Loading...
HomeMy WebLinkAboutAddenda - BID - 5763 GATEWAY PARK PIERWALL PROJECTCity of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 BID #5763 GATEWAY PARK PIERWALL PROJECT SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5763 Gateway Park Pierwall Project OPENING DATE: February 4, 2003, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. The following list of items is for clarification for the project: Revised bid schedule The bid schedule for the project is hereby revised. A line item has been added to accommodate caisson drilling into competent rock. The item added with be as follows: 8. Rock Drilling Equipment -'carbide tipped" to be paid for hourly with an estimated quantity of 20 hours. This item will be paid only upon approval by the ENGINEER and will be determined in the field at the time of drilling. Please use the attached Addendum #2 Bid Schedule when submitting your bid. Spoils The spoils generated by the caisson excavation may be disposed of at the Gateway Park site. The disposal location will be at an approved area aproximately'/ of a mile from the project site location. If you should have any questions, please contact Jason Stutzman, Project Manager at (970) 221- 6366 or John Stephen, CPPB, Senior Buyer, at (970) 221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Page 1 of 1 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 Bid #5763 Addendum #2 Bid Schedule Project: Gateway Park Pierwall Project SpeclItem Number Description Unit Unit Cost Estimated Quantity Item Cost 626-01 Mobilization LS 1 503-02 Drilled Caisson 18 inch diameter LF 242 601-03 C.I.P. Pier Headwall LF 42 602-04 Reinforcing Steel (Epoxy Coated lbs. 800 5 Remove and Reset Guardrail LF 40 6 Traffic Control LS 1 7 Remove and Replace Asphalt Pavement w/ Asphalt Curb SF 135 8 Rock Drilling Equipment -'carbide tipped' HR 20 TOTAL Dollars Cents Page 2 of 1