Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 16100CHANGE ORDER NO. 8 PROJECT TITLE: Gardens on Spring Creek (AKA) Community Horticulture Center CONTRACTOR: EDAW, Inc. PROJECT NUMBER: P-731 DESCRIPTION: Professional Design Services In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: Add'I fees to complete Final Complianc4'meetings, project Entry Sign, revise Const Docs to include fire line, revise Irrigation Drawings, review cast -in - place Box Culvert as a change in construction drawings, add Site Electrical drawings as a PDP requirement, and add design for proposed Education Wing to building. 2. Description of change: See attached — EDAW fee request and back-up information 3. Change in contract cost: Yes 4. Change in contract time: Yes (professional services agreement extended to 12131/03). Attach additional sheets as reauired ORIGINAL CONTRACT COST $ 225,000.00 TOTAL APPROVED CHANGE ORDERS 213,728.00 TOTAL PENDING CHANGE ORDERS 00 TOTAL THIS CHANGE ORDER $ 24,621.00 ADJUSTED CONTRACT COST $463,349.00 (Assuming all change orders approved) A 1 ACCEPTED BY: REVIEWED BY: Greg rst, PE "EDAW, Incorporated Jack Giphola, PE APPROVED BY: k_a' LL-1 1 en Seefeld, cc: City Clerk Project File Contractor Purchasing Engineer PMPD Supervisor Facilities Project Manager 3-ld-o3 Date Date 3/6/03 Date