CHANGE ORDER NO.3
City Plan Update
EDAW
2204769
1. Reason for change: During the process of updating City Plan, a potential change of current
plans along Harmony Road from an employment zone to a regional center has been
proposed. These additional tasks will enable the City to analyze how such a significant
change in this area would impact the long-term economic development prospects and the
potential impact of this center on existing retail areas and the City's operating budget.
2. Description of Change: The additional funds will be used for the Contractor to provide
additional assistance in the following items, per the attached scope of work:
• Labor:
o Task 1. Project Initiation
o Task 2. Analysis of Retail Impacts
o Task 3. Analysis of Fiscal Impacts
o Task 4. Analysis of Employment Land Availability
o Task 5. Conclusions and Recommendations
• Expenses
3. Change in Contract Cost: $19,560 Total
(Labor - $18,860 and Expenses - $700)
4. Change in Contract Time: None
ORIGINAL CONTRACT COST
$388,750
TOTAL APPROVED CHANGE ORDERS
$ 90,000
TOTAL PENDING CHANGE ORDERS
$ 0
TOTAL THIS CHANGE ORDER
$ 19,560
TOTAL % OF ORIGINAL CONTRACT, THIS CO.O.:
0.050%
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S
0.041%
ADJUSTED CONTRACT COST
$4989310
(Assuming all change orders approved.))
�� kx"
DATE: 3 I , o
ACCEPTED BY:
ACCEPTED BY
REVIEWED BY
APPROVED BY
cc: Purchasing
ED W's Representative
t DATE: 2�,f�la
i ject er, Ken aido
DATE: 3 O
J c Di for
DATE: d3
oe Fra c, ire-ctor
FORT COLLINS LIFESTYLE CENTER ANALYSIS
PROJECT APPROACH AND METHODOLOGY
A private developer has approached the City of Fort Collins about the possibility of
locating a lifestyle retail center within the City. While recognizing that such a major
regional retail draw could have significant economic and fiscal benefits, the City is
understandably concerned about the potential impact of this center on existing retail
areas, including Foothills Mall and downtown. Additionally, it would also like a better
understanding of how this center will impact the City's operating budget. The
developer has indicated that it is interested in 50 to 60 acres along Harmony Road.
Current plans designate that area as an employment zone and the City would like to
understand how a potential change in this area will impact its long-term economic
development prospects.
TASK 1: PROTECT INITIATION
EPS will meet with City Staff to initiate the project and obtain additional information
concerning the developer's plans for the lifestyle center. This may include any market
studies, conceptual site plans, building size, tenant mix, and project schedule that the
developer has provided. Any information regarding changes or plans for Foothills Mall
would also be helpful. EPS understands the confidential nature of this information and
will not divulge such information to anyone outside of the immediate project team. We
would also like to meet with the City's Finance Department to discuss information it has
available to facilitate the analysis of impacts on other retail centers. EPS would request
sales tax disaggregations for the past five to ten years by retail area (i.e. Foothills Mall,
downtown, etc.) from the City's Finance Department, in addition to information on the
City's revenues and expenses for the same time period. This information will be
analyzed to determine the significance of the retail areas to the City's budget. EPS will
also conduct a brief visual survey, with a particular emphasis on Foothills Mall and
downtown, to document the retail stores currently operating in these areas.
TASK 2: ANALYSIS OF RETAIL IMPACTS
EPS will develop a possible tenant mix for the lifestyle center and estimate potential
retail sales levels and origin of sales by location (e.g. from City residents and from the
larger trade area). This will be based on information provided by the developer.
EPS will calibrate its retail inflow -outflow model already developed for use in the City
Plan update. The model will be adjusted to account for the new retail center and to
accommodate the retail store types found within a lifestyle center. This will result in an
estimate of the potential demand for certain retail store types. The demand potential
will be compared with the supply of regional -type retail goods, primarily general
13806wrlt r2-28-03.doc
merchandise, apparel, home furnishing and other shoppers goods store types
predominately found in the Foothills Mall area and in downtown.
EPS will then estimate what portion of the new center sales represent net new sales
within Fort Collins and what portion will be sales transfers from existing store locations,
specifically Foothills Mall. These sales transfers will be allocated by store type and
major location. Based on these sales estimates, the level of impact on existing centers
will be quantified and further explained regarding the potential impacts (if significant)
on the viability of existing retail centers.
The analysis of sales flows will be conducted on up to three development scenarios to be
mutually agreed on potentially including the following:
■ Addition of the Lifestyle Center to the current competitive pattern
■ Current competitive pattern
■ Expanded Foothills Mall
TASK 3: ANAL_YSIS OF FISCAL IMPACTS
The analysis of fiscal impacts will translate the estimates of net new retail sales and sales
transfers into sales tax revenues and the resultant impacts on City General Fund
revenues. The fiscal impacts will be estimated over a ten year period following project
development. The fiscal analysis will also include a baseline provision of revenues that
will account for the development of a lifestyle center in Loveland and the impacts of that
project on the City of Fort Collins. It will also address the implications of a potential
investment in Foothills Mall and the benefits versus the impacts of a decline in Foothills
Mall revenue assuming no improvements are made to the site.
TASK 4: ANALYSIS OF EMPLOYMENT LAND AVAILABILITY
The developer has exercised an option on approximately 50 to 60 acres of land along
Harmony Road on land owned by LSI. The City is interested in better understanding
the long term impacts on business and economic development of this change in land
use.
EPS' employment projections for the City Plan update were based on the State
Demographer's long-term projections for the region. These employment projections,
along with an analysis of how much of this potential can be absorbed in other parts of
the Harmony Corridor and the City will be compared. While land information acquired
from the City Plan process was generated on a general basis for the City, more specific
information for the Harmony Corridor area is needed. Available information that can be
provided by the City will be obtained to ascertain how much of an impact the removal
of these lands from the employment lands area in the City will affect long-term
economic development.
13806=1 &2-28-03.do
TASK 5: CONCLUSIONS AND RECOMMENDATIONS
EPS will summarize its findings over the course of the project in several technical
memoranda and its conclusions and recommendations in a final report. The technical
memoranda will be presented after Tasks 213 and 4. A final report approximately 10 to
15 pages in length will summarize the technical memoranda including the analysis
undertaken and data sources. It will also include final conclusions and
recommendations. EPS will be available to make presentations, answer questions or
visit with appropriate Staff and/or Council to review any of the analysis, conclusions,
and recommendations.
73806cvr1t r2-28-03. doc
BUDGET AND SCHEDULE
FPS proposes to complete the scope of services within 45 to 60 days of project initiation.
The work will be completed on a time and materials basis up to a maximum of $19,560
as shown in Table 1 below. Any public meetings will be billed at cost. (Two public
meetings with preparation time are estimated at $2,880.) EPS is prepared to begin work
with a notice to proceed from the client and receipt of a signed contract.
Table 1
Proposed Budget
Fort Collins Lifestyle Center Analysis
Description
Principal
Dan
Guimond
Vice
President Associate
Arleen Nicole M.
Taniwaki Layman
Total
Hours
Total
Costs
Labor
Task 1: Project Initiation
8
8
8
24
$3,080
Task 2: Analysis of Retail Impacts
4
20
24
48
$5,420
Task 3: Analysis of Fiscal Impacts
4
12
12
28
$3,300
Task 4: Analysis of Employment Land Availability
4
12
0
16
$2,220
Task 5: Conclusions and Recommendations
8
16
16
40
$4,840
Total Hours
28
68
60
156
Hourly Rate
$165
$130
$90
Dollars by Person
$4,620
$8,840
$5,400
$18,860
Expenses
Local Travel $400
Report Production $200
Miscellaneous Expenses 100
Total Expenses $700
Total Labor and Expenses $19,660
Source: Economic & Planning Systems
13806cvr1tr2-28-03.doc