ADDENDUM No. 2
BID #5763
GATEWAY PARK PIERWALL PROJECT
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5763 Gateway Park Pierwall Project
OPENING DATE: February 4, 2003, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
The following list of items is for clarification for the project:
Revised bid schedule
The bid schedule for the project is hereby revised. A line item has been added to accommodate
caisson drilling into competent rock. The item added with be as follows:
8. Rock Drilling Equipment -'carbide tipped" to be paid for hourly with an estimated quantity
of 20 hours. This item will be paid only upon approval by the ENGINEER and will be
determined in the field at the time of drilling.
Please use the attached Addendum #2 Bid Schedule when submitting your bid.
Spoils
The spoils generated by the caisson excavation may be disposed of at the Gateway Park site. The
disposal location will be at an approved area aproximately'/ of a mile from the project site location.
If you should have any questions, please contact Jason Stutzman, Project Manager at (970) 221-
6366 or John Stephen, CPPB, Senior Buyer, at (970) 221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
Page 1 of 1
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
Bid #5763
Addendum #2 Bid Schedule
Project:
Gateway Park Pierwall Project
SpeclItem
Number
Description
Unit
Unit Cost
Estimated
Quantity
Item Cost
626-01
Mobilization
LS
1
503-02
Drilled Caisson 18 inch diameter
LF
242
601-03
C.I.P. Pier Headwall
LF
42
602-04
Reinforcing Steel (Epoxy Coated
lbs.
800
5
Remove and Reset Guardrail
LF
40
6
Traffic Control
LS
1
7
Remove and Replace Asphalt Pavement w/ Asphalt Curb
SF
135
8
Rock Drilling Equipment -'carbide tipped'
HR
20
TOTAL
Dollars
Cents