SUPERINTENDENT: John Oatsvall PROJECT MANAGER: Tina Connett SCOPE: Construction of approximately 1.5 miles of soft surface trail and a trail head including extensive erosion control, a road base parking lot and concrete sidewalks and plaza. FOSSIL CREEK COMMUNITY PARK — PH. 1A OWNER: City of Fort Collins 215 North Mason Street Fort Collins, CO 80524 Jeff Lakey (303) 221-6360 CONTRACT AMOUNT ARCHITECT: BHA Design 4803 Innovation Drive Fort Collins, CO 80525 Roger Sherman (970) 223-7577 $956,545.07 COMPLETION DATE: 5102 PROJECT SUPERINTENDENT: Richard Coulter PROJECT MANAGER: Ted Johnson SCOPE: Site construction including earthwork and site utilities for future phases. Z JIM HAMM POND & NATURE AREA OWNER: City of Longmont 747 Coffman Street Longmont, CO 80501 Paula Fitzgerald (303) 651-8448 CONTRACT AMOUNT: ARCHITECT: Norris Dullea 710 West Colfax Avenue Denver, CO 80204 (303) 892-1166 $630,855.05 COMPLETION DATE: 6/02 PROJECT SUPERINTENDENT: Bob Coulter PROJECT MANAGER: Ted Johnson SCOPE: Park construction including a restroom building, asphalt parking lot and entry drive, concrete paths and pads, crusher fines trail, site furnishings, site electrical, underground sprinkler system with pump system and landscaping. FAIRGROUNDS REGIONAL PARK PLAYGROUND RENOVATION OWNER: Douglas County Government 9651 South Quebec Street Highlands Ranch, CO 80130 Curt Sloan (303) 470-0140 ARCHITECT: Design Concepts 211 North Public Road, Suite 200 Lafayette, CO 80026 Carol Henry (303) 664-5301 CONTRACT AMOUNT: $87,182.18 COMPLETION DATE: 4/02 PROJECT SUPERINTENDENT: Chad Oleson PROJECT MANAGER: Tina Connett SCOPE: Playground renovation including grading, concrete walks, drainage pipe, concrete retaining wall and seat wall. 5 HIGHLAND HERITAGE REGIONAL PARK ENTRY SIGN OWNER: Douglas County Government 9651 South Quebec Street Highlands Ranch, CO 80130 Curt Sloan (303) 470-0140 ARCHITECT: Design Concepts 211 North Public Road, Suite 200 Lafayette, CO 80026 Carol Henry (303) 664-5301 CONTRACT AMOUNT: $61,329 COMPLETION DATE: 4/02 PROJECT SUPERINTENDENT: Chad Oleson and John Oatsvall PROJECT MANAGER: Tina Connett SCOPE: Installation of park entry sign with landscaping and irrigation at the Highland Heritage Regional Park in Highlands Ranch. AURORA WHEEL PARK OWNER: City of Aurora 1470 South Havana Street, #502 Aurora, CO 80012 Jack Cooper (303) 739-7179 CONTRACT AMOUNT: $1,968,599.63 ARCHITECT: ICON Engineering, Inc. 8100 South Akron Street, Suite 300 Englewood, CO 80012 (303) 221-0802 COMPLETION DATE: 5/02 PROJECT SUPERINTENDENT: Mike Paetzel PROJECT MANAGER: Ted Johnson SCOPE: Construction of an athletic complex that consisted of a shot-crete skate park, three in -line hockey rinks with associated equipment, group shelter building on a colored and patterned concrete plaza, concrete trails, site utilities and electrical, site amenities, fencing, and an asphalt roadway and parking lot. ATHLETIC FIELDS AT THE RIDGE AT WEST MEADOWS OWNER: Foothills Park & Rec. Dist. 3624 S. Kipling Parkway Denver, CO 80235 Colin Insley (303) 409-2304 CONTRACT AMOUNT ARCHITECT: Design One Consultants, LLC 140 E. 191h Ave., Ste. 202 Denver, CO 80203 Mike Walker (303) 832-2020 $1,426,495.02 COMPLETION DATE: 4/02 PROJECT SUPERINTENDENT: Chad Oleson and Wesley Statkus PROJECT MANAGER: Tina Connett SCOPE: Construction of an athletic complex consisting of two ball fields, a multi use field, parking lots and a picnic shelter. Contract also included modifications to an existing detention pond and outlet structure off -site. BINGHAM LAKE TRAIL OWNER: ARCHITECT: Douglas County Parks & Trails The Architerra Group 100 Third Street 8361 Sangre de Cristo Road Castle Rock, CO 80104 Suite 110 Littleton, CO 80127 Randy Burkhardt Dean Pearson (303) 663-6226 (303) 948-0766 CONTRACT AMOUNT: $218,650 COMPLETION DATE: 08/01 PROJECT SUPERINTENDENT: Wesley Statkus PROJECT MANAGER: Tina Connett SCOPE: Construction of a crusher fines trail, concrete plaza, parking lot, and a concrete boat ramp. 7 DAD CLARK PARK OWNER: Highlands Ranch Metro. District 62 West Plaza Drive Highlands Ranch, CO 80126 Gary Wardle (no longer with Highlands Ranch) (303) 791-2710 CONTRACT AMOUNT: $707,629 PROJECT SUPERINTENDENT: Bob Coulter PROJECT MANAGER: Tina Connett ARCHITECT: Shalkey & Team, Inc. 820 161h Street, Suite 825 Denver, CO 80202 (303) 820-3340 COMPLETION DATE: 09/01 MAINTENANCE: 5/02 SCOPE: A community park including concrete trails, picnic shelter, playground, restroom building, asphalt multi -use court, rock sculpture feature, asphalt parking lot, site amenities landscaping, seed, sod, and irrigation. VALMONT PARK OWNER: City of Boulder 3198 N. Broadway Boulder, CO 80306 Drew Horton (303) 413-7223 CONTRACT AMOUNT: $2,237,583.94 ARCHITECT: McLaughlin Water Engineers, Inc. 2420 Acott Street Denver, CO 80211 Brian Chevalier (303) 458-5550 COMPLETION DATE: 4/02 PROJECT SUPERINTENDENT: Ray Gonzales PROJECT MANAGER: Ted Johnson SCOPE: A community park including earthwork, intensive site drainage and utility installation, concrete trails, signage, asphalt parking lot, site amenities, site electrical, pedestrian foot bridges, feature boulders, rock walls, pavers, landscaping, seed, sod, and irrigation. This project required extensive redesign by the City of Boulder during construction in order to avoid intruding on sensitive wildlife habitats. ECI worked closely with the City of Boulder to ensure that the project progressed as smoothly as possible during the redesign and held the project open during the winter of 2001- 2002 in order to allow the City of Boulder to complete the project per their designs in the spring of 2002. 0 ROCK CREEK SOUTH RECREATION CENTER OWNER: Superior Metro. Dist. No. 2 141 Union Boulevard, Suite Lakewood, CO 80228 Bryan Appleby (303)987-0835 ARCHITECT: The Norris Dullea Company 150 710 West Colfax Avenue Denver, CO 80204 Greg Fischer (303) 892-1166 CONTRACT AMOUNT: $2,007,216 COMPLETION DATE: 5/01 MAINTENANCE: 5/02 PROJECT SUPERINTENDENT: Mike Paetzel PROJECT MANAGER: Ted Johnson SCOPE: Construction of a 4,000 SF outdoor swimming pool and a 3,000 SF cabana building. The cabana building includes restrooms, showers, and locker rooms complimented by timber beam details and extensive sandstone masonry. Site construction includes a skate park, concrete sidewalks, site utilities, decorative pool fencing, a playground, 2 picnic shelters, asphalt paving, masonry walls, signage, site furnishings, site electrical, and landscaping and irrigation including two acres of sodded areas. EATON PARK: OWNER: City of Boulder 3198 N. Broadway Boulder, CO 80304 Mike Gurrola (303)413-7220 ENGINEER: City of Boulder 3198 N. Broadway Boulder, CO 80304 (303) 413-7220 CONTRACT AMOUNT: $152,770 COMPLETION DATE: 8/01 PROJECT SUPERINTENDENT: John Oatsvall PROJECT MANAGER: Ted Johnson SCOPE: A negotiated neighborhood park including earthwork, concrete flatwork, flagstone paving, picnic shelter, site furnishings, boulders, landscaping and crusher fines trails. 9 BAYOU GULCH REGIONAL PARK PHASE I OWNER: Douglas County 100 Third Street Castle Rock, CO 80104 Randy Burkhardt (303) 660-7495 ENGINEER: Design Concepts 211 North Public Road, Suite 200 Lafayette, CO 80026 Kerry Bonge (303)664-5301 CONTRACT AMOUNT: $291,347 COMPLETION DATE: 05101 PROJECT SUPERINTENDENT: Bob Coulter IRRIGATION SUPERINTENDENT: Wesley Statkus PROJECT MANAGER: Ted Johnson SCOPE: The first phase of park construction including earthwork, concrete flatwork, site furnishings, landscaping, irrigation, crusher fines trails, and site drainage improvements. CASTLE ROCK COMMUNITY PARK OWNER: Town of Castle Rock 2301 N. Woodlands Blvd. Castle Rock, CO 80104 Jeff Brauer (303) 814-7446 ENGINEER: Carder -Burgess 216 16`h Street, Suite 1700 Denver, CO 80202 Steve Wilensky (303) 820-5240 CONTRACT AMOUNT: $3,348,587 COMPLETION DATE: 07/01 PROJECT SUPERINTENDENT: Rick Coulter Chad Oleson IRRIGATION SUPERINTENDENT John Oatsvall PROJECT MANAGER: Tina Connett SCOPE: Completion of an existing baseball field complex. This project required extensive value engineering and design/build construction in order to tie existing construction to new construction while staying within the Town of Castle Rock's budget constraints. This project included the completion of 2 existing baseball fields, the addition of 2 new ballfields, 2 post tension concrete roller hockey courts with associated equipment, structural concrete bleachers and walls, asphalt paving, site amenities and a playground. 10 Environmental Concerns. Inc. CONTRAC OR BY:�__ Ric and A. Coulter, Vice President ADDRESS: 2526E. Hwy._402, P.O. Box 2135 Loveland,_ CO 805_39 8. BID SCHEDULE (Base Bid) GARDENS OF SPRING CREEK PHASE 1 TOTAL BASE BID Q ��,y �� � AA.9 t ($l . (1) B-Z qoc . t)e') > ADD ALTERNATES Item Description Price LANDSCAPE 1. Planter Area C & D 930,afl 2. Planter Area A & B $ ARCHITECTURE 3. Entry Vestibule $ Oki,(� 4. Restroom Building $ 7.7 -) /T\ 9. PRICES V j Vi0- kJIJI vt ' a DOLLARS The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25o) of the total Agreement Price. 7/96 Section 00300 Page 2 BOULDER SKATE PARK OWNER: City of Boulder 3198 N. Broadway Boulder, CO 80306-0791 Drew Horton (303) 413-7223 ARCHITECT: Shapins Associates 1738 Pearl Street, Suite 200 Boulder, CO 80302 Alen Calder (303) 442-4588 CONTRACT AMOUNT: $695,190.00 COMPLETION DATE: 12/00 PROJECT SUPERINTENDENT: Mike Paetzel PROJECT MANAGER: Ted Johnson SCOPE: Construction of a high profile concrete skate park at Scott Carpenter Park in Boulder. This project included earthwork, drainage, ornamental fencing, specialized concrete bowls consisting of rebar, coping and shotcrete, concrete flatwork, site utilities, masonry walls, and site amenities. During construction Environmental Concerns worked with numerous sponsors to promote community participation in the project with the City of Boulder. HIGHLAND HERITAGE REGIONAL PARK PARKING LOT OWNER: Douglas County 100 Third Street Castle Rock, CO 80104 Curt Sloan (303) 470-0140 ARCHITECT: Design Concepts 211 North Public Road, Suite 200 Lafayette, CO 80026 Carol Henry (303) 664-5301 CONTRACT AMOUNT: $531,184 COMPLETION DATE: 9/00 PROJECT SUPERINTENDENT: Bob Coulter IRRIGATION AND LANDSCAPE SUPERINTENDENT: John Oatsvall PROJECT MANAGER: Tina Connett SCOPE: Parking lot construction including earthwork, asphalt paving, asphalt striping, signage, storm drainage system, concrete flatwork, irrigation, site electrical sod, seeding, and landscaping. 11 CHALLENGER REGIONAL PARK PHASES I — VIII OWNER: Douglas County 100 Third Street Castle Rock, CO 80104 Ron Benson (303) 660-7490 CONTRACT AMOUNT: $3,456,047 PROJECT SUPERINTENDENTS ARCHITECT: Design Concepts 211 North Public Road, Suite 200 Lafayette, CO 80026 Carol Henry (303) 664-5301 COMPLETION DATE: 7/00 Rick Coulter Mike Paetzel Chad Oleson SCOPE: Environmental Concerns performed as a CM/GC for Douglas County for eight consecutive years to complete the construction of a master planned athletic complex including three baseball fields and multi -use athletic fields with associated amenities. This project includes earthwork, fencing, concrete flatwork, irrigation, landscaping, site electrical, picnic shelters, a restroom/concession building, scorers booths, asphalt paving, flagstone paving, extensive masonry seat walls, multi -use courts, a playground and site amenities. FOOTHILLS_ COMMUNITY PARK I A, I B I C & I D OWNER: City of Boulder 3198 N. Broadway Boulder, CO 80304 Maureen Spitzer (303)413-7227 ARCHITECT: Design Concepts 211 North Public Road Lafayette, CO 80026 Rob Layton (303)664-5301 CONTRACT AMOUNT: $2,962,933 COMPLETION DATE: 7/00 PROJECT SUPERINTENDENT: Mike Paetzel — All Phases Ray Gonzales — Phase IC LANDSCAPING SUPERINTENDENT: Wesley Statkus — Phase ID PROJECT MANAGER: Ted Johnson SCOPE: Construction of a phased community park including earthwork, site utilities, concrete trails and decorative flatwork, asphalt parking lot, maintenance facility building with public restrooms and garden storage building, trickle channel and three pools, dumpster enclosure, decorative ornamental fencing and artwork, two post tension courts, playground and youth fitness area, site furnishings, shade shelter, community gardens, seed, 12 acres of sod, and a raw water system. 12 BIG DRY CREEK OWNER: Highlands Ranch Metro. District 62 West Plaza Drive Highlands Ranch, CO 80126 Karl Ferguson (303)791-2710 ARCHITECT: Mundus Landscape Architecture 62 East 16th Avenue, #110 Denver, CO 80203 (303)830-0319 CONTRACT AMOUNT: $633,963 COMPLETION DATE: 10/00 PROJECT SUPERINTENDENT: Bob Coulter LANDSCAPE AND IRRIGATION SUPERINTENDENT: John Oatsvall PROJECT MANAGER: Tina Connett SCOPE: A community park including concrete trails, picnic shelter, playground, restroom building, basketball court, multi -use athletic field, asphalt parking lot, site amenities, landscaping, seed, sod, and irrigation. PINERY PARK OWNER: Douglas County 100 Third Street Castle Rock, CO 80104 Ron Benson (303)660-7495 ARCHITECT: Design Concepts 211 North Public Road, Suite 200 Lafayette, CO 80026 Carol Henry (303)664-5301 CONTRACT AMOUNT $87,812 COMPLETION DATE: 2/00 PROJECT SUPERINTENDENT: Chad Oleson SCOPE: A negotiated playground renovation project that included demolition work, grading, import fill, a masonry retaining wall, concrete flatwork and curbwalls, drainage pipe and rock, site amenities and fencing. 13 COTTONWOOD GLEN PARK OWNER: City of Fort Collins 281 N. College Avenue Fort Collins, CO 80521 Craig Foreman (970)221-6618 ARCHITECT: The Architects Studio 151 W. Mountain Avenue Fort Collins, CO 80524 Glenn Koen (970)482-8125 CONTRACT AMOUNT: $1,134,739 COMPLETION DATE: 5/00 PROJECT SUPERINTENDENT: Bob Coulter Landscaping and Irrigation: John Oatsvall SCOPE: Community park including earthwork, domestic water service and distribution, sanitary sewer service, restroom building, picnic shelter, irrigation pond with liner, concrete flatwork, asphalt road, path and parking lot, site drainage, playground, site furnishings, site electrical, ballfield, multi -use court, landscaping, irrigation pump house, wet well and inlet, and system. Environmental Concerns, Inc. was the general contractor for the restroom building on this project. WILLOW FARM PARK OWNER: City of Longmont 747 Coffman Street Longmont, CO 80501 Paula Fitzgerald (303)651-8448 ARCHITECT: Design Concepts 211 N. Public Road Lafayette, CO 80026 Carol Henry (303)664-5301 CONTRACT AMOUNT: $1,112,118 COMPLETION DATE: 5/00 PROJECT MANAGER AND SUPERINTENDENT: Mike Paetzel Landscaping Superintendent: Ray Gonzales Irrigation Superintendent: Brett Kloberdanz SCOPE: Construction of a 14 acre community park including the renovation of a 50-year-old barn into a picnic shelter and restrooms. Site work included the site amenities, a post tension roller hockey rink, basketball court, multi -use playing fields, concrete walks including decorative concrete features, 7,000 S.F. playground with a hand pump water feature, site lighting, asphalt parking lot, landscaping, irrigation, picnic shelter, and 25 ton pedestrian bridge. This project was awarded the Gold Hard Hat Award for Outstanding Landscape Project of 2000. 14 BRADFIELD PARK OWNER: City of Boulder 1777 N. Broadway P.O. Box 791 Boulder, CO 80306-0791 Mike Gurrola (303)441-3061 ARCHITECT: Play Environments, LLC 606 Kimbark Street Longmont, CO 80501 (303)682-0854 CONTRACT AMOUNT: $389,654. COMPLETION DATE: 4/00 PROJECT MANAGER AND SUPERINTENDENT: Chad Oleson Landscaping Superintendent: Ray Gonzales SCOPE: Community park including demolition, earthwork, site electrical, site drainage, prefabricated pedestrian bridge, stone walls and columns, fencing, landscaping, basketball court, concrete sidewalks and plaza, playground, wood fibar safety surfacing, and site amenities. WEST WOODS PARK OWNER: City of Arvada 8101 Ralston Road Arvada, CO 80004 Harry Johnson (303)431-3020 ARCHITECT: City of Arvada CONTRACT AMOUNT: $308,230 COMPLETION DATE: 8/99 PROJECT MANAGER AND SUPERINTENDENT: Bob Coulter Landscaping Superintendent Ray Gonzales SCOPE: Community park including earthwork, concrete flatwork, ballfield construction, irrigation, seeding, site amenities, playground drainage and safety surfacing. 15 REDSTONE PARK OWNER: HIGHLANDS RANCH METRO 3280 Redstone Park Circle Highlands Ranch, CO 80126 Brian Muller (303)791-2710 ARCHITECT: DIST. DESIGN CONCEPTS 211 North Public Road Lafayette, CO 80026 Carol Henry (303)664-5301 CONTRACT AMOUNT: $3,123,338 COMPLETION DATE: 10/99 PROJECT MANAGER AND SUPERINTENDENT: Rick Coulter Landscape and Irrigation Superintendent: Brett Kloberdanz SCOPE: Construction of athletic complex and community park including, earthwork, site utilities, site amenities, site lighting and electrical, 4 lighted baseball/softball fields, 7 soccer/multi- use fields, 8 lighted tennis courts, pond with pumping system, landscaping, 27 acres of irrigation, asphalt parking lot, playground, concrete flatwork and plaza and site masonry. MITCHELL GULCH PARK OWNER: TOWN OF CASTLE ROCK 680 North Wilcox Street Castle Rock, CO 80104 Rob Hanna (303)660-1036 ARCHITECT: THE NORRIS DULLEA COMPANY 710 West Colfax Avenue Denver, CO 80204 Jon Seier (303)892-1186 CONTRACT AMOUNT: $558,217 COMPLETION DATE: 10/98 PROJECT MANAGER AND SUPERINTENDENT: Mike Paetzel Landscape and Irrigation Superintendent: Dan Bushnell SCOPE: Park construction including earthwork, concrete sidewalks and improvements, storm drainage, fencing, site amenities, signage, playground, shelter, irrigation, and landscaping. 16 GRANT FRONTIER PARK OWNER: CITY AND COUNTY OF DENVER 200 West 14th Avenue Denver, CO 80204-2700 Karen Grote (303)964-2552 ARCHITECT: WENK AND ASSOCIATES 1035 Cherokee Street Denver, CO 80204 Billy Gregg (303)628-0053 CONTRACT AMOUNT: $1,044,065 COMPLETION DATE: 6/98 PROJECT MANAGER AND SUPERINTENDENT: Rick Coulter Landscape and Irrigation Superintendent: Ray Gonzales SCOPE: This high profile project for the City and County of Denver is part of the South Platte River Corridor Project and is located in South Denver's Overland neighborhood. The creation of this project was the result of negotiations between Denver City officials and the Overland Neighborhood Association who wanted safer access to an existing park along the Platte River. To transform the park area a section of Platte River Drive was removed and the existing park was extended and renovated. Construction included the removal and replacement of existing pedestrian bridges over the Platte River, an asphalt parking lot, concrete sidewalks and bikeway, site signage, a playground, site amenities, irrigation and landscaping. WESTFIELD PARK OWNER: CITY OF FORT COLLINS 281 North College Avenue Fort Collins, CO 80524 Craig Foreman (970)221-6366 ARCHITECT: BHA DESIGN, INC. 4803 Innovation Drive Fort Collins, CO 80525 Roger Sherman (970)223-7577 CONTRACT AMOUNT: $1,021,493 COMPLETION DATE: 10/98 PROJECT MANAGER AND SUPERINTENDENT: Bob Coulter Landscape and Irrigation Superintendent: Ray Gonzales SCOPE: Park construction including site clearing and demolition, earthwork, site utilities, concrete flatwork, crusher fines trail, and cast -in -place concrete wall, irrigation pump and aeration system, pump house, site electrical and lighting, restroom building, pavilion, baseball field, playground, site furnishings, irrigation, and landscaping. 17 COBBLESTONE PARK OWNER: CITY OF WESTMINSTER 4800 West 92nd Avenue Westminster, CO 80030 Becky Eades (303)430-2400 CONTRACT AMOUNT ARCHITECT: CIVITAS, INC. 1250 Bannock Street Denver, CO 80204 Liz Lancaster (303)571-0053 $590,410 COMPLETION DATE: 7/98 PROJECT SUPERINTENDENT: Landscape and Irrigation Superintendent: Mike Paetzel Dan Bushnell SCOPE: Park construction including earthwork, site drainage, landscape, irrigation system including an irrigation/storm water management pond, concrete pond wall, site amenities, pedestrian bridges, concrete flatwork and concrete pond wall, and playground. BRIGHTON BALLFIELD COMPLEX OWNER: CITY OF BRIGHTON 22 South 4th Avenue Brighton, CO 80601 Dirk Richwine (303) 659-4050 ARCHITECT: DESIGN CONCEPTS 211 North Public Road Lafayette, CO 80026 Axel Bishop (303) 664-5301 CONTRACT AMOUNT: $1,030,397 COMPLETION DATE: 8/97 PROJECT MANAGER AND SUPERINTENDENT: Rick Coulter Landscape and Irrigation Superintendent: Brett Kloberdanz SCOPE: Construction of a four field softball complex including earthwork, storm drainage utilities, detention pond, site electrical, dug -out buildings, concrete flatwork, chain link fencing, gates, and backstops, sod, seed and irrigation. fiE No Text cm__ IM Site Construction Management A Division of Environmental Concerns, Inc. PRINCIPALS: MANAGEMENT QUALIFICATIONS BRIAN PETERSON, PRESIDENT: Graduated from the University of Nebraska Curtis with a degree in commercial horticulture. 25 years experience in landscaping, irrigation and site improvement projects. Estimator and project manager for L&M Enterprises from 1976 to 1979. Founded Environmental Concerns, Inc. in 1980. Operations and estimating general manager specializing in contract negotiation. RICK COULTER, VICE PRESIDENT AND GENERAL SUPERINTENDENT: 18 years experience in the Landscape and Construction Industry, 16 years with Environmental Concerns, Inc. General Superintendent of field operations. Specializes in large athletic complex construction, concession building construction, subcontractor management, value engineering, and owner/contractor relations. BARB PETERSON, SECRETARY / TREASURER: 22 years of business management experience. RESPECTFULLY SUBMITTED: 14 12/3/02 Signature Richard A. Coulter Date Vice President Title Arborist �67 License Number (If Applicable) (Seal - if�%Bid is by c rporation) Attest: X-" Desiree Lange Address 2526 E__Hw_y_ 402,__P.O. Box 2135 Loveland, CO 80539 Telephone 0 669-6291 7/96 Section 00300 Page 3 FIELD STAFF: MIKE PAETZEL, SUPERINTENDENT: 13 years experience with Environmental Concerns in landscaping and site construction. Two years experience as a safety committee member whose responsibilities include accident investigation and field safety management. Superintends large site construction projects over a million dollars that include skate parks, roller hockey rinks, multi -use buildings, and complex site elements. Has worked extensively on projects with the City of Boulder and the City of Longmont. Constructed the Rock Creek Recreation Center for the Town of Superior. Recently completed the construction of the Aurora Wheel Park athletic complex for the City of Aurora and the Diamond Valley Sports Complex for the Town of Windsor. Currently constructing the East West Greenway project at the Stapleton Redevelopment for M.A. Mortenson. CHAD OLESON, SUPERINTENDENT: 8 years experience with Environmental Concerns, Inc. in landscaping and site construction. Has successfully completed park projects in the $500,000+ dollar range. Specializes in equipment operation, drainage installation, demolition, and grading. Has managed multiple projects for Douglas County. Recently completed the construction of the CSU Transit Center in Fort Collins. Is currently working on the Section 30 Park and Ballfields for the City and County of Broomfield. BOB COULTER, SUPERINTENDENT: Over 30 years experience in the site construction industry and building construction industry, 4 years with Environmental Concerns. Superintends site construction projects with restroom and shelter buildings. Has successfully completed park projects for Douglas County, Highlands Ranch, Longmont and the City of Fort Collins. Recently completed the construction of the Highland Heritage Dugouts for Douglas County. Is currently constructing the Greenland Open Space Trails for Douglas County. RAY GONZALES, SUPERINTENDENT: 13 years of experience with Environmental Concerns, Inc. on landscaping and irrigation projects. Promoted to site construction superintendent in 2000. Managed the construction of Valmont Park for the City of Boulder and worked on the Fossil Creek Park and the CSU Transit Center for the City of Fort Collins. JOHN OATSVALL, SUPERINTENDENT: 6 years of experience with Environmental Concerns, Inc. on landscaping and irrigation projects. Is currently managing the construction of the Bluffs Regional Park for Douglas County and has recently completed the construction of the Highland Heritage Entry Sign for Douglas County. Constructed Eaton Park for the City of Boulder. WESLY STATUS, SUPERINTENDENT: 6 years of experience with Environmental Concerns, Inc. on landscaping and irrigation projects. Has successfully completed work for Foothills Park and Recreation District and Douglas County. Instrumental in supervising landscape and irrigation subcontractors for ECI. Manages all warranty construction for ECI. OFFICE STAFF: TINA CONNETT, OFFICE MANAGER AND PROJECT MANAGER: 1995 Graduate of Colorado State University with a degree in Political Science. 6 years of experience as office manager for Environmental Concerns. Two years of experience as a safety committee member whose responsibilities include claims reporting and management. Promoted to project manager in 2000. Has successfully managed projects for Douglas County, Highlands Ranch, the Town of Castle Rock and the Town of Windsor. Is currently the project manager for the East/West Greenway at Stapleton and the Greenland Open Space for Douglas County. TED JOHNSON, PROJECT MANAGER AND LEAD ESTIMATOR: 1999 Graduate of Colorado State University with a degree in Construction Management. 5 years of experience in the commercial construction industry, 4 years with Environmental Concerns. Experience in project management, estimating and site work. Has successfully managed the Foothills Community Park, Valmont Park and the Boulder Skate Park for the City of Boulder and the Aurora Wheel Park for the City of Aurora. Managed the construction of a luxury town home four-plex in Winter Park, Colorado. Is currently the project manager for the CSU Transit Center Project and the Section 30 Park and Ballfields. SEAN REYNOLDS, CONSTRUCTION MANAGEMENT INTERN: Sean is currently attending Colorado State University and is pursuing a degree in Construction Management. Assists project managers and estimators with bid take -offs, project scheduling using Suretrac, bid document procurement, submittals, and subcontractor bid solicitations. DESIREE LANGE, ADMINISTRATIVE ASSISTANT: 2001 Graduate of the University of Northern Colorado with a degree in Accounting. 6 years experience with Environmental Concerns. Handles accounts payable, certified payroll, payroll, human resources, MSDS book preparation and other administrative tasks. Cilent4: 41b/U hNVUU1 ACORDTM CERTIFICATE OF LIABILITY INSURANCE ioio2/03 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Flood & Peterson Insurance Inc ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 4821 Wheaton Drive HOLDER. THIS CERTIFICATE DOES ALTER THE COVERAGE AFFORDED NOT AMEND, EXTEND OR BY THE POLICIES BELOW. P 0 Box 270370 Fort Collins, CO 80527 INSURED Environmental Concerns, Inc. PO Box 2135 Loveland, CO 80539 COVERAGES INSURERS AFFORDING COVERAGE INSURERA: EMC Insurance Company INSURERB: Pinnacol Assurance INSURER C: Fireman' s Fund INSURER D: INSURER E: THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR i LTR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION DATE (MM/DD/YY) DATE (MM/DD/YY) LIMITS A GENERAL LIABILITY 12 X 6 0 4 0 2 0 3 1 0/ 0 1/ 0 2 10 / 01 / 0 3 EACH OCCURRENCE $1 , 0 0 0, 0 0 0 X COMMERCIAL GENERAL LIABILITY j FIRE DAMAGE (Any one tire) $1 0 0 , 0 0 0 CLAIMS MADE rI OCCUR MED EXP (Any one person) $ 5 , 000 PERSONAL & ADV INJURY $1, 000, 000 GENERAL AGGREGATE $2 , 000, 000 GEN'LAGGREGATE LIMITAPPLIESPER: PRODUCTS -COMP/OP AGG s2,000,000 PE O I 1 X POLICY ! LOC A AUTOMOBILE LIABILITY 12 E 6 0 4 0 2 0 3 1 0/ 0 1/ 0 2 1 10 / 01 / 0 3 COMBINED SINGLE LIMIT $1 0 0 0, 0 0 0 '� X ANY AUTO (Ea accident) , ALL OWNED AUTOS �i BODILY INJURY SCHEDULED AUTOS (Per person) $ X HIRED AUTOS BODILY INJURY S X I NON -OWNED AUTOS (Per accident) - X Drive Other Carl', 'PROPERTY DAMAGE S (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ _ AUTO ONLY: AGG $ A EXCESS LIABILITY 2 J 6 0 4 0 2 0 3 1 10/ 01 / 0 2 1 0/ 0 1/ 0 3 1 EACH OCCURRENCE I$ 2 0 0 0 0 0 0 XI OCCUR a CLAIMS MADE AGGREGATE I $2 , 0 0 0, 0 0 0 i$ DEDUCTIBLE X'. RETENTION $10 0 0 0 $ .b WORKERS COMPENSATION AND 1221742 0 7 / 0 1/ 0 2 0 7/ 01 / 0 3 X WC STATU- OTH- / ITCF � LI�•11TS ER EMPLOYERS' LIABILITY i E.L. EACH ACCIDENT $1 , 0 0 0, 0 0 0 E.L. DISEASE - EA EMPLOYEE, $1 , 0 0 0 , 0 0 0 E.L. DISEASE - POLICY LIMIT I S 1, 0 0 0, 0 0 0 C OTHER :MXI98381359 10/15/02 10/15/03 1$3,000,000 Limit Builders Risk i i$2,500,000 Frame Limit $1,000 Deductible DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS IaM I II-IUA I t NULUtM ADDITIONAL INSURED; INSURER LETTER: LANLCLLA IIUIV SHOULD ANYOFTHE ABOVE DESCRIBED POLICIESBE CANCELLED BEFORETHE EXPIRATION Information Purposes Only DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 3 0_ DAYS WRITTEN NOTICETOTHE CERTIFICATE HOLDERNAM ED TOTHE LEFT, BUTFAILURE TO DO SO SHALL IM POSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON TH E INSURER,ITS AGENTS OR REPRESENTATIVES. AUTHORt$ED REPRESENTATIVE r.%.UnLj k1lut/J- OL L {{bL.SU-L /J1 1Nlt\. v Av urlu%,UnrUrIA1jury IZ1oo Flood and Peterson Insurance, Inc. November 19, 2002 Re: Environmental Concerns, Inc. Gentlemen: Environmental Concerns, Inc. has an established surety relationship with Employers Mutual Casualty Company, and we are pleased to confirm the availability of bonding capacity for their projects. Flood & Peterson has been acquainted with Brian Peterson and his management staff for many years, and we view them as one of the most qualified, competent and professional contractors in Northern Colorado. Environmental Concerns, Inc. is bonded through Employers Mutual Casualty Company. Employers is an A rated company with a Best Financial Rating of X. Employers has approved bonds in the ten million dollar range for a single job and has not imposed an upper limit for total work program. We strongly recommend Environmental Concerns for your project. Sincerely, Darlene Krings Bond Department P.O. Box 270370 • Ft. Collins. Colorado 805-7-0370 • (970) 266-8710 • Fax (970) -166-8715 "Sewing People Silica 1939" SECTION 0041.0 BID BOND EKNOronmenL MEN BY THESE' PRESENTS: that we, the undersigned CoUrprna, _= as Principal, and Employers Mutua_1Casualty"'Company as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $ 5% of total bid for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement .for the construction of Fort Collins Project, GARDENS ON SPRING CREEK; BID NO. 574B. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated_ The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 2 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 3rd day of December , 24 02, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL Name:Environmental Concerns, Inc. Address: P.O. Box 2135 Lovelan , CO 8 539 By: L" �L,4� -A-i-cliard A. Cou ter Title: Vice President ATTEST: By., esiree Lange ;SEAL} '7/96 SURETY Employers Mutual Casualty Company P.O. Box 441098 Aurora, CO 80044 By: Title: Attorney -in -Fact (SEAL) Section 00410 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 200 of the contract. 7/96 SUBCONTRACTOR 1• Section 00430 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Environmental__Conceras, Inc_ 2. Permanent main office address: 2526E. Hwy._402z Loveland, CO 80537 3. When organized: 19 4. If a corporation, where incorporated: Colorado May 1, 1983 3. How many years have you been engaged in the contracting business under your present firm or trade name? 22 Xears 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) See attached 7. General character of Work performed by your company: Installation of pump station, sleeving, miscellaneous grading and subgrade's, erosion control _materials, —site amenities, crusher fines trails, pavers and small storm drainage systems. 8. Have you ever failed to complete any Work awarded to you? No If so, where and whv? 9. Have your ever defaulted on a contract? No If so, where and why? 10. Are you debarred by any government agency? No If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. See attached 12. 13 List your major equipment available for this contract. S-ee- attached - -- - - Experience in construction Work similar in importance to this project: Valmont Park -- Boulder, CO ------------------ _ _ _ _ _Fossil Creek Park Ph._1-A Fort Collins, CO Foothills Community Park Ph. IA -ID - Boulder, CO 14. Background and experience of the principal including officers: members of your organization, See attached----_ is. Credit available: $ Medium 7 figure range 16. Bank reference: The Home State Bank, 935 N. Cleveland Ave., Loveland, CO 80537 17. Will you, upon request, fill out a detailed any other information that may be Yes financial statement and required by the furnish OWNER? 18. Are you licensed as a General CONTRACTOR? yes If yes, in what city, county and state? class, license and numbers? Arborist #67 Fort Collins Larimer, CO What 19. Do you anticipate subcontracting Work unde If yes, what percent of total contract? and to whom? '-�N_o c1 I z s Contract? Yes 20. Are any lawsuits pending against you or your firm at this time? No If DETAIL yes, 7/96 Section 00420 Page 2 21. What are the limits of your public liability? See attached sample Certificate of Insurance What company? EMC Insurance Company_ DETAIL 22. What are your company's bonding limitations? Please see attached letter from Flood & Peterson 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at Loveland this 3rd day of December 2002. E_n_vi_r_o_nm_e_nt_al Concerns, Inc. Name o�f/Pi deer/ B y ' �T ---r- Richard A. Coulter - Title: Vice -President State of_0j_QXa_Q } County of Larimer __Bi_chard A Co liter being duly sworn deposes and says that he is Vice President of Environmental Concerns, Inc. and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this e ber 2002 Notary Public My commission expires 3rd day of psi I Nq C'p2Z G? NOT c� �, •A��LIC 0 F CO LORD' 7/96 Section 00420 Page 3 No Text VEHICLES YEAR ENVIRONMENTAL CONCERNS, INC. EQUIPMENT LIST AS OF 12/3/02 MAKE MODEL VIN 1990 Chevy Suburban 1GBEV16K4LF146493 1990 Chevy #1 Pickup 1GCDC14Z3LZ237170 1990 GMC 2-Ton Dump 1GDG6H1PlLJ603217 1991 GMC 2-Ton Topkick 1GDG6HIP7MJ058789 1994 Chevy C1500 1GCDC14Z7RZ231364 1995 Dodge Ram Pickup 1B7KF26C6SS204149 1995 Dodge Ram Pickup 187KF26C155198146 1997 Chevy K1500 Extended Cab 2GCEK19RXV1274373 1999 Dodge Ram 1500 CC 3B7HF13Z2XM539227 2001 Ford F Series 3FTSW31 F81 MA13654 2001 Dodge Ram 2500 367KF2361G752033 2002 Dodge Ram 2500 3B7KF23622M248270 EQUIPMENT John Deere 4x4 Tractor 790 LV079OG475301 1992 Case Uni Loader 1845c JAF0101800 1993 Case Backhoe 580JK JJG0176878 1994 Case Backhoe 580SK JJG0173372 1996 Case Skid Steer 1845c JAF0191878 1997 Case Skid Steer 1845c JAF0224610 1998 Case Skid Steer 1845c JAF0274586 1995 Case Backhoe Attachment D125 JAF0166243 1998 Case Pallet Forks LAF1137 SN# 41087 Case Pallet Forks 1998 Vermeer V5750 Lease/Purchase Vermeer Tree Spade TS-30 1VRC101L9T1001780 1993 Fabricated Wheel Compactor 1999 Case Trencher 560 JAF0254012 2001 Case Skid Steer 1845c JAF0334249 TRAILERS 1973 Porta space Office Trailer CMP 1094 1985 GE Captial Office/Construction Trailer GSV-832 SE# 0177R 1985 830 Satellite Mobile Storage Office SE# 17320 1981 Elder Trailer Work Wagon OW241108 SE# WC4529 1983 Red Equipment Trailer ID612191COLO 1992 Homemade 4-Wheeler Trailer 1 D0601907CO 1992 Eager Beaver 10HDB 112HAN302NLO39349 1993 Sport Trailer 6X10 CARGO STI0BPC12S9935143 1997 Big Tex Trailer 12P1-20 16VPX2027V1388907 MISCELLANEOUS Fimco Lawn & Garden Sprayer LG25B 25 Gal 12-volt (2) Honda Water Pumps WH2OX Lely Rotera Model #RH450 1995 Lowe 12" Auger Model DFB - 12 Pentax Transit AL6 Sanborn Air Compressor Model B07FL350-20 SE# L0880931 Black & Decker 9" Power Miter Saw Ski] Circular Saw 1994 Stihl Weed Eater Model FS76 SE# 626919490 Toro Lawnmower Bench Grinder Model 59500 Husgvarna Chain Saw 50 Rancher Hotsey Model 550E 1995 Coleman Powermate Generator 1994 Gen Set Generator Pro 4000 6EGHB28018A 1994 Walker Mower MTSD SE# 2414601637 Box Scraper 1998 John Deere Box Bushhog BX720 1995 Spectra Physics Laser Transit David White Auto Lazer 2110 Laser 2110 - Level SN# AG193815 Meyer Snow Plows SN# 09238 Maxey Snow Plow SN# A4061 John Deere Snow Blower TRS22 MOTR22A180264 Snapper Lawn Mower ECLP21601RV 95101584 1999 CTI Forks 60 S 56271 Stihl Trimmer 241080629 John Deere 4x4 Tractor 790 LV079OG475301