HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - 9932825CHANGE ORDER NO. Addendum #2
PROJECT TITLE: LaPorte Trail Bridge Design
CONTRACTOR: AYRES Associates
PROJECT NUMBER:
PURCHASE ORDER NO.: 9932825
DESCRIPTION: Revisions for elevating trail
1. Reason for change: Environmental sensativity and habitat preservation mandate a revision to the
original design
2. Description of Change: The project had already been completed through the preliminary design phase.
The original design placed aprox. 250' of trail along an embankment fill along the
south bank of the Poudre River. Environmental sensitivity issues then arose, thus
requiring this portion of the project to be revisited. The attached document
presents the estimated costs for 'redesigning' this portion of the project. This
estimate accounts for redesigning this section with a scope to elevate the trail
along this section of the river bank.
3. Change in Contract Cost: $45,015.00
4. Change in Contract Time: N/A
ORIGINAL CONTRACT COST $69,900.00
TOTAL APPROVED CHANGE ORDER $32,270.00
TOTAL PENDING CHANGE ORDER $0.00
TOTAL THIS CHANGE ORDER $45,015.00
TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 64.40%
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 110,57%
ADJUSTED CONTRACT COST $147,185.00
(Assuming all change orders approved)
ACCEPTED BY:
Contractor's Represent
ACCEPTED BY:
Project Manager
REVIEWED BY:
Title:
APPROVED BY:
Title:
APPROVED BY:
Purchasing Agent over
cc: City Clerk Architect
Contractor Engineer
Project File Purchasing
DATE: O�
DATE: ? (,
v_4r:9
DATE:
DATE:3